Loading...
46 Bridge St_zoning set_5.31.23 Stamped (1)www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 9 P M COVER COVERSHEET AND PROJECT DESIGN GOALS 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC INDEX OF DRAWINGS COVER COVERSHEET AND PROJECT DESIGN GOALS EX100 EXISTING BASEMENT EX101 EXISTING FIRST FLOOR EX102 EXISTING SECOND FLOOR EX200 EXISTING ELEVATIONS A100 PROPOSED BASEMENT A101 PROPOSED FIRST FLOOR A102 PROPOSED SECOND FLOOR A200 PROPOSED ELEVATIONS A900 SCHEDULES & DETAILS NEIGHBORHOOD AREA MAP 46 BRIDGE STREET PROPERTY BOUNDARIES & AREA OF WORKSALEM SATELLITE MAP 46 BRIDGE STREET SALEM, MA 01970 APPLICABLE CODES International Building Code 2015 (IBC 2015) International Residential Code 2015 (IRC 2015) International Existing Building Code 2015 (IEBC 2015) International Mechanical Code 2015 (IMC 2015) International Energy Conservation Code 2018 (IECC 2018) 780 CMR (Ninth Edition) Base Volume, Massachusetts Building Code 780 CMR 51.000: Residential Volume 105 CMR 410.000: Sanitary Code, Chapter II 780 CMR (Ninth Edition) Chapter 13: Energy Efficiency Amendments 780 CMR (Ninth Edition) Residential, Chapter 11: Energy Efficiency Amendments 780 CMR (Ninth Edition) Appendix AA Stretch Energy Code Portions of the International Fire Code and NFPA 13, 13D, 13E, 13R as required No. Description Date UP UP EXISTING WALLS DEMOLISHED WALLS 25'-7" 32 ' - 3 " www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 3 0 P M EX100 EXISTING BASEMENT 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC No. Description Date 1 3/8" = 1'-0" EXISTING BASEMENT FLOOR. DN UP KITCHEN OFFICE LIVING BEDROOM DINING CLBATHROOM 25'-7" 11 ' - 9 " 20 ' - 6 " www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 3 1 P M EX101 EXISTING FIRST FLOOR 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC No. Description Date 1 3/8" = 1'-0" EXISTING FIRST FLOOR. EXISTING WALLS DEMOLISHED WALLS DN KITCHEN BATHROOM OFFICE LIVING BEDROOM DINING CLBATHROOM32 ' - 3 " www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 3 2 P M EX102 EXISTING SECOND FLOOR 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC No. Description Date EXISTING WALLS DEMOLISHED WALLS13/8" = 1'-0" EXISTING SECOND FLOOR. First floor 0" Second floor 9'-8" Third floor 17'-8" Basement -9'-4" First floor 0" Second floor 9'-8" Third floor 17'-8" Basement -9'-4" First floor 0" Second floor 9'-8" Third floor 17'-8" Basement -9'-4" First floor 0" Second floor 9'-8" Third floor 17'-8" Basement -9'-4" www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 3 3 P M EX200 EXISTING ELEVATIONS 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC No. Description Date 1 1/4" = 1'-0" EXISTING EAST / SIDE 3 1/4" = 1'-0" EXISTING SOUTH / BACK 2 1/4" = 1'-0" EXISTING NORTH / FRONT 4 1/4" = 1'-0" EXISTING WEST / SIDE UP UP EXISTING WALLS DEMOLISHED WALLS www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 3 P M A100 PROPOSED BASEMENT 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC 3/8" = 1'-0"1 PROPOSED BASEMENT FLOOR. No. Description Date UP UP DN Ra n g e Refrigerator DN UP 6 1/2" 6'-10 1/2" 8"8'-8" 4 1/2"15'-4"6 1/2" 7'-5"25'-7" 6 1/2" 11 ' - 9 " 6 1 / 2 " 7' - 2 " 6 1 / 2 " 11 ' - 8 1 / 2 " 6 1 / 2 " 11 ' - 9 " 20 ' - 6 " 32 ' - 3 " 116 SF BEDROOM 1 105 67 SF OFFICE 104 228 SF KITCHEN/LIVING ROOM 101 92 SF COMMON ENTRY AREA 103 35 SF MUDROOM 108 1 1 1 1 1 1 1 ADDED WALLS EXISTING WALLS DEMOLISHED WALLS 104 105 103101100 CL 106 CL 107 BATHROOM 102 8'-8" 102 3'-0" 3'-0 1/2" 7' - 6 1 / 2 " 107 106 63 SF MUDROOM 100 - --- PARTITION TYPE 1 * ALL PARTITIONS TO BE TYPE 1 UNLESS SPECIFIED -1 Layer 1/2" gypsium wall board or blueboard -2x4 stud wall, 16" o.c. -1 layer 1/2" gypsium wall board or blueboard PARTITION TYPE 2 (2-hr rated,wet) -1 layer 5/8" type 'x' wall board -2X6 studwall 16" o.c. -3" roxul (or similar fire-rated) insulation -1 layer 5/8" type 'x' gypsum wall board www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 5 P M A101 PROPOSED FIRST FLOOR 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC 3/8" = 1'-0"1 PROPOSED FIRST FLOOR No. Description Date DN Ra n g e Re f r i g e r a t o r DN 6 1 / 2 " 11 ' - 2 1 / 2 " 7' - 9 1 / 2 " 10 " 11 ' - 4 " 6 1 / 2 " 11 ' - 9 " 20 ' - 6 " 32 ' - 3 " 6 1/2" 6'-10 1/2"12'-8"4 1/2"12'-0"6 1/2" 7'-5"25'-7" 6 1/2"19'-6 1/2"4 1/2"12'-0"6 1/2" 33'-0" 6 1 / 2 " 15 ' - 4 " 4 1 / 2 " 1' - 8 " 4 1 / 2 " 13 ' - 5 " 6 1 / 2 " 32 ' - 3 " 130 SF BEDROOM 1 204 182 SF BEDROOM 2 205 119 SF BEDROOM 3 200 190 SF KITCHEN/LIVING ROOM 201 1 1 ADDED WALLS EXISTING WALLS DEMOLISHED WALLS BATHROOM 202 BATHROOM 203 CL 206 CL 207 200 201 1 1 10 ' - 0 " - --- PARTITION TYPE 1 * ALL PARTITIONS TO BE TYPE 1 UNLESS SPECIFIED -1 Layer 1/2" gypsium wall board or blueboard -2x4 stud wall, 16" o.c. -1 layer 1/2" gypsium wall board or blueboard PARTITION TYPE 2 (2-hr rated,wet) -1 layer 5/8" type 'x' wall board -2X6 studwall 16" o.c. -3" roxul (or similar fire-rated) insulation -1 layer 5/8" type 'x' gypsum wall board www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 6 P M A102 PROPOSED SECOND FLOOR 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC 3/8" = 1'-0"1 PROPOSED SECOND FLOOR No. Description Date FIRST FLOOR 0" SECOND FLOOR 9'-8" Third floor 17'-8" Basement -9'-4" FIRST FLOOR 0" SECOND FLOOR 9'-8" Third floor 17'-8" Basement -9'-4" FIRST FLOOR 0" SECOND FLOOR 9'-8" Third floor 17'-8" Basement -9'-4" FIRST FLOOR 0" SECOND FLOOR 9'-8" Third floor 17'-8" Basement -9'-4" www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 8 P M A200 PROPOSED ELEVATIONS 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC 1/4" = 1'-0"1 PROPOSED EAST / SIDE 1/4" = 1'-0"2 PROPOSED NORTH / FRONT 1/4" = 1'-0"3 PROPOSED SOUTH / BACK 1/4" = 1'-0"4 PROPOSED WEST / SIDE No. Description Date www.socialimpactcollective.com Scale Date Drawn By Checked By Project Number Social Impact Collective 11 Florence Street MA 01890 admin@socialimpactcollective.com Phone: +18575262299 Site Survey / Civil: Address Address e-mail Phone Structural Engineer: Address Address e-mail Phone MEP Engineer: Address Address e-mail Phone Consultant: Address Address e-mail Phone PERMIT SUBMISSIONS 5/ 3 0 / 2 0 2 3 9 : 1 6 : 2 9 P M A900 SCHEDULES & DETAILS 00000 Incremental Developers 46 BRIDGE STREET 16 MAR 2023 OT MC DOOR SCHEDULE DOOR # ROOM WIDTH HEIGHT THICKNESS MATERIAL TYPE MANUFACTURER MODEL REMARKS 100 2'-8" 6'-6" 2" SWINGING 101 2'-8" 6'-6" 2" SWINGING 102 2'-8" 6'-6" 2" SWINGING 103 2'-8" 6'-6" 2" SWINGING 104 2'-6" 6'-6" 2"FOLDABLE 105 2'-6" 6'-6" 2"FOLDABLE 106 3'-0" 7'-0" 2"SWINGING 107 3'-0" 7'-0" 2"SWINGING 200 2'-8" 6'-8" 2"FOLDABLE 201 2'-8" 6'-6" 2"SWINGING ROOM SCHEDULE ROOM # NAME FLOOR FLOOR FINISH BASE FINISH WALL FINISH CEILING FINISH COMMENTS 100 MUDROOM FIRST FLOOR 101 KITCHEN/LIVING ROOM FIRST FLOOR 102 BATHROOM FIRST FLOOR 103 COMMON ENTRY AREA FIRST FLOOR 104 OFFICE FIRST FLOOR 105 BEDROOM 1 FIRST FLOOR 106 CL FIRST FLOOR 107 CL FIRST FLOOR 108 MUDROOM FIRST FLOOR 200 BEDROOM 3 SECOND FLOOR 201 KITCHEN/LIVING ROOM SECOND FLOOR 202 BATHROOM SECOND FLOOR 203 BATHROOM SECOND FLOOR 204 BEDROOM 1 SECOND FLOOR 205 BEDROOM 2 SECOND FLOOR 206 CL SECOND FLOOR 207 CL SECOND FLOOR No. Description Date