Loading...
373 Highland Ave-Report 10.31.23-Light Gauge Steel Inspection of Massachusetts -The Construction Testing People Pagel 5 Richardson Lane,Stoneham,MA 02180 781-438-7756(Voice)787d38-6216(Fax) Report Date 10-31-2023 Light Gauge Steel Inspection Report No. 3 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc WEATHER: TIME: 8:00 AM CONTACT:Chris Renton SUMMARY: A visit was made to the above noted project to inspect the cold formed exterior framing. Previous report noted items to be installed have been addressed. Manufacturers screws are installed on the deflection slide clips, spazzer bars installed within 12" of top of exterior wall, bottom jamb clips have been installed according to detail. The exterior cold formed steel framing is installed according to Executive Building Systems drawings. GENERAL REMARKS: These test results/observations were related to Chris Benton prior to departure. PremiumTravel Inspector Time Hours Time Name No Min Day 1 Hr(s) C. Lund REVIEWED BY: Bryan M. Crabtree -Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc: City of Salem Greg Salamida Connolly Brothers Inc Robert Spence Connolly Brothers Inc Matthew Lawton TF Moran Kyle Roy Geotechnical Services Inc Glen zoladz City of Salem Voula orfanos Cumming Group Joe Vickery Connolly Brothers Inc Chris Benton