Loading...
64-525 - 12 WOODBURY COURT - CONSERVATION COMMISSION 2�1�i40Tl LIA L &? JOB 0�3�30Qi� �0�3� �QQo Professional Land Surveyors& Civil Engineers ESSEX SURVEY SERVICE 1958- 1986 OSBORN PALMER 1911 - 1970 BRADFORD&WEED 1885- 1972 June 5, 2013 Ms. Julia Knisel, Chair Salem Conservation Commission 120 Washington Street Salem,MA 01970 RE: DEP 64-525 F 16481 12 WOODBURY COURT SALEM, MA Dear Madam Chair: I have completed an As Built Survey and prepared a Plan of the above referenced property. The construction is in substantial compliance with the Site Development Plan dated August 18, 2012. The following deviation was noted: The parking area is shaped differently. Sincerely, Christopher R. Mello,PLS President CRM:lc 104 LOWELL STREET PEABODY, MASS. 01960 TELEPHONE: 978-531-8121 FAX: 978-531-5920 w�,coniolr��4 CITY OF SALEM CONSERVATION COMMISSION July 15, 2013 Mark DeNisco 13 Lynch Street Peabody, MA 01960 Certificate of Compliance—DEP #64-525-12 Woodbury Court Dear Mr. DiNesco: Please find the enclosed certificate of compliance for the above-referenced project. This certificate must be recorded at the South Essex County Registry of Deeds, 45 Congress Street (Shetland Park) 44100 in Salem. Please fill out and return the Recording Information on page 3 of the certificate, which will indicate to the Salem Conservation Commission that the document has been recorded. If you have any further questions please feel free to contact me at 978-619-5685. Sincerely, Tom De me Conservation Agent/Staff Planner Enclosures CC: Wayne Scott DEP Northeast Regional Office Massachusetts Department of Environmental Protection -- Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 064-0525 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Providedby DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer,use Leach Street, LLC only the tab key Name to move your 6 Andrews Brothers Way cursor-do notuse Mailing Address key.the return Peabody MA 01960 City/Town State Zip Code rd 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Mark DeNisco rtan Name May 24,2012 064-0525 Dated DEP File Number 3. The project site is located at: 12 Woodbury Court Salem Street Address City/Town 36 1 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Wayne Scott,Trustee Property Owner(if different) Essex 31420 195 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: i4 M s Dates wpakm8b.doc•rev.1223M WPA Peon 8B,Cenifinte of Compliance•Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: e , WPA Form 813 — Certificate of Compliance 064-0525 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification Check all that apply: ❑� Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions:The following conditions of the Order shall continue: (Include-any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). r Condition Numbers: \ I a' S n wu dui ru.f n 021, Q 1� -R�y�y C IR..Q✓� at r�u. C. Authorization Issued by: City of Salem 3 Conservation Commission D e of Is once This Certificate must be signed by a majority of the Conservation ommission and a copy sent to;the applicant and appropriate DEP Regional Offic S e http://www.mass.gov/dep/abouUregion/findvour.htm . Signatures`: 14 wpafm 8ft doc•rev.1223109 WPA Form 88,Certificate of Canphance•Page 2 of 3 - t Massachusetts Department of Environmental Protection -- Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 064-0525 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To:-------- ----- --------- ---------- ----- ---------- ----- ----- --------------- ----- ----- City of Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: 12 Woodbury Court, Salem, MA 064-0525 Project Location DEP File Number Has been recorded at the Registry of Deeds of: Essex County for: Leach Street, LLC Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpafnn8b.Coc•rev.1223109 WPA Forn 89,CeNfoale of Compliance•Page 3 of 3 ��NDfT�d �'; CITY OF SALEM A ' CONSERVATION COMMISSION R�iM11Vg� May 29, 2012 Mark DeNisco 10 Bailey Terrace Peabody, MA 01960 Re: Order of Conditions—DEP #64-525-12 Woodbury Court Dear Mr. DeNisco: Enclosed, please find the Order of Conditions for the above referenced project. Following the 10-business-day appeal period, this document and the attached Special Conditions must be recorded at the Essex County Registry of Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once recorded, please return a copy of Page 12 of the Order, which will indicate to the Commission that the document has been recorded. As indicated in the Order, prior to any work commencing: 1. this Order must be recorded, 2. all pre-construction conditions must be satisfactorily addressed 3. a sign shall be displayed showing DEP File#64-525 within public view, and 4. contact me at least 48 hours prior to any activity to schedule a pre-construction meeting to review the Order with your hired contractor. 