Compressive Strength Report -Concrete Report Date 09-28-2023
Report No. 26
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231
CLASS CONCRETE: 4000# 3/4" No. Of Sets: 6 CUBIC YARDS: 253
SET 1 LOCATION: BOG Lines E.5/3.8
Total Unit Slum in. 6
Lab Size Area Date Date Age Load Load Fracture Air Temp. F. 48
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp F 70
C409 4.00 x 8.00 12.57 Good 09/28/23 10/05/23 7 45,000 3,580 2 Truck No. 272
C410 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 57,000 4,530 3 Ticket No. 1573
C411 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 63,000 5,010 3 Time 7:15
C412 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 69,000 5,090 3 Unit Wtlbs/cu ft
C413 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 61,000 4,850 3 Air Content % 1.8
C419 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 70,000 5,570 1 3
SET 2 LOCATION: BOG Lines E/2.4
Total Unit Slum in. 7
Lab Size Area Date Date Age Load Load Fracture Air Temp. F. 49
No. (in.) (sq.In.) Condition Cast Tested Days (tbs.) (psi.) Type Conc Temp F 68
C415 4.00 x 8.00 12.57 Good 09/28/23 10/05/23 7 47,500 3,780 3 Truck No. 264
C416 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 56,000 4,460 3 Ticket No. 1579
C417 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 64,500 5,130 3 Time 8:00
C418 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 60,500 4,810 3 Unit Wtlbs/cu ft
C419 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 66,000 5,250 3 All Content % 2.2
C420 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 63,000 5,010 3
SET 3 LOCATION: SOG, Lines D.5/2.7
Total Unit Slum in. 7
Lab Size Area Date Date Age Load Load Fracture Air Temp. F. 54
No. (in.) (sq.in.) Condition Cast Tested Days (tbs.) (psi.) Type Conc Temp F 70
C421 4.00 x 8.00 12.57 Good 09/28/23 10/05/23 7 54,000 4,300 2 Truck No. 160
C422 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 60,000 4,770 2 Ticket No. 1588
C423 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 62,500 4,970 3 Time 9:05
C424 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 64,500 5,130 3 Unit Wtlbs/cu ft
C 425 4.00 x 8.00 12_57 Good 09/28/23 10/26/23 28 70,D00 5,570 3 Air Content °h 2.3
C426 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 65,500 5r210 3
SET 4 LOCATION: SOG, Lines D.K/3
' Of Massachusetts
'The Construction Testing People'
Page 2
5 Richardson Lane, Stoneham,MA 02180 781-438-7755(Voice)781-438.6216(Fax)
Compressive Strength Report -Concrete Report Date 09-28-2023
Report No. 26
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
Total Unit Slump(in.) 5 3/4
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 58
No. (in.) (sq.In.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 74
C427 4.00 x 8.00 12.57 Good 09/28/23 10/05/23 7 50,000 3,980 1 Truck No. 268
C428 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 64,000 5,090 3 Ticket No. 1595
C429 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 66,000 5,250 2 Time 10:00
C430 4.00 x 8.00 12.57 Good 09/28/23 10/2,6/23 28 65,000 51170 2 Unit Wtlbs/cu ft
C431 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 69,000 5,490 3 Air Content(%) 1.6
C432 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 67,000 5,330 3
SET SLOCATION: SOG, Lines D.d/2.3
Total Unit Slump(in.) 6
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 61
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp(F) 73
C054 4.00 x B.00 12.57 Good 09/28/23 10/05/23 7 55,000 4,380 3 Truck No. 160
C055 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 61,000 4,850 3 Ticket No. 1602
C056 4.00 x 8.00 12,57 Good 09/28/23 10/26/23 28 75,000 51970 3 Time 10:55
C057 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 74,000 5,890 2 Unit Wtlbs/cu ft
C058 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 75,000 t 5,9701 3 Air Content(%) 1.8
C059 1 4.00 x 8.00 12.57 Good 09/28/23 1 10/26/23 28 65,000 5,170 2
SET 6 LOCATION: SOG Lines D.d/3.7
Total Unit Slump(in.) 6
Lab Size Area Date Date Age Load Load Fracture Air Temp.(F.) 63
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Cone Temp(F) 75
C433 4.00 x 8.00 12.57 Good 09/28/23 10/05/23 7 50,000 3,980 1 Truck No. 203
C434 4.00 x 8.00 12.57 Good 09/28/23 10/12/23 14 63,500 5,050 2 Ticket No. 1614
C435 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 68,000 5,410 3 Time 12:00
C436 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 72,500 5,770 3 Unit Wtlbs/cu ft
C431 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 69,000 5,990 2 Air Content(%) 1.7
C 938 4.00 x 8.00 12.57 Good 09/28/23 10/26/23 28 67,500 5,370 3
GENERAL REMARKS: "MRWR; Cylinders received on 1012123. Early Morninq Rate 6:00am-7:00am.
Inspector Premium Travel
Name Time Hours Time
Christopher Viger No Max Day 1 Hr(s)
Luis Castro No Max Day 1 Hr(s)
Of Massachusetts
'The Construction Testing People'
Page 3
5 Richardson Lane,Stoneham,MA 02180 781-438-7755(Voice)781438.6216(Fax)
Compressive Strength Report -Concrete Report Date 09-28-2023
Report No. 26
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
.REVIEWED BY: Bryan M. Crabtree
FRACTURE TYPES
Typal Type 2 Type 3 Type 4 Type5 Type 6
Reasonably wellJormed Well4ormed cone on Columnar vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends, one end,vertical cracks cracking through with no cracking or bottom(occur but end of
less than f In. running through caps, both ends,no through ends;tap commonly with cylinder is
[25 mm]of cracking no well-defined cone well4ormed cones with hammer to unbonded caps) pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via assail. Please email us at reports@utsofaaes.com for more information.
cc: City of Salem Greg Salamida
Connolly Brothers Inc Robert Spence
JG MacLellan Garrison Todd
Connolly Brothers Inc Matthew Lawton
TF Moran Kyle Roy
Geotechnical Services Inc Glen Zoladz
City of Salem Voula Orfanos
Cumming Group Joe Vickery
Connolly Brothers Inc Chris Benton
Of Massachusetts
'The Construction Testing People'
Page 4
5 Richardson Lane,Stoneham, MA 02180 781-438.7755(Voice)781-438-6216(Fax)
Compressive Strength Report -Concrete Report Date 09-28-2023
Report No. 26
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
FIELD SUMMARY REPORT
'Total Pour: SOG, Lines D-F/1-4
Method of Placement: ®Pump ❑Chute Discharge ❑ Bucket ❑Other
Other:
Method of Concrete Consolidation: ®Vibrator ❑ Other
Other:
Cylinder Fabrication Location: ❑ Truck Discharge Chute ® End of Pump Hose
Cylinder Storage: U Curing Box 0 Thermal Blanket U Hay/Straw El Trailer 10 Field
❑ Other
Placement Protection: ❑Thermal Blankets ❑ Heat ® None
❑ Other
Slump Specification(in.) 4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks: Mix ID#40402542; Superintendent Chris Benton was aware of trucks 2696160 being
poured at a slump out of specification, and was ok with it.
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane,Stoneham,MA 02180 781.438-7755(Voice)781-438-6216(Fax)
Report Date 09-28-2023
Report No. 26
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Attachment
®0f Massachusetts Inc.
"The Construction Testing Peopee� Page F 1
r ,
2
DAILY REPORT OF CONCRETE POUR
PROJECT NAME: 3 1 � fiaolt fK� f /C PROJECT NO.:
0 11
DATE: q�qn C AIR TEMP.: TOTAL YARDS: ?�>
LOCATION OF POUR: (-
Load & Slump Batching Batching Time In 1 Yards Concrete 1 % of Ticket# 1 No. of
Truck k Inches In Out Minutes Temp. Air Cylinders
,7Z 6 1 ( ,ZU 7.K ►
Z6�t 6:3b 7 W 1'3
�7� 6: 3 7;q5 70 I'%3 I s76
z0 17 7, 0 1�'D 1''S , Iba l q 1.a
�z �'i � 1 ��6G I I ►6z .
Zo3 _T' 5 "75 16U
f >> �.3r
:UvA
I60 -7 7,.S coo 170 & M I
7 V.K T 35 I''il�
f310C 1 I rr , �° ►. 6 '°'stir I -
I� Zo71
Ili / f l0/'.3�� /�t5� I '"rl � `°Z oO
INSPECTOR: 6{_�-ram Lf/�S 65t U REMARKS: 44//
UTS of Massachusetts, Inc. Page e
5 Richardson Lane,Stoneham,MA 02180 781-438.7755(Voice)781.438-6216(Fax)
Report Date 09-28-2023
Report No. 26
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, MA
0 Of Massachusetts Inc.
"The Construction Testing hem Page
'72 DAILY REPORT OF CONCRETE POUR
PROJECT NAME:: Ip qq� 1) �11G1(
_T kd Ayi,, .Y� PROJECT NO.:
DATE: ZD�/ AIR TEMP.: ( o TOTAL YARDS: ZS/�
LOCATION OF POUR:_SUh
Load & Slump Batching Batching Time In Yards Concrete % of Ticket# No. of
Truck# Inches In Out Minutes Temp. I Air I Cylinders
of 1,3� `�U I " zw 16z1
f ,qo I0 � ,
Z03 lii , �, �> ��
I I I
I I I I
I
I
I
I I I
I I
I
INSPECTOR: C�✓t S 1'1 �-f i �VI S ��Ij�lij REMARKS: /1))4goy6���Z