Loading...
373 Highland ave_ Soil Inspection Report ' Of Massachusetts 'The Construction Testing People' Page 1 5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781.438-6216(Fax) Soil Inspection Report Report Date 10-04-2023 Report No. 15 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highland Avenue Salem, MA Contractor Connolly Brothers !no WEATHER: Sunny 61° TIME: 7:OOAM CONTACT:Chris Benton of Connolly Brothers Inc PURPOSE: Perform field density testinq EQUIPMENT: None TEST METHOD: ❑ Sand Cone ® Nuclear Densometer TITLE: ❑Inspector ❑ Staff Engineer ❑ Engineer Maximum Field Test percent Dry Dry Percent Elevation No. Moisture Density Density Compaction Location (Feet) 1 5.1 150.4 146.9 97.7 Floor Slab Base Floor Slab Base 2 4.9 150.4 145.9 97.0 Floor Slab Base Floor Slab Base 3 4.3 150.4 143.8 95.6 Floor Slab Base Floor Slab Base 4 6.5 150.4 145.2 96.5 Floor Slab Base Floor Slab Base 5 4.7 150.4 146.2 97.2 Floor Slab Base Floor Slab Base 6 5.31 150.4 145.3 96.6 Floor Slab Base Floor Slab Base 7 M4. 150.4 145.6 96.8 Floor Slab Base Floor Slab Base 8 150.4 146.3 97.3 Floor Slab Base Floor Slab Base 9 150.4 147.5 98.1 Floor Slab Base Floor Slab Base 30 150.4 145.3 96.6 Floor Slab Base Floor Slab Base I1 150.4 146.9 97.7 Floor Slab Base Floor Slab Base 12 150.41 145.61 Floor Slab Base Floor Slab Base OBSERVATIONS: This report follows a site visit to test the earthwork for floor slab base. The performance of this earthwork was completed prior to arrival and was not observed by JTS. The section of the floor slab base appeared dry, compacted and stable. Twelve field density tests were performed in accordance with the ASTM D6938 Nuclear Dencometer method of testing. The field density test results were found to be in excess of 95€ relative compaction of the MDD derived from the modified proctor test (ASTM D1557) . The field density test results are in conformance with project specifications. These observations/testing results were reported to Mr. Benton during this visit. Areas reviewed and/or tested were based on elevations, stakeouts or work limits provided by others and were not independently confirmed by JTS. ' Of Massachusetts The Construction Testing People' Page 2 5 Richardson Lane,Stoneham,MA 02180 781438-7755(Voice)781438-6216(Fax) Soil Inspection Report Report Date 10-04-2023 Report No. 15 Distribution Copy Job Number 27183 Project Tropical Products, 373 Highlana Avenue Salem, MA Contractor Connolly Brothers Inc Inspector Promiurn Trowl Name Time Moore Time M. Hashem No Min Day I 1 Hr lsl REVIEWEDBY: Chuck eraser Our reports are available in FDF form via email. Please email us at reports@utsofmass✓s..acom_forraaore information. CC: City of Salem Greg Salamida Connolly Brothers Inc Robert Spence Connolly Brothers Inc Matthew Lawton IF Moran Kyle Roy Geotechnical Services Inc Glen 2oladz City of Salem Voula Orfanos Cumming Group Joe Vickery Connolly brothers Inc Chris Benton UTS of Massachusetts, Inc. Page 3 5 Richardson Lane,Stoneham,MA 02180 781.438-7755(Voice)787138.6216(Fax) Report Date 10-04-2023 Report No. 15 Job Number 271e3 Project Tropical Products, 373 Highland Avenue Salem, MA Attachment 10l441z3 TAda,C,.A PA d,,ars H,HaS61e Ins 14Ai"La-. /"Ve UT'S SnSert 1'4A �_ sold ns�+y T-eSr e 1� 5'SG^V11021.1-191Cv .09 v V \J i- '17'A -'i Unw4NW 5e ,65,119 > s _ 5'SOG%1521561-$35CV , 7'$OGX13 X'.16�- CY _. O— { 1'506X 1%89� 9]C f t. 1 \ 4 ..� .� ... .. U /1DWA&VER�LL PLI,N-LQWERLM4 � D"wroMXVOSxM CONSTRUCTION SET ewrrmu ,w.6ex_=_`1 OVERALLPLAN- .. LOWER LEVEL BJR Cw,eRl Muwl F,e. "° F A-1.00