64-476 - 25 WINTER ISLAND ROAD - CONSERVATION COMMISSION 76
_.., CITY OF SALEM
J � CONSERVATION COMMISSION
9F��YI.VF.Ld1aF
September 28, 2009
Doug and Jean Karam
25 Winter Island Road
Salem,MA 01970
Re: Certificate of Compliance—DEP #64-476—25 Winter Island Road, Salem,MA
Dear Mr. and Mrs. Karam
Enclosed, please find the Certificate of Compliance for the above referenced project. This
Document must be recorded at the Essex County Registry of Deeds, Shetland Park 45
Congress Street, Suite 4100 Salem, Massachusetts. Please fill out and return the Recording
Information on page 4 of the Certificate of Compliance, which will indicate to the Salem
Conservation Commission that the document has been recorded.
If you have any further questions please feel free to contact me at (978) 619-5685.
Sincerely,
Carewq
uesr
Y
Conservation Agent/ Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 813 — Certificate of Compliance 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Douglas and Jean Karam
computer, use Name
only the tab
key to move 25 Winter Island Road
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/Town State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Douglas and Jean Karam
Name
w July 7, 2008 64-476
Dated DEP File Number
3. The project site is located at:
25 Winter Island Road Salem
Street Address Cityrrown
Map 44 25 and 26
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex 27966 323
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
September 23, 2009
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed.The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpaform eb doc•rev.7113/04 Page 1 of 4
J
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 813 - Certificate of Compliance 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem Z00
Conservation o?priDEEP
Dat of Issuance
This Certificat med by a majority of the Conservation Commission and a copy sent to the
applicant and a Regional Office (See Attachment).
Signature Ox
wpaform Boom•rev.7/1 M4 Page 2 of 4
a
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-476
Pr Act M.G.L. c. 131 40 Massachusetts Wetlands Protection o , � Provided by DEP
C. Authorization (cost.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
24 September 2009
On this Day Of Month Year
before me, the undersigned Notary Public, personally appeared
K. Cornacchio, D. Pabich, M. Blier, R. Christie, and C. McCauley,
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
cityrrom
CAREY R.l it i
NatryPrbfe
�N Camiron
It 2013
nature if Notary P is
Care Du ues
Printed Name of Notary Public
August 16, 2013
My Commission Expires(Date)
Place notary seal and/or any stamp above Signature of Notary Public
wpaform so doc•rev.7113104 age 3 of 4
Massachusetts Department of Environmental Protection
�- Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
25 Winter Island Road 64-476
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpaform 8b.doc•rev.7113/04 Page 4 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
1 DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colrain Hartpden Manrce Pittsfield Tynngham
436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales
Alford Cumnington Hatfield Monterey Richmond Ware
Suite 402 Anthers) Dalton Hawley Montgomery Rowe Warwick
Springfield, MA 01103 Ashfield Deerfield Heath Monson Russell Washington
Phone:413-784-1100 Becket Eastharrpton Hinsdale Mount Washington Sandisfield Wendell
Belchenown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton
8landfoal Erving Huntington - New Salem Shelburne West Springfield
Bnmfeltl Florida Lanestamugh North Adams Shutesbury West Stockbridge
Buckland Gilt Lee Northampton Southampton Whately
Chademont Goshen Lenox Northfield South Hadley Wilbraham
Cheshire Granby Levered Orange Southwick Williamsburg
Chester Granville Leyden Ous Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley Middlefield Peru Tolland
DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge
627 Main Street Ashbumham Clinton Hubbardston Millville Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester, MA 01608 Athol Dudley Holliston Noahbomugh Southborough Westborough
Phone:508-792-7650 Auburn Ounstable Lancaster Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer - East Brookfield Leicester North Brookfield Spencer West Brookfield
Bane Fitchburg Leominster Oakham Sterling Westford
TDD:508-767-2788 Bellingham Gardner - Littleton Oxford Stow Westminster
Berlin Grafton Lunenburg Paxton Sturbndge Winchendon
Blackstone Groton Marlborough Pepperell Sutton Worcester
Bolton Harvard Maynard Petersham Templeton
Boxborough Hardwick Medway Phillipsum Townsend
Boylston Holden Mandan Princeton Tyngsborough
Brookfield - Hopedale Milford Royalston Upton
DEP Southeast Region Abington Dartmouth Freetown Mattawisett Pmvincetawn Tisbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham - Trum
Attleboro Dighton Gosnold Nantucket Rehoboth Wareham
Lakeville,MA 02347 Avon Ouxbury Halifax New Bedford Rochester Wellfeet
Phone:508-946-2700 Barnstable Easmam Hanover Noah Attlebonough Rockland West Bridgewater
Berkley East Bridgewater Hanson Norton Sandwich West
Fax: 508-947-6557 Ppa
Bourne Easton Harwich all Scituate Weal Tilbury
TDD:508-946-2795 Brewster Edgartown Kingsto O
n Oakk Bluffs Seekonk Whitman
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Marlon Plainville Stoughton
Chatham Foxborough Marshfield Plymouth Swansea
Chilmark Franklin Mashpee Plymplon Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield
1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole
Arlington Cohasset Hull Middleton - Reading Waltham
Boston, MA 02108 Ashland Concord Ipswich Millis Revere Watertown
Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nanant Rowley Wellesley
Beverly Dover Lincoln Natick Salem Wenham
TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newbu Sherbom We
stwood
eymouth
Braintree FraminghamGeorgetown
Malden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea North Stoneham Wilmington
BurlingtonCambridge
Gloucester Marblehead North Andover Sudbury Winchester
Carbntlge GrovelaHamilton
Medf Medford
North Reading Swampscott Winthrop
Canton Hamilton Mellow Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
w aform8b.doc•DEP Addresses•rev.9/28/09
P Page 1 0l 1
� �M f qqpp
r ppQ�yy � tli:
SO
MRa I'r`q
.�Y
a
i
k
R'
i
� ���' A!f- �'�.yF as ♦ y„ +
��q,�� ♦ L_,df 4 �� Q " k'�' f o' n ��,, j "iA'^' v�, � �1l'G {�`piM,l:��t^'� " -.
