373 Highland Ave _ Tropical Products_ Compressive Strength Report_ Concrete ' Of Massachusetts
'The Construction Testing People'
-Page 1
5 Richardson Lane,Stoneham,MA 02180 781-438.7755(Voice)781-438.6216(Fax)
Compressive Strength Report -Concrete Report Date 09-29-2023
Report No. 27
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM: C-172 C-31 C-143 C-1064 C-231
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: C-39 C-1231
CLASS CONCRETE: 4000# 3/4" No.Of Sets: 6 CUBIC YARDS: 253
SET ILOCATION: SOG Lines C.V/3.3
Total Unit Slum In. 7
Lab Size Area Date Date Age Load Load Fracture Air Tom . F. 52
No. (In.) (sq.In.) Condition Cast Tested Days (Ws.) (pal.) Type Conc Tom F 73
C739 4.00 x 8.00 12.57 Good 09/29/23 10/06/23 7 51,000 4,060 3 Truck No. 269
C 740 9.00 x 8.00 12.57 Good 09/29/23 10/13/23 14 56,000 4,111 3 Ticket No. 1642
C741 4 x 8 12.57 Good 09/29/23 10/27/23 28 Time 7:20
C742 4 x B 12.57 Good 091/29/23 10/27/23 28 Unit Wt lbs/cu ft
C 793 4 x B 12.57 Good 09/29/23 10/27/23 28 Air Content % 2.3
C744 4 x 8 12.57 Good 09/29/23 1
10/27/23 28
SET 2LOCATION: SOG Lines C.V/2.3
Total Unit Slum In. 7
Lab size Area Date Date Aga Load Load Fracture Air Temp. F. 54
No. (in.) (sq.In.) Condition Cast Tested Days (Ibs.) (psi.) Type Conc Temp F 72
C733 4.00 x 8.00 12.57 Good 09/29/23 10/06/23 7 45,500 3,620 3 Truck No. 264
C734 4.00 x 8.00 12.57 Good 09/29/23 10/13/23 14 53,500 4,260 3 Ticket No. 1646
C735 4 x 8 12.57 Good 09/29/23 10/27/23 28 Time 8:00
C736 4 x 8 12.57 Good 09/29/23 10/27/23 28 Unit Wt lbslcu It
C737 4 x 8 12.57 Good 09/29/23 10/27/23 2B Air Content % 2.1
C738 1 4 x 8 12.571 Good 09/29/23 1 10/27/23 1 28
SET 3LOCATION: SOG, Lines C.d/3.3
Total Unit Slum In. 6
Lab 8W Area Date Date Age Load Load Fracture Air Temp. F. 55
No. (In.) (sq.In.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Temp F 73
C727 4.00 x 8.00 12.57 Good 09/29/23 10/06/23 7 57,500 4,570 3 Truck No. 263
C728 4.00 x 8.00 12.57 Good 09/29/23 10/13/23 14 63,000 51010 2 Ticket No. 1656
C729 4 x 8 12.57 Good 09/29/23 10/27/23 28 Time 8:50
C730 4 x 8 12.57 Good 09/29/23 10/27/23 28 Unit Wt lbs/cu ft
C731 4 x 8 12.57 Good 09/29/23 10/27/23 28 Air Content %) 1.6
C732 1 4 x 8 1 12.57 Good 1 09/29/23 10/27/23 1 28
SET 4LOCATION: SOG, Lines B.V/2.3
' Of Massachusetts
-The Construction Testing People
Page 2
5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781.438-6216(Fax)
Compressive Strength Report-Concrete Report Date 09-29-2023
Report No. 27
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. SG MacLellan
Total Unit Slump(in.) 6 3/4
Lab Size -:n
Data Date Age Load Load Fracture Air Temp.(F.) 57
No. (in.) ( tlglon Cast Tested Days (lbs.) (psi.) Type Conc Tamp(F) 74
C709 4.00 x 8.00 12.57 Good 09/29/23 10/06/23 7 48,500 3,860 2 Truck No. 261
C710 4.00 x 8.00 12.5] Good 09/29/23 10/13/23 14 64,000 5,090 3 Ticket No. 1665
C711 4 x 8 12.57 Good 09/29/23 ]0/27/23 28 Time 9:4 0
C712 4 x 8 12.57 Gootl 09/29/23 30/27/23 28 Unit Wt lbslcu It
C713 4 x 8 12.57 Good D9/29/23 11/27/23 28 Air Content(%) 2._
C 714 4 x 8 12.57 Good 09/29/23 10/27/23 28
SET 5LOCATION: SOG Lines e.x/2.4
Total Unit Slump(in.) 6
Lab SW Area Date Date Aga Load Load Fracture Air Temp.(F.) 59
No. (in.) (sq.in.) Condition Cast Tested Days (lbs.) (psi.) Type Conc Tamp(F) 75
C679 4.00 x 6.00 12.57 Good 09/29/23 10/06/23 7 52,500 4,180 3 Truck No. 182
C680 4.00 x 8.00 12.57 Good 09/29/23 10/13/23 14 57,500 4,570 3 Ticket No. 1673
C681 4 x 6 12.57 Good 09/29/23 10/27/23 20 Time 10:50
C682 4 x 8 12.57 Good 09/29/23 10/27/23 28 Unit Wt lbs/ou ft
C683 4 x 8 12.57 Good 09/29/23 10/27/23 20 Air Content(%) L 5
C684 4 x 8 12.57 1 Good 1 09/29/23 10/27/23 28
SET 6LOCATION: SOG Lines B.1/3.3
Total Unit Slump(in.) 7
Lab Sim Area Date Date Age Load Load Fracture Air Temp.IF.) 60
No. (in.) (sq.In.) Condition I Cast Tested Days ([be.) 1peiJ Type Conc Temp(F) 74
C685 4.00 x 0.00 12.57 Good 09/29/23 10/06/23 7 40,000 3,180 2 Truck No. 264
C686 4.00 x 8.00 12.57 Good 09/29/23 10/13/23 14 54,000 4,300 2 Ticket No. 1683
C687 4 x 0 12.57 Good 09/29/23 10/27/23 20 Time 11:45
C688 4 x 0 12.57 Good 09/29/23 10/27/23 28 Unit Wt ibs/cu ft
C689 4 x 8 12.57 Good 09/29/23 10/27/23 28 Air Content(%) 2.4
C690 1 4 x 8 12.57 1 Good 09/29/23 10/27/23 28
GENERAL REMARKS: *MRWR, 1% NCA; Cylinders received on 10/2/23. Early Morninq Rate 6:00am-1:00am.
Inspector Premium Travel
Name Time Hours Time
ChrisiopLer Viger I No iMax Day 1 Hris)
Luis Cas[roI No iMax Day I Hrls)
Of Massachusetts
'The Construction Testing People'
Page 3
5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781.438.6216(Fax)
Compressive Strength Report-Concrete Report Date 09-29-2023
Report No. 27
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
.REVIEWED BY: Bryan M. Crabtree
1 FRACTURETYPES
i I �
Type i Type 2 Type 3 Type 4 Type5 Type 6
Reasonably MiNfamed Well/ormedcona on coWmowr vaitlsal Dlagonalfreduru Side fractures st top Similar to Type
cone.on both and., one end,vertical trucks cracking through with no oncking or bosom(occur but and of
We.than 1 In. running through ceps, boa,mods,no through ends;tap commonly with cylinder Is
125 mm1 of crocking no walldafn.d cone well+ormed cones with hemmer to unbondad cap.) pointed
throught saps on other end di.gngulshhom
Type t
our reports are available in PDF form via email. Plaase amail us at reportOutsofeoaas.com for more inforaution.
cc: City of Salem Greg Salamicia
Connolly Brothers Inc Robert Spence
JG MacLellan Garrison Todd
Connolly Brothers Inc Matthew Lawton
IF Moran Kyle Roy
Geotechnical Services Inc Glen Zoladz
City of Salem Voula Orfanos
Cumming Group Joe Vickery
Connolly Brothers Inc Chris Benton
' Of Massachusetts
'The Construction Testing People'
Page 4
5 Richardson Lane,Stoneham,MA 02180 781.438.7755(Voice)781438.6216(Fax)
Compressive Strength Report-Concrete Report Date 09-29-2023
Report No. 27
Distribution Copy Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Contractor Connolly Brothers Inc
Concrete Co. JG MacLellan
FIELD SUMMARY REPORT
-Total Pour: SOG, Lines B-D/1-3.5
Method of Placement: ®Pump ❑Chute Discharge ❑ Bucket ❑Other
Other:
Method of Concrete Consolidation: ®Vibrator ❑ Other
Other:
Cylinder Fabrication Location: ❑ Truck Discharge Chute ® End of Pump Hose
Cylinder Storage: Curing Box 13Thermal Blanket HaylStraw Trailer W Field
❑ Other
Placement Protection: ❑Thermal Blankets ❑Heat ® None
❑ Other
Slump Specification(in.) 9-6
Number of slumps out of specification reported to
H rejected
Approved by
Remarks: Mix ID#404102542; Superintendent Chris Benton was aware of trucks 269, 264(load
#20, 261 and 264(load #23)being poured at a slump out of specification and was ok
with it.
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane,Stoneham,MA 02180 781J38.7755(Voice)781-438-6216(Fax)
Report Date 09-29-2023
Report No. 27
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Salem, MA
Attachment _
Of Massachusetts Inc.
"The C*Mtfuctloll TeSting people" Page# Z
_ DAILY REPOR
T OF CONCRETE POUR
PROJECT NAME: 3 111G V PROJEC/T(NO.:
DATE 15,�J U �IR � �--3 TOTAL YARDS: L J/%
LOCATION OF POUR:
Load& Slump Bitching Bitching Time In Yards Concrete I %of Ticket is No.of
1
Truck# Inches In Out Minutes Temp. Air � Cylinders
w 635 1I I " 7
"/ 1
Z6 6 SS 7: 35 40 113 ►6
Z6Z 7. TZ I' y
Q 7 700 D 17Z 94
Zo3 7; 0 MCI
M s
160 730 )ZI
z�� �,5o g),3 its I"lug I 165�t
Z6� 6 9:ou 6 111610 3 L� C 6
l y 6 o I" 1-"
�y 1 y;l 6 III 6T---
u5 q lali43 1660
Z6� ;0 I i 1666
g11D q; I''► 6 166�
lS�q 1;30 io;lp qb f16 ) /t J
INSPECTOR r REMARKS: AX:IJft J'T[/
UTS of Massachusetts, Inc. Page s
5 Richardson Lane,Stoneham,MA 02180 781-438.7755(Voice)781.438.6216(Fax)
Report Date 09-29-2023
Report No. 27
Job Number 27183
Project Tropical Products, 373 Highland Avenue
Attachment Salem, MA
Of
Massachusetts Massachusetts inc.
"The Construction Testing Peopim Page# 2 t
�/ DAILY REPORT OF CONCRETE POUR
PROJECT NA JMME: 14 a AA,I wPROJECT N
DATE: I' V2 / AIR TEMP.: TOTAL YARDS:
LOCATION OF POUR: JV b `k�.
Load& Slump Batching Belching Time In Yards Concrete I %of Ticket# No.of
Truck# Inches In Out Minutes Temp. Air ZI Cylinders
10,go Zt ,IMIK
IgZ ',00 1066 56 11 1 I. 103 C 6
IMo 11160 I "kio I ego
zk3 10:10 f'1Io/� 6 I1123 1 16
16 10:�5' II113� I"Iz�I
Z� 10'55 II; ' I°Za 71`&o -i 16f3 r�6
I
• � I
I I
i
i
I �
I
INSPECTOR: 64r)5 V'�i0�; ,'SCG5fi'() REMARKS:rhX��UIUGJI