Loading...
20 COMMERCIAL STREET - BUILDING INSPECTION * 20 COMMERCIAL STREET 0020 COMMERCIAL STREET 762-2002 GIS#: 266 'n COMMONWEALTH OF MASSACHUSETTS Map: 26 Block: CITY OF SALEM Loi: 0050.,. " Permit: < Building; ' Category. 323 New hospitals&i BUILDING PERMIT ermit# Project# JS-2002-1716" Est:Cost: $40,000.00:` Fee: ' $405.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: `- Contractor: License: Use Group: Brian Morris Lot Size(sq:ft.): 19300 Owner: JEANNETTE REALTY TRUST Zoning: - BP Applicant: JEANNETTE REALTY TRUST Units Gamed: Units Lost ., AT. 0020 COMMERCIAL STREET ISSUED ON: 21-May-2002 AMMENDED ON. EXPIRES ON: 20-Nov-2002 TO PERFORM THE FOLLOWING WORK. 762-2002; FOUNDATION ONLY FOR ALL CREATURES VETERINARY CLINIC. TSP POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: Footings: Rough: Rough: Rough: Foundation: Final: Final: Final: Rough Frame: Fireplace/Chimney: D.P.W. Fire Health Insulation: Meter: Oil: Final: House# Smoke: Treasury: Water: Alarm: Sewer: Sprinklers: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING REC-2002-001839 20-May-02 1470 $405.00 GeoTMS®2002 Des Lauriers Municipal Solutions,Inc. `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA APR 1 12002 ^TINS CO S°t'��CTION Co"INC. TECHNICAL SPECIFICATIONS Client Dr. ELIZABETH BRADT Salem MA Architect KOCH ARCHITECTS Ipswich MA Contractor MARTINS CONSTRUCTION Danvers MA �N �H81 April 08, 2002 Koc%f{rc/rsfecf� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA TABLE OF CONTENTS Division 2-Sitework 02050 Demolition . 02100 Site Preparation 02200 Earthwork 02500 Paving and Surfacing 02580 Pavement Markings Division 3-Concrete 03100 Concrete Formwork and Accessories 03200 Concrete Reinforcement 03300 Cast-in-Place Concrete 03370 Expansion Control, Finishes and Sealers End of Table of Contents /�oc/nr4rc/rs,`acfc 'ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA DIWSION 02 SHEWORK 02050 DEMOLITION 01. Temporarily disconnect all utilities from the existing structure or specific areas of the existing structure, whichever is intended for demolition. 02. Take down the superstructure of two existing single story buildings of varying construction type. Remove all discarded material and debris from the site. 03. Breakup and remove from site the concrete slab and foundation system of the closest building to Commercial Street, as shown on the drawings. 04. Breakup and remove from site the concrete slab of the rear building. 05. Breakup and remove from site the concrete retaining wall at the side parking area. 06. Remove and legally dispose off site, of all discarded materials and construction debris. None of the broken-up concrete shall be reused as fill material 02100 SITE PREPARATION 01. Take down and dispose off-site, trees, shrubs and vegetation in the areas, identified on the drawings or as specifically directed by the owner or architect, interfering with the proposed buildings, site improvements, drives and parking areas. 02. Install erosion control devices. 03. Provide dust control during all time of site and earth work. 02200 EARTHWORK EXCAVATION 01. Contractor to remove all topsoil in the areas of site improvements and buildings and stock pile on site for future use, as directed by the architect. 02. Subsoil excavation shall be to elevations, grades and dimensions as shown on the drawings, plus ample space for construction operation and inspection of excavation and the foundation system. Footing and foundations must rest on undisturbed material, with no loosened and softened zones and must be free from standing water. 03. Excavation for exterior footings shall be to undisturbed soil at a minimum of four(4)feet below finished grade or as indicated on the drawings. Footings interior to the building shall be as shown on the drawings. 04. Provide excavation and backfill for all utility lines, including crushed stone borrows and concrete encasements where required. 05. Slope sides of excavated areas to respond to the prevailing soil stability and comply with local codes and ordinances and all OSHA Regulations for construction worker's safety. Where sloping is not possible due to space restrictions or stability of excavated material, provide shoring and bracing. Provide professional engineering for shoring and bracing system designs. 06. Contractor to be responsible to remove and legally dispose of all unsuitable soil and fill material from site. It is not the contractors responsibility to remove soils and materials declared CONTAMINATED. 07. Maintain storage deposits of excavated materials, or materials used in back-fill operations a minimum distance of 25 feet away from any watercourse or any drainage facility. Provide adequate measures for erosion and sediment control to protect any downstream areas from siltation. Koc%flrc/rs>fectff `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA 02200 EARTHWORK continued FILL MATERIALS 01. Building foundations are designed for a soil bearing capacity of 2 tons(4000 lbs/sf) per square foot. 02. Structural fill, as founding material for paved areas,foundations and slabs, is assumed to be clay soil materials, composed of hard, durable particles with less than 5%non-plastic fines. Structural fill shall be free of clay lumps, rock or gravel larger than 2"in diameter,organic and vegetable matter, wood, brick, debris, trash,frozen materials and any other material, which are deemed to be unacceptable to the architect. 03. Common fill shall be well graded mineral soil, substantially free of organic materials, loam, wood trash and other objectionable materials which may be compressible or which can not be compacted properly. Common fill shall not contain snow or frozen material, nor contain stones larger than 3" in diameter. 04. The use of on-site soils as common fill is permitted, provided, that the water content can be controlled to achieve compaction of 92%MDD. O5. Crushed stone borrow material shall be composed of a uniform blend of durable, hard rock particles and shall be free of organic and vegetable matter, wood, concrete, masonry rubble, debris,trash, frozen materials and any other material, which are deemed to be unacceptable to the architect. O6. Gravel base for paving shall be a uniformly graded mixture of crushed stone, or crushed and un- crushed gravel,free of organic and vegetable matter,wood, brick,debris,trash,frozen materials and any other material, which are deemed to be unacceptable to the architect. 07. Sand fill shall be course, builders sand for under-slab cushion layer. O8. Topsoil shall be spread at least 6"deep,friable clay,loam material and be reasonably free of subsoil, clay lumps, stones, weeds, roots, objects over 2"in diameter and other objectionable material. EROSION CONTROL 01. Prior to and during excavation operations, institute erosion control measures, conforming to the requirements, codes and regulations of all governmental agencies having jurisdiction. 02. As required and /or specified on the site improvement documents, install silt fencing, hay bales or check dams. 03. At the existing and /or newly constructed catch basins construct temporary filters or siltation barriers. 04. For the completion of this project it is required, that all stormwater drainage systems are checked and cleaned from all construction debris or incidental erosion materials, to allow for the designed flow requirements. FROST PROTECTION 01. Protect the base of all excavated areas which are to receive bearing foundation systems, against freezing, where atmospheric temperature is expected to be less than 35 degrees F. MOISTURE CONTROL 01. Adjust moisture content of existing sub-grades or fill materials as necessary, by adding water or by drying. Compacted fill and backfill materials shall have a moisture content between two (2) percent above and below the OPTIMUM MOISTURE CONTENT, all as determined by ASTM D 1557. 02. Remove and replace,or scarify and air dry soil materials, that are too wet to permit their compaction to the specified density. DUST CONTROL 01. Employ all methods required to effectively control dust created by the work of this Section. Removed materials carried off-site by trucks shall, be covered with secured tarpaulins. 02. Public streets and roadways shall be kept free of spilled materials, mud and debris related to the s construction work. Koc/r-flrc/rsfecE� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA 02200 EARTHWORK continued FILL SCHEDULE 01. Compact all fills to the Maximum Dry Density(MDD) specified for the individual applications below and in accordance with ASTM D 1557 and ASTM C 136: Site Grading: Common fill for green areas and site grading in 12" loose lifts, compacted to 90% MDD Footings: Structural fill in 8"loose lifts,compacted to 95%MDD Beneath slabs-on-grade: 8"thick structural fill, compacted to 95% MDD Over structural fill place Emil polyethylene vapor barrier Over vapor barrier place a 2"layer of compacted, dampened, course sand Backfill against foundation walls and footings: Common fill in 9" loose lifts compacted to 92% MDD Beneath pavement sub-base: Common fill in 9" loose lifts compacted to 92% MDD Pavement: 9"thick gravel sub-base beneath all roads and pavement areas, compacted to 95%MDD. Pipe bedding, working mats, curbing: Install one continuous, leveled, 9"thick layer of crushed stone at trench bottom and compact to 95%MDD. (Crushed Stone Borrow) 02500 PAVING AND SURFACING ASPHALT PAVING 01. Furnish and install asphaltic concrete paving, MDPW Type 1-1, in the areas shown on the drawings and consisting of the following layers: New areas: Binder Course Two(2)Inches Wearing Course One(1) Inch Existing paved areas to be resurfaced: Overlay Wearing Course Two(2) Inches 02. All asphalt/cement mix shall be in accordance with AASHTO T195. 03. Saw cut existing roadway paving and patch new and overlay paving at entry drives. 04. At areas to be resurfaced or where the binder course has been exposed for a prolonged period, apply a bitumen tack coat at the rate of .05 to .15 per square yard of surface. ASPHALT CURBS AND BERMS 01. Asphalt concrete curbing shall be machine formed, STANDARD CURB or CAPE COD BERM as indicated on the drawings. Asphaltic/cement mix shall match the wearing course mix of adjacent paved areas and be in accordance with AASHTO T195. 02580 PAVEMENT MARKINGS 01. Provide labor and material for pavement markings, lines and symbols as shown on the drawings. 02. All paint shall be reflectorized traffic paint, conforming to federal specification TT-P-1 15C, Class A. End of Division 02 Sitework r Koch-flrc/rrfecf� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA DMSION 03 CONCWME 03100 CONCRETE FORMWORK AND ACCESSORIES 01. For unexposed planer surfaces use: exterior type Douglas Fir Grade B-B(concrete form) Plywood conforming to NBS PS-1 of 3/4" minimum thickness undressed lumber No.2 common or better Before re-using forms withdraw nails and thoroughly clean surfaces which are to be in contact with the concrete. 02. For exposed to view planer surfaces use: Class 1 B-B High Density Overlay Plyform, exterior grade, not less than 5 ply nor less than 5/8"thick and conforming to US Product Standard PS-1-74 03. Form ties shall be factory fabricated, snap-off steel ties or type 302/304 stainless steel snap ties, as may be required for the application. Use ties with set-back cones for exposed concrete. 04. Universal form release agents shall be mineral oil or chemically neutral, water insoluble, containing no waxes or silicones and have a low sulfur content. 05. Filler strips for expansion joints shall be non-extruding type conforming to ASTM D1751. 