Loading...
9 CLOVERDALE AVENUE - BUILDING JACKET 4=2s01 ED The Commonwealth of Massachusetts NSPEC ,.Ta GES Board of Building Regulations and Standards t�pp CITY OF 4t � Massachusetts State Building Code, 780 CMR 20(bB rAA&�'�n„ Building Permit Application To Construct, Repair, Renovate Or Demolish a one-or Two-Farnily Dwelling This Section For.Official Use Only In Building Permit Number:Offi D to A�ppliedt � / •� Building cial(Print Name). - Si `gnattue ! ^ SECTION 1:SITE INFORtvIATION' 1.1 P operty Address 1.2 Assessors binp ds Parcel Numbers I.I a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq III Frontage(If) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required - Provided. Required - Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone information: 1.8 Sewage Disposal System: Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Public❑ Private❑ Check if es❑ SECTION Z: PROPERTY OWNERSHIP' 2. Own t of Rec d: - �} - ( KA (G 70 h O po fAWf� Al 1 L�l 1 I�tlme(Print) City,State,ZIP qCi -jj� 7 µ�sy'�U IanrceDzzSG 1. No.and Street Telephone ifEmail Address SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ 1 Owner-Occupied ❑ Repairs(s) ❑ Altemtion(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg.❑ Number of Units_ Other ❑ Specify: Brief Description of Proposed Work: SECTION 4: ESTIrNIATED CONSTRUCTION COSTS Estimated Costs: Official Use Only Item Labor and�latenals) I. Building $ 1. Building Permit Fee:$ Indicate how fee is Determined: ❑Standard Citylrown Application Fee 2. Electrical S ❑Total Project Cost?(item 6)x multiplier x 3. Plumbing $ 2� Qther Fees: .S 4. Mcch;utical (FIVAC) S List: 5. Mechanical (Fire i 'rotal All Fees:S Suppression) Check No. Check Amount: Cash Amount: 6. Tutai Project Cost: 'S ❑ ❑Paid in Full Outstandign Balance Due: D �\� � .—k-C) vk,O- Z l2 f$ECTION5: CONSTRUCfIONSERVICES 5.1 Construction�upenvisor License(CSL) s L` I ^l�".=� r d1�s License Number Expiration Date Name of CSL Holder List CSL Type(see below) Type' Description No.;md Street U Unn5lricteJ DuilJin s u �to 35,000 cu. Il. R Restricted I&2 F:unil Dwellin City/rown,State,ZlP M Masonry RC Rooting Covering WS Window and Siding SF Solid Fuel Burning Appliances 1 insulation Telephone Email address D Demolition 5.2 Registered Nome Improvement Contractor(HIC) HIC Registration Number Expiration Date I IIC Camp:my Nmnc or HIC Registrant Name No. and Street Email address City/Town,State ZIP Tele hone SECTION 6:WORKERS'.CONIPENSATION INSURANCE AFFIDAVIT(M.G.L.c.1SL§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Isivance of the building permit. Signed Affidavit Attached? Yes ..........❑ No........... ❑ SECTION 7a:OWNER AUTHORIZATION:TO BE COMPLETED WHEN OWNER'S AGENT ORCONTRACTORAPPLIES FOR BUILDING PERMIT -' 1,as Owner of the subject property,hereby authorize t9 act on my behalf,in all matters relative to work authorized by this building permit application. l ) y Print Owner's Name(Electronic Signature) - Date f SECTION 7b: OWNEW ORAUTHORIZED AGENT DECLARATION By entering my name below, 1 hereby attest under the pains and penalties of perjury that all of the information contained in this application is e a d accurate to best of i knowledge and understanding. C� v _/ ?,d (o Print Owner's or Authorized Agan ,rate(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or anowner who hires an unregistered contractor —(not registered in the Home Improvement Contractor(HIC) Program);will nor have access to the arbitration program or guaranty, fund under M.G.L.c. Id2A.Other important informationbn theHlC-Program can be fotfoJ a --- t-- --- www mass eov:'oea Information on the Construction Supervisor License can be found at www.�as 2. When substantial work is planned,provide the information below: 'total floor area(sq. R.) (including garage, finished basementlattics,decks or porch) Gross living area(sq. it.) - Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open_ 3. "Total Project Square Footage"may be substituted for"Total Project Cost" At The Commonwealth of Massachusetts t CITY OF Board of Building Regulations and Standards ITY �j� Massachusetts State Building Code,730 CNIR SALEM 1 Revised1hit 201/ Building Permit Application To Construct, Repair, Renovate Or Demolish a One-or Two-Family Dwelling This Section For Offici Use Only Building Permit Number: Date. pplied: D b Building Official(Print Name). Signature- - /Date SECTION 1:SITE INFOILNIATION L1 y�,ru erty Address:(e /9U'e 1.2 Assessors blap&Parcel Numbers Y��UVePt(4 1.la Is this an accepted street?yes ✓ no Map Numbcr Parcel Number 1.3 "Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sit 11) Frontage(R) 1.5 Building Setbacks(ft) Front Yard Side Yuals Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check ifyes❑ SECTION2: PROPERTY OWNERSHIP'' 2.l Ownert of,�ecord: ANN f 2C1 S6LEt4 At V�e(Print) City,State,ZIP CI ovetran le AU2 g7MV 12-M- loorce pcomcts�, kJA No. and Street Telephone ss SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building`g Owner-Occupied 51 1 Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ph' Demolition ❑ Accessory Bldg. ❑ Number of Units_ Other ❑ Specify: Brief\Resc\iption of Proposed Work' jAr�i nC. ct Q u v160 6ts ro0(vV Cam` Cl h acts-kna OL��r� SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and iblaterials I. Building S 1. Building Permit Fee:$ Indicate how fee is determined: 2. Electrical .S ❑Standard City/Town Application Fee ❑Total Project Cost(Item 6)x multiplier x 3. Plumbing S 2. Other Fees: $ J� % 4. Mechanical (1-IVr1C) S List: 5. Mechanical (Fire S Su ression) Total All Fees:$ Check No._Check Amount: Cash Amount: 6. Total Project Cost: ,S /8'r �Q O ❑ Paid in Full ❑Outstanding Balance Due: �� k 60� SECTION 5: CONSTRUCTION SERVICE ' 5.1 Construction Supervisor License(CSL) PQ,V' La 1p r I License Number E.epimta Date Name df CSL Holder /7 List CSL Type(see below) ri Va+,e D Y V-2 No.and Street Type Description , - Ai.&At _ 1 - 4 A� n 0 `9 CI q U Unrestricted(Buildings u to 35,000 cu.It.) 1.�TD I-`d^ 'C R. Restricted 1&2 Family Dwelling Cityfrown,State,ZIP NI Nlasonry RC Roofing Covering WS Window and Siding p ' �nry SF Lid F Burning Appliances 17B 3)-7 �c.�l�b I Ins Fuel Burning Telephone G-ZE_ Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) `p 3Y 7 1 7 C Co` n uG , O n Cb HIC Registration Number piration Dute IIIC Co ipanoime or HIC Registrant Name �f A -'k A ir-c- o.t=76 RAH n 0IN9 p-79 3)1 c2bDF' Email address City/Town,State,ZIP / Tele hone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(MtG,L.c.,I5Z.§ 25C(6)):. Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .......... No...........❑ SECTION 7a:OWNER AUTHORIZATION,TO BE COMPLETED WHEN: OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize Pao/l.-a h r i e (/ O4CI,(CO 5_fir&C/ -rA tg act on my behalf, in all matters rel Ive to work authorized by this building permit applica ion. 14I)n Arce/lU����.