1f you have any further questions, please feel free to contact me at 978-619-5685. Sincerely, Tom Devine Conservation Agent/ Staff Planner Enclosures CC: DEP Northeast Regional Office Wayne Scott, Trustee V t Attachment to Order of Conditions # 64-525 5 Page 1 of 5 SALEM CONSERVATION COMMISSION DEP FILE #64-525 12 Woodbury Court City of Salem, Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats of Rare Wildlife and Certified Vernal Pools Map (October 1, 2008) from Natural Heritage & Endangered Species Program (NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vemal pools. This Order is issued under the Massachusetts Wetlands Protection Act, M.G.L.Chapter 131, Section 40 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 50. This Order permits the construction of residential structure and appurtenances within land subject to coastal storm flowage. Prior to the start of construction, applicant must obtain approval from the City to tie into the municipal stormwater system. GENERAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety (including all 5 pages of Special Conditions) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the I0-business-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 50. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones, other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing on site, a DEP Sign showing DEP File#64-525 must be installed at the entrance to the site and seen from the public way, but not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers, or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40, the Wetlands Regulations 310 CMR 10.00, and shall have the right to require any data or documentation that it deems necessary for that evaluation. "L 2 Attachment to Order of Conditions # 64-525 Page 2 of 5 8. The term "Applicant" as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of see. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans Plan to Accompany Notice of Intent Located in Salem, MA prepared for Mark DeNisco (Title) 5/16/2012 (Dated) Clayton Morin (Signed and Stamped by) City of Salem Conservation Commission (OnJlle with) 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the y u c Attachment to Order of Conditions # 64-525 f Page 3 of 5 change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued, the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. PRIOR TO CONSTRUCTION 17. Prior to the commencement of any activity on this site other than activities listed above, there must be a Pre-Construction Meeting on site between the project supervisor, the contractor responsible for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Agent at (978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre- Construction Meeting. 18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 19. No clearing of vegetation, including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 20. There shall be sufficient additional erosion control materials stored under cover on the site to be used for emergency erosion control purposes. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in any wetland resource area and/or buffer zones. The erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum standards for this project; the Commission or its Agent may require additional measures. 22. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The area of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through hay bale sediment traps, silt tiller bags or other means approved by the Commission or its Administrator. Rom' ti Attachment to Order of Conditions # 64-525 Page 4 of 5 26. Within thirty(30)days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two(2) months, a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 29. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 30. All waste products, grubbed stumps, slash;construction materials, etc. shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 31. Cement trucks shall not be washed out in any wetland resource or buffer zone area, nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 32. All exposed sub-soils shall be covered by a minimum of three(3) inches of quality screened loam topsoil prior to seeding and final stabilization. 33. Immediately following drainage structure installation all inlets shalt be protected by silt fence, haybale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 34. There shall be no pumping of water from wetland resource areas. 35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including, but not limited to,civil administrative penalties under M.G.L Chapter 21 A, section 16. AFTER CONSTRUCTION 38. Upon completion of construction and final soil stabilization, the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(CDC): (1) A Completed Request for a Certificate of Compliance form (WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. (3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under thejurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: Attachment to Order of Conditions # 64-525 4 Page 5 of 5 (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances, structures and best management designs, including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures" include,but are not limited to,all buildings, septic system components, wells, utility lines, fences,retaining walls,and roads/driveways; (d) A line delineating the limit of work-"work" includes any tilling,excavating and/or disturbance of soils or vegetation approved under this Order; 39. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 40. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 41. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized their removal. ADDITIONAL CONDITIONS 42. Prior to the start of construction, applicant must obtain approval from the City to tie into the municipal storm water system. Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPrransacuon# Salem . Oty/Town A. General Information Please note: Salem this form has 1. From- -- - --___- been modified Conservation Commission with added 2. This issuance is for space to a. ®Order of Conditions b. ❑ Amended Order of Conditions accommodate .(check one): the Registry of Deeds 3. To: Applicant Requirements Mark DeNisco Important a. First Name b. Last Name When filling out forms c.Organization ----- on the 10 Bailey Terrace computer, use only the J. Mailing Address tab key to Peabody MA _ 01960 move your e. CitylTown I.State c g. Zip Code cursor-do not use the 4. Property Owner (if different from applicant): return key. Wayne Scott, Trustee — r! rze a. First Name b.Last Name c.Organization 505 Paradise Road Apt. 121 J. Mailing Address - --- Salem MA 01970 e. City/Town f.State g.Zip Code 5. Project Location: 12 Woodbury Court _ __ Salem a. Street Address L. City/Town 36 1 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude, if known: 42d31 m38s 70d53m35.6s d. Latitude e. Longitude woforro5doc- rev.05/19r2010 Page 1 or 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassIDEPFlIe# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information (cont.) 6. Property recorded at the Registry of Deeds for (attach additional information if more than one parcel): Essex South a. County b.Certificate Number(if registered land) 18216 7 c. Book J. Page 4/26/2012 _ 5/24/2012 5/30/2012 7. Dates: a. Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance s. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Plan to Accompany Notice of Intent Located in Salem, MA Prepared for Mark DeNisco a. Plan Title Eastern Land Survey Associates Clayton A. Morin b. Prepared By C. Signed and Stamped by 5/16/2012 1"=20' J. Final Revision Date e. Scale f.Additional Plan or Document Title g. Date B. Findings i. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act (the Act). Check all that apply: a. ❑ Public Water Supply b. El Land Containing Shellfish c. P Prevention of Pollution d. ❑ Private Water Supply e. ❑ Fisheries f ® Protection of Wildlife Habitat g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ❑ Flood Control 2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. w;,Yonn5.doc• rev.05,19,2010 Page 2 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 ` WPA Form 5 — Order of Conditions MassDEP FIIe# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Oty/Town B. Findings (Cont.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. C. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). 1 ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and the wetland resource area specified in 310 CMR 10.02(1)(a) a.linear feet Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a. linear feet b. linear feet c.linear feet d. linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet C.square feet d.square feel s. ❑ Land Under Waterbodies and a.square feet b.square feet c.square feet d.square feet Waterways e.Gy dredged f.cly dredged 7. ❑ Bordering Land _ Subject to Flooding a.square feet b.square feet C. square feet d. square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g,cubic feet h.cubic feet 8. ❑ Isolated Land _ Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet 9. ❑ Riverfront Area b. total sq.feet Sq ft within 100 ft d.square feet f. square feet Sq It between 100- 200 It f.cu h.square feetj.square feet wpafornn5.dac• re, 0 5/1 9120 10 Page 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement o. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the Ocean a.square feet b.square feet c.c/y dredged d.c/y dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. El Coastal Beaches __ cu yd cu yd a. square feet b.square feet c. nourishment d. nourishment ❑ _ cu yd cu yd 14. Coastal Dunes a.square feet b.square feet c.nourishment d.nourishment 15. ❑ Coastal Banks a. linear feet b. linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a. square feet b.square feet c.Gy dredged d. c/y dredged 19. ❑ Land Containing _ Shellfish a.square feet b.square feet c.square feet J.square feet 20, ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.Gy dredged b.c/y dredged 21. ® Land Subject to 4,525 4,525 Coastal Storm a.square feet b.square feet Flowage wpaiorm5 aoc iev.0511912010 Pape 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 Order of Conditions — MassDEP File k F r, Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town B. Findings (cont.) #22. Ifthe 22 ❑ Restoration/Enhancement ': project is for the purpose of restoring or f squ are a. ue feet of BVW - enhancing a q b.square feet of salt marsh wetland resource area 23. ❑ Stream Crossing(s): In addition to the square footage that a. number of new stream crossings b. number of replacement stream crossings has been C. General Conditions Under Massachusetts Wetlands Protection Act entered in Section B.5.c (Bow)(or S B.17.c(Salt The following conditions are only applicable to Approved projects. Marsh)above, 1 Failure to comply with all conditions stated herein, and with all related statutes and other please enter regulatory measures, shall be deemed cause to revoke or modify this Order. the additional 9 Y y amount here. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on 5/30/2015 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. ,,paform5da, rev.05l192010 Page 5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MassDEP"] "File Number 64-525 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A) to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition #13 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. wpaform5 Aoc rev.05I 1912010 Page 6 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 - Order of Conditions MassDEP File# " Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transactloo# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order (the "Project") is (1)❑ is not (2)® subject to the Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards, then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs) shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stormwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; ii. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; iii. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv. all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans) approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. wpabrmStlo<• rev.05119/2010 Page 7 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for 8MP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party (defined in General Condition 18(e)) shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement ("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan ("O&M Plan") and certifying the following: i.) the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and if.) the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority, evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f) through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f) through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. Ih the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans, the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. wpalorm5.doo• rev.05119/2010 Page 8 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassDEP FIIe# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction# Salem City/Town C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three (3) consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stormwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission") upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stormwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stormwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit (as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits) shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stormwater BMPs shall include access gates and shall be at least six inches above grade to allow for wildlife passage. Special Conditions (if you need more space for additional conditions, please attach a text document): .vpalorrnSc]ac rev.05I 102010 Page 9 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands 64-525 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP-Transaction 4 Salem City/Town D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Salem hereby finds (check one that applies): Conservation Commission a. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1. Municipal Ordinance or Bylaw 2. Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ® that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: Wetlands Protection and Conservation Ordinance c. 50 1. Municipal Ordinance or Bylaw 2. Citation 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows (if you need more space for additional conditions, attach a text document): Attached special conditions are issued under the Wetlands Protection Act and are sufficient for compliance with the local ordinance wpaform5,doc rev.051192010 Page 10 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: _ Bureau of Resource Protection - Wetlands 64=525 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Tmneaation# Salem City/Town E. Signatures Important: This Order is valid for three years, unless otherwise specified as a special When filling out forms on the condition pursuant to General Conditions#4, from the date of issuance. 1. Date of Issuance computer, use Please indicate the number of members who will sign this form. only the tab key This Order must be signed by a majority of the Conservation Commission. 2. ber of Signers to move your cursor-do not The Order must be mailed by certified mail (return receipt r uested or n delivered to use the return the applicant. A copy must be mailed, hand delivered or fi elegtr is ly t the same y time with the appropriate MassDEP Regional Office. µM('iad Sign ❑ by hand delivery on ® by certified mail, return receipt requgsted, on Date Date :,C3- — F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act (M.G.L. c. 131, § 40), and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. .vpa5sigs doe rev_0212512010 Page_of Massachusetts Department of Environmental Protection Provided by MassDEP: C ` Bureau of Resource Protection - Wetlands 64-525 --E WPA Form 5 — Order of Conditions M P File# Ilt Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction _Salem City/Town G. Recording Information Prior to commencement of work, this Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. --- Conservation Commission -------" ----- - Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ------------------------------------------------------------------------------- To: Conservation Commission - ------"-- _-- Please be advised that the Order of Conditions for the Project at: Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner --- — - --"--- ----- and has been noted in the chain of title of the affected property in: ---- ---------- Book - --ge -- - - ._----_._ ---- - ------------ Pa In accordance with the Order of Conditions issued on: --- -------- Date -- ----- ---- ----------- -- If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number - - ------""---- ignature of Applicant wpo(orm5doc- rev.05119i2010 Page 12 of 12 MA DEP I)ttp://pLiblic.dep.state.ma.tis/wetiand/wetland.aspx Public Access to Wetiand Notices of Intent Search Criteria:Instructions Region: - - - Fell L'i :m e125P F[le Notices_ and -'— Orders Online City/Town''SALEM I Start Date. 4/8/2010 a -- End Date: 5/8/2012 Results per page. 100 Search Clear The search returned 31 meant Displaying 100 records per page. N01 FI N Film Mpl toot's Iba fs ;Locator iCooper Ranchim;Town I comfort First Nste Last N rre i 0640526 129f012 'TAY EVANS SALEM SOtMJ MASSAGHIISETTSIPE SALEM' 1 SUBTIDAL (DIVISION OF MARINE 'FISHERIES 1 ...... 066-0525 JTQ012 MARK DENISCO '12 WOODBURY HE ALEMPkase show how the 'COURT ,. .placement of fill and foundation A2lone rill not tlegect reipct,o red'rett '.,. Iwo energy o rwersb and .npoa walerSamecanse storm iter to channel taster toward Ipropen_a o�wpaaomy Cou 1 Few sill the proposed bu lane trt meet requirements Onhe !FEW Co i l Construction l Manual for BUHn�snA Grade On Page 6-10 I Stereo 6 d 3.2,Addiional I Minimum Recommend for L.. .._t_ .._...._ BuildingsAZs P O6d 052d 312012012 LUKE FgBBRI i10 HUBON hCOLLNM LLC <E SALEMj :STREET ifPetls Chapter 91 license 0640523 311/2012 WILLIAM WHARFF �162 FEDERAL PE SALEM WM1at is the ELSE I 1064 (STREET r- The Her proposes to after and 00os.r ELSE: i however,mere is nd-mm1 on the plan or in the flanden regarding how € r this will be done.It filling of the 100-yr flood elevation is € proposed acut and fill chars i 'should be submitted to I MassDEP&Salem (Conner r Comenmsbn.ns Icm tied owner,me mpen vib tl 111,19,11 1 showed The pl t must I in fo permission t r -his m mu pia a system 1 j I from thecryof saiem.is me iI subsnhace'nno-atran system only raking the roof top Thee+ i This treatment train would not get BOh TSS reimval wilhour € s an appropr ste pretreatment BMP Please drpla n how runoff j-11 entenhe sea rcm fo shay .wRhour by pass n9 n and venwalN llnwonw Bridge (street.Tne sunaI,diffusion ". base Shona bays an ___ ...encv..all 064 0522 I2/10/2012 _WARREN SHORE ;d ECHNO GY!Ib Bp R i$gLEM! IN ROADWAY) 't10 Cemmenis IN ROADWAY) I j 066 0521 I1/30I2012 BEVERLY AU%FORO PANAI LAFAYETTE - DiNAGAS( lNE SALEM' •.STREET !GRID N4TgN4L fJC Cmmapms ' GRID 0610520 ;1112112011 NSOIN NAIDEN '',DOLL INS COVE IPNT1i GRID i� SALEM BEACH DEBRIS ! 401 may be resulted. REMOVAL r ._.... .._..._... .... .... .. _..i. _.... _ -.._._.. 1 0660519 ;1111012011 ILANDROA ISL WIMER HE SALEM�Under Remew I$LANp R0A0 ISLAND LLC E ..._. .....i_.