Loading...
372 Essex Street - Fountain Excavation Sketch 031423 (1)2'-6"~5'-0"3'-6"Pump Vault Concrete Sump Ex. Fountain Basin Excavation Plan Scale: 3/8" = 1'=0" 6" concrete slab Drain 3'-0"1'-6"Granite footing 15'-8"10"Pump Vault Gravel for winter/high water drainage Backfill to level grade Water feed Concrete base Sculpture base Excavate ~6'-6"2'-6"5'-0"5'-0"15'-8" Concrete base for pedestal Pedestal base Excavate 30"D Excavate 30"D Excavate 36"D Sump 2'-6"2'-6"10"Notes: See Aquatic Art Technology design document for plumbing details. Pump Vault to consist of 6" of concrete over 8" gravel base with drain in the center. High Water Drainage to consist of 18" gravel bed at level of bottom of Pump Vault. High Water drain to pass below concrete slab in Pump Vault. Backfill drainage pit to level grade for re-sodding. Sump pit within fountain to be 6" concrete sides and bottom. Backfill excavation when plumbing is installed and pour new basin floor and concrete base for central fountain structure. Gravel for winter/ high water drainage 3'-0" In-ground box for local water shutoff and backflow valve City Water Feed Vertical water feed to fountain Pump Vault 6" concrete slab Drain Excavate