12 Pope Street Sprinkler test New England Fire & Sprinkler Protection, Inc.
80 Brick Kiln Road
Chelmsford, MA 01824
(978) 452-2895 (978) 453-5475 - Fax
LOCATION: SALEM HEIGHTS 100%ANNUAL SPRINKLER TEST
12 POPE ST.
SALEM, MA 10/23/15
VALVE MANUFACTURE AMES SIZE 10" MODEL YEAR
WET X DRY ACCELERATOR: YES NO X
WATER FLOW TEST: (THROUGH 2" DRAIN VALVE,WIDE OPEN)
1. PRESSURE: STATIC 150 PSI RESIDUAL PSI 65
2. APPROXIMATE LENGTH OF DRAIN PIPE 20 FEET
3. DRAIN DISCHARGE: INSIDE: OUTSIDE: X OTHER:
ALARM TEST: 2" DRAIN INSPECTORS TEST
1. WATER MOTOR GONG-
SATISFACTORY? YES X NO SEC 15
2. INSIDE HORNS/STROBES YES N/A NO SEC
3. EXPLAIN ANY"NO"ANSWERS:
4A. IS SYSTEM SUPERVISED: YES X NO By Whom FACP
4B. WAS A SIGNAL RECEIVED: YES X NO Explain: MASTERBC
#4121
SUPPLIES:
1. NUMBER: 1
2. SIZE #1 10" #2 #3 #4
3. FROM WHAT STREET POPE ST.
ADDITIONAL DATA(I.E. - FIRE PUMP TANK, COMMENTS, ETC)
-NOTE#1 —THERE IS A CORRODED NIPPLE LEAKING WATER ON THE 2ND FLR STAIRWAY#6
-NOTE#2—LEAKING DRAIN/INSPECTORS TEST ON STAIRWAY#1 ON THE 7TH &THE 8TH FLOOR
-NOTE#3—LEAKING DRAIN/INSPECTORS TEST ON THE 3RD FLR IN STAIRWAY#3
Page 1 of 2
ti� Y New England Fire & Sprinkler Protection, Inc.
'f 80 Brick Kiln Road
i
Chelmsford, MA 01824
(978) 452-2895 • (978) 453-5475 - Fax
LOCATION: SALEM HEIGHTS 100%ANNUAL SPRINKLER TEST
12 POPE ST.
SALEM, MA 10/23/15
CONTROL VALVES:
1. NUMBER: 6 INSIDE X OUTSIDE
2. INDICTING TYPE? YES X NO
3. FOUND OPEN? YES X NO
4. LEFT OPEN? YES X NO
IS SYSTEM TAGGED YES X NO
DATE OF TEST 10/23/2015 NEXT TESTING DUE DATE 10/2016
m w
New England Fire & Sprinkler Protection, Inc.
80 Brick Kiln Road
- Chelmsford, MA 01824
(978) 452-2895 • (978) 453-5475 - Fax
LOCATION: SALEM HEIGHTS 100%ANNUAL SPRINKLER TEST
12 POPE ST.
SALEM, MA 10/23/15
VALVE MANUFACTURE STAR SIZE 3" MODEL A YEAR 1995
WET DRY X ACCELERATOR: YES NO X
WATER FLOW TEST: (THROUGH 2" DRAIN VALVE, WIDE OPEN)
1. PRESSURE: STATIC 150 PSI RESIDUAL PSI 70
2. APPROXIMATE LENGTH OF DRAIN PIPE 15 FEET
3. DRAIN DISCHARGE: INSIDE: X OUTSIDE: OTHER:
ALARM TEST: 2" DRAIN INSPECTORS TEST
1. WATER MOTOR GONG-
SATISFACTORY? YES N/A NO SEC
2. INSIDE HORNS/STROBES YES X NO SEC 25
3. EXPLAIN ANY"NO"ANSWERS:
4A. IS SYSTEM SUPERVISED: YES X NO By Whom FACP
4B. WAS A SIGNAL RECEIVED: YES X NO Explain: MASTERBc
#4121
SUPPLIES:
1. NUMBER. 1
2. SIZE #1 10" #2 #3 #4
3. FROM WHAT STREET POPE ST.
ADDITIONAL DATA(I.E. - FIRE PUMP TANK, COMMENTS, ETC)
-NOTE#1 —THE GAUGE BETWEEN COMPRESSOR AND THE FIRST CHECK NEEDS TO BE REPLACED
Page 1 of 2
New England Fire & Sprinkler Protection, Inc.
a f 80 Brick Kiln Road
Chelmsford, MA 01824
(978) 452-2895 • (978) 453-5475 - Fax
LOCATION: SALEM HEIGHTS 100%ANNUAL SPRINKLER TEST
12 POPE ST.
SALEM, MA 10/23/15
CONTROL VALVES:
1. NUMBER: 3 INSIDE X OUTSIDE
2. INDICTING TYPE? YES X NO
3. FOUND OPEN? YES X NO
4. LEFT OPEN? YES X NO
IS SYSTEM TAGGED YES X NO
DATE OF TEST 10/23/2015 NEXT TESTING DUE DATE 10/2016
I '