__ .�..._....... __. 064-0518 ;IIll1212011 MKHFAL O'BRIEN I72 FLINT ''.RNERVIEW HE SA LEM NO Comments (STREET PLACE LLD 0660517 fi/ISQOtI DAVID KIbOWLTON 46 EN ERY HE SALEM IA'.H EN GINEER EER ROAD( �NO Commen6 MCGRAT FORK) I ARK( 10600516 5/13/2011 ROBERT HIJBBARO 60&64 GROVE Met PROJECT NE SALEM STREET AND MANAGEMENT iNO Comments (HARMONY LLD '.. E GROVE ROAD 0660515 4/6/2011 PETER GOLDEN BAKERS ISLAND tE SALEM,.NO Oceanside _._. T .. 0640514 ;.3/4I2011 PATRICIA LEAVENNORTH�ROIITE I A NB l MASSACHUSETTS NE SALEM L Marbi dIel Sall Marsh (LORING AVE) [DOT HIGHWAY in the location of the figure AT THE DNIBION IMaSsDOT or suffy F sap (FOREST RNER andshs present in the work ''.. area.Theme Should net be I Plawd on coastal ban,of in 1 of 3 5/8/2012 1:16 PM Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands MassDEP File Number WPA Form 3 — Notice of Intent L11 Massachusetts Wetlands ands Protection Act M.G.L. c. 131, §40 OocumentTrensactioh Number Salem City/Town 'mp°'m"t When filling out A. General Information forms on the computer,use 1. Project Location(Note: electronic filers will click on button to locate project site): only the tab key to move your 12 Woodbury Court Salem 01970 cursor-do not e.Street Address use the return b.City/Town c.Zip Code key. Latitude and Longitude: 42-3138.0 7053-35.6 d.Latitude e.Longitude r Map 36 Lot 1 f.Assessors Map/Plat Number g.Parcel/Lot Number ,M, 2. Applicant: Mark DeNisco a.First Name b.Last Name Note: N/A Before c.Orgenludon completing this form consul 10 Bailey Terrace your local d.Street Address Conservation Peabody MA 01960 Commission a.CgTawn f.State ZI Code munl�Ibylaaw 617-902-8532 9 P or ordinance. h.Phone Number i.Fax Number J.Emai Address 3. Property owner(required if different from applicant): ❑ Check if more than one owner Wayne Scott Trustee a.First Name b.Last Name N/A c.Organization 505 Paradise Road, Apt. 121 d.Street Address Salem MA 01970 a.Cfly/Town f.State g.Zip Code i.Fax Number J.Emag address 4. Representative(if any): N/A a.First Name b.Last Name c.Company d.Street Address e.C ty/ 'own f.State g.Zip Code h.Phone Number i.Fax Number J.Emag address 5. Total WPA Fee Paid(from N01 Wetland Fee Transmittal Form): 1,050.00 512.50 537.50 a.Total Fee Paid b.State Fee Paid c.Cky/Town Fee Paid wpaform3.doc•rev. 11/18/09 Pape 1 of 8 Massachusetts Department of Environmental Protection Provided byMassDEP: Bureau of Resource Protection -Wetlands MasaDEP Flle Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Domina SaalemlemrdTransacticn Number . S Cityfrown A. General Information (continued) 6. General Project Description: Construct two family dwelling,driveway, parking and utilities 7a. Project Type Checklist: 1. ❑ Single Family Home 2. ❑ Residential Subdivision 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial 5. ❑ Dock/Pier 6. ❑ Utilities 7. ❑ Coastal Engineering Structure 8. ❑ Agriculture(e.g., cranberries, forestry) 9. ❑ Transportation 10. ® Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24(coastal)or 310 CMR 10.53(inland)? 1.❑ Yes ® No If yes, describe which limited project applies to this project: 2.Limited Project 8. Property recorded at the Registry of Deeds for. Essex South WA a.County b.Cer88cate i(it registered land) 18216 7 c.Book d.Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. ❑ Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. ❑ Inland Resource Areas(see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any.supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. For all projects affecting other Resource Area Size of Proposed Alteration Proposed Reolacement(if any) Resource Areas, please attach a a. ❑ Bank narrative 1.linear feet 2.linear feet e)pthe reesouc b. ❑ Bordering Vegetated area was Wetland 1.square feet 2.square feet delineated. c. ❑ Land Under 1.square feet 2.square feet Waterbodies and Waterways 3.cubic yards dredged wpaform3.doc•rev. 11/16/09 Page 2 of 8 LlMassachusetts Department of Environmental Protection Provided by_MgssOEP: Bureau of Resource Protection - Wetlands Mas$0EP File Number WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 ocume reneacticnlvurrubar. Salem City/Town B, Buffer Zone & Resource Area Impacts (temporary & permanent) (contra) Resource Area Size of Proposed Alteration Proposed Replacement(if any) d.❑ Bordering Land Subject to Flooding 1.square feet 2.square feet e.❑ Isolated Land 3.cublo feet of flood storage lost 4.cubk feet replaced Subject to Flooding 1.square feat 2.cu Ic feet of food storage lost 3.ask feet replaced f. ❑ Riverfront Area 1.Name of Waterway(if available) 2.Width of Riverfront Area(check one): ❑ 25 ft. -Designated Densely Developed Areas only ❑ 100 ft. -New agricultural projects only ❑ 200 ft. -All other projects 3.Total area of Riverfront Area on the site of the proposed project: square feet 4. Proposed alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft c.square NO betveeen 100 R and 200 f. 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No 8.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No 3. ® Coastal Resource Areas: (See 310 CMR 10.25-10.35) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online users: Include your Resource Area Size Of Proposed Altpra ion Proposed Replacement r anv) document transaction number a.❑ Designated Port Areas Indicate size under Land Under the Ocean, below (provided on your receipt b.❑ Land Under the Ocean page)with all 1.square feat supplementary Information you submit to tiro 2.cubk yards dredged Department c.❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d.❑ Coastal Beaches 1.square feet 2.cubk yards beach nourlahment e.❑ Coastal Dunes 1.square feet 2.eubk yards dune nourishment wpaform3.doc•rev. 11/1mg Page 3 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands MaaeDEP His Number ; WPA Form 3 - Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DmerdTrapeaction Number Salem cityrrovm B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Size of Proposed Alteration Proposed Replacement(if anvl f. ❑ Coastal Banks 1.linear feet g. ❑ Rocky Intertidal Shores 1.square feet h.❑ Salt Marshes 1 square feet 2.sq it restoration,rehab.,creation i. ❑ Land Under Salt Ponds 1.square feet 2.cubk:yards dredged I. ❑ Land Containing Shellfish 1.square feet k.❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.cubic yards dredged 1. 0 Land Subject to 4,525 Coastal Storm Flowage 1.square feet 4. ❑ Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a.square feet of SYMI b.square feet of Self Marsh 5. ❑ Project Involves Stream Crossings e.number of new stream crossings b.number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wedands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Welland Wildlife published by the Natural Heritage and Endangered Species Program(NHESP)7 To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to hftp:/Avww.mass.gov/dtwele/dfw/nheso/repulatory review/ododty habitationline viewer htm. a. ❑ Yes ® No It yes, include proof of mailing or hand delivery of Not to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 2008 Route 135,North Drive b.Date of map Westborough, MA 01581 wpafcrm3.doc•rev. 11/16/09 Pepe 4 of 8 I L11Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau Of Resource Protection - Wetlands MaasDEP lle Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 DocumentTransacdonNumber. Salem City/Town C. Other Applicable Standards and Requirements (cont'd) If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321 CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please complete Section CA.C, and include requested materials with this Notice of Intent(N01); OR complete Section C.1.d, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA Fling which may take up to 90 days to review(unless noted exceptions in Section 2 apply, see below). 1. c. Submit Supplemental Information for Endangered Species Review' 1. ❑ Percentage/acreage of property to be aftered: (a)within wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2. ❑ Assessor's Map or right-of--way plan of site 3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed treeNegetation clearing line, and clearly demarcated limits of work••" (a)❑ Project description(including description of impacts outside of wetland resource area& buffer zone) (b)❑ Photographs representative of the site (c)❑ MESA filing fee(fee information available at httD://www.mass.aov/dfwele/dfw/nheso/regulatory review/mesa/mesa fee schedule htm). Make check payable to'Commonwealth of Massachusetts-NHESP' and mail to NHESP at above address Projects alferfng 10 or more acres of land, also submit (d)❑ Vegetation cover type map of site (e)❑ Project plans showing Priority& Estimated Habitat boundaries d. OR Check One of the Following 1.❑ Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, htto:/fwww.mass.00v/dfwele/dtw/nheso/regulatory review/mesa/mesa exemptions htme the N01 must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.❑ Separate MESA review ongoing. a.NHESP Tracking 0 b.Date submitted to NHESP Some projects not in Estimated Habitat may be located in Priority Habitat,and require NHESP review(see http://w w.mass aov/dfwele/dhv/nheso/nheso him regulatory review tab). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. *'MESA projects may not be segmented(321 CMR 10.16).The applicant must disclose full development plans even N such plans are not required as part of the Notice of Intent process. wpaform3.doc•rev. 11/16/09 Page 5 of 8 Massachusetts Department of Environmental Protection Provided by MasaDEP Bureau of Resource Protection -Wetlands MaseDEp Flle Number WPA Form 3 - Notice of intent Massachusetts Wetlands Protection Act M.G.L. c. 131 §40 Document.TransecdonNumber: Salem CityfrMn C. Other Applicable Standards and Requirements (cont'd) 3.