Loading...
373 Highland Ave- Light Gauge Steel_10-13-23 Asal. Of Massachusetts W 'The Construction Testing People Page 1 5 Richardson Lane,Stoneham,MA 02180781.438-7755(Voice)781-438-6216(Fax) Light Gauge Steel Inspection Report Date 10-13-2023 Report No. 2 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers Inc WEATHER: TIME: 9: 30 AM CONTACT: Chris spnton SUMMARY: A visit was made to the above noted project to inspect the cold formed steel framing. The roof parapet framing and front entry walls, canopy and rough openings. The installation of the cold formed framing is found to be in general conformance with the executive building systems drawings. A few items remain to be installed. 1. Bridging/Spazzer bars within 12" of top of walls. 2. Rough opening bottom clip screws on top deflection clips. 3. Manufacturer supplied screws on to deflection. Work is on going. GENERAL REMARKS: These test results/observations were related to Chris Benton prior to departure. Inspector Premium Travel Name I Time Hours Time C. Lund No Min Day 1 Hr(s) REVIEWED BY: Bryan M. Crabtree IFAC Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc: City of Salem Greg Salamida Connolly Brothers Inc Robert Spence Connolly Brothers Inc Matthew Lawton IF Moran Ayle Roy Geotechnical Services Inc Glen Zoladz City of Salem Voula Orfanos Cumming Group Joe Vickery Connolly Brothers Inc Chris Benton