Loading...
4 CLEVELAND ROAD - BUILDING JACKET The Commonwealth of Massachusetts CITY OF Board of Building Regulations and Standards Massachusetts State Building Code, 780 CMR SALEM Revised Mar 2011 \ Building Permit Application To Construct, Repair, Renovate Or Demolish a One- or Two-Fancily Dwelling 1_\ This Section For O ,cial Use Only 'Qy Building Permit Number: 16ate Applied: Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION 1.1 Property Address: �� 1.2 Assessors Map& Parcel Numbers I.1 a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public ❑ Private ❑ Zone: _ Outside Flood Zone? Check if yes❑ Municipal ❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP` 2.1 Owner of Re(�ord: C b rI (mil bvfr `�A� Qm /A 0147 0 Name(Print) City, State,ZIP '"J] � �( 677( No. and Street Telephone Email Address SECTION 3: DESCRIPTION OF PROPOSED WORK(check all that apply) New Construction ❑ Existing Building❑ Owner-Occupied ❑ 1 Repairs(s) Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units Other ❑ Specify: Brief Description of Proposed Work': SECTION 4:ESTIMATED CONSTRUCTION CO TS Item Estimated Costs: Labor and Materials) Official Use Only 1. Building $ 5 3 I. Building Permit Fee: $ Indicate how fee is determined: 2. Electrical $ ❑ Standard City/Town Application Fee ❑ Total Project Cost' (Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ i List: 5. Mechanical (Fire Suppression) $ Total All Fees: $ 6. Total Project Check No. Check Amount: Cash Amount: Cost: [$ (y5. 13 1 0Paid in Full ❑ Outstanding Balance Due: . 9 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 7 1 ( p'7 k f` 3 R�DIA ` 6,C( I(' License Number Expirati7 Date Name of CSL Holder l;� rt'uLgu's List CSL Type(see below) C�. No. and Street Type Description i7Y �' 6170 U Unrestricted(Buildings u to 35,000 cu.ft. 77 �t� I,,�1 _ R Restricted 1&2 FamilyDwelling City/Town, State,ZfP M Masonry RC CoveringRoofing Window � WS Window andndSiding SF Solid Fuel Burning Appliances d I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) Lowey M e 1PYt�r HIC RreA i((stbbratio N b Ex vati n Date HIC Com any Niamg r HIC egis rant Name �3r _.E_ no� �e t No.�nd�treet IVIA 01 f70 �'V� E City/Town,State,ZIP Telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT (M.G.L.c. 152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issu ce of the building permit. Signed Affidavit Attached? Yes .......... No ........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, as Owner of the subject property,hereby authorize A1 , �16` r ka Inn e to act on my behalf, in all matters relative to work authorized by this building permit application. Pnn[ vi er s Name Electronic Signature) Date SECTION 7b: OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below, 1 hereby attest under the pains and penalties of perjury that all of the information contained in this application is true d a;curate o the b t of my knowledge and understanding. Print Owner's or Authorized Agent's ame—(Eleetro e`Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC) Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A. Other important information on the HIC Program can be found at www:mass.gov,/oca Information on the Construction Supervisor License can be found at www.mass. og v/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics, decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" UPC 10330 No.153L • HASTIH38. UH (llit> of �islem, ICE A ' Raarb of Appeal 2001 SEP 2b P Z 3b DECISION OF THE PETITION OF CAROL PERRY REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 4 CLEVELAND ROAD R-1 A hearing on this petition was held September 19, 2001 with the following Board Members present: Nina Cohen, Chairman, Richard Dionne, Stephen Harris and Nicholas Helides. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The petitioner is requesting a Variance from left yard setback, as well as a Variance from the 30 per cent lot coverage, for the property located at 4 Cleveland Road the property located at 72 Proctor Street located in an R-1 zone. The Variances, which have been requested, may be granted upon a finding by this Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structure involve. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. Attorney Scott M. Grover represented the petitioner. 2. Plans were submitted showing the addition to the property. 3. There was no opposition to the proposed addition. 4. Petitioner stated she needed more space for her teenage sone r DECISION OF THE PETITION OF CAROL PERRY REQUESTING A VARIANCE FOR THE PROPERTY LOCATED AT 4 CLEVELEND ROAD R-1 pagetwo On the basis of the above findings of fact, and on, the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and Without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted 4-0, to grant the Variances requested, subject to the following conditions; 1. Petitioner shall comply with all city and state statures, ordinances, codes and regulations. 2. All construction shall be done as per the plans and dimensions submitted. 3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be strictly adhered to. 4. Petitioner shall obtain a building permit prior to beginning any construction. 5. Exterior finishes of the new construction shall be in harmony with the existing construction. 6. A Certificate of Occupancy is to be obtained. 7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction including, but not limited to, the Planning Board. Variance Granted September 19, 2001 Richard Dionne Vhf Board of Appeal r DECISION OF THE PETITION OF CAROL PERRY REQUESTING A VARIANCE FOR PROPERTY LOCATED 4 CLEVELAND ROAD R-1 page three A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11. The Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that is has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal