142 CANAL STREET - EMAIL - DEMOLITION + PROJECT1
Maureen Davis
From:David Greenbaum
Sent:Tuesday, May 16, 2023 10:37 AM
To:Maureen Davis
Subject:FW: Demolition Requirements for Salem, MA
Attachments:22-2576 Asbestos Inspection Report for 142 Canal St., Salem, MA.pdf; Inspection
Report.pdf; 136 CANAL 091420.pdf
Hi Maureen,
Could you please upload the attachments and this email to Laserfiche?
Thank you,
Dave
David Greenbaum, RS, CHO
Health Agent
Salem Board of Health
98 Washington Street, 3rd Floor
Salem, MA 01970
Phone - 978-619-5650
Office – 978-741-1800
From: Mark Livesey <mark@symesassociates.com>
Sent: Friday, May 12, 2023 5:19 PM
To: David Greenbaum <dgreenbaum@Salem.com>
Cc: dricciarelli@segerarchitects.com; MarkLivesey <MarkLivesey@symesassociates.com>
Subject: RE: Demolition Requirements for Salem, MA
Hi David,
We are in the process of adding 4 residential units to 142 Canal St Salem, this was approved by the Planning Board on
12/19/2022. We have a building permit application into the building department and working through the checklist to
secure a building permit.
Here is the information for the conditions set by the Board of Health:
1. Project Manager: Mark Livesey Mark@Symesassociates.com Cell (978) 836-8127.
2. No DEP tracing number issued. New units to be constructed within the footprint of the existing building.
3. Attached is a copy of the licensed Asbestos Inspector’s Report.
4. DEP filing not required
Caution: This email originated from outside our system. Please do not click links or open attachments unless you
recognize the sender and know the content is safe.
2
5. Original Drainage plan was completed per original development, certificate of compliance issued 2022. No
changes.
6. Inspection report from A1 Exterminators is attached
7. Rodent Control plan from A1 Exterminators is attached
8. Dust Control during demolition will be provided by Salem Fire Department detail. Street sweeping will be
provided by Meninno Construction Co. – site contractor.
9. Kidder Wrecking Inc. will dispose of all demolition materials as they are generated. Meninno Construction Co.
will dispose of any extra materials during excavation of new footings.
10. Trash and recycling contract is attached.
11. All trash and recycling containers are located within chain-link fence enclosures with privacy slats
12. Plan approved by Salem Fire for access
13. Noise levels from the resultant establishment generated by operations will not increase the broadband sound
level by more than 10 dB(A) above the ambient levels measured at the property line.
14. All dumpster trash areas are currently enclosed. Temporary construction dumpster will be enclosed within the
construction fence during the project.
15. The Developer will disclose in writing to the Health Agent the origin of any fill material needed for the project.
16. All waste materials shall be disposed of in an environmentally sound manner as described by the Board of
Health
17. The Developer will notify the Health Agent when the project is complete for final inspection and confirmation
that the above conditions have been met.
Look forward to getting this project started.
Let me know if you have any questions or need anything additional at this point.
Thank you,
Mark
Mark J. Livesey
Director of Project Management
50 Dodge Street – Beverly, MA 01915
3
Tel. (978) 922-5300 Fax. (978) 922-5444
Mark@SymesAssociates.com
www.SymesAssociates.com
From: David Greenbaum <dgreenbaum@Salem.com>
Sent: Wednesday, September 16, 2020 8:45 AM
To: Mark Livesey <mark@symesassociates.com>
Cc: dricciarelli@segerarchitects.com
Subject: RE: Demolition Requirements for Salem, MA
Mark,
You are welcome to come by the Board of Health but if it is easier I will sign this and send it back to you through
email. Let me know which you prefer.
David
David Greenbaum, RS
Health Agent
Salem Board of Health
98 Washington Street, 3rd Floor
Salem, MA 01970
Phone - 978-619-5650
Office – 978-741-1800
From: Mark Livesey <MarkLivesey@symesassociates.com>
Sent: Wednesday, September 16, 2020 7:24 AM
To: David Greenbaum <dgreenbaum@Salem.com>
Cc: dricciarelli@segerarchitects.com
Subject: RE: Demolition Requirements for Salem, MA
Hi David,
We are on track to occupy 136 Canal St this week.
A scanned copy of the routing slip is attached.
Let me know if you have any questions and if I can stop by this morning for Board of Health approval.
Thanks,
Mark
4
The information contained in this message may be privileged, confidential and protected from disclosure. If the
reader of this message is not the intended recipient, or an employee or agent responsible for delivering this
message to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this
communication is strictly prohibited. If you have received this communication in error, please notify your
representative immediately and delete this message from your computer. Thank you.
From: Mark Livesey
Sent: Thursday, September 3, 2020 5:37 PM
To: 'David Greenbaum' <dgreenbaum@Salem.com>
Cc: dricciarelli@segerarchitects.com
Subject: RE: Demolition Requirements for Salem, MA
Hi David,
Hope all is well with you.
We are making progress at University Square – Canal St – Salem. Planning board decision is attached for your
reference.
Finishing up the 1st new building – 136 Canal St (22 apartments and 5 retail spaces) and we are going for a partial
certificate of occupancy for this building soon. Trying to occupy 9/15.
I am reaching out to see if there is anything you need from me at this point in the project.
Planning Board requires us to notify the Board of Health upon completion of the project for compliance, which we
anticipate early 2021 – but wanted to see if you can confirm compliance for 136 Canal St now to line up with our partial
certificate of occupancy.
Thanks,
Mark
Mark J. Livesey
5
Director of Project Management
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-5300 Fax. (978) 922-5444
MarkLivesey@SymesAssociates.com
www.SymesAssociates.com
From: Mark Livesey
Sent: Monday, May 20, 2019 4:38 PM
To: David Greenbaum <dgreenbaum@Salem.com>
Cc: dricciarelli@segerarchitects.com
Subject: FW: Demolition Requirements for Salem, MA
Hi David,
Good to see you at the departmental meeting on Friday 5/10.
Wanted to take a minute to follow up with the items we discussed.
1. Attached is the pest control plan from our exterminator
2. Dust Control: Meninno Construction, our site contractor, is utilizing their water truck
for dust control.
Let me know if you have any questions or need any additional information at this point.
Thanks,
Mark
6
Mark J. Livesey
Director of Project Management
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-5300 Fax. (978) 922-5444
MarkLivesey@SymesAssociates.com
www.SymesAssociates.com
From: Mark Livesey
Sent: Thursday, April 25, 2019 4:19 PM
To: David Greenbaum <dgreenbaum@Salem.com>
Cc: 'Elizabeth Gagakis' <EGagakis@Salem.com >; dricciarelli@segerarchitects.com
Subject: RE: Demolition Requirements for Salem, MA
Hi David,
We are getting geared up to start the site work at 136 Canal St over the next few weeks.
Pest management program is in place, paperwork is attached.
Let me know if you have any questions or need any additional information.
Thanks,
Mark
7
Mark J. Livesey
Director of Project Management
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-5300 Fax. (978) 922-5444
MarkLivesey@SymesAssociates.com
www.SymesAssociates.com
From: Elizabeth Gagakis [mailto:EGagakis@Salem.com]
Sent: Monday, April 01, 2019 2:10 PM
To: Mark Livesey <MarkLivesey@symesassociates.com>
Cc: David Greenbaum <dgreenbaum@Salem.com>
Subject: RE: Demolition Requirements for Salem, MA
Hi Mark,
We actually have a new health agent, David Greenbaum – he will be the one primarily responsible for this kind of thing
from now on. I’ve copied him on the email here, so you can forward this info to David when you have it all together.
Thank you!
Liz
From: Mark Livesey <MarkLivesey@symesassociates.com>
Sent: Monday, April 01, 2019 9:20 AM
To: Elizabeth Gagakis <EGagakis@Salem.com>
Subject: RE: Demolition Requirements for Salem, MA
8
Hi Liz,
Thanks for your help last fall with getting the buildings at 132-144 Canal St demolished.
Now we are ready to move forward with the new buildings.
The Planning Board decision lists a number of requirements (below) that we need to provide
for the Board of Health and I wanted to get started on getting this information over to the
Board of Health now, as we will be applying for a building permit over the next couple of
weeks.
Are you the best contact to send this information?
Thanks,
Mark
1. Board of Health
a. The owner shall comply with the following specific conditions issued by the Board of Health:
b. The individual presenting the plan to the Board of Health must notify the Health Agent of the name, address, and
telephone number of the project (site) manager who will be on site and directly responsible for the construction
of the project.
c. If a DEP tracking number is issued for this site under the Massachusetts Contingency Plan, no structure shall be
constructed until the Licensed Site Professional responsible for the site confirms that the site meets the DEP
standards for the proposed use.
d. A copy of the Licensed Asbestos Inspector’s Report must be sent to the Health Agent.
e. A copy of the Demolition Notice sent to the DEP, Form BWPAO6, must be sent to the Health Agent.
f. The developer shall give the Health Agent a copy of the 21E report.
g. The developer shall employ a licensed pesticide applicator to exterminate the area prior to construction,
demolition, and/or blasting and shall send a copy of the exterminator’s exterminator’s survey report, treatment
plan and treatment reports to the Health Agent.
h. The developer shall maintain the area free from rodents throughout construction.
i. The developer shall submit to the Health Agent a written plan for dust control and street sweeping which will
occur during construction.
j. The developer shall submit to the Health Agent a written plan for containment and removal of debris, vegetative
waste, and unacceptable excavation material generated during demolition and/or construction.
k. Noise levels from the resultant establishment(s) generated by operations, including but not limited to
refrigeration and heating, shall not increase the broadband sound level by more than 10 dB(A) above the ambient
levels measured at the nearest abutting residential property line.
l. The developer shall disclose in writing to the Health Agent the origin of any fill material needed for the project.
9
m. The resultant establishment shall dispose of all waste materials resulting from its operation in an environmentally
sound manner as described to the Board of health.
n. The drainage system for this project must be reviewed and approved by the Northeast Mosquito Control and
Wetlands Management District.
o. The developer shall notify the Health Agent when the project is complete for final inspection and confirmation
that above conditions have been met.
Mark J. Livesey
Director of Project Management
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-5300 Fax. (978) 922-5444
MarkLivesey@SymesAssociates.com
www.SymesAssociates.com
From: Elizabeth Gagakis [mailto:EGagakis@Salem.com]
Sent: Tuesday, October 09, 2018 4:13 PM
To: Mark Livesey <mark@bridgetonpropertiesllc.com>
Subject: RE: Demolition Requirements for Salem, MA
Hi Mark, sorry I missed this for this afternoon – thanks for all the documentation, everything looks good. I’ll be in the
office tomorrow morning until about 11, then I’ll be in again from about 2:30-4. Let me know if that works.
Thanks!
Liz
From: Mark Livesey <mark@bridgetonpropertiesllc.com>
Sent: Tuesday, October 09, 2018 11:16 AM
10
To: Elizabeth Gagakis <EGagakis@Salem.com>
Subject: Fwd: Demolition Requirements for Salem, MA
Hi Liz,
Any chance I can stop by this afternoon to have this demo permit application for 144 Canal St. signed?
Mark
Begin forwarded message:
From: "Mark Livesey" <mark@bridgetonpropertiesllc.com>
To: "Elizabeth Gagakis" <EGagakis@Salem.com>
Subject: RE: Demolition Requirements for Salem, MA
Hi Liz,
Thanks for your help with the demolition permit for 132-138 Canal St.
Next I am working on the demolition permit for 144 Canal St.
Attached you will find the Asbestos testing reports along with the final
remediation reports for 144 Canal St.
Pest control documentation for 144 Canal St is attached.
We are working with Salem Engineering and Salem Fire on getting water from the
hydrant on Canal St for dust control. Permit for use of hydrant and water usage is
covered.
Kidder Wrecking Inc of 247 Main St Plaistow NH is the demolition contractor that
will be performing the work. They are scheduled to start on 10/12/2018 and
should be finished by 10/30/2018.
Let me know if you need any additional information.
I need BOH sign off for the demolition permit application, please let me know
when I can stop by for this.
Thanks,
Mark
11
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Mark J. Livesey
Senior Property Manager
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-7800 Fax. (978) 922-5444
Mark@BridgetonPropertiesLLC.com
From: Elizabeth Gagakis [mailto:EGagakis@Salem.com]
Sent: Thursday, September 20, 2018 3:45 PM
To: Mark Livesey <mark@bridgetonpropertiesllc.com>
Subject: RE: Demolition Requirements for Salem, MA
Mark,
This all looks good, thank you! I will be in the office until just after 5 today if you want to come by with
the routing slip for me to sign.
Thanks,
Liz
Elizabeth Gagakis, REHS
Acting Health Agent
City of Salem Board of Health
98 Washington Street, 3rd Floor
Salem, MA 01970
Phone 978-741-1800
From: Maureen Davis
Sent: Thursday, September 20, 2018 1:12 PM
To: Elizabeth Gagakis <EGagakis@Salem.com>
Subject: FW: Demolition Requirements for Salem, MA
From: Mark Livesey <mark@bridgetonpropertiesllc.com>
Sent: Thursday, September 20, 2018 12:43 PM
To: Maureen Davis <MDavis@Salem.com>
Subject: RE: Demolition Requirements for Salem, MA
12
Hi Maureen,
Thanks for the information.
Attached you will find the Asbestos testing reports along with the remediation
reports for 132-138 Canal St.
Pest control documentation for 132-138 Canal St is attached.
We are working with Salem Engineering and Salem Fire on getting water from the
hydrant on Canal St for dust control. Permit for use of hydrant and water usage is
covered.
Kidder Wrecking Inc of 247 Main St Plaistow NH is the demolition contractor that
will be performing the work. They are scheduled to start on 10/1/2018 and
should be finished by 10/2018.
Let me know if you need any additional information.
I need BOH sign off for the demolition permit application, please let me know
when I can stop by for this. I will be in the area this afternoon and tomorrow
morning.
Thanks,
Mark
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
Mark J. Livesey
Senior Property Manager
50 Dodge Street – Beverly, MA 01915
Tel. (978) 922-7800 Fax. (978) 922-5444
13
Mark@BridgetonPropertiesLLC.com
From: Maureen Davis [mailto:MDavis@Salem.com]
Sent: Wednesday, August 22, 2018 3:45 PM
To: Mark Livesey <mark@bridgetonpropertiesllc.com>
Subject: Demolition Requirements for Salem, MA
Hi Mark,
In response to your voice message today, attached please find the information that must be provided to
the Board of Health for Salem, MA prior to the demolition of structures.
Please don’t hesitate to call me should you have any questions or require additional information.
Sincerely,
Maureen Davis
Principal Clerk
Salem Board of Health
98 Washington St., 3rd floor
Salem, MA 01970-3523
978-619-5654