� fS 3� w§ti ♦:�,�r s i>'�c�' ems. �'� � '�"�.�t":�'�.t��"',� -"`tiCls'��-'��`�'�` "�' ��"�;;, a J,`3� M's.. ! r vey.; 4 ,,.,.�-'� ,wx vx '� • . 2��'` ,�,�4�r f 'sa'�+w.a` § `' .� e� '15p "-�r
�„F ,s r "�'`.i j. '}l+a► N..M"�� ,'.. 'f � � '46 � :l tr�vs y
�i.�« ads .. - +r��y ,qf,�$3 ,yG � � ♦`�.. � ��a ~„� ( �'� }+*`�
,� `. � " r " ` ,wfs r..f s'�wt�y"y v/�y i`F,,;Ay' >`� '••A A" rf 4'g< \ r arad��sg�:�t"'n��y!"S�wF.'. ; � '��t _ -.�
� .,�e ..- � R ££ ��� k�r r' .'''��R s)rs�:��'X "' Sd `� �+.�1� �X .'� r k �s3-,wA �.�• �"' � � F �� ' ��
�dr:
A�.Ir' Y r44r .
vat
w x. �` "M .r �w�4 }.,. t!}•� ". ' r 7� �'�`'c'�k J ` , 4'.-'yt`3,.d,,.. � I �,�tq
may; � ' I . !x"r � +� � �'�" n � •,�''� :�'.A`sy/. �'�
.E
Iwo,
j1
NSA
IrS�` . 2 I��f �T`� �2s\�� ♦- t� CTO, iy�..
*"RN
Y�R,;V i� Ri
���`5 � Y'f`�� �'� "'t`•'�F�k ! " t�
,Wvj `�y
r1tl { �,3i y it /� +�yti Y ggjk
��i(""������ ! A�\�1;� k�y�4�+`.�p va.>�1�� +'��K"b�8�c�lt >r,r'+"Tw �q�FJ� r . y •�
,i'';,I,r tz ; �>•.P s�� r#gy�+�+. '.1,;1�.it4�,� 3 `�'.. 4 i 4 ! 't'` i
�1 It ��® '��,. � ��fitib'rfi� .�*ii'yr��t'�\ � �i'�� �t � �r � 'i � .1•
INS Y4
�
`yy ` � •' �/ �y��..-��' rvi ^ate..s.�` ! Y�, r ��
Via, ;.
1 i
�JP�a,.
.4� � ���a. +��i. IJ !/��,��� J�';�`�• a } �� +"t+`=Z�-h'aJ'h � �.y � '.,� E.� T:,i tiai`",'
� kl '+�� 1as �. r� ' f aaf He �t_r ii'7tt X,.xly .,aae "Y�„ i •�+ ± t `
.ar
Ilk
fF
.,J �� �\�- .�^ .. , ,. as - w • � , ,�� z' _ . I s .."`y�vc',ti��'iC v �4.�±`�i� \tom. �w,els �i �h� ,�.� i;.y_"'' y � .E ,.'• } �3eaY-0}�14i'��, t �, � ,y,''',�� ..
4 � Y� l� � � ._ v� � »J✓'� �. �'\f1 3ij +��� tf�• f ` Y � ! 5•K h
,,,. .=� \ ��,t�� S - . � iSt 1 .f'-\'�Sa-•'54��`� �. xs � ».t s1'? cf y+� E '�, � " � s
��.-ray j�'t'x+ ! �; � r d��. � 3v 'a..f'��ti "�r., "�'.'r✓lSt;+.YYh..t�GYt �e�}},A �
�1
VI; 4/
�% ``t":�'..�- y I` tit �.,� 1 ��t♦ ff`x.�:,; aj*¢ �gyt,�4� � '' �,� .__
r tilt 7�j�Sr � ♦ i r �1'\F[t" l; � t'.y"y'1 i$T + �y 11 � G 7�`
a "� r "I '�t�'a�.a�A +i3t „ pt, r♦ C ��c�,4 ��1c f� k'3�;:'�$ ����� 1+: 1 T tt r. LII
t+'}k i' 'k'''r 9'' F ti' T3 x ,4= -•�Sr r
I ± , ;+4 a' ;54'kv'f�-.. �t� �/� t'b�+ �.�'>♦,�H�� 'h� �r�y,�.��' � � � � i� ;sl E:V��r(
`fit w Ta y, FI l.F;
i hip
g"IIII
,aa,..�•``1 I t 7 � `a�f. �'y l 15��[� .:,(.�#{r EPA
2,
"CY 4 'f �b y Y .\♦y. �'bt4 f,Fy`d y.1 i.�{}tPA + .
• ti1
Nr n
a
1
f ^M
IF+ ..
Ilk
! aal/Cy� alpZ 4 ..
f l �r �*
�(a -. a s . '�4� •.r i r �' � s
l Y q15�
r ` 3 � "�' /.•� . Cash.,« _ � y _ , ` .�^a•!
!
a x+ � � {y�t1• 2 ��
f � : M*° '���a f+�.yil�g�a'Q�'�' t,��4�i1 '� #i !I is` •'�
h« w
a�
r u
N4,
ti• v1 ...... � y4P lrl R
r xF�i ' Fv -• �d\���Y7 ayr�«p °H1�A ,� -�4 � ��.._ .
6I �
"Oil
y 2 ►'
• ' ^,1,s I ! `: i4 g��
.1A `
t: eFz �a
-
0
N
s �y
"=
ti ttrtl' "'F K ,r.F i � 9 -r 9 a .,+�^ .�lj:,. +5�' y �*x�c $i.<. ® tAp♦ ;r .,:�G
a \ t W• v "Yt} � `} v 4 �'^ :r. v7 .yF '� xry
�i
14
4',iy f"` �,• 2A 4 a "' r, ^r "� ' - 4 Ttr {dl >i „ '
-�,�p-��F� >�. 14� �ti.. Y a�� a�� ' ,� 'tS �`} � � # v-,a:���� � �'4'a•�- vr. b�'"�'"[5 P e , y, p
'�6���gg
t � Rs �' t'�' `�y t � �'.: '.�sf"r� + tt..�,^ a � � 'l" �'R�� r� `i'�'�k✓'"¢S �s- ivr Y vT�.
,.�q..yy�����lcv ,..+9r 1 .(�{ ka� r ;' t � 1 �� '�at2 ,urt.�`� ♦ ,' '�� '.lkq +�,� �,
��.'� da�`"'y,#� �i9P �i� l $s A zT•yA r�'S.. ,'X{,yy 9"`r ?�° `yrjg}w. [� k2S' A _
"+-
�;a� r c r.V�v, � A'i JY i"k "♦, i. � •{ .r S z.� �i�" '{'.t 1)
t v Sky,
f'* �f4lt*aN11 4$s ,�d 1'g.�. Y�:�^S�,�rF I�S'-'.. :. �'X r• t .- -� � ob���'awK`�d
�� �' �" � . � �'xx� 7�y< ^ � "i3X�'q'Y t?� '.do •, � ♦�" < � 1J x k S.
i
il 6 �b YaY —y` +.,.i �'f }W��yr 4 ��e r .. ^� y }``�T S� ��✓ice., t
,2' t+_ '.T¢
3 S �^4 � w'.. �f rp 3p . »Y � .t3ra� : r ��p,g3•�m � .. fiYiS7
j..+yYx 3t+�T'�`,. f- �.��'.r`...� .�� +•^._is �- � � J tee+ � 3� _. �;�
dG4;�. �, / / � 1�l' '"ter s>r � d _ r � iA•.caY� 7 :''" ,yv''r,1y'
�; r �. 777 ��l .1 �� �•,.a,� rr `� a �'
! �w }, e v
e
0
.ram +_ ° • �-'yY+ `!1�"'.�. '� '"�. aia.�pL"'u ^':Y
4
`"`r� �+di�{ �� a••0°.OTsa�.k �.r �f,�,�3 � � `
r,ai P fa �.•+•. R 1(� i c
tit WR
BMW
NF
�ja
SI'
s/7} .E /h'aOTi
E o �
`�' ! ' �I� :>-•,,7���--`��' gam.
