0 REAR COMMERCIAL STREET - BUILDING INSPECTION REAR COMMERCIAL STREET
PLANNING & ZONING NEWSLETTERS
X83 FEB 22 P12 :41
CITY CLEM'S OFFICE
SALE!"I MASS
February 23, 1983
SPECIAL PERMIT
WETLANDS AND FLOOD HAZARD DISTRICT
MR. LOUIS—BOISVERT
(REAR COMMERCIAL STREET—,/
L SALEM,-MASSACHUSMTTS 01970
On Thursday, February 17 , 1983 , the Planning Board of the City
of Salem held a public hearing regarding the application of
Mr. Louis Boisvert for a Special Permit under Section P , Wet-
lands and Flood Hazard Districts , of the Salem Zoning Ordinance
with respect to the construction of an addition to an existing
building at Rear Commercial Street within a flood hazard dis-
trict.
• At a regularly scheduled meeting of the Planning Board on
February 17 , 1983 , the Board voted, by a vote of five in
favor, none opposed to approve the application as complying
with the requirements for the issuance of the permit with
the following conditions :
1. All work shall conform to the Plan entitled, "Site Plan,
Arro Engineering, Salem, MA. " dated November 9 , 1982 , Revised
November 30 , 1982 , December 30 , 1982 , and February 1, 1983 ,
drawn by Carter and Towers Engineering Corporation, Swampscott,
Ma. 01907 .
2 . Upon completion of the proposed construction, an engineer
shall certify the building was constructed at or above 15 . 36 mlw.
3 . This order does not grant any property rights or any exclusive
privileges; it does not authorize any injury to private/public
property. or an_v invasion of public/private rights .
I hereby certify that a copy of this decision has been filed with
the City Clerk, and a copy is on file with the Planning Board,
SPECIAL PERMIT
MR. LOUIS BOISVERT n - Page 2
RF:�,EI\'Fn,
• This Special .Permi:t shall not take effect'�n c v of the de-
cision bearing the certification of the Citv2t1c twenty
dans have elapsed and no appeal has been filed or that if such
anpeal has been filed, and it has been dAE[ kk bl((a('9rjp#f�ied , is
recorded in the Essex Countv Registry of De W11AA1 . indexed in
the grantor index under the name of the owner or record or is
recorded and noted on the owner' s certificate of title . The fee
for recording or registering shall be raid by the owner or an-
nlicant.
WALTER POWER III �. b
ard
Chairman, Planning Bo
WP :dev
•
w
v C3
C, N ern
LJ ^ �
C Cn
1_J
U1 U2 s
M f—
V
j
a
FORM 4
ORDER @ °;{ 6ND�30iYsf
WETLAND S PROTECTION ACT
G.L.1 E8 1731; sQ34P0 13
RECEIVED
CITY OF SALEM,MASS.
-------------------------------------------------------------------
CITY/TOWN Salem FILE NUMBER 64-87
TO: NAME Dor. Louis Boisvert ADDRESS c/o John Serafini Jr.
alem
CERTIFIED MAIL NUMBER
PROJECT LOCATION:
Address Rear Commercial Street, Salem, MA.
Recorded at Registry of Deeds Book 6424 Page 497
Certificate (if registered)
REGARDING:
Notice of Intent dated January 3, 1983
and plans titled and dated Site Plan for Arro Engineerincr
Nov. 9 , 1962, _.ev. 2-1-83
THIS
.- -
THIS ORDER IS ISSUED ON (date) February 7 , 1983
-------------
Pursuant to the authority of C.L. c. 131, s. 40, the Salem
Conservation Commission has reviewed your Notice of Intent
and plans identified above, and has determined that the area on which
the proposed work is to be done is significant to one or more of the
interests listed in G.L. c. 131, s. 40. The Salem Conservation Commission
hereby orders that the following conditions are necessary to protect $
said interests-and' all. work shall be performed in strict accordance
with them and with the Notice of Intent and plans identified above -
except where such-plans are modified by said conditions.
----------------------==--------------------------------------------- #
CONDITIONS
1. Failure to comply with all conditions stated herein, and with
all related statutes and other regulatory measures, shall be
/ deemed cause to revoke or modify this order.
-1-
FORM 4 ;
rc
ORDER OF CONDITIONS CONTINUED FILE NU?MER 64-87 ,
2. This order does not grant any property rights or any exclu-
sive privileges; it does not authorize any injury to private
property or invasion of private rights.
3. This order does not relieve the permittee or any other per-
son of the necessity of complying with all other applicable
federal, state or local statutes; ordinances, by-laws and/
or regulations.
4. ' The work authorized hereunder shall be completed within one
(1) year from the date of this order unless it is for a
maintenance dredging project subject to Section 5(9). The
order may be extended by the issuing authority for one or
more additionaL one-year periods upon application to the
said issuing authority at least thirty (30) days prior to
the expiration date of the order or its extension.
5. Any fill used in connection with this project shall be clean
fill, containing no trash, refuse, rubbish or debris; includ-
ing, without limiting the generality of the foregoing, lumber,
bricks, plaster, wire, lath, paper, cardboard, pipe, tires,
ashes, refrigerators, motor vehicles or parts of any of the
foregoing.
6. No work may be commenced untill all appeal periods have
elapsed from the order of the Conservation Commission or from r
a final order by the Department of Environmental Quality
Engineering.
7. No work shall be undertaken until the final order, with
respect to the proposed project, has been recorded in the
Registry of Deeds for the district in which the land is
located within the chain of title of the affected property.
Thu Document number indicating such recording shall be sub-
mitted on the form at the end of this order to the 'issuer
of this. order prior to commencement of work.,
- i
8. A sign shall be displayed at the site not less than two
square feet or more than three square feet bearing the
cords, "Massachusetts Department of Environmental Quality I
Engineering, Number 64-87 " r
9. Where the Department of Environmental Quality Engineering
is requested to make a determination and to issue a super-
seding order, the Conservation Co-, aission shall be a party
to all agency proceedings and hearings before the Depart-
- -. meet-
. �-•-
-2_