�8���— 10171i.3 Print Owner's Nate(Electronic Signature) Dale SECTION 7b:OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below,) hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires at unregistered contractor (not registered in the home Improvement Contractor(HIC) Program),will not have access to the arbitration program or guaranty fund under NLG.L.c. I42A.Other important information on the HIC Program can be found at www.nuasS.,,ov'oca Information on the Construction Supervisor License can be found at www.massyov/dM 2. When substantial work is planned, provide the information below: "rota) floor area(sq. ft.) (including garage, finished basemendattics,decks or porch) Gross living area(sq. fl.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number ofhalf/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "total Project Square Footage"may be substituted for Total Project Cost" FRoIV of 9� ti ti e v t� Q r -- --- - r r 4 h • r r 2 K/0 1 AG TG Houg C PT h a ax to D ^� y Add �3��z wty%tRA1 � � /d,G 5i✓�Ld1�Fu�? O I� o l To ye or1��r�G�tiS P f#2 ��1 GueS D � R -38' e ei�r�✓6 cerc.iv': Jors% veMTed '1 - S6r yp��z ,ArVD CAW/ TrGl w95E' �NSuGRktoA/ � i n hG y uNG vyN.4L 51 d i;VG wrivpauF cox Frig N �(yWood BA& S+de oN wo`�S 2x 6 s o e ExrsTiv� 2xro Do�h� e i'• � � � J � J V %as i v u � v �Xig%/�E✓� HavS G � ro oil O Wh5 h CA � s�:2Y 2. 2 fb i3yro6d Doo &S � o ti t 1= Lao � t. AA/ v II ZX fi I�AF7C/z3 �y G D h� Pty WOOL/ �l 2x6 171,E . AGRT*t x C DX rl/� N p mlp 6NW.41-S5 Z • P O _ C 2 Y 6 S/-1,ip e- ?i z /a P, rx/S7ivC F�zH�^� ---------- wA I Vo 9 CLOVERDALE AYFNtTL 5,wUZI ` UPC 10330 _to.153L HASTINGS, HN 9 CLOVERDALE AVENUE 324-14 ¢,, Gls# 17s9= F° - COMMONWEALTH OF MASSACHUSETTS Map 6H A-1_ OS B1ock = ,s CITY OF SALEM Lot: 0083 ategory: ' '� RENOVATIONS u, Bent# 32414:110i; BUILDING PERMIT >..reject# JS-2014000753 st. Cost ,;, $18,000.00 = Fee Charged: > $131.00 Balance Due: $.00'L' ,, , n`° ' PERMISSION IS HEREBY GRANTED TO: Const:Class: , Contractor: License: Expires: Use G2oup: _ �, � : °" Royal Construction Co Inc CONSTRUCTIO SUPERVISOR- 13523 Lot Srze(sq ft.) 6743.95921" im Zoning RI ' Owner: PORCELLO WILLIAM P,ANNA M Units Gamed:'' Applicant: Royal Construction Co Inc Units Lost: �' i'i;a;" Nom, ;;; yAT. 9 CLOVERDALE AVENUE Dig Safe#:" ` ISSUED ON. 16-Oct-2013 AMENDED ON: EXPIRES ON. 16-Apr-2014 TO PERFORM THE FOLLOWING WORK. ADDING A LAUNDRY ROOM ON AN EXISTING OUTSIDE DECK. POST THIS CARD SO IT IS VISIBLE FROM THE STREET Electric Gas Plumbing Building Underground: Underground: Underground: Excavation: Service: Meter: Footings: Rough: Rough: Rough: Foundation: Final: Final: Final: Rough Frame: Fireplace/Chimney; D.P.W. Fire Health Insulation: Meter: Oil: Final: House# Smoke: Water: Alarm: Assessor Treasury: Sewer: Sprinklers: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF SALEM UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Signature: Fee Type: Receipt No: Date Paid: Check No: Amount: BUILDING PEC-2014-000754 15-Oct-13 1147 $131.00 GeoTMS®2013 Des Lauriers Municipal Solutions,Inc. Ft; 4 Plans must be filed and approved by the Inspector prior to a permit being granted �-F 3 CITY OF SALEM No. J 13 _ Ward (� HISTORIC DISTRICT? Y N A Date y IF FOR SIDING, HAS ELECTRIC 0 Home Phone PERMIT BEEN OBTAINED? Y N Bus. Phone APPLICATION _ FOR PERMIT TO �� /,f6�` TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit to build according to the following specifications: Owner's name and address �/L //�2ecCGa 7 GCcie�lCe yr/� Architect's name Builder's name � - A/iL c c .s Location of building, No. 9 GLa�eyl/it /�y� What is the purpose of building? - , If dwelling, # of units? Material of bldng? Will building conform to law? Asbestos? Estimated cost City Lie.O State Lie.# Signature of Applicanl zz SIGNED UNDER THE PENALTY OF PERJURY DESCRIPTION OF WORK TO BE DONE Mail Permit to: « E yard APPLICATION FOR PERMIT TO ROOF REROOF OR INSTALL SIDING Location T. C PERMIT GRANTED \ Approv! � 11 i nspector �� No. City of Salem Ward_. x y A•"ctwvr.vd' - APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-I. Applicant to complete all items in sections:I, II, Ill, IV,and IX. AT(LOCATION) 1 Tiz�yC % w A 1 ZONING DISTRICT LOCATION (NO.) 1 s REEn OF BETWEEN f4 % f. _` 0.,t.. --- (CROSS 16 REET7 AND ICROSSSTREETI BUILDING LOT SUBDIVISION LOT BLOCK SIZE IL TYPE AND COST OF BUILDING -All applicants complete Parts A-D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE 1 ❑ New building Residential Nonresidential 2 ❑ Addition(if residential,enter number of new 12 ❑ One family 18 ❑ Amusement,recreational housing units added,if any,in part D, 13) 19 E] Chruch,other religious 13 ❑ Tvro or more family-Enter number 3 Alteration(See 2 above) of units....................................................... 20 ❑ Industrial 21 1:1 Parking garage 4 E] Repair replacement 14 ❑ Transient hotel,motel,or dormitory- Enter number of units ........................... 22 E] Service station,repair garage 5 ❑ Wrecking(It multifamily residential,enter number 23 ❑ Hospital,institutional of units in building in Part D, 13) 15 ❑ Garage 24 ❑ Office,bank,professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ❑ Public utility 26 E] School,library,other educational 7 E] Foundation only 77 ❑ Other-SpecTy 27 ® Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 0 Private(individual,corporation,nonprofit Institution,etc.) 29 ❑ Other-Specify 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, parochial school,parking garage for department store,rental office building,office building 10. Cost of improvement ......................................................... $ 4B v Soo at industrial plant.It use of existing building is being changed,enter proposed use. To be installed but not included _ in the above cost L?AYL.E 5.5 S*W a Sp 0kC.G aElectrical........................................................................... b. Plumbing.......................................................................... NON ReA e_% QLj X %-r17 f VoP_ T!HI=i Z Ll'3"S, c. Heating,air conditioning............................................. : .. Acousti clams �8►t..&xg , 1-�I l71 : Sete, d. Other(elevator.etc.)..................................................... ((�� (�`7 — l/y� 11. TOTAL COST OF IMPROVEMENT s 4e 5oa °- C,�'e-PaT Tot cm37 YY�-5 V A" �T III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions, complete Parts E'=L;demolition, complete only Parts J&M,all others skip to IV E. PRINCIPAL TYPE OF FRAME F. PRINCIPAL TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL I. TYPE OF MECHANICAL 30 ❑ Masonry(wall bearing) 35 ❑ Gas 40 ❑ Public or private company Will there be central air ' -31 ❑I;Wood frame 36 ❑ Oil 41 ❑ Private(septic tank,etc.) conditioning? pW 32 Structural steel 37 ❑ Electricity 44 la Yes 45 ❑ No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator? 34 ❑ Other-specify 39 ❑ Other-Specify 42 ❑ Public or private company 46 ❑ Yes 47 Ej No •.♦. t - 43 ❑ Private(well,cistern) ' J.DIMENSIONS M. DEMOLITION OF STRUCTURES: 48. Number of stories ............................................................ squ loor 49. total ors,based n exterior Has Approval from Historical Commission been received all floors,re feet of exterior dimensions ......................................................................... for any structure over fifty(50)years? Yes_ No 50. Total land area,sq.rt...................................................... Dig Safe Number K.NUMBER OF OFF-STREET PARKING SPACES Pest Control: 51. Enclosed ..........................................................._............... sz. omHAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED?doo s................................_........................................... Yes No L RESIDENTIAL BUILDINGS ONLY Water: 53. Enclosed ............................................................................ Electric: Gas: 54. Number of Fell.......... .............. Sewer: bathrooms DOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Parti BEFORE A PERMIT CAN BE ISSUED. IV. COMPLETE THE FOLLOWING: Historic District? Yes_ No (If yes, please enclose documentation from Hist. Com.) Conservation Area? Yes_ No (If yes, please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes. No Is property located in the S.R.A.district? Yes_ No Comply with Zoning? Yes—)( No (If no,enclose Board of Appeal decision) Is lot grandfathered? Yes_ N (If yes,submit documentation/if no,submit Board of Appeal decision) If new construction, has the proper Routing Slip been enclosed? Yes_ No_ Is Architectural Access Board approval required? Yes_ No (If yes,submit documentation) Massachusetts State Contractor License # 025231 Salem License # Home Improvement Contractor# Homeowners Exempt form (if applicable) Yes_ No CONSTRUCTION TO BE COMMENCED WITHIN SIX (6) MONTHS OF ISSUANCE OF BUILDING PERMIT If an extension is necessary, please submit CONSTRUCTION IS TO BE COMPLETED BY: in writing to the Inspector of Buildings. V. IDENTIFICATION - To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. PIiaYL.ES Q Owner or ��S LQSseci M 1Ft&Lb M Ass. . 359-7600 2. 5 I–&z4t> SZ 251 (of Contractor Builder's IL M A DZI(P5 License No. -dpi 3. e 508 Architect or Engineer Q-r�js (IG-j✓ql. I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized Nent and we agree t0 conform to 01 applicable laws of this jurisdiction. Signature of a7!5iln Address Application date 1 DO NOT WRITE BELOW THIS LINE VI. VALIDATION Building FOR DEPARTMENT USE ONLY Permit number Building Use Group Permit issued 19 Fire Grading Building Permit Fee $ Live Loading Certificate of Occupancy $ Approved by: Occupancy Load Drain Tile $ T Plan Review Fee $ O J10—k r w. TITLE NOTES AND Data -(For department use) 5 o r 2, W 8 C."1 -r e.,Vj Dov v:te t- PERMIT TO BE MAILED TO: DATE MAILED: Construction to be started by: Completed by: Y VI ZONING PLAN EXAMINERS NOTES DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN -For Applicant Use O N ENGINEER'S HYDRAULIC NOTES THE RELOCATION OF SPRINKLER HEADS AS SHOWN ON THIS DRAWING WILL NOT . ADVERSELY AFFECT THE HYDRAULIC CHARACTERISTICS OF THE EXISTING SPRINKLER SYSTEM. A REVIEW OF THE ORIGINAL DRAWINGS PREPARED IIY ARTEC SPRINKLER 'CORP. (DRAWING 1 OF 1, CONTRACT NO. 94-108) AND ASSOCIATED HYDRAULIC. CALCULATIONS PREPARED BY 'HYDRATEC, INC. (CONTRACT NO. 948024R) INDICATE THAT THE ORIGINAL HYDRAULIC DESIGN IS MORE CONSERVATIVE FOR THE FOLLOWING REASONS: ` 1. HEAD SPACING IN THE PAYLESS SHOE IS 100 "SQ.FT./HEAD AND IS LESS THAN OR EQUAL TO THE ORIGINAL SPACING REQUIRING A MINIMUM r..,.. \ OF 20 GPM PER HEAD BASED ON A .2 GPM/SQ.FT. DENSITY. W DIVIDING WALL MARIMUM FLOW IS 3 TION OF THE , UE THE LOCA 2. D TO . �. HEADS ON A BRANCH LINE VRS. THE MORE CONSERVATIVE 5 HEADS ; SHOWN. IN THE ORIGINAL DRAWING AND CALCULATION. THIS RESULTS IN A REDO= BRANCH LINE FLOW OF"APPROXIMATELY 72 GPM VRS THE _ 132 GPM ORIGINALLY CALCULATED. !r ACCORDINGLY, THE FRICTION LOSS IN THE BRANCH LINE AND SYSTEM IS SIGNIFICANTLY REDUCED WHEN EVALUATING THE PAYLESS AND OPEN TENANT / AREAS. THIS WILL RESULT IN INCREASED AND MORE EFFICIENT WATER ` \ DELIVERY TO THE FIRE AREA. NOTES e ' v -. 1. THE FIRE PROTECTION SYSTEM -SHOWN ON TRIS - PLAN HAS BEEN • DESIGNED AND IS TO BE ...INSTALLED - IN ACCORDANCE WITH ALL APPLICABLE STANDARDS OF TEE NATIONAL. FIRE .CODES, ,PUBLISHED BY THE NATIONAL FIRE PROTECTION ASSOCIATION. 2. ALL HANGERS ARE TO BE INSTALLED AND LOCATED IN ACCORDANCE WITH ,. LAPPA #13. _ . �. -3. STANDARD TEMPERATURE SPRINKLERS ARE TO BE INSTALLED . IN ACCORDANCE WITH NFPA #13.. / - .: 4. THE OWNER IS TO PROVIDE ,HRAT THR000ROUT TEE BUILDING TO - I � ,'`I its , / - PREVENT WATER IN THE SYSTEM FROM FREEZING. THE OWNER IS ALSO TO MAINTAIN TRIS SYSTEM IN ACCORDANCE WITH NEPA STD. #25 - ISCr - MAINTENANCE AND TESTING CRITERIA. !!,,••�� + 6. THIS DRAWING IS INTENDED TO SIIOW THE GENERAL ARRATJGP.F mur AND /-T r�r G 3�r!H♦t}ar r r0 r � ... �o a^. :. EXTENT OF WORK TO BE PREFORMED. mm LOCATIONS GIVEN ARE : ` C,. APPROXIMATE AND ARE SUBJECT TO MODIFICATIONSASMAY BE FOUND - d rVJlr_ ly �° OH }��+tllrr j`f: NECESSARY TO. I188T ANY STRUCTURAL OR JOB CONDITIONS. THE "� CONTRACTOR IS TO VISIT THE JOB SITE TO VERIFY ALS. DIMENSIONS \ f�y�f�'1{lG Znl /Gu/aCror�- - i AND JOB CONDITIONS. . - -.6. , OCCUPANCIES IN THIS STRUCTURE ARE NOT TO EXCEED ORDINARY - `•` NAZARDGROUP II CRITERIAAS ESTABLISHED IN -NFPA STD. #13. 1 A FIRE PROTECTION AND'.'RYDRAULIC ANALYSIS -INDICATING THS h ACCEPTABILITY OF THE FIRE SUPPRESSION SYSTEM TO MEET THE - r PROPOSED -.HAZARD MUST BE CONDUCTED BY A LICENSED FIRS PROTECTION ENGINEER PRIOR TO OCCUPANCY CHANGES OF A HIGRER . .HAZARD OR CEILING CONFIGURATION CHANGES. � . j _ . _.�v.� ____ _ It u°'° fl14 fLCLErn° ! f e1 np - -- -- r, C „ l r� _. — — i -- all J _, r l � lit I g 1 .1 0 - 1 - yo-, - -° --- ' - °� !_ ;° _,_ j U t4 I I r 1+YPP.OV C royal by 8n9 th - - "` _ � : r DCC 10 app- - -•1 _ I �h*n�ty havinS 3>uTc&F ' -�--j-- ,-• of SALENS,PISAP • ? , 7T mn, Air act 1 a5 O 1 Aeaz(. 2elvcx.te 45 F Z hcw ('7-),4'0) P VED` y Y-0 . . .-S_. rL..; .1/ Y' � -. _ .,CiEC/FOAL aHTirru'' 0' C _ `- �. A•q �P r py CF Ft4E FFOT£� 01 Oj-10 A \ 2 C' I �� �RQlocAtc .�1as in _ _ suelE /J it-010i PRO EGTICN DEYIC�i °- YLEFE CO+•oLb • �f \tiR, J� (1,a `'^t` O�l Jq I��G/!0 S�oCC. PS \ _ C"_. L� We T pipe / I�YP M'!. . .im'd/r' H� r ` : FlF:7.LTE9T t.r) I�Y:G'f^O;I.FCft CO'% v J F -Z ('' ' 5 is v+* 1 t" 71/f -r0O F. .. "iC ostD�./�{ �. k r'.0 aR1 :'„ @tsl/!�" T V 1 i IQL U r , I, ro REV. NO. REVISION BY - \. PYROTECH CONSULTANTS Inc. !! P.O.BOX .1532 SANDWICH, MASS. 02563 508 888-580 ' : . ! ! Yr ��'. P 'S �..J../.'".?.t ,._C N PYY/.' - 1.L11J/7l ( I 8 l r 11/• APPROVED BY: L 6CALE; '! , rim. !V it APFROVED BY " ,�- DRAWN BY SCALE: � e .. / � DRAWN BY ire DATE: REVISED DATE: P p e �!S$ ShGQ SOGYCCi _ ! P7 1 < TC 0l/l r— a r^ p i C / !a c, vesS �a^r� l""I c (-cie �r CLJ7G DRAWING NUMBER l J n�/L�✓ �u✓`` Cr DRAWIN FPS'U� G NUMBER /r 0V"( Silr > PRECISION PRrSS 116 STB-E' - City of Salem, Amoarbuattz : • OFr-iCE t 36oarb of Sppeal ISM ' JJ AMENDED DECISION DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 CLOVERDALE AVE & 21 VERONA AVENUE A hearing on this petition was held April19, 2000 with the following Board Members present: Stephen Harris, Ronald Harrison, Richard Dionne , Stephen Buczko and Paul Valakagis. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance to allow the creation of a lot at 9 Cloverdale Ave of 6,744 sq. ft and to allow a parcel at 21 Verona Ave of 17,066 with less frontage than required for the property located at 9 Cloverdale Ave and 21 Verona Ave. The Variances, which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. The petitioner represented by Attorney William DiMento. 2. Plans were presented showing entrance and egress from new lot. 3. Councillor O'Leary spoke in favor of the petition. 4. There was no opposition to the petition. v DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 CLOVERDALE AVENUE & 21 VERONA AVENUE page two On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted 5-0, to grant the Variances requested, subject to the following conditions; 1. Petitioner shall comply with all city and state stature ordinances, codes and codes regulations. 2. All construction shall be done as per the plans and dimensions submitted and approved by the Building Inspector. 3. Petitioner shall obtain a building permit prior to beginning any construction. 4. Petitioner shall obtain proper street numbering from the City of Salem Assessors Office and display said number so as to be visible from the street. 5. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 6. Petitioner shall obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 7. Access will be off of Spring Side Avenue for lot#2. Variance Granted April 19, 2000 61d c Richard Dionne, Member Board of Appeals f DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY 9 CLOVERDALE ANE & 21 VERONA AVENUE page three A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. CItp of *alem, f ft oarbuatto- l ,r ?3F Q: EM. MA • Friiti'5 OFFICE �aalrh of �p;peat 1000 MAY - I P 3: 02 DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 CLOVERDALE AVE & 21 VERONA AVENUE A hearing on this petition was held April19, 2000 with the following Board Members present: Stephen Harris, Ronald Harrison, Richard Dionne , Stephen Buczko and Paul Valakagis. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance from rear setback requirements to construct an addition for the property located at 34 West Avenue located in an R-1 zone. The Variances,which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. The petitioner represented by Attorney William Dimento. 2. Plans were presented showing entrance and egress from new lot. 3. Councillor O'Leary spoke in favor of the petition. 4. There was no opposition to the petition. DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 9 CLOVERDALE AVENUE & 21 VERONA AVENUE page two On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore,the Zoning Board of Appeal voted 5-0, to grant the Variances requested, subject to the following conditions; 1. Petitioner shall comply with all city and state stature ordinances, codes and codes regulations. 2. All construction shall be done as per the plans and dimensions submitted and approved by the Building Inspector. 3. Petitioner shall obtain a building permit prior to beginning any construction. 4. Petitioner shall obtain proper street numbering from the City of Salem Assessors Office and display said number so as to be visible from the street. 5. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 6. Petitioner shall obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. 7. Access will be off of Spring Side Avenue for lot#2. Y, �Cn. Variance Granted Y r v April 19, 2000 N Richard Dionne, Member Board of Appeals DECISION OF THE PETITION OF WILLIAM PORCELLO REQUESTING A VARIANCE FOR THE PROPERTY 9 CLOVERDALE ANE& 21 VERONA AVENUE page three A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. 4� d C� 1 ,Ti n 1 V 0. D O N