Loading...
GROVE STREET APARTMENTS - NOTICE OF PROJECT CHANGE Commonwealth of Massachusetts RECEIVE® Executive Office of Energy and Environmental Affairs ■ MEPA Office APR 18 2023 CITY OF SALEM Notice of Project Change BOARD OF HEALTH The information requested on this form must be completed to begin MEPA Review of a NPC in accordance with the provisions of the Massachusetts Environmental Policy Act and its implementing regulations (see 301 CMR 11.10(1)). EEA# 15043 Project Name: Mixed Use Development—Grove Street Apartments (previously reviewed as Mixed Use Development— Harmony Grove Road Apartments) Street Address: 60 & 64 Grove Street and 1, 3 & 5 Harmony Grove Road Municipality: Salem Watershed: North Coastal Universal Transverse Mercator Coordinates: Latitude: N420 31' 20" Lon itude: W700 54' 45" Estimated commencement date: June 2022 Estimated completion date: June 2027 Project Type: Residential & Commercial I Status of project design: 90 %complete Proponent: 116 Bennington Street Realty Trust Street Address: 282 Bennington Street Municipality: East Boston I State: MA Zip Code: 02128 Name of Contact Person: Robert H. Griffin, PE Firm/Agency: Griffin-Eng ineerin Group, LLC Street Address: 495 Cabot Street, 2"d Floor Municipality: Beverly State: MA Zip Code: 01915 Phone: 978-927-5111 Fax: E-mail: bgriffin@griffineng.com With this Notice of Project Change, are you requesting: a Single EIR? (see 301 CMR 11.06(8)) ❑Yes ®No a Special Review Procedure? (see 301CMR 11.09) ❑Yes ®No a Waiver of mandatory EIR? (see 301 CMR 11.11) ❑Yes ®No a Phase I Waiver? (see 301 CMR 11.11) ❑Yes ®No Which MEPA review threshold(s) does the revised project meet or exceed (see 301 CMR 11.03)? Identify any new or modified review threshold(s) associated with the project change. (3)(b)(5):New non-water dependent use of filled tidelands. Which Agency Permits does the revised project require? A new Chapter 91 license from MassDEP is required for the Community Building and Dog Park. A license was issued for the removal of existing buildings, environmental remediation, stormwater outfalls, and construction of a water-dependent shared-use pathway along and over the North River canal. The removal of the 60 Grove Street office building was administratively approved by MassDEP Waterways Division. A MBTA license is required for the Fitness Building and Dog Park within the Zone of Influence. A license from the Community Building is pending. A license (Application for Entry upon MBTA Railroad, Transit, or other Property) was issued for railroad crossing improvements and has expired. A new license will be required. A new Order of Conditions is required for the Dog Park and Fitness Building. A Final Order of Conditions for work under the Massachusetts Wetlands Protection Act was previously issued by MassDEP for the project. An Order of Conditions from the Salem Conservation Commission was obtained for the Communi Building _ _ Effective January 6,2023 A Tier 11 classification/permit for environmental site cleanup activities under the Massachusetts Contingency Plan (MCP) was issued by MassDEP. Cleanup work is generally complete. Identify any financial assistance or land transfer from an Agency of the Commonwealth for the revised project, including the Agency name and the amount of funding or land area in acres: Metropolitan Area Planning Council funding (approximately$140k, administered by the City of Salem) was received to support site environmental assessments. PROJECT INFORMATION In 25 words or less, what is the project change? The project change involves . . redeveloping 60 Grove St. with a community building, constructing a dog park on 3 Harmony Grove Rd, and a fitness building on 64 Grove St. See full project change description beginning on page 3. Date of publication of availability of the ENF in the Environmental Monitor: (Date: 4/24/13) Was an EIR required? ®Yes ❑No; if yes, was a Draft EIR filed? ®Yes (Date: 3/26/14 ) ❑No was a Final EIR filed? ❑Yes (Date: ) ®No was a Single EIR filed? ❑Yes (Date: ) ®No Have other NPCs been filed? ®Yes (Date(s): 3/15/15 & 8/30/16 ) ❑No If this is an NPC solely for lapse of time (see 301 CMR 11.10(2)) proceed directly to ATTACHMENTS &SIGNATURES. PERMITS 1 FINANCIAL ASSISTANCE/ LAND TRANSFER List or describe all new or modified Agency permits, financial assistance, or land transfers not previously reviewed: include list of Agency Actions (e.g., Agency Project, Financial Assistance, Land Transfer, List of Permits) New Ch. 91 License for Community Building & Dog Park META License Are you requesting a determination that this project change is insignificant such that an EIR should not be required (note that the Proponent may also seek an advisory ruling under 301 CMR 11.10(6))? A change in a Project is ordinarily insignificant if it results solely in an increase in square footage, linear footage, height, depth or other relevant measures of the physical dimensions of the Project of less than 10% over estimates previously reviewed, provided the increase does not meet or exceed any review thresholds. A change in a Project is also ordinarily insignificant if it results solely in an increase in impacts of less than 25% of the level specified in any review threshold, provided that cumulative impacts of the Project do not meet or exceed any review thresholds that were not previously met or exceeded. (see 301 CMR 11.10(6)) ❑Yes ®No; if yes, provide an explanation of this request in the Project Change 2 Description below. FOR PROJECTS SUBJECT TO AN EIR If the project requires the submission of an EIR, are you requesting that a Scope in a previously issued Certificate be rescinded? ❑Yes ®No; if yes, provide an explanation of this request The requirement to prepare an EIR for this project was rescinded in the Secretary's Certificate dated May 8, 2015. If the project requires the submission of an EIR, are you requesting a change to a Scope in a previously issued Certificate? ❑Yes ®No; if yes, provide an explanation of this request SUMMARY OF PROJECT CHANGE PARAMETERS AND IMPACTS Summary of Project Size Previously Net Currently & Environmental Impacts reviewed Change Proposed LAND Total site acreage 8.3 0 8.3 Acres of land altered 5.7 0 5.7 Acres of impervious area 2.8 +0.4 3.2 Square feet of bordering vegetated 0 0 0 wetlands alteration Square feet of other wetland alteration: Bank: 60 ft +285 ft 345 ft (30' Temp) Land Under Water: 50 sf 0 sf 50 sf Bordering Land Subject to Flooding: 80,000 sf 0 sf 80,000 sf Acres of non-water dependent use of tidelands or waterways 0 +0.3 0.3 STRUCTURES Gross square footage 137,768 +8,646 146,414 Number of housing units 129 -5 124 Maximum height (in feet) 49.2' (Apt. Bldg) 0 49.2' (Apt. Bldg) TRANSPORTATION Vehicle trips per day 895 +23 918 Parking spaces 216 -15 201 WATERIWASTEWATER Gallons/day (GPD) of water use 28,080 -2,370 25,710 GPD water withdrawal 0 0 0 GPD wastewater generation/treatment 26,325 -2,220 24,105 Length of water/sewer mains (in miles) 0.22 (water) 0 0.22 (water) 0.12 sewer 0 0.12 sewer 3 Does the project change involve any new or modified: 1. conversion of public parkland or other Article 97 public natural resources to any purpose not in accordance with Article 97? ❑Yes ®No 2. release of any conservation restriction, preservation restriction, agricultural preservation restriction, or watershed preservation restriction? ❑Yes ®No 3. impacts on Rare Species? ❑Yes ®No 4. demolition of all or part of any structure, site or district listed in the State Register of Historic Place or the inventory of Historic and Archaeological Assets of the Commonwealth? ❑Yes ®No 5. impact upon an Area of Critical Environmental Concern? ❑Yes ®No If you answered `Yes' to any of these 5 questions, explain below: PROJECT CHANGE DESCRIPTION (attach additional pages as necessary). The project change description should include: (a) a brief description of the project as most recently reviewed, (b) a description of material changes to the project as previously reviewed, (c) if applicable, the significance of the proposed changes, with specific reference to the factors listed 301 CMR 11.10(6), and (d) measures that the project is taking to avoid Damage to the Environment or to minimize and mitigate unavoidable environmental impacts. If the change will involve modification of any prior mitigation commitments or previously issued Section 61 Finding, include a description of any such changes and a draft of the modified Section 61 Finding (or it will be required in Supplemental EIR). The project change description should include a comprehensive description of the proposed project change, including a description of any work or activities associated with the original project that have occurred to date. At the discretion of the MEPA Office, an alternatives analysis for the changed component(s) of the project may be required, including a summary of alternatives considered and associated environmental impacts at a level of detail commensurate with the scope and scale of the proposed change. In addition to the required attachments, the filing should include supporting technical data (e.g., a Traffic Impact and Access Study, Stormwater Report, etc.) as appropriate. It should include a full list of mitigation commitments that remain unchanged from the previously reviewed project. The project continues to be the comprehensive redevelopment of the former Salem Oil & Grease factory site on Grove Street and Harmony Grove Road in Salem. Building demolition and environmental remediation is generally complete. The current property owner, 116 Bennington Street Realty Trust, purchased the property in April 2018. Redevelopment plans continue to include construction of three multi-family residential buildings on the 64 Grove Street parcel and a shared use path through the site. Site work commenced in June 2022. Construction of the first apartment building is underway. The material changes to the project since the most recently reviewed Notice of Project Change are: 4 1) Community Building -The 2016 Notice of Project Change was to remove the former office building on the 60 Grove Street property with no definitive redevelopment plan. The present redevelopment plan is to construct a two-story, 2,400-sf community building. The building first floor will contain a meeting room and gathering space (facility of public accommodation). The second floor will contain two private offices. A parking lot with 15 parking spaces is proposed in front of the building. The 25-ft wide water-dependent use zone along the North River Canal will be improved with benches, walkway, bike rack, landscaping and an interpretive sign describing the history of the property. 2) Dog Park-A dog park is proposed on the remediated former tannery infiltration area between the railroad tracks and the North River Canal on the 3 Harmony Grove Road property. The proposed 5,300 square-foot fence-in dog park will be open to the public. 3) Fitness Building —A one-story, 4,800 square-foot fitness building with outdoor basketball court is proposed at the rare of the 64 Grove Street property. The area was formerly designated as a containment cell for remediation waste. The waste has been removed from the site. The fitness building is intended for apartment complex residents. 4) Minor Apartment Building Changes—The property Architect and Proponent have made a few minor building changes: the number of units has decreased by 5 (from 129 to 124) and the number of bedrooms has decreased thereby reducing waster and sewer demand. 5) Minor Site Layout Changes—Minor site changes have been made reflecting Salem zoning changes. Some retaining walls have been removed or reduced due to site grading and parking layout changes. The fitness building reduced the westerly parking lot size. The Proponent presented modified project plans to the City of Salem Planning Board at public hearings in 2022. The Planning Board commissioned a third-party engineering consultant to review the site design changes and stormwater management system. The plans were modified to incorporate board and consultant input. The Planning Board approved all of the changes shown on the modified site plans provided herewith. The project changes lessen potential project impacts so that there is no longer any exceedance of the MEPA review threshold for Transportation as presented in the 2013 ENF (918 vehicle trips per a day proposed). The construction of a new non-water dependent Community Building continues to exceed the MEPA review thresholds for Wetlands, Waterways, and Tidelands. The property is entirely comprised of filled tidelands and was previously occupied by a 17,000 square-foot office and warehouse building. The proposed 2,400 square-foot Community Building is a less intensive use of the property and will better serve the public. The small Community Building significantly lessens traffic, water demand, wastewater generation, and stormwater management impacts. Unavoidable potential project impacts have been minimized through careful project design. During construction, erosion and sedimentation controls will be implemented to minimize potential impacts to the adjacent North River Canal. Proper construction techniques will avoid impacts on surrounding properties. Stormwater runoff quality from the site will improve significantly as compared to pre-construction conditions due to the implementation of modern stormwater management techniques and site-wide environmental cleanup. The Project Proponent has committed to complying with the MEPA Greenhouse Gas Policy to reduce potential future environmental impacts. 5 ATTACHMENTS &SIGNATURES Attachments: 1. Secretary's most recent Certificate on this project 2. Plan showing most recent previously reviewed proposed build condition 3. Plan showing currently proposed build condition 4. Original U.S.G.S. map or good quality color copy (8-1/2 x 11 inches or larger) indicating the project location and boundaries 5. List of all agencies and persons to whom the proponent circulated the NPC, in accordance with 301 CMR 11.10(7) Signatures: Tf Ad Date Signature of Responsible Officer Date Signature of pers reparing or Proponent NPC (if different from above) AnthonyRoberto Robert H. Griffin. PE Name (print or type) Name (print or type) 116 Bennington Street Realty Trust Griffin Engineering Group. LLC Firm/Agency Firm/Agency 282 Benninciton Street 495 Cabot Street, 2"d Floor Street Street East Boston. MA 02128 Beverly. MA 01915 Municipality/State/Zip Municipality/State/Zip 617-293-1525 978-927-5111 Phone Phone 6