Loading...
178 Federal Street - C of A application - electrical service4/10/23, 12:00 PM about:blank about:blank 1/2 Salem Historical Commission 98 WASHINGTON STREET, SALEM, MASSACHUSETTS 01970  (978) 619-5685 Application for: Certificate of Appropriateness - HCA-23-22 Date of Submission: April 8, 2023 Owner at Submission (from Assessor) Daniel Gutierrez   Applicant name:Daniel Gutierrez Owner (from Applicant) Applicant phone:8323260678 Owner Phone 8323260678 Applicant email:majidaniel@gmail.com Owner Email danielg60@hotmail.com Address of Property: 178 Federal St, Salem, MA 01970    Declared District:  McIntire Year Built (From Assessor)1870 Occupancy (from Assessor) Zoning (From Assessor)R2 Building Type (from Assessor) Property Use (From Assessor) Type of Work: Other   Is work visible from Public Way?:Yes Applicant's Description of Work:Our current electrical connection is not up to code, and in order to complete work (installing downspouts) previously approved per HCCA-23-5, which includes moving the electric point of contact, a set of electrical work will be needed. There are 3 parts to this work: * Upgrading the current meter.  The meter we have does not have an external cutoff, which is current code.  This requires a larger box as per electric company.  We would also as part of this work to upgarde to a 200amp box from a 100amp box, since the box will have to be replaced either way. * Replacing the conduit above the meter.  Our current conduit is 1.5" wide, it needs to be 2" wide.  Replacement will be similar painted material, and will be painted the same color as the home as is the current conduit. * Moving the point of contact to the left rake on the front face.  Due to the placement of windows on the home and a 3 foot distance requirement, there is no area on the left side of the home where the meter currently resides.  In order to minimize wiring on the front face, the conduit will remain on the side of the house (eventually obscured by the copper downspout), and run a 90*. angle along the roof 's rake beneath the downspout's gap. Additional work: We will be upgrading to 200amps from 100amps in order to support shifting our kitchen from gas to electric, as well as replacing internal breaker boxes to be up to code.  Neither of these alterations are visible from outside of the home, but I wanted to bring up since they are listed in the statement of work. 4/10/23, 12:00 PM about:blank about:blank 2/2