PHOTO LOG
25 WINTER ISLAND ROAD,SALEM,MAssACHusETTs
nu.umm,um,ox�/al/w eruvs�nN�.toxmvvw.nmrz/scus Mmm
XN
1 gg
it �
H
Erosion control measures still In place along the public way and at the edge of 27 Wfinter Island Road,
owned by the Kan ma.
r
Line of erosion control measures,looking to the East
Page i of 2
#,A-4�P—�4`fa���aW>w
r R11 IT
� �
1 (l� 1T11ITM w
�y'����� �. � Imp "�nR•�
v
✓ran #`. - �5.�+ 3 •_y�YR I' �F _ .�.'S�r,�Cs`"'^
w
w �"
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance oq-g71,
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This request is being made by:
forms on the uQIQ.� J�Ay� A"O—fkl
computer, use Name
only the tab
key to move
your cursor- Mailing Address
do not use the _^culls l
return key. City/Town State Zip Code
q-1Q) --74 r -z.I'► 9
Q Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
1D5iut1as 4 Jea.nKaxw-n
Applicant
J LJJ%I '71 2-602) �p L4_ t{-7 (p
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized in �?s
an Order of Street Address City 7n
Conditions,the MAP 4'i I P0�►r 21 # 2-501 #2 6
property owner
must request a Assessors Map/Plat Number ParceVLot Number
Certificate of Compliance 4. The final Order of Conditions was recorded at the Registry of Deeds for:
from the issuing
authority stating Property Owner(if different) p
that the work or E SS E-1
portion of the Vl0 J
work has been County Book Page
satisfactorily
completed. Certificate(if registered land)
5. This request is for certification that(check one):
V the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
RECEIVED
AUG 2 8 2009
wpaform8a doc•rev.7113104 Page i of 2
DEPT. OF PLANNIING&
CO AUNiTY DEVELOPMENT
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection -Wetlands
WPA Form 8A — Request for Certificate of Compliance '`���
Massachusetts Wetlands Protection Act M.G.L. c. 131 §40 Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
❑ Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
N(No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see Attachment).
wpaform8a_dm•rev.7/13/04 Page 2 of 2
r o
CITY OF SALEM
- -'� CONSERVATION COMMISSION
%11E VTSTT FARM
PROJECT LOCATION: �� �`�` DATE OF SITE VISIT ! Q�
PROJECT PROPONENT: t a DEP FILE NUMBER:
PROPOSED WORK: QQ-Q- n� /¢n�- to Q2 (0-0 WOR Fo Q YDgtciv�
��..
IN ATT DANCE:
Commission Members/Agent: Abutters:
Applicant/Property Owner/Representative: d l>n (,u
C' LwaY 0.' Q/Is�
SITE VISIT PURPOSE:
❑Request for Determination ❑Abbreviated Notice of Resource Area Delineation I XI Notice of Intent
❑Certificate of Compliance ❑Enforcement/Violation ❑Emergency �❑-] Informal
AREASOF:]URISDICTION.,' � _ _ ,
INLAND RESOURCE AREAS tc COASTAL RESOURCE AREAS
D❑Bank <Land Subject to Coastal ❑Land Under the Ocean
("""`Storm Flowage
[:]Bordering Vegetated Wetland
ElPort Area ❑Coastal Beach
El Land Subject to Flooding
❑ Coastal Dune ❑Barrier Beach
❑Land Under Water Bodies or Waterway
Name: Coastal Bank ❑Rocky Intertidal Shore
❑Riverfront Area ❑ Salt Marsh ❑ Land Under Salt Pond
❑Vernal Pools ❑ Land Containing ❑Anadromous/Cata-
Shellfish dromous Fish Run
❑ Bordering Vegetated Wetland in Coastal Area
120 WA.SHINGMN S'rRFF9', SALFM, MASSACHU58:T1's 01970 • TFi,: 978.745.9595 FAX: 978.740.0404 0 WWW.sA1.cM.CoM
BUFFER ZONE (within 100-feet)
❑Water Body ❑ Bordering Vegetated Wetland ❑ Bank ❑ Coastal Beach ❑Coastal Dune
INTERESTS PROTECTED:
❑Protection of Water Supply ❑ Protection of Groundwater Supply w Flood Control
eg Storm Damage Prevention Prevention of Pollution /❑Protection of Fisheries
❑ Protection of Wildlife Habitat Protection of Land Containing Shellfish
Is this an exempt project: If so, why?
Are resource area boundaries delineated correctly? If not,explain.
a 1MA .r �.rli x
SITE VISIT DOCUMENTATION: ; ��ww . : ,, ..',h�.a
❑Photos ❑ Site Map ❑Other:
OBSERVATIONS
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
Ce�rr i� lnA cR -10
RECOMMENDATIONS: �.
i `bh(,O401T,,gl�r
r r CITY OF SALEM
* ° , CONSERVATION COMMISSION
July 7, 2008
Doug and Jean Karam
25 Winter Island Road
Salem, MA 01970
Re: Order of Conditions—DEP#64-476
25 Winter Island Road, Salem, Massachusetts
Dear Mr. and Mrs. Karam:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (as of July 16, 2008), this document and the attached
Special Conditions must be recorded at the Essex County Registry of Deeds (Shetland
Park Shetland Park 45 Congress Street, Suite 4100, Salem, MA). Once recorded, please
return a copy of Page 9 of the Order, which will indicate to the Commission that the
document has been recorded.