03200 CONCRETE REINFORCEMENT 01. Deformed reinforcing bars in sizes, shapes and lengths shall be as shown on the drawings and conform to ASTM A615, Grade 60. 02. Concrete slabs shall be reinforced with welded wire fabric (WWF 6x6-W 2.9 x W 2.9)Conforming to ASTM At 85. Use flat sections only. 03. Concrete cover of reinforcing steel shall be as shown on the drawings, as specified by ACI 318, or as follows: footings 3" foundation walls, grade beams 1-1/2" slabs on grade centered 04. Reinforcing tie wires shall be a minimum of 16 GA, annealed type. 05. Concrete embedded, sill anchors for wood framed exterior wall sills, shall be hot-dipped galvanized,12" long, 1/2"thick threaded bolt with a 2" bend at one end and be placed at 6'-0"o.c. with a minimum of at two (2) bolts per sill piece and 12"from any end and/or corners. Alternative methods of attachment, using expansion bolt anchors, epoxy set anchors or strap ties need to be submitted to the architect for approval. 06. At the joints between existing and proposed concrete/foundation walls, install 16" long, #5 bars at 12"O.C.. Drill bars into existing concrete and set with non-shrink grout. 07. Provide and install all chairs, bolsters, bar supports and spacers in sizes and shapes to firmly support all reinforcing during concrete placement. 03250 CONCRETE ACCESSORIES 01. Provide and install HVA Adhesive Anchors, drilled into hardened concrete, in diameters, edge distance, embedment and spacing as shown on the drawings or as directed and as manufactured by HILTI Fastening Systems. Adhesives may be applied in capsules or injected. `ALL CREATURES' veterinarian Hospital 20 Commercial Street, Salem MA 03300 CAST-IN-PLACE CONCRETE 01. All concrete footings shall be place on undisturbed soil or controlled compacted back-fill, having a minimum bearing capacity described in Division 02, Section 02200 Earthwork. 02. All concrete work is to be in accordance with the Governing Building Code requirements for reinforced concrete, ACI 318 and specifications for structural concrete for buildings ACI 301. 03. All concrete shall be quality controlled, normal weight, air-entrained concrete with the following strength, cement and water ratios as per ACI 211.1: compressive strength cement tactor water/cement ratio 3000 psi 517 lbs/cubic yard 0.6 gal. by weight 04. Design compressive strength is based on a 28 day cure period. Strength application to be as shown on the drawings. 05. Allowable concrete slump shall be as follows: footings 4 inches slabs 3 inches walls 4 inches 06. All concrete exposed to weather shall be air entrained at 6%(+/- 1%)of volume. 07. Cold weather concreting precautions shall be submitted for approval, along with the proposed concrete mix designs. 08. Protect newly placed concrete against low and extremely high temperatures and against rapid loss of moisture, as per ACI 306 and ACI 305 latest edition. 03370 EXPANSION CONTROL, FINISHES AND SEALERS 01. At concrete wall surfaces exposed to view, remove all fins and loose concrete and fill all honeycombed surfaces, stone pockets and other irregularities, immediately after the removal of forms with cement mortar. Mortar color to match adjacent surfaces of the exposed concrete. 02. Interior concrete floor slabs shall be steel trowel finish and provided with a concrete sealer. Submit floor hardener/sealer for approval. 03. Provide wall construction joints at a minimum of 50'intervals, as needed to control cracking and/or differential settlement or as differently shown on the drawings. Provide shear transfer dowels and galvanized steel keyway sections at construction and control joints. 04. Provide expansion control joints at the floor slabs,l/4"wide and 1"deep, at 30'intervals and in a 36"x 36"diamond shaped square at each column or as otherwise shown on the drawings. These joints may be saw cut within 48 hours of concrete placement or by using removable strip inserts. 05. Exterior slabs, sidewalks, ramps and steps shall be broom finish, perpendicular to the direction of travel, to achieve a non-slip surface. Provide non-slip steel nosings as inserts at each step. End of Division 03 Concrete Martins Construction Company, Inc. Letter of Transmittal 130 Sylvan Street\Danvers\Massachusetts 01923 Telephone: 978-777-9084\ Fax: 978-750-4281 To: Salem Building Inspector Date: May 2, 2002 VIA HAND Job Number: 01-14 Re: All Creatures Veterinary Clinic Attention: Mr. Peter Strout Salem, MA Spec. Ref: Permit From: Brian J. Morris EMAIL: brian@martins-construction.com WE ARE SENDING YOU ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ® Affidavit COPIES DATE NO. DESCRIPTION 3 5-1-02 Controlled Construction -Architect THESE ARE BEING TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval ® For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ For construction ❑ FORBIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS Please do not hesitate to call me with any questions. Office or cell#978-697-1554. Thank you. Copy To: file BRIAN J. MORRIS 5-2-02 Signed By Date CONSTRUCTION CONTROL -Architect- Project Number.....11120....... Project Title.........ALL CREATURES' Veterinarian Hospital..................... Project Location....20 Commwclal Street,...Salem...MA......................................................................... Nature of Project...demolftion of two existing structures and construction of a new single......................... ............................story building............................................................................................................ ............................................................................................................................................................ In accordance with 780 CMR(Commonwealth of Massachusetts Building Code) Section 116.0 Construction Control, and specifically Sections 116.2.2 Architect's I Engineer's Responsibilities during Construction and 116.4 On Site Project Representation, I. ........RAINER KOCH................................................ Registration No. ........MA 5056..................... being a registered architect, have prepared or directly supervised the preparation of all design plans, computations and specifications for the above named project and I state,that such plans, computations and specifications meet the applicable provisions of the Commonwealth of Massachusetts Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. As it may be required and applicable for the project, I will monitor the construction process and provide the following tasks: 1. Review for conformance to the design concept.,shop drawings, samples and other materials which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approve the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stages of construction, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. 4. Be present at the construction site on a regular basis or as proposed in the attached inspection schedule, and/or 1 will send other appropriately qualified design professionals, to determine that the work is proceeding in accordance with the documents submitted with the building permit application and the applicable provisions of the Commonwealth of Massachusetts Building Code. 5. Provide the building inspector with an original, stamped report for each site visit, scheduled or otherwise. 6. Issue a Statement of Project Completion at the time the construction is considered substantially complete and ready for occupancy I understand,that no CERTIFICATE OF OCCUPANCY will be issued until all reports and a statement of project completion have been submitted to the satisfaction of the building inspector I code enforcement official. f Signed...... Date...........May..01..2002................................ P��SR ka�i I!{OF CONSTRUCTION CONTROL -Architect- Project Number.....11120....... Project Title.........ALL CREATURES' Veterinarian Hospital..................... Project Location....20 Commercial Street,...Salem...MA.......................................................................... Nature of Project...demolition of two existing structures and consbWion of a new single......................... ............................story buildling....................................................................................................... ..... ............................................................................................................................................................ In accordance with 780 CMR (Commonwealth of Massachusetts Building Code) Section 116.0 Construction Control, and specifically Sections 116.2.2 Architect's/Engineer's Responsibilities during Construction and 116.4 On Site Project Representation, I, ........RAINER KOCH................................................ Registration No. ........MA 5056......................... being a registered architect, have prepared or directly supervised the preparation of all design plans, computations and specifications for the above named project and 1 state,that such plans, computations and specifications meet the applicable provisions of the Commonwealth of Massachusetts Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. As it may be required and applicable for the project, I will monitor the construction process and provide the following tasks: 1. Review for conformance to the design concept.,shop drawings, samples and other materials which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approve the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stages of construction, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. 4. Be present at the construction site on a regular basis or as proposed in the attached inspection schedule, and/or I will send other appropriately qualified design professionals, to determine that the work is proceeding in accordance with the documents submitted with the building permit application and the applicable provisions of the Commonwealth of Massachusetts Building Code. 5. Provide the building inspector with an original, stamped report for each site visit, scheduled or otherwise. 6. Issue a Statement of Project Completion at the time the construction is considered substantially complete and ready for occupancy I understand,that no CERTIFICATE OF OCCUPANCY will be issued until all reports and a statement of project completion have been submitted to the satisfaction of the building inspector/code enforcement official. I Signed.......��.�. va ARey�r Date...........May..01..2002................................ ; 5056 OT CONSTRUCTION CONTROL -Architect- Project Number.....11120....... Project Title.........ALL CREATURES' Veterinarian Hospital..................... Project Location....20 Commercial Street,...Salem..MA.......................................................................... Nature of Project...demolition of two existing structures and consbuction of a new single......................... ............................story building............................................................................................................ ............................................................................................................................................................ In accordance with 780 CMR (Commonwealth of Massachusetts Building Code) Section 116.0 Construction Control, and specifically Sections 116.2.2 Architect's/Engineer's Responsibilities during Construction and 116.4 On Site Project Representation, I. ........RAINER KOCH................................................ Registration No. ........MA 5056......................... being a registered architect, have prepared or directly supervised the preparation of all design plans, computations and specifications for the above named project and I state, that such plans, computations and specifications meet the applicable provisions of the Commonwealth of Massachusetts Building Code, all acceptable engineering practices and applicable laws and ordinances for the proposed use and occupancy. As it may be required and applicable for the project, I will monitor the construction process and provide the following tasks: 1. Review for conformance to the design concept:shop drawings, samples and other materials which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approve the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stages of construction,generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. 4. Be present at the construction site on a regular basis or as proposed in the attached inspection schedule, and/or I will send other appropriately qualified design professionals, to determine that the work is proceeding in accordance with the documents submitted with the building permit application and the applicable provisions of the Commonwealth of Massachusetts Building Code. 5. Provide the building inspector with an original, stamped report for each site visit, scheduled or otherwise. 6. Issue a Statement of Project Completion at the time the construction is considered substantially complete and ready for occupancy I understand,that no CERTIFICATE OF OCCUPANCY will be issued until all reports and a statement of project completion have been submitted to the satisfaction of the building inspector/code enforcement official. �^ 1 Signed........�4Ak... .... eecyrrF Date...........May..01..2002................................ ba r' �' I a oo,� � Nsaeai� s p� `� Yhof0 I I rl rr . , 6 �✓W✓'J7�G♦�L � � ...—_ J�6 I :✓ _ d..-, .D - t �'✓ t � I G'✓, i �?-__._: I.�.�Tf��_.-. �.IJ Zn'. . _ I 't:+J �'✓gib _ _ !tet j .11 x I �, _ I II 'I7,11 � _ 5 .19 — . --- �/ / ZZ �- : �/l i � i _:.LiIAY}'✓ ___.._ .. 4a-. _ ._.l_.. _' -__ — Y _._ ✓ __ � --#p.rl��- 1. . t��✓ _��:.. h:';Fir�FJ _G .l ..`i 1 _-� ,_ - ♦ /' • _•4k._l0 I � / 71,17 11 I I I li - ! 117'1 it Irl. Ii 1 tj. , f_J -.�t�0.✓. r — - - - - l L ✓ • .:fY qDG 1'd"IZ :$ k1F-1 . .t I }- �G. f✓ D 4 _ .. . �. _ +.,� ♦ _ _ • - f 8._la tie d. �{0�7y- -�. .� I:•.' \ � .�L ,.- if� _� —�- *rl QVrt bk7, _ x rl i 1 i 2' Mfr — 1 1 0 o 0 o 16 � 7 8 Oundat'®n . ®eta� s�++ I I _. 1 l ate..- _ -..1/2'= 1'-0•.u.o.n... : j I Ili � l /� I � ' • Fes., P vAIYtAh� / `'1 / _- I I r 1 I;, ( i i I I• k439t, larv2: I L �blrvll it I�I� ® �OII / 7'On 2�1 bll o T } JQ it I q i 1 I ` I I r I 6 I 4 IT I � I I 4 � i j Ii ; tj I %DIr� II � J I j I _ Dr — d I APR 1 12002 I. h � f � +i � I I NS CONSTRUCTION CO.,IrIC. 1_ � r1ART1 ...__ I J _ I NP CP I I pMr y�ry � v' `ALL CREATURES' veterinarian Hospital 20 Commercial Street, Salem MA APR 1 1 2002 I fll ?0 .TINS CONST?tlP.Tlos cep., INC TECHNICAL l SPECIFICATIONS Client Dr. ELIZABETH BRADT Salem MA Architect KOCH ARCHITECTS Ipswich MA Contractor MARTINS CONSTRUCTION Danvers MA fia eyel� r' Q7 �kTer April 08, 2002 Kochffrc/r!l¢c� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA TABLE OF CONTENTS Division 2-Sfiework 02050 Demolition 02100 Site Preparation 02200 Earthwork 02500 Paving and Surfacing 02580 Pavement Markings Division 3-Concrete 03100 Concrete Formwork and Accessories 03200 Concrete Reinforcement 03300 Cast-in-Place Concrete 03370 Expansion Control, Finishes and Sealers End of Table of Contents Koc/rf/rc/tsf¢cf-s `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA DIVISION 02 SHE WORK 0205.0 DEMOLITION 01. Temporarily disconnect all utilities from the existing structure or specific areas of the existing structure, whichever is intended for demolition. 02. Take down the superstructure of two existing single story buildings of varying construction type. Remove all discarded material and debris from the site. 03. Breakup and remove from site the concrete slab and foundation system of the closest building to Commercial Street, as shown on the drawings. 04. Breakup and remove from site the concrete slab of the rear building. 05. Breakup and remove from site the concrete retaining wall at the side parking area. 06. Remove and legally dispose off site, of all discarded materials and construction debris. None of the broken-up concrete shall be reused as fill material 02100 SITE PREPARATION 01. Take down and dispose off-site, trees, shrubs and vegetation in the areas, identified on the drawings or as specifically directed by the owner or architect, interfering with the proposed buildings, site improvements, drives and parking areas. 02. Install erosion control devices . 03. Provide dust control during all time of site and earth work. 02200 EARTHWORK EXCAVATION 01. Contractor to remove all topsoil in the areas of site improvements and buildings and stock pile on site for future use, as directed by the architect. 02. Subsoil excavation shall be to elevations, grades and dimensions as shown on the drawings, plus ample space for construction operation and inspection of excavation and the foundation system. Footing and foundations must rest on undisturbed material, with no loosened and softened zones and must be free from standing water. 03. Excavation for exterior footings shall be to undisturbed soil at a minimum of four(4)feet below finished grade or as indicated on the drawings. Footings interior to the building shall be as shown on the drawings. 04. Provide excavation and backfill for all utility lines, including crushed stone borrows and concrete encasements where required. 05. Slope sides of excavated areas to respond to the prevailing soil stability and comply with local codes and ordinances and all OSHA Regulations for construction worker's safety. Where sloping is not possible due to space restrictions or stability of excavated material, provide shoring and bracing. Provide professional engineering for shoring and bracing system designs. 06. Contractor to be responsible to remove and legally dispose of all unsuitable soil and fill material from site. It is not the contractors responsibility to remove soils and materials declared CONTAMINATED. 07. Maintain storage deposits of excavated materials,or materials used in back-fill operations a minimum distance of 25 feet away from any watercourse or any drainage facility. Provide adequate measures for erosion and sediment control to protect any downstream areas from siltation. KochfZrc/rifecdr `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA 02200 EARTHWORK continued FILL MATERIALS 01. Building foundations are designed for a soil bearing capacity of 2 tons (4000 lbs/sf) per square foot. 02. Structural fill, as founding material for paved areas,foundations and slabs, is assumed to be clay soil materials, composed of hard, durable particles with less than 5%non-plastic fines. Structural fill shall be free of clay lumps, rock or gravel larger than 2"in diameter, organic and vegetable matter, wood, brick, debris, trash, frozen materials and any other material, which are deemed to be unacceptable to the architect. 03. Common fill shall be well graded mineral soil, substantially free of organic materials, loam, wood trash and other objectionable materials which may be compressible or which can not be compacted properly. Common fill shall not contain snow or frozen material, nor contain stones larger than 3"in diameter. 04. The use of on-site soils as common fill is permitted, provided, that the water content can be controlled to achieve compaction of 92%MDD. O5. Crushed stone borrow material shall be composed of a uniform blend of durable, hard rock particles and shall be free of organic and vegetable matter, wood, concrete, masonry rubble, debris, trash,frozen materials and any other material, which are deemed to be unacceptable to the architect. 06. Gravel base for paving shall be a uniformly graded mixture of crushed stone, or crushed and un- crushed gravel, free of organic and vegetable matter, wood, brick, debris, trash, frozen materials and any other material, which are deemed to be unacceptable to the architect. 07. Sand fill shall be course, builders sand for under-slab cushion layer. 08. Topsoil shall be spread at least 6"deep,friable clay, loam material and be reasonably free of subsoil, clay lumps, stones, weeds, roots, objects over 2" in diameter and other objectionable material. EROSION CONTROL 01. Prior to and during excavation operations, institute erosion control measures, conforming to the requirements, codes and regulations of all governmental agencies having jurisdiction. 02. As required and /or specified on the site improvement documents, install silt fencing, hay bales or check dams. 03. At the existing and /or newly constructed catch basins construct temporary filters or siltation barriers. 04. For the completion of this project it is required, that all stormwater drainage systems are checked and cleaned from all construction debris or incidental erosion materials, to allow for the designed flow requirements. FROST PROTECTION 01. Protect the base of all excavated areas which are to receive bearing foundation systems, against freezing, where atmospheric temperature is expected to be less than 35 degrees F. MOISTURE CONTROL 01. Adjust moisture content of existing sub-grades or fill materials as necessary, by adding water or by drying. Compacted fill and backfill materials shall have a moisture content between two (2) percent above and below the OPTIMUM MOISTURE CONTENT, all as determined by ASTM D 1557. 02. Remove and replace, or scarify and air dry soil materials,that are too wet to permit their compaction to the specified density. DUST CONTROL 01. Employ all methods required to effectively control dust created by the work of this Section. Removed materials carried off-site by trucks shall, be covered with secured tarpaulins. 02. Public streets and roadways shall be kept free of spilled materials, mud and debris related to the construction work. Koc/r-flrc/rsfecf� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA 02200 EARTHWORK continued FILL SCHEDULE 01. Compact all fills to the Maximum Dry Density (MDD)specified for the individual applications below and in accordance with ASTM D 1557 and ASTM C 136: Site Grading: Common fill for green areas and site grading in 12"loose lifts, compacted to 90% MDD Footings: Structural fill in 8"loose Its,compacted to 95% MDD Beneath slabs-on-grade: 8"thick structural fill, compacted to 95%MDD Over structural fill place 6mil polyethylene vapor barrier Over vapor barrier place a 2"layer of compacted,dampened, course sand Backfill against foundation walls and footings: Common fill in 9" loose lifts compacted to 92% MDD Beneath pavement sub-base: Common fill in 9" loose lifts compacted to 92% MDD Pavement: 9"thick gravel sub-base beneath all roads and pavement areas,compacted to 95% MDD. Pipe bedding, working mats, curbing: Install one continuous, leveled, 9"thick layer of crushed stone at trench bottom and compact to 95% MDD. (Crushed Stone Borrow) 02500 PAVING AND SURFACING ASPHALT PAVING 01. Furnish and install asphaltic concrete paving, MDPW Type 1-1, in the areas shown on the drawings and consisting of the following layers: New areas: Binder Course Two(2)Inches Wearing Course One(1) Inch Existing paved areas to be resurfaced: Overlay Wearing Course Two(2) Inches 02. All asphalt/cement mix shall be in accordance with AASHTO T195. 03. Saw cut existing roadway paving and patch new and overlay paving at entry drives. 04. At areas to be resurfaced or where the binder course has been exposed for a prolonged period, apply a bitumen tack coat at the rate of.05 to .15 per square yard of surface. ASPHALT CURBS AND BERMS 01. Asphalt concrete curbing shall be machine formed, STANDARD CURB or CAPE COD BERM as indicated on the drawings. Asphaltic/cement mix shall match the wearing course mix of adjacent paved areas and be in accordance with AASHTO T195. 02580 PAVEMENT MARKINGS 01. Provide labor and material for pavement markings, lines and symbols as shown on the drawings. 02. All paint shall be reflectorized traffic paint, conforming to federal specification TT-P-1 15C, Class A. End of Division 02 Sitework Kocr<-ffrc/rrfccf� `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA DIMON 03 CON =- 03100 03100 CONCRETE FORMWORK AND ACCESSORIES 01. For unexposed planer surfaces use: exterior type Douglas Fir Grade B-B(concrete form) Plywood conforming to NBS PS-1 of 3/4" minimum thickness undressed lumber No.2 common or better Before re-using forms withdraw nails and thoroughly clean surfaces which are to be in contact with the concrete. 02. For exposed to view planer surfaces use: Class 1 B-B High Density Overlay Plyform, exterior grade, not less than 5 ply nor less than 5/8"thick and conforming to US Product Standard PS-1-74 03. Form ties shall be factory fabricated, snap-off steel ties or type 3021304 stainless steel snap ties, as may be required for the application. Use ties with set-back cones for exposed concrete. 04. Universal form release agents shall be mineral oil or chemically neutral, water insoluble, containing no waxes or silicones and have a low sulfur content. 05. Filler strips for expansion joints shall be non-extruding type conforming to ASTM D1751. 03200 CONCRETE REINFORCEMENT 01. Deformed reinforcing bars in sizes, shapes and lengths shall be as shown on the drawings and conform to ASTM A615, Grade 60. 02. Concrete slabs shall be reinforced with welded wire tabric.(WWF 6x6-W 2.9 x W 2.9) conforming to ASTM A185. Use flat sections only. 03. Concrete cover of reinforcing steel shall be as shown on the drawings, as specified by ACI 318, or as follows: . footings 3" . foundation walls, grade beams 1-1/2" slabs on grade centered 04. Reinforcing tie wires shall be a minimum of 16 GA, annealed type. 05. Concrete embedded, sill anchors for wood framed exterior wall sills, shall be hot-dipped galvanized,12"long, 1/2"thick threaded bolt with a 2"bend at one end and be placed at 6'-0"o.c. with a minimum of at two (2) bolts per sill piece and 12"from any end and/or comers. Alternative methods of attachment, using expansion bolt anchors, epoxy set anchors or strap ties need to be submitted to the architect for approval. 06. At the joints between existing and proposed concrete/foundation walls, install 16" long, #5 bars at 12"O.C.. Drill bars into existing concrete and set with non-shrink grout. 07. Provide and install all chairs, bolsters, bar supports and spacers in sizes and shapes to firmly support all reinforcing during concrete placement. 03250 CONCRETE ACCESSORIES 01. Provide and install HVA Adhesive Anchors, drilled into hardened concrete, in diameters, edge distance, embedment and spacing as shown on the drawings or as directed and as manufactured by HILTI Fastening Systems. Adhesives may be applied in capsules or injected. `ALL CREATURES' Veterinarian Hospital 20 Commercial Street, Salem MA 03300 CAST-IN-PLACE CONCRETE 01. All concrete footings shall be place on undisturbed soil or controlled compacted back-fill, having a minimum bearing capacity described in Division 02, Section 02200 Earthwork. 02. All concrete work is to be in accordance with the Governing Building Code requirements for reinforced concrete, ACI 318 and specifications for structural concrete for buildings ACI 301. 03. All concrete shall be quality controlled, normal weight, air-entrained concrete with the following strength, cement and water ratios as per ACI 211.1: compressive strength cement factor water/cement ratio 3000 psi 517 lbs/cubic yard 0.6 gal. by weight 04. Design compressive strength is based on a 28 day cure period. Strength application to be as shown on the drawings. 05. Allowable concrete slump shall be as follows: footings 4 inches slabs 3 inches walls 4 inches 06. All concrete exposed to weather shall be air entrained at 6%(+/- 1%)of volume. 07. Cold weather concreting precautions shall be submitted for approval, along with the proposed concrete mix designs. 08. Protect newly placed concrete against low and extremely high temperatures and against rapid loss of moisture, as per ACI 306 and ACI 305 latest edition. 03370 EXPANSION CONTROL, FINISHES AND SEALERS 01. At concrete wall surfaces exposed to view, remove all fins and loose concrete and fill all honeycombed surfaces, stone pockets and other irregularities, immediately after the removal of forms with cement mortar. Mortar color to match adjacent surfaces of the exposed concrete. 02. Interior concrete floor slabs shall be steel trowel finish and provided with a concrete sealer. Submit floor hardener/sealer for approval. 03. Provide wall construction joints at a minimum of 50' intervals, as needed to control cracking and/or differential settlement or as differently shown on the drawings. Provide shear transfer dowels and galvanized steel keyway sections at construction and control joints. 04. Provide expansion control joints at the floor slabs,I/4'wide and V deep, at 30'intervals and in a 36"x 36"diamond shaped square at each column or as otherwise shown on the drawings. These joints may be saw cut within 48 hours of concrete placement or by using removable strip inserts. 05. Exterior slabs, sidewalks, ramps and steps shall be broom finish, perpendicular to the direction of travel, to achieve a non-slip surface. Provide non-slip steel nosings as inserts at each step. End of Division 03 Concrete I�nr.�z fFra�iferLr 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection -Wetlands Provided by DEP WPA Form 5 - Order of Conditions <t"` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 �w A. General Information Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ❑ Order of Conditions not use the return key. ® Amended Order of Conditions (March 28, 2002) To: Applicant: Property Owner(if different from applicant): Elizabeth S. Bradt Same Name Name 22 Larchmont Road Mailing Address Mailing Address Salem MA 01970 City/Town State Zip Code City/Town State Zip Code 1. Project Location: 20 Commercial Street Salem Street Address City/Town Map 26 Lot 0050 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex South 16418 448 County Book Page Certificate(if registered land) 3. Dates: Amended March 28, 2002 Amended March 28, 2002 April 12, 2001 May 10, 2001 Amended May 10, 2001 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Amended Topographical Plan of Land, 20 Commercial Street Salem 02/02/02 Title Date 5. Final Plans and Documents Signed and Stamped by: Gail L. Smith Name 6. Total Fee: $525.00 (from Appendix B:Wetland Fee Transmittal Form) WPA Form 5 Page t of 8 Re¢02100 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection - Wetlands Provided by DEP WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ❑ Order of Conditions not use the return key. ® Amended Order of Conditions (March 28, 2002) _Q To: Applicant: Property Owner(if different from applicant): Elizabeth S. Bradt Same Name Name 22 Larchmonf Road Mailing Address Mailing Address Salem MA 01970 City/rown State Zip Code City[Town State Zip Code 1. Project Location: 20 Commercial Street Salem Street Address City/Town Map 26 Lot 0050 Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex South 16418 448 County Book Page Certificate(if registered land) 3. Dates: Amended March 28, 2002 Amended March 28, 2002 April 12, 2001 May 10, 2001 May 10, 2001 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Amended Topographical Plan of Land 20 Commercial Street Salem 02/02/02 Title Date 5. Final Plans and Documents Signed and Stamped by: Gail L. Smith Name 6. Total Fee: $525.00 (from Appendix B:Wetland Fee Transmittal Form) WPA Fom 5 Page l of Rev.02100 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection -Wetlands Provided by DEP WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Public Water Supply ❑ Land Containing Shellfish ❑ Prevention of Pollution ❑ Private Water Supply ❑ Fisheries ❑ Protection of Wildlife Habitat ❑ Groundwater Supply ❑ Storm Damage Prevention . ® Flood Control Furthermore, this Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA form 5 Page 2 of 8 Rev.02/00 45 j DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection -Wetlands Provided by DEP y WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or'more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP"] "File Number 64-320 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental WPA Fenn 5 Page 3 of e Rev.02100 45 jD DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection - Wetlands Provided by DEP WPA Form 5 - Order of Conditions .c Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Y C B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions (use additional paper, if necessary): See Attached Findings as to municipal bylaw or ordinance Furthermore, the Salem hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: Name Municipal Ordinance or Bylaw Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: WPA Fon 5 Page 4 of 8 Re¢02/00 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64320 Bureau of Resource Protection -Wetlands Provided by DEP WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Name Municipal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from the date of issuance. Mn \O 2o-o Date This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (ret t requested) or hand delivered to the applicant. A copy also must be mailed or hand delivere , a sam time to the appropriate Department of Environmental Protection Regional Office (se pp ix nd the property owner(if different from applicant). i Signat res:,,'` (y'� 4 ' On Of cam). —C-)o"L Day Month and Ye i before me personally appeared to me known to be the person described in and who executed the foregoing instrument and acknowledged that he/she executed the same as his/her free act and deed. WPA Form 5 Page 5 of 8 Rev.02100 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection -Wetlands Provided by DEP WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 No ry PublicMy Comer imission Expires This Order is issued to the applicant as follows: ❑ by hand delivery on by certified mail, return receipt requested, on [AtN 9 z� Date z Dahl C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservation Commission WPA Form Page 6 of Rev.02/00 45 ju DEP File Number: Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection - Wetlands Provided by DEP s WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. To: Salem Conservation Commission - - Please be advised that the Order of Conditions for the Project at: 20 Commercial Street Amended 64-320 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number WPA Fo.5 Page 7 of 8 Rev.02/00 _ 45 DEP File Number: JU Massachusetts Department of Environmental Protection 64-320 Bureau of Resource Protection -Wetlands Provided by DEP WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA Forth 5 Page B of 8 Rev.07/00 Salem Conservation Commission AMENDED SPECIAL CONDITIONS—DEP FILE #64-320 20 Commercial Street, Salem, MA 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans,the Act,and 310 CMR 10.00,and may require any information,measurements,photographs, observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing,a sign shall be displayed showing DEP file#64-321, and not placed on a living tree. 6. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27 (5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. . 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order, shall occur on this property without prior approval from the Commission. 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L.Ch. 131, Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s)is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number NA as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials,stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged. 20. There shall be NA hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; additional measures may be required by the Commission. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps,silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures, firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans,and copies of the documents and reports cited in Condition# 11,shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill,free of masonry,stumps, asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grubbed stumps,slash,construction materials,etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. The project shall not cause an increase in run-off onto adjacent properties, either during construction or when completed. 38. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L. Chapter 2IA,section 16. POST CONSTRUCTION 39. All disturbed areas,slopes and proposed landscape areas shall be loamed and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded,loamed,and seeded prior to November 1 of each year, if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 40. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner; b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built'plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas; and c. Distances to all structures within 100 feet of any wetland resource area.. 41. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 42. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall fust request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. co CITY OF SALEM MASSACHUSETTS BOARD OF APPEAL CITY OF SALEM, MA n 9 120 WASHINGTON STREET, 3RD FLOOR CLERKS OFFICE 1(p�. SALEM, MA 01970 TEL. (978) 745-9595 FAX (978) 740-9846 STANLEY J. USOVICZ, JR. 1002 MAR 21 P 3: 21 MAYOR DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREETBPD A hearing on this petition was held March 20, 2002 with the following Board Members present: Nina Cohen, Richard Dionne, Nicholas Helides, Bonnie Belair and Stephen Harris. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance from front, side and rear setbacks and a Variance from the buffer zone to allow the construction of a new building for the property located at property located at 20 Commercial Street in a BPD zone. The Variances, which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. Attorney Joseph Correnti, 63 Federal Street, Salem represented the petitioner. 2. The Petitioner,Dr. Elizabeth Bradt, is the owner of the property located at 20 Commercial Street. 3. Dr. Bradt is a licensed veterinarian who plans to use the property to create a new veterinary office. This Board by Special Permit dated November 23, 1999, and extended through May 22, 2002 allowed the veterinary office use. The Petitioner is requesting a further three-month extension of this Special Permit, through August 22, 2002, so as to allow sufficient time to begin construction on the newly revised plan submitted with this petition 4. The Petitioner has appeared before this Board on November 17, 1999, March 21, 2001 and October 30, 2002, and has obtained Variances to reconstruct portions of DECISION OF THE PETITION OFELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD pagetwo the existing building on the premises. 5. The current plan, as submitted, proposes to demolish the existing building and to Rebuild a new single-story structure of approximately 5,096 square feet, which is 1,700 square feet smaller than the plan previously approved by the Board. 6. The present petition seeks Variances from the front, side, and rear yard setbacks, As well as the required buffer zone in this BPD district, so as to allow the construction of the building as shown on the plan. Specifically, the Petitioner has requested a front yard setback of 31.9 feet, a side yard setback of 9.1 feet, a rear yard setback of 9.8 feet, and a residential buffer zone setback of 55 feet. 7. The plan, as submitted, proposes 19 parking spaces, which is sufficient to serve the needs of the veterinary office. 8. That due to the size and shape of the lot, the Petitioner would effectively be prohibited from building any structure whatsoever without the requested relief. 9. The proposed use in this business zone is complimentary and will not adversely Impact the existing use in that area. 10.The plan, as submitted, will allow for more green space and open areas on the lot Compared to the previously approved plan. 11.The granting of a three month extension for the Special Permit allowing the Veterinary office use, through August 22, 2002, will allow the Petitioner sufficient time to begin construction on the newly revised plan submitted with this Petition. 12.There was no opposition to the petition. On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted 5-0, to grant the Variances requested, subject to the following conditions; • DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD page three 1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted and approved by the Building Commissioner. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Petitioner is to obtain a Certificate of Inspection. 6. Petitioner is to obtain approval from any City Board of Commission having jurisdiction including, but not limited to, the Planning Board. 7. No outdoor kenneling of animals is permitted. VARIANCE GRANTED & SPECIAL PERMIT EXTENDED Q - I MARCH 20, 2002 �,// #-e," CSC Nicholas Helides Board of Appeal G DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD page four A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal .¢o CITY OF SALEM MASSACHUSETTS BOARD OF APPEAL C1 I Y OF SALEM, MA 1 t 120 WASHINGTON STREET, 3RD FLOOR CLERK'S OFFICE SALEM, MA 01970 TEL. (978) 745-9595 FAX (978) 740-9846 STANLEY J. USSROVICZ, JR. ..1001 NOV 1MAYO9 P 2. 19 REQUEST FOR AN EXTENSION OF THE SPECIAL PERMIT FOR ELIZABETH BRADT FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET R-2 At a hearing held on November 14,200 1,the Board of Appeal voted unanimously to allow a six (6)month extension for the Special Permit granted for Elizabeth Bradt for the property located at 20 Commercial Street.The six (6)month extension is based on the previous decision having been recorded at the City Clerk's office on November 22, 1999. A5 Z � cscrn� Nina Cohen, Chairman Board of Appeal .�o r CITY OF SALEM9 MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MA 01970 qq TEL. (978) 745-9595 EXT. 380 FAX (978) 740-9846 STANLEY J. USOVICZ, JR. PETER STROUT, DIRECTOR OF PUBLIC PROPERTY MAYOR November 2, 2001 4:%Opy Morin Fabrication Inc. P.O. Box 920 20 Commercial Street Salem, Ma. 01970 Dear Mr. Morin: In response to your letter dated November 1, 2001 please not the following: The property in question, map 26, lot 0073, is zoned business park development. The metal fabrication that your firm engages in, fits nicely into the allowed uses for business park development zones. In response to the building complying with Mass Architectural Access Board's regulations, there are currently no violations. The proposed use of the building would not constitutes a change of use as defined by the AAB. Also, if no construction or improvements are planned, none of the other"Triggers" for handicap compliance would be tripped. Sincere , P er trout Building Inspector cc: Mayors Office Councillor Hayes Citp of &aiem, Iflazeacbmatte; CITY OF SALEM. MA y A3oarb of Sppeaf CLERK'S OFFICE ,2001 MAR 22 P Z. 33 DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD A hearing on this petition was held March 21, 2001 with the following Board Members present: Nina Cohen, Chairman, Richard Dionne, Stephen Buczko, Stephen Harris and James Hacker. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting Variances from the front setback and side setback to construct the proposed entryway and side stair tower for the property located at 20 Commercial Street located in a BPD zone. The Variances, which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. The Petitioner, Dr. Elizabeth Bradt, is the owner of the property located at 20 Commercial Street. Dr. Bradt plans to use a portion of the building on her property for her veterinary practice. 2. The Petitioner has requested Variances from front setback and side setback to construct the proposed entryway and side stair tower. The proposed front setback is 1.3 feet and the proposed side setback is 2.9 feet. 3. Attorney Joseph Correnti of the firm of Serif ini, Serif in!, Darling &Correnti, LLP, Represented the petitioner. 4. On November 17, 1999, the Zoning Board of Appeals granted Dr. Bradt's request to change the then existing nonconforming use to another nonconforming use, a veterinary practice. 5. A new redesign for the building has been selected which will enable persons with disabilities to access the office, and will properly raise the floor elevation to at or above the 100-year flood level so as to avoid potential future flooding damage. DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD page two 6 The front portion of the building will be demolished and rebuilt. By raising the building a new entrance from the street has to be created which includes the proposed handicap ramp, as well as the enclosed towers shown on the plans submitted. 7 The proposed rebuild of the front portion of the building will be build according to flood and handicap access standards of the Building Code. 8 In order to construct the proposed improvements, two parking spaces were lost. 9 Ms. Wendy Goldsmith, the owner of a business located at 18 Commercial Street, spoke in support of the requested relief. On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted 5-0, to grant the Variances requested, subject to the following conditions; 1. Petitioner shall comply with all city and state statures, ordinances, codes and regulations. 2. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 3. All construction shall be done as per the plans and dimensions submitted. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. A Certificate of Occupancy shall be obtained. 6. A Certificate of Inspection shall be obtained. 7. Petitioner shall obtain approval from any City Board or Commission having jurisdiction, including, but not limited to, the Planning Board. • DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD page three 8. No overnight kennels. 9. Overnight hospitalization allowed, but no boarding of healthy animals. Variance Granted Cs�' March 21, 2001 Step`+hko, Member Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal f {j Ccity of "'kilPm, tt a atttljusPfts 3oQ �Rntirb of Au ral i=tq9 P0`J 22 P 3 35 DECISION ON THE PETITION OF ELIZABETH BRADT REQUESTING A SPECIAL PERMIT FOR THE PROPERTY LOCATED AT 20 COMMERCIAL'STREET R=2`\ A hearing on this petition was held November 17, 1999 with the following Board Members present: Nina Cohen, Chairman, Ronald Harrison, Stephen Buczko, Stephen Harris, and Richard Dionne. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner requests a Special Permit to under Section 9-4 (b) to allow a change from one nonconforming use to another (Veterinary Office) for the property located at 20 Commercial Street BPD. The provision of the Salem Zoning Ordinance which is applicable to this request for a Special Permit is section 5-3 Q), which provides as follows: Notwithstanding anything to the contrary appearing in this Ordinance, the Board of Appeal may, in accordance with the procedure and conditions set forth in Section 8-6 and 9-4, grant Special Permits for alterations and reconstruction of nonconforming structures, and for changes, enlargement, extension of expansion of nonconforming lots, land, structures, and uses, provided, however, that such change, extension, enlargement or expansion shall not be substantially more detrimental than the existing nonconforming use to the neighborhood. In more general terms, this Board is, when reviewing Special Permit requests, guided by the rule that a Special Permit request may be granted upon a finding by the Board that the grant of the Special Permit will promote the public health, safety, convenience and welfare of the City's inhabitants. A. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings or stuctures in the same district. B. Literaf enforcement of the provisions of the Zoning Ordinance would involve Substantial hardship, financial or otherwise, to the petitioner. C. Desirable relief may be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. The Board of Appeal, after careful consideration of the evidence presented, and after viewing the plans, makes the following findings of fact: •t cP''. t�A UEEtCE DECISION ON THE PETITION OF ELIZABETH BRADT REQUEg.TQE�A�L 35 PERMIT FOR THE PROPERTY LOCATED AT 20 COMMERCIAL BPD page two 1. Attorney Joseph Correnti, 63 Congress Street, represented the petitioner. 2. Many letters of support were read from Federal Street Neighborhood Association. 3. Attorney George Atkins, representing the seller of the property, spoke in support of the request. 4. Petitioner would like an open a Veterinary Office. _ On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows; 1. Literal enforcement of the provisions of the ordinance would involve substantial hardship on the petitioner. 2. The relief requested can be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the ordinance. 3. The Special Permit granted can be granted in harmony with the neighborhood and will promote the public health, safety, convenience and welfare of the City's inhabitants. Therefore, the Zoning Board of Appeal voted unanimously, 5-0, to grant the relief requested, subject to the following conditions: 1. Petitioner shall comply with all city and state statues, codes ordinances and regulations. 2. All construction shall be done per the plans and dimensions submitted and approved by the Zoning Enforcement Officer. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. A Certificate of Inspection shall be obtained. 5. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 6. A Certificate of Occupancy shall be obtained. 7. No outside kennels. S LEM, i'gA —� S OFFICE DECISION OF THE PETITION OF ELIZABETH BRADT REQUESTING A SPECIAL PERMIT FOR THE PROPERTY LOCATED AT 20 COMMERCIAL STREET BPD page three i999 NON 22 P 3: 35 8. Overnight hospitalization allowed but no boarding of healthy animals. Special Permit Granted \ November 17,1999 Richard Dionne, Member Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17, of MGL Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to MGL Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision, bearing the certification of the City Clerk that the 20 days have elapsed and no appeal has been fled, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. .-1 I f l !.' ! of , CITYC ;� NABS. AUGUST 16, 1977 DECISION ON THE PETITION SUBMITTED 3Y JFANjNc,'I'TE REALTY TRUST BY PAUL LYONS FOR A VAi7IANCE ON PROPER'PI LOC"IED AT 20 Coi�liflc RCIAL - STYF,`:'I' (INDUSTRIAL DISTRICT) A hearingon this Petition was held on Tuesday, August ', 15, 1977, with members Jane Lundregan, Donald Eame,::, Arthur Labre-_,que, Saill.iam Abbott and Associate i4enioer James Boulger sitting on the Board_ Associate Member Douglas Hopper was also present. Notices were mailed to abutters and others in accordance with M.G.L_ .Chp.80F Mr. Paul Tremblay represented the Petiioner before the Board. The Company wishes a variance from the density regulations set forth in Section VI of th:_ Salem Zoning Ordinance to allow for the addition to the building which is presently a non-conforminq structure as to density requirements. r The addition would face Canal Street. The addition would be approximately 100 ft. x 35 ft. to the front of the ex .stinq building and the Purpose of the building is to provide for apple storage space and to relocate the offir_•_ area. The building will be of masonry construction with a 12 ft. cement block wall_ The Board voted unanimously to grant the varia,_ce requested to provide for the addition of a 100 ft. x35 ft. structure to be added to the front of the building, facing Canal Street_ The variance will allow for the addition to be constructed with the necessary variation from density regulations set forth in Section v2, 'fable 2, Salem 'Zoning by-law. The Board focmd that it could grant the variance requested without any detriment to the surrounding neighborhood. VARIANCE GRANTED *************tea** Apoeal from this Decision, if any, shall be made pursuant to Section 17 of the Nlass. General Laws, Chapter 808, and shall be filed within 20 days after the date of - filing of this Decision in the office of -the City Clerk. - Pursuant to Mass. General Laws, Chapter 808, Section 11 the Variance or Special Pernit grunted her._in, shall not take effect until a copy of the Decision, bearing the certif9.cat_ion of the City Clerk, that 20 days have elapsed and no appeal has - been filed, or that, if such an appeal has been filed, it has been dismissed or denied :is recorded in the South Essex Registry of Deeds and indexed under the nave of the o.•mar of record or is recorded and noted on the owner's Certificate of Title. Copy of this Decision has been filed with the Planning Board and the City Clem. BOARD Or APPEAL T. Lundreg :n . - ;,S�ecmtarY THE COMMONWEALTH OF MASSACHUSETTS Statement of Discontinuance, Change of Residence, Change of Location of Business, Withdrawal, or Deceased from Business or Partnership. .......................O an uary...5................ 19..95..... In conformity with the provisions of chapter one hundred and ten, section five, of the General Laws, as amended, the undersigned hereby declare(s) that...it................has (kf{X(y) this day discontiuuedXjrXe ;kqk k4 A Qfifvf@kY'�ddt)Wf>`tFrW) the business of ........................................................................................................................................................................................................ Subu.r •n=Hea�:ing--and Condi tionin9................. ..._................... - ................---------. - -- - - .. .d ............ 20 Commercial Street conucted at ............. ........ .... ..r . .. ......................................................................................... Street in the or town of..........Sal.e ........................................................................................................................................... as set forth In cc ca a filed in the office of the Clerk of said city or town on....qulx.5} 1.994 Nalne Address Suburban Oi-1-.Co..,.__If1G,.................................... ...20...Comtnerci-al... t...,...Sal.em. ..Mq.....0347(1•.................... ...................................................................................... ........................................................................................................ . ... .................................................................................. ................................................................................................ ....... . ....................... Charles F. Holland, Pre ent & Treasurer SIGNATURE I hereby state that the location of the business as it appears on the Business certificate of my residence ......................................................................................................................................................................................................... filedon........................................................................................................................................................................ .19...........:_ hasbeen changed to...................................................................................................................................................................... .............. ................................................................................ ... . ..............:........... SIGNAI URE Administrator for Estate of By ....................... .... Executor under the will of - ........................................................................................................................................................................................................ ......... ._asex................................................ss. .......................January.-5 ............ 19.45..... Personally appeared before me the above-named............... ••Pad............ Treasurer-.of--Suburban._Oi.l._�o.,.,...rQ ........................................................................................................ .. and made oath that the foregoing statements are true. (SEAL) Notary Public ............................................................... ............... . .. . TITLE THE COMMONWEALTH OF MASSACHUSETTS Statement of Discontinuance, Change of Residence. Change of Location of Business, Withdrawal, or Deceased from Business or Partnership. .........J.an uar y...5............................... 19.95...... In conformity with the provisions of chapter cine hundred and len, scoien live, of the 6vinaral laws, as amended, the undersigned hereby declare(s) that.......Lt.............has 11865) this day discontinued (XO6=x xkvxx)x xx4Mttabtx%vxAxa=w the business of ......... ............................................................................................................:............................................................................ Suburban Companies ........ ................................................................................................................................................------ conducted at ..... " ......................... Street .......................................................................................................... inthe city or town of.........S.d1P.Jlf............................................................................................................................................... as set forth in certificate filed in the office of the Clerk of said city or town on....� U!y 5, 1994 Name Address Subbrba n..Q.i.i...GQ...,...znc............................. 2.0._.Gommerci a1..St_.....Sa.1.etn,...MA....Ili9.7.0..--.............. ...................................................................................... ........................................................................................................ . ......................... .. .................................................. .......................................................................................................... ............................;-..,............................................. . .................................. . ..... ........... ....... ... ................... ... arles F. Holland, resident & Treasurer stuNAlunE I hereby state that the location of the business as it appears on the Business certificate of my residence - ......................................................................................................................................................................................................... filedon....................................................................................................................................................................... .19............. hasbeen changed to...................................................................................................................................................................... ................................................................................ ....A..../. ...l... J h.�.......1 . ...... //l ��i 21` .............._.... .. SICNA'I'lnlli Administrator for Estate of Lxecutor under the will of ..................................................................................................................................................................................................... Essex ss. J....... ..S................. 19.45..... Personally appeared before me the above-named...............ChAI ,l't?.$...F.....�f1).�dl�d�..11rl?S1f�flllL..and............ Treasurer of 9ubmrban Oil Co- .............. , In. .c.- . .................................................................................. .. .. . . ............ . .. and made oath that the foregoing statements are trite. (SEAL) Notary Public ..........................................................I.... ..,._ ., .. TITLE THE COMMONWEALTH OF MASSACHUSETTS Statement of Discontinuance, Change of Residence, Change of Location of Business, Withdrawal, or Deceased from Business or Partnership. ...... ...J.anuary...5.......................... 19.95..... In conformity with the provisions of chapter one hundred and ten, section five, of the General Laws, as amended, the undersigned hereby declare(s) that...........it.........has (" this day discontinued Xxetiexdxbtmtndx Z<if7QIGMt4 �IXXtd6btfjcthe business of ........................Y.a.l.u.e..Foe.1.s............................................................................................................................. ......................... .............................................................................................................................. ........................................ .. .. ......... ................ conducted at ....20.........Commerci .................al........................................................................................................................................ Street inthe city or town of...........Sal.eol............................................................................................................................................. as set forth in certificate filed in the office of the Clerk of said city or town on........�Vly..5., 19.9.4 Na+ne Address Suburban Oil Co. , Inc. 20 Commercial St. , Salem MA .. . . .. .......................................................... 01970 ...................................................................................... ..........................---.....---................................................................... . ...................................................................................... ....................................................................... .............................. . ...................................................................................... ................. ........... .. � � !1 rdesident ..y...............Charles F. Holl & Treasurer SIGNATURE I hereby state that the location of the business my residence appears a as it I ears on the Business certificate of ......................................................................................................................................................................................................... fledun........................................................................................................................................................................ .19............_ hasbeen changed to.................................................................................................................................... .............................. .. ...................................... ........................................ ....................................... RIGNA'I URI: By Administrator for Estate of Lxecutur under the will of - .............._... ........................................................................................................................................................................................................ Essex ...................................................................ss. .........A119gry...5.............................. 19..95..... Personally appeared before me the above-named.04l:.z...F.....Ho. land.....P.Tp2siAeat..and...Tr"wrer- .......-of Suburban Oil_.CO. ,. Inc................................................................................................................................ . .. and made oath that the foregoing statements are true. I � ............. . ... .. . ...... .. ... ........_..... . ... (SEAL) Notary Public ............................................................... .... ... ...... TITLE CtU of �5- abra, gasBiarlpsefts f OCTOBER 26' 1978 PILE P DECISION ON THE PETITION SUBMITTED BY BERGERON BATLI $ KITCHEN CONCERNING PROPERTY LOCATED AT 20 COI%MERCIAL STREET (ONNED BY JEANNETTE REALTY-) R-2 DISTRICT A hearing on this petition was held on October 26j 1978 with the following members of the Board present: Jane T. Lundregan, Donald Fames, Arthur Labrecque, Douglas Hopper, James Boulger, and Alternate Member, John Nutting. Notices were sent postpaid to abutters and others and duly ,published in the Salem Evening News on October 12 and 19, 1978 in accordance with Mass. General Laws, Chapter 80S. Mr. Lyons represented himself before the Board and noted that he would like to erect a roof type sign that would be approximately 30 ft. x 3 ft. over his building and the sign does not conform to the Salem Sign Ordinance. He stated that if he did not have the roof top sign, because of the peculiar location of his building, his business cannot be seen from the main road. It was stated the sign, as proposed, would be silouetted against the roof. Mr. Gregory Senko, the City Planner, argued that the Petitioner has available to him alternatives to the sign presented which would be in conformance with the Sign Ordinance, and would be as visible as the proposed non-conforming sign. The Board voted to deny the.Petition requested. The Board noted that the question of hardship was not proven in that the Petitioner had alternatives available to him that were acceptable. The Board found that it could not grant the permit requested without derogating from the intent of the Salem Zoning Ordinance. PERMIT DENTED PPFE4 U011 THIS r;KISWh T f !X c14�.i c t �7)2SgW.Nr TD SECT 1 17 0: THE VASS. � rcNERALLL;!S, CV;'.pic c: h > , ant I. LundregaR o SG Ns'S ,1 Ln THE DATE OF FILR.B TNIS DLCISID:. IN T C Secretary A COPY OF THIS DECISION HAS BEEN FILED WITH THE SALEM PLoWNTING BOARD A TD CITY CLERK. avl[�Q FIELD COPY ~ CITY OF SALEM BUILDING SALEM. MASSACHUSETTS 01970 PERMIT Feb. 25, 93 53-93 Peter Hollond DATE �ll PERMIT NO. APPLICANT^� ADDRESS *} �T[[LSTF C. /�T:r�F/�IN0.1 - ISI.EETI IC:INTR S L1[E N]!N]!1 Z'lLTf.:1[St1TION5 OFFIN.•S:P NUMBER OF- (TIP( Or IMpR Ov[M[NTI M0. IPROPO][O U![1 Idu r(' aY "VEL E V ZONING AT 140C ATiDNI DISTRICT Irvo.l ISTP[[il BET WEE•. AND ICP05, STR[[11 'CROSS ETPEETI LOT SUBOIV IG ON LOT BLOCK SIZE BUILDING IS 70 BE FT_ WIDE N, FT. LONG BY FT. IN NEIGMT AND SMALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OP FOUNOAT ION _ ALT LRfT y(]j� [[y� /Sy �yTyy�/ E�/� ITvvu REMARKS: ALTERATIONS 1V OMCE & STOCK ROOM CALL FOR PERMTT TO OCCUPY 745-9595 AREA OR - p 2,763.00 PERMIT 23.00 VOLUME ESTIMATED COST S n.,a... ([V1BIC^S,,O�VnPE rf[il ���—+-- GEE OWNER - Peter Hollond AnDFESs [ SaMeluria Avv..p e` ,r*; Leo E. Tremblay IN$PECTOK OF BUILDINGS INSPECTION RECORD DATE NOTE PROGRESS - COITICUN$ •No REMARK{ INSPECTOR No.--62`�� City of Salem Ward ii APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to complete all items in sections:1, ll, Ill, IV, and IX. I. NING AT(LOCATION) �0 �BI��J T�� r� DISTRICT LOCATION ,//(NO.) (STREET) OF BETWEEN /21m_ 157' AND BUILDING (CROSS STREE (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE II. TYPE AND COST OF BUILDING -All applicants complete Parts A -D A. TYPE OF IMPROVEMENT D. PROPOSED USE-"FOR"DEMOLITION"USE MOST RECENT USE 1 ❑ New building_ Residential Nonresidential 2 E] Addition(If residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,if any,in part D, 13) 19 ❑ hruch,other religious 13 ❑ Two or more family-Enter number 3 dAfleration(See 2 above) of units....................................................... 20 Industrial ❑ 4 E] Repair replacement 14 E] Transient hotel,motel,or dormitory- 21 Parking garage Enter number of units ........................... 22 ❑ Service station,repair garage 5 ❑ Wrecking(n multifamily residential,enter number ❑ 23 [:] Hospital,institutional of units in building in Part D, 13) 15 Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ❑ Public utility 7 ❑ Foundation only 26 ❑ School,library,other educational 17 ❑ Other-Specify - 27 El Stores,mercantile B.OWNERSHIP 28 [1 Tanks,towers 8 Pnvate(individual,corporation,nonprofit 29 E] Other-Specify institution,etc.) 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, 2 parochial school;parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ q._R ,/ at industrial plant.If use of existing building is being changed,enter proposed use. To be installed but not included in the above cost a. Electrical .......................................................................... Soo b. Plumbing.............................................................I............ c. Heating,air conditioning............................................. - .. d. Other(elevator,etc.)..................................................... 59 6Q 11. TOTAL COST OF IMPROVEMENT $ " III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions, complete Parts E-L;demolition, complete only Parts J& M,all others skip to IV E. PRINCIAL TYPE OF FRAME F. PRINCIP/)L TYPE OF HEATING FUEL G. TYPE QF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 Masonry(wall bearing) 35 Gas 40 Public or private company Will there be central air 31 ❑ Wood frame 36 ❑ Oil 41 ❑ Private(septic tank,etc.) cendriitti0 g? 32 ❑ Structural steel- 37 C] Electricity 44 UVJ Yes 45 ❑ No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE QF WATER SUPPLY L'-1/ Will there by an ell 0 ' 34 ❑ Other-Specify 39 ❑ Other-Specify 42 Public or private company 46 ❑ Yes 47 No 43 ❑ Private(well,cistern) J.DIMENSIONS 4e. Number of stones .......................I.................................. M. DEMOLITION OF STRUCTURES: 49. Total square feet of floor area, Approval all floors,based on exterior Has pp oval from Historical Commission been received dimensions .............................13.0...0..................... for any structure over fifty(50)years? Yes_ No_ 50. Total land area,sq.ft....................................................... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: HAVE THE FOLLOWING LkILITIES BEEN DISCONNECTED? 52. Outdoors................. ..0............................................... Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed ..........................-................................................. Electric: Gas: 54. Number of Full........................................... Sewer: bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial........................-.........._ BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No-/— (If yes, please enclose documentation from Hist. Com.) Conservation Area? Yes_ No ✓ (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes-Z No Is property located in the S.R.A. district? Yes_ No-A—/ Comply with Zoning? Yes No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes_ No✓ (If yes,submit documentation/if no,submit Board of Appeal decision) If new construction, has the proper Routing Slip been enclosed? Yes No J� Is Architectural Access Board approval required? Yes 0-,u/—/� (If yes, submit documentation) Massachusetts State Contractor License# Salem License# Home Improvement Contractor# Homeowners Exempt form (if applicable) Yes_ No_ CONSTRUCTION TO BE COMM WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary,please submit CONSTRUCTION IS TO BE COMPLETED BY: in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. ' �a ,ja'�4e1P1j 0/9174 7 ySam Owner or Lessee 2. Contractor Builder's License No. 3. Architect or Engineer I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized agent and we agree to Gor1form t plicable laws of this jurisdiction. Signature o Address Application date O DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building �? Q� FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit issued 19 c Fire Grading Building Permit Fee $ '5� Live Loading Certificate of Occupancy $ Approved by: Occupancy Load Drain Tile Plan Review Fee $ TITL NOTES AND Data- (For department use) PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN •For Applicant Use II ` \ l� Qs �1 I O O APPROVED2 N 3 Subject to evgroval by any ctber autlbµity having jurictidicn. 1 _ u AREAPPR' FD SOLELY FOR I.DEW.TiFi..i.'fi::'10; TYPE AND LOCA`C�2i OF "FIRE PROTE(MON DPC":;ES. ALL P::i' PROT'.f,TiG'1 D-EVICES ARE 91ECT TO :- F44FALTcS idiD iliff;icTiOH,FOFt ri.ETE CO`APLI A@CE F9TH'i T—FIR%.`^DE. l A P 1 W I � I 9 I y0 X /2 .G 30' 0 I Al I I i I � ` COMMONWEALTH OF MASSACHUSETTS F k DEFAIC:'MENT OF INDUSTRIAL ACCIDENTS _ 600 WASHINGTON STREET fames Gamooec BOSTON, MASSACHUSETTS 02111 -omm:ss one, WORKERS' COMPENSATION INSURANCE AFFIDAVIT (licensee/perminee) with a principal place of business/residence at: (Citylstate/Zip) do hereby certify, under the pains and penalties of perjury, that: [ ) I am an emplover providing the following workers' compensation coverage for my employees working on this job. Insurance Company Policy Number ( ] I am a sole proprietor and have no one working for me. [ ) I am a sole proprietor, general contractor or homeowner (circle one) and have hired the contractors listed below who have the following workers' compensation insurance policies: Name of Contractor Insurance Company/Policy Number Name of Contractor Insurance Company/Policy Number Name of Contractor Insurance Company/Policy Number (] I am a homeowner performing all the work myself. NOTE: Please be aware that while homeowners who employ persons to do maintenance,construction or repair work on a dwelling of not more than three units in which the homeowner also resides or on the grounds appurtenant thereto are not generally considered to be employers under the Workers' Compensation Act(GL C. 152,sect. 1(5)),application by a homeowner for a license or pernit may evidence.he legal z:a:.ss of an employ-r under the Werkars' Compensation Act. 1 undersand that a copy of this statement will be forwarded to she Department of Industrial Accidents' Office of Insurance for coverage verification and that failure to secure coverage as required under Section 25A of MGL 152 can lead to the imposition of criminal penalties consisting of a fine of up to$1500.00 and/or imprisonment of up to one you and civil penalties in the form of a Stop Work Order and a fine of S100.00 a dayagainstme. Signed this .Ai - li.::e� day of 19 Licensee/Permittee Licensor/Permirtor APPOINTMENT FOR FINAL Sa,Zem Fite Department CTION MUST BE F.� n t ce P�ceveion Bwceau I APPOINTMENT FOR FINAL INSPE MADE AT LEAST ONE WEEK 48 La4agette Stceett INSPECTION MUST BE Satem, Ma 01970 MADE AT LEAST ONE WEEK AHEAD...._.----•-- (5 0 8) 745-7777 AHEAD_.......... FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In accordance with the provt-6ton6 o4 .the Ma,"ach.u,6etta State Buitd ing Code and the Sa.Zem FZ�ce Code, appli.cat.Lon vs hereby made 4on approval o4 ptan s and the 46uance o4 a ceAtt4tcate o4 appn.ovat 4o,% a buZtdtng perm-i t by the Salem F.�ce Department. (Re4. Section 113. 3, Maga. State B.Zdg. Code) Job Location: Q Owner./Occupant: Eteath cat Contractor: F.ih.e Suppreaad on Contractor: S-i_gnatwm o4 Appt-i.eant: Phone ii: Z�I -S:2Plf .i Adda".6 o4 7� L // Cty on. 7 Applicant: Town: c�glel� Approval date: y Ce4,t.i4-Lcate 04 app2ova2 4-6 henebyc/g2anted, on approved pta.n6 on aubm-LttaE o4 project dela t. 6, by .the Salem F.vice Department. Att ptanb ane approved .6otety 4or tdent,,,cation o4 type and .Zocati,on o4 4tte ptotecti,on devtcea and equtpment. Att ptan.b are .6ubjer-t to apptova2 o4 any othe% author.fty having juni.6dtctZon. Upon comptetton, the apptLcayrt .on .<"ta ter(a) .6hatt aeque.6t an t"pect-Lon and/on teat o4 the 4.i�ce protection devtcea and equipment. ( ** FOR ADDITIONAL REQUIREMENTS, SEE REVERSE SIDE ** ) 0 New con6truction. E Property location h" no compliance with the pn.ov-i 6ton.6 o4 Chapter. 148, Section 26 C/E, M.G. L. , retative to the tn-6taZati,on o4 approved J-i a atacm dev.i cea. The owner o4 thi-6 paopenty t.6 requiAed to obtain compliance a.6 a coed Lt4,on o4 obta.i ring a Buttding Permit. 0 Property Zocation t4 .i,n compliance w.cth the pnov.i,6to" o4 Chapter. 148, Sectton 26 C/E, M.G. L. ExpZ�ua on date: ,3 , St9 F lice 4 ici a 2 Fee due: unde7 , 500 Sq. Ft. 10. 00 X731 r. FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In compliance with the provision of Section 113.5 of the Massachusetts State Building Code, and under guidelines agreed upon by the Salem Bldg. Inspector and the Salem Fire Chief, the applicant for a building permit shall obtain the Certificate of Approval (see reverse side) and stamped plan approval from the Salem Fire Prevention Bureau. Said application and approval is required before a building permit may be J W issued. The Massachusetts State Building Code requires compliance z 3 approval of the Salem Fire Department, with reference to provisions of U. m W Articles 4 and 12 of the Building Code, the Salem Fire Code, Massachusetts W N p General Laws, and 527 Code of Massachusetts Regulations. y The applicant shall submit this application with three (3) sets of plans, p drawn in sufficient clarity, to obtain stamped approval of the Salem Fire F- r ¢ Department. This applies for all new construction, substantial a a. W WW alterations, change of use and/or occupancy, and any other approvals a " ¢ 6 required by the Massachusetts General Laws, and the Salem Fire Code. ¢ z za Exception: Plans will not be required for structural work when the proposed work to be performed under the building permit will not, in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. Notice: Plans are normally required for fire suppression systems, fire alarm systems, tank installations, and Fire Code requirements. Under the provisions of Article 22 of the Massachusetts State Building Code, certain proposed projects may not require submission of plans or complete compliance with new construction requirements. In these cases, provisions of Article 22, Appendix T, and Tables applicable shall apply. This section shall not, however, supersede the provisions outlined in the Salem Fire Prevention Regulations, Chapter 148, MGL, or 527 Code of Massachusetts Regulations. All permits for fire code use and/or occupancy shall apply for the entire structure; fire alarm and/or smoke detector installation shall apply to the entire structure based upon current requirements as per Laws and/or Codes, but the existing structure may comply with regulations applicable for existing structures. Notice: Sub-contractors may also be required to file individual applications for a Fire Department Certificate of Approval for the area of their work. Such sub-contractors shall file an Application to Install with the Fire prevention Bureau prior to commencing any work for those areas applicable. s FORFOR F1NAI- FINN- TMENM SBE E Form 81X (10/90) pDINTMENT FST BE Ap$PE TION $SONE w EK 1NSpE0TI0N ST ONE WEEK 1MADE AT SEA MADE AT lEA ^--� ANFAD....... ...... -------- �90A =t3 3F AFyE=al BERGERON COMPANY, INC: 47 CANAL STREET, SALEM, MA 01970 (508) 744-4317 JAN 23 22 AH 152 FAX(508) 745-9879 FI E H I VE 0 PITY DE -c:LE ', tjASS. January 2E , 1993 . CERTIFIED MAIL Suburban Oil Company 20 Commercial St —, -4 Salem, Ma. 01970 Gentlemen : We have been informed from the Building Department and Fire Department that storage trucks are not allowed in that area. Please correct this situation immediately. BERGEROI COMPANIS, INC. Paul J. L ns' President PJL/psb cc : Building Dept .) Fire Dept . I�Sti' i . .. CITY OF SALEM D. BOARD OF APPEAL Will give a public hearing to Notice all interested persons on the an oad'ei petition of Dante P. D'Aprile been iss I' individually and as president of authoria Salem Welded Products Com- gas seri ., IPanY, Inc., to erect an addition tea; ( to an e3dsting structure at 20 citial alm I ` Commercial Street, and asking bert C. that the Board grant a variance ants . from the applicable density re- alf .. ..: '— - quirements of the City Zoning SALEM,' ;. Ordinance with regard to lot portto i .. area, lot width, and front and MAG !` side,dard sebbacks. A hearing will be held on this appeal on USOG - F' Monday,.]flay 24, 1071, at 9.00 'i P.M. in the Council Chamber in li City Ball. . .BOARD OF'APPEALS, May 4, S .i By JOSEPH F. DOYLE, a .. Secretary Rr� . - . May 7 .10,.197L: . 1 y t - 1 � I '1 TELEPROBE 744.0078 Ru. PNCME 838.3340 LAW OFFICE OF MAVRICE A. CHOUINARD 81 WASHINGTON STREET SALEM. MASS 01870 May 5, 1970 Mr. William Simmons 29 Mason Street Salem, Massachusetts Dear Mr . Simmons : I enclose herewith an original copy of the agreement sighed by Salem Welded Products Co. Inc. , Dlante D'Aprile, President, allowing you the 15 feet that you demanded, thus overruling the 5 feet approved by the City of Salem. Said agreement has been filed and a final decree has been docKeted in the Superior Court dated April 29, 1970, and signed by Judge Tomas.illo; the Attorneys and the City Solicitor , signing for the Board of Appeals. Also enclosed is my bill for setvices, over and above the retainer , to cover expenses and court costs. I hope that everything is satisfactory with you and I thank you for your favor .in this matter. Very truly yuurs , Maur.ive A. Chou.inard Esq. \ j A G R E E M E N T For and in consideration of the mutual promises herein contained the undersigned WILLIAM SIMMONS, DANTE D'APRILE, and the SALEM WELDED PRODUCTS, CO. ,' INC. do hereby agree as follows: 1. That Salem Welded Products Co., Inc, and Dante D'Aprile do hereby bind themselves not to erect any building closer than fifteen (151 ) feet from the southerly boundary of the property owned by said William Simmons and which said realty is known as 29 Mason Street, Salem, Massachusetts and . abuts a portion of the property known as 20 Commercial Street, . Salem, Massachusetts owned by the said Salem Welded Products Co., Inc. 2, That in consideration of the aforesaid fifteen foot setback from the rear and southerly boundary of the aforesaid realty of William Simmons the said William Simmons does agree to Dismiss Bill in Equity pending in the Essex Superior Court Case No. 1844. IN WITNESS WHEREOF, ' we hereunto set our hands and seals this twentymseventh day of April,' 1970. SALEM wELDED PRODUCTS 00.�INC/ Eye �cz �l�• /�Y r,« i President Haste D'Apri e l _ I / Wiliam Si ns