❑ Separate MESA review completed. Include copy of NHESP'no Take'determination or valid Conservation&Management Permit with approved plan. 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? a.❑ Not applicable—project is in inland resource area only b.❑ Yes N No If yes, include proof of mailing or hand delivery of N01 to either. South Shore-Cohasset to Rhode North Shore-Hull to New Hampshire: Island,and the Cape&Islands: Division of Marine Fisheries- Division of Marine Fisheries- Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 1213 Purchase Street—3rd Floor 30 Emerson Avenue New Bedford,MA 02740-W94 Gloucester, MA 01930 Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional Office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern(ACEC)? online users: a.❑ Yes N No If yes, provide name of ACEC(see instructions to WPA Form 3 or MassDEP Include your Website for ACEC locations). Note: electronic filers dick on Website. documerd transaction b.ACEC number (provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water your receipt (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? page)with all suppiemenb" a.❑ Yes N No Information you submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Deperbnerd. Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? a.❑ Yes N No 6. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a.❑ Yes.Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(kXq)and check if t.❑ Applying for Low Impact Development(LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.❑ A portion of the site constitutes redevelopment 3.❑ Proprietary BMPs are included in the Stormwater Management System. b.N No. Check why the project is exempt: 1.❑ Single-family house wpaforrn3.doc•rev. 11/16/09 Page 6 of 8 Massachusetts Department of Environmental Protection Provided by MessDEP: Bureau of Resource Protection - Wetlands MessDEP File Number WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salalememr¢Traneac6onNumbe[ S ctiyfrown C. Other Applicable Standards and Requirements (cont'd) 2.❑ Emergency road repair 3.® Small Residential Subdivision(less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project)with no discharge to Critical Areas D. Additional Information Applicants must include the following with this Notice of Intent(NOI). See instructions for details. Onllne Users: Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department. 1.® USGS or other map of the area(along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.0 Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland[BVW]replication area or other mitigating measure)relative to the boundaries of each affected resource area 3. ® Identify the method for BVW and other resource area boundary delineations(MassDEP BVW Field Data Fonn(s), Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4. ® List the titles and dates for all plans and other materials submitted with this N01. Plan to Accompany Notice of Intent a.Plan Title Eastern Land Survey Associates Inc. Christopher R. Mello PLS b.Prepared By c.Signed and stamped by March 22, 2012 1"=20' d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date 6. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, K needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. e. ® Attach NOI Wetland Fee Transmittal Form 9. ❑ Attach Stonnwater Report, if needed. wpaform3.doc•rev. 11/16/09 Page 7 of a Massachusetts Department of Environmental Protection Provided,byMasaDEP: Bureau Of ReSOUTC@ PTOteC110n -Wetlands MasaDEP Flle Number WPA Form 3 — Notice of intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Docume TrTraneeconNumber Salem E. Fees City/Town 1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. . Applicants must submit the following information(in addition to pages 1 and 2 of the N01 Wetland Fee Transmittal Form)to confirm fee payment: 1`11 2.Municipal Che k Number 3.Check da I y� a.�So 4.state Check Number 5.Check date MAeIL 1 N 1sr� 8.PeYor name on check:Fkat Neme 7.Payor name on cheek:Lest Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line of the proj I ti a- 1 9 of Appl nt 2.Date 3.Signature of Property Owner(B different) 4.Date 5.signature of Representative(d any) 8.Data For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two copies of the N01 Weiland d Fee Transmittal Form, and the City/town fee to the Conservation Commission by certified mail or hand delivery. payment, ForMassDEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one copy of the N01 Weiland Fee Transmittal Form, and a copy of the state fee payment to.the MassDEP Regional Office(see Instructions)by certified mail or hand delivery. Other. If the applicant has checked the'yes' box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. wpaform3.doc•rev. 11/16/09 Page 8 of 8