As indicated in the Order,prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File# 64476 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions, please feel free to contact me 978-619-5685.
Sincerely, n n
[lam'J
Carey D ues
Consery ion Agent/ Staff Planner
Enclosu
res
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor-do not Douglas and Jean Karam
use the return a. First Name b.Last Name c.Company
key. 25 Winter Island Road
d. Mailing Address
Salem MA 01970
e.City/Town I.State g.Zip Code
4. Property Owner (if different from applicant):
a. First Name b.Last Name c.Company
d. Mailing Address
e.City/Town f.State g.Zip Code
5. Project Location:
25 Winter Island Road Salem
a.Street Address b.City/Town
Map 44 Lot 26
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e.Latitude I.Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
23597 234
c.Book d. Page
7. Dates: May 8, 2008 June 12, 2008 July 7, 2008
a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance -
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Plan of Land, Salem, MA
a.Plan Title
Richard L. Williams Richard L. Williams
b.Prepared By c.Signed and Stamped by
June 12, 2008 1"=10'
d. Final Revision Date e.Scale
I.Additional Plan or Document Title g. Date
naform5.dm• rev.311105 - Page 1 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131 40
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply
a. ❑ Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ❑ Private Water Supply e. ❑ Fisheries f. ❑ Protection of Wildlife
Habitat
g. ❑ Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
5.. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under W aterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f,cu.yd dredged
wpaform5 Goc• rev.311/05 Page 2 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet
8. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet .
Cubic Feet Flood Storage c cubic feet d.cubic feet e.cubic feet f,cubic feet
9. ❑ Riverfront area zi.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft g.square feet h.square feet I.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet - b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmt. d.rly nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.rly nourishmt. d.c/y nourishmt
15. ® Coastal Banks 200 200
a.linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ® Land Subject to Coastal
Storm Flowage a.square feet b.square feet
wpaform54oc• rev.3IV05 Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection" [or, "MA DEP'J
"File Number 64-476 "
wpafcrm5.doc• rev.3l1105 Page 4 of
Massachusetts Department of Environmental Protection
I
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A)to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
space for
additional
conditions,
select box to
attach a text
document
w aform5.doc• rev.311105 Page 5 of 9
Massachusetts Department of Environmental Protection DEP He Number:
- Bureau of Resource Protection -Wetlands
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a. Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
additional The special conditions attached to this Order of Conditions relate to both the City of Salem's local
conditions,select box to ordinance and the Massachusetts Wetlands Protection Act.
attach a text -
document
vvpaform5.do • rev.311105 Page 6 of 9
Massachusetts Department of Environmental Protection
�-- Bureau of Resource Protection - Wetlands
DEP File Number:
1 WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special �t;(tf 1 �8
condition pursuant to General Conditions#4, from the date of issuance. 1.Date of s ance
Please indicate the number of members who will sign this form:
This Order must be signed by a majority of the Conservation Commission. z.Number of s gners
The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applicant.
Signatures:
✓" Q
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 12 June 2008
Day of Month Year
Before me, the undersigned Notary Public, K. Cornacchio, D. Pabich, M. Blier,ewe ,
personally appeared D. Summer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
CityrFown
CAREV R.
JareDu
11
M2ta ubl ues
f Notary Public
Place notary seal and/or any stamp above August 16, 2013
My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on by certified mail, return receipt requested, on
w ZL
Date
Date
wpalorv5.Eoc• rev.3/1/05
Page 7 of 9
Massachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.doc- rev.W1105 Page 8 of 9
Massachusetts Department of Environmental Protection
�— Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-476
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
25 Winter Island Road 64-476
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
,vpaform5.doo• rev.311105 Page 9 of 9
Attachment to Order of Conditions#64476
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-476
25 Winter Island Road
City of Salem,Massachusetts
ADDITIONAL FINDINGS
This parcel does not include habitat of rare wildlife,nor does it contain certified vernal pools, according to the June
1, 2003 Map of Estimated Habitats of Rare Wildlife and Certified Vernal Pools, published by the Massachusetts
Natural Heritage and Endangered Species Program.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
This Order permits the relocation and installation of boulders within the 100 foot buffer zone as well as Coastal
Bank and Land Subject to Coastal Storm Flowage resource areas. Boulders will be placed along 200 feet of coastal
bank to protect the upland from storm damage. This Coastal Bank does not contribute sand to nearby beaches so the
installation of boulders at the approved location will not affect the nourishment of beaches or sandy areas. The
Commission has requested that all work be completed from the upland side and that the boulders be pinned to the
existing outcroppings of bedrock and that high grade mortar, that can withstand wave action, be used between the
boulders where necessary.
It is anticipated that upon the completion of this project the existing hay bales and silt fence located on the
subject property will be removed and properly disposed.
SPECIAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(ALL 5 PAGES)at the Essex Registry of
Deeds or the Land Court for the district in which the land is located, within the chain of title of the
affected property; and recording information(Registry book and page numbers or Land Court certificate
number)must be submitted to the Salem Conservation Commission (`Commission' hereinafter)in
writing, before any work approved in this Order commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-476, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. The term"Applicant" as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
Attachment to Order of Conditions#64-476
Page 2of 5
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
7. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) The City of Salem Wetlands Protection Ordinance and its Regulations
8. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
10. The Commission and its Administrator shall have the discretion to modify the erosion/ siltation control
methods and boundary during construction if necessary.
11. The Commission or its Administrator,officers,or employees shall have the right to enter and inspect the
property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL
Chapter 131, Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any
data or documentation that it deems necessary for that evaluation.
12. The Commission or its Administrator shall have the discretion to modify the erosion/siltation control
methods and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Plan of Land, Salem, MA
Title
June 12, 2008
Dated
Richard L. Williams
Signed and Stamped by
City of Salem Conservation Commission
On file with
15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved
plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
Attachment to Order of Conditions#64-476
Page 3of 5
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above, there shall be a
PRE-CONSTRUCTION MEETING between the project supervisor, the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978) 745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. Prior to the pre-construction meeting and commencement of any activity on this site,the boundary flags of
all wetland resource areas shown on the approved site plan(s) shall be inspected and replaced by field
survey if decayed or missing so that each flag is clearly visible in the field. Flagging used to identify
wetland resource areas shall be of a color different from any other flagging used on the site. Flags shall
be checked regularly and replaced as necessary until work is completed.
20. No clearing of vegetation, including trees, or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
21. Prior to commencement of construction on site, the limits of wetland resource areas closest to
construction activity shall be flagged with surveyor's tape and shall remain in place during construction.
The limits of areas to be impacted and the limits of work in the replication area(s) shall be clearly
flagged.
EROSION CONTROL
22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment form entering wetland resource areas.
24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
Attachment to Order of Conditions#64-476
Page 4of 5
25. The area of construction shall remain in a stable condition at the close of each construction day.
26. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
27. Within thirty(30)days of completion of construction on any given portion of the project, all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
28. If soils are to be disturbed for longer that two months, a temporary cover of rye or other grass should be
established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
34. There shall be no pumping of water from wetland resource areas.
35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
36. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A,section 16.
AFTER CONSTRUCTION
37. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
" Attachment to Order of Conditions#64476
Page 5of 5
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines, fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
38. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds.
39. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
40. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
41. The boulders shall be secured by a metal pin or other method approved by the Conservation Agent or
the Commission to the existing rock outcropping.
42. High grade mortar shall be used between the large boulders where appropriate.
�o
�v CITY OF SALEM
CONSERVATION COMMISSION
}4%TTVTC%T�7T FORM
,,�
PROJECT LOCATION: °�� Wlt�f 1I0K� DATE OF SITE VISIT to �L OS
PROJECT PROPONENT: S 1 '1t0J`, 1� M"_ ' rDEP FILE NUMBER:
PROPOSED WORK: tnA�� Io yoatL,R YA4�9A�J� QA— [r6LfO.mS repi
Get df
r
IN ATTENDANCE:
Co m sso e b rs Abutters:
L
Applicant/Property Owner/Representative:
SITE VISIT PURPOSE:
❑Request for Determination ❑Abbreviated Notice of Resource Area Delineation Notice of Intent
❑Certificate of Compliance ❑Enforcement/Violation ❑Emergency ❑ Informal
AREAS OF JURISDICTION:
INLAND RESOURCE AREAS - COASTAL RESOURCE AREAS
❑Bank ❑ Land Subject to Coastal ❑Land Under the Ocean
Storm Flowage
❑Bordering Vegetated Wetland
❑ Designated Port Area ❑Coastal Beach
❑Land Subject to Flooding
❑ Coastal Dune ❑Barrier Beach
❑Land Under Water Bodies or Waterway
Name: Kcoastal Bank ❑Rocky Intertidal Shore
❑Riverfront Area ❑ Salt Marsh ❑ Land Under Salt Pond
❑Vernal Pools ❑ Land Containing ❑Anadromous/Cata-
Shellfish dromous Fish Run
❑ Bordering Vegetated Wetland in Coastal Area
120 WASHING—Mu STREET, SAILEM, MASSACtwsETTS 01970 . Tr;u 978.745.9595 FAX: 978.740.0404 . WWW.SALF.M.CoM
t
BUFFER ZONE (within 100-feet)
❑Water Body ❑ Bordering Vegetated Wetland KBank ❑ Coastal Beach ❑Coastal Dune
INTERESTS PROTECTED:
❑Protection of Water Supply ❑ Protection of Groundwater Supply Flood Control
2(Storm Damage Prevention 'prevention of Pollution ❑Protection of Fisheries
❑ Protection of Wildlife Habitat ❑ Protection of Land Containing Shellfish
Is this an exempt project: If so,why?
Are resource area boundaries delineated correctly? If not,explain.
SITE VISIT
❑Photos ❑ Site Map ❑Other:
OBSERVATIONS.
Take into account relevant aspects or features such as: natural or piped drainage or obvious pollution;
topography; existing vegetation; possible alternative sites; signs of wildlife, possible vernal pools, rare species
habitat; landmarks; recent or historical disturbances; proximity to other water bodies or drainage areas;
adjacent land uses.
RECOMMENDATIONS:
' Project File: SAL-0059A
' Douglas and Jean Karam
#25 Winter Island Road
Salem, MA 01970 RECE f t."ED
' MAY 0 8 [uu8
DEPT. OF PLANNG&
' COMMUNITY DEVELOPMENT
Notice of Intent
Application
Proposed Riprap Wall Repair
' #25 Winter Island Road
Salem, MA
' May 2008
1
' 603 Salem Street
Wakefield, MA 01880
Tel: (781) 246-2800 Nantucket, VIA 0#2554
Fax: (781) 246-7596 Tel: (508) 228-7909
YHaye�sEagineenng. Inc.
' Massachusetts Department of Environmental Protection Provided by Ma§sDEP.
Bureau of Resource Protection - Wetlands
`MassDEP File Number
WPA Form 3 - Notice of Intent
x.,
"v Document Transaction Numb
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
�i-9'D SRLGtr-t In��iLRrJ�Sp��q/on)�ZtZr�A-a9cCciryrrown
Important:When filing out A. General Information
' forms on the
computer,use 1. Project Location (Note: electronic filers will click on button to locate project site):
only the tab key
to move your 25-27 Winter Island Road and adjacent City Salem 01970
' cursor-do not
use the return parcel. b.City/Town c.Zip Code
key. Latitude and Longitude:
d.Latitude e.Longitude
' 44 25 and 26
f.Assessors Map/Plat Number g.Parcel/Lot Number
2. Applicant:
' Douglas &Jean Karam
a. First Name b. Last Name
Note:
' Before c.Organization
completing this 25 Winter Island Road
form consult
your local d.Street Address
Conservation Salem MA 01970-5766
' Commission e.City/Town f.State g.Zip Code
regarding any
municipal bylaw (978)741-2179
or ordinance. h.Phone Number i.Fax Number j.Email Address
' 3. Property owner(required if different from applicant): ❑ Check if more than one owner
Applicant and City of Salem
' a. First Name b.Last Name
c.Organization
' d.Street Address
e.Cityrrown I.State g.Zip Code
' h. Phone Number i. Fax Number j.Email address
4. Representative (if any):
' Elizabeth Wallis/ Richard Williams
a.First Name b. Last Name
Hayes Engineering Inc.
' c.Company
603 Salem Street
d.Street Address
' Wakefield MA 01880
e.City/Town f.State g.Zip Code
(781)246-2800 (781)246-7596 Iwallis@hayeseng.com
h.Phone Number i. Fax Number j.Email address
' 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$100.00 $37.50 $62.50
' a.Total Fee Paid b.Slate Fee Paid a Cityrrown Fee Paid
' wpaform1doc•rev.02/21/08 Page 1 of 8
' Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands
MassDEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
L' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Citylrown
A. General Information (continued)
' 6. General Project Description:
The applicant proposes to repair the riprap seawall as shown on the accompanying plan and as
described in the attached "Project Narrative"
' 7a. Project Type Checklist:
1. ® Single Family Home 2. ❑ Residential Subdivision
' 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial
' 5. ❑ Dock/Pier 6. ❑ Utilities
7. ❑ Coastal Engineering Structure 8. ❑ Agriculture (e.g., cranberries, forestry)
' 9. ❑ Transportation 10. ❑ Other
7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 (coastal)or 310 CMR 10.53 (inland)?
' 1. ❑ Yes ® No If yes, describe which limited project applies to this project:
' 2. Limited Project
8. Property recorded at the Registry of Deeds for:
t Essex south
a.County b.Certificate#(if registered land)
23597 234 &239
c. Book d. Page Number
' B. Buffer Zone & Resource Area Impacts (temporary & permanent)
1. ❑ Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering
' Vegetated Wetland, Inland Bank, or Coastal Resource Area.
2. ❑ Inland Resource Areas (see 310 CMR 10.54-10.58; if not applicable, go to Section B.3,
Coastal Resource Areas).
' Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
' For all projects
affecting other Resource Area Size of Proposed Alteration Proposed Replacement(if any)
Resource Areas,
please attach a
narrative a. ❑ Bank 1. linear feet 2.linear feet
explaining how b. ❑ Bordering Vegetated
the resource
area was Wetland 1.square feet 2.square feet
delineated.
' c. ❑ Land Under 1, linear feet 2.linear feet
Waterbodies and
Waterways
3.cubic yards dredged
wpaform3.doc•rev.02/21/08 Page 2 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
t Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Resource Area Size of Proposed Alteration Proposed Replacement(if any)
d. ❑ Bordering Land
' Subject to Flooding 1.square feet 2.square feet
3.cubic feet of Flood storage lost 4.cubic feet replaced
' e. ❑ Isolated Land
Subject to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet replaced
' f. ❑ Riverfront Area 1.Name of Waterway(if available)
' 2.Width of Riverfront Area (check one):
❑ 25 ft. - Designated Densely Developed Areas only
' ❑ 100 ft. - New agricultural projects only
❑ 200 ft. -All other projects
' 3. Total area of Riverfront Area on the site of the proposed project: square feet
4. Proposed alteration of the Riverfront Area:
a.total square feet b.square feet within 100 ft. c.square feet between 000 ft.and 200 ft.
1 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
6. Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
3. ® Coastal Resource Areas: (See 310 CMR 10.25-10.35)
Check all that apply below. Attach narrative and supporting documentation describing how the project
' will meet all performance standards for each of the resource areas altered, including standards
requiring consideration of alternative project design or location.
Online Users:
' Include your Resource Area Size of Proposed Alteration Proposed Replacement (if any)
document
transaction number a. ElDesignated Port Areas Indicate size under Land Under the Ocean, below
' (provided on
your receipt b. ❑ Land Under the Ocean
page)with all 1.square feet
supplementary
information you 2.cubic yards dredged
' submit to the
Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below
' d. ❑ Coastal Beaches 1.square feet 2.cubic yards beach nourishment
e. ❑ Coastal Dunes 1.square feet 2.cubic yards dune nourishment
' wpaform3.doc•rev.02/21/08 Page 3 of 8
' Massachusetts Department of Environmental Protection Provided by Ma55DEP
Bureau of Resource Protection - Wetlands MassDEP File Number 6
1 WPA Form 3 - Notice of Intent
Document Transaction Number
Sal
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 -- -�
ern
City/Tom
B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd)
Size of Proposed Alteration Proposed Replacement(if any)
f. ® Coastal Banks 25+/_
g. ❑ Rocky Intertidal 1.linear feet
Shores 1.square feet
' h.❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation
i. ❑ Land Under Salt
Ponds 1.square feet
2.cubic yards dredged
I. ❑ Land Containing
Shellfish 1.square feet
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
' above
1.cubic yards dredged
I. ® Land Subject to 105 +/-
Coastal Storm Flowage 1.square feet
4. ❑ Restoration/Enhancement
' If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the
square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional
amount here.
' a.square feet of BVW b.square feet of Salt Marsh
C. Other Applicable Standards and Requirements
' Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review
1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on
' the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural
Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts
Natural Heritage Atlas or go to htti)://www.mass.gov/dfwele/dfw/nhesl)/nhregmap.htm.
' a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
' 2006 Route 135, North Drive
b.Date of map Westborough, MA 01581
If yes, the project is also subject to Massachusetts Endangered Species Act(MESA)review(321
1 CMR 10.18). To qualify for a streamlined, 30-day, MESANVetlands Protection Act review, please
complete Section CA.C, and include requested materials with this Notice of Intent(NOI); OR
complete Section CAA, if applicable. If MESA supplemental information is not included with the NOI,
by completing Section f of this form, the NHESP will require a separate MESA filing which may take
up to 90 days to review(unless noted exceptions in Section 2 apply, see below).
wpaform3.doc•rev.02/21/08 Page 4 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
C. Other Applicable Standards and Requirements (cont'd)
' 1. c. Submit Supplemental Information for Endangered Species Review
' 1. ❑ Percentage/acreage of property to be altered:
(a)within wetland Resource Area
percentage/acreage
t (b)outside Resource Area
percentage/acreage
2. ❑ Assessor's Map or right-of-way plan of site
' 3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of
wetlands jurisdiction, showing existing and proposed conditions, existing and proposed
tree/vegetation clearing line, and clearly demarcated limits of work**
(a)❑ Project description (including description of impacts outside of wetland resource area &
bufferzone)
' (b) ❑ Photographs representative of the site
(c)❑ MESA filing fee (fee information available at:
http://www.mass.gov/dfwele/dfw/nhesp/nhenvmesa.htm)
1 Make check payable to"Natural Heritage & Endangered Species Fund"and mail to
NHESP at above address
Projects altering 10 or more acres of land, also submit.
(d)❑ Vegetation cover type map of site
(a)❑ Project plans showing Priority & Estimated Habitat boundaries
d. OR Check One of the Following
' 1.❑ Project is exempt from MESA review.
Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14,
http://www.mass.govldfwele/dfw/nhