Loading...
WoNumber1 Work Order Action,Inc. Job Number: 23-208-A 47 Washington St. Work Order Date: 5/10/2023 Gloucester,MA 01930 Ownership: Renter Phone: 978-283-2131 Atlantic Weatherization Auditor:Bryan Vaudo 61 Rear Jefferson Ave Email:bvaudo@actioninc.org Salem MA 01970 Cell: 978-590-1498 Email: tpalm01@comcast.net Phone: 978-744-8143 Cell: 508-726-1036 Lisa Wallmark NGRID Gas $7,136.26 36 Derby St Total $7,136.26 Salem Ma 01970-5606 Contact Person:Barbara Wioneck Contact Phone: 781-929-6519 Safety Issue(s):Knob&Tube Wiring/Lead Paint Possible Authorized Actual Measure Description Qty Price Total Qty Total Comments Basement Insulation 6 ml poly on ground-Fire-rated 455 $2.04 $928.20 Area from washer/dryer to electric panels poly 6 ml poly on ground-Standard 476 $1.34 $637.84 Area behind washer/dryer and addition poly room Sill/mudsill seal&insulate to R-19 132 $3.96 $522.72 (TMAX) Doors Fixed Sweep triple flange 2 $27.00 $54.00 Both side doors Weatherstrip w/Q-Ion or equivalent 2 $76.00 $152.00 Both side doors Health&Safety Replace Clothes Dryer/Exhaust Fan 1 $67.00 $67.00 Dryer hose is semi rigid but in poor Transition Duct only condition. Misc Measures Attic/basement blower door guided 2 $125.00 1$250.00 Basement,chimney,and other openings. sealing with two-part foam Date: 5/10/2023 Page 1 Work Order: Job Number: 23-208-A Vent kit/bath fan 1 $153.00 $153.00 Vent 1st floor fan out sidewall Permit Building Permit 1 $125.00 $125.00 Wall Insulation Double nailed asbestos(dense pack) 894 $4.75 $4,246.50 1st floor net walls. cellulose or equivalent Total $7,136.26 Contractor Instructions: Before Starting the Job: During,the Job: 1.Please notify us 24 hours before starting or scheduling a job. 1.This residence was built before 1978.Lead safe practices are 2. Obtain required building permit. required. 2.Total for Heath&Safety and Repairs cannot exceed$2500.00. Additional Contractor Instructions: Attic Inspection form attached? Yes N/A (Circle One Certificate of Insulation posted? Yes No (Circle One) Atlantic Weatherization hereby certifies that this job was supervised and completed in compliance with all Department of Labor Standards and Lead RRP regulations. Contractor Signature: Date: RRP License#: I hereby acknowlege that all work has been completed and inspected. Customer Signature: Date: Date: 5/10/2023 Page 2 Work Order: Job Number: 23-208-A Energy Director: Uale: f Fiscal Officer: Date: FOR AQE NCY UEE QNLY Pre Post Language Other than English needed? Yes No (Circle One) Dryer CO 0.000 If Yes,indicate language: Stove CO 0.000 Occupany change in last 18 months? Yes No (Circle One) H2O Tank CO 0.000 Comments: Heating System CO 0.000 Number of windows Ambient CO 0.000 Number of rooms Blower Door Date: 5/10/2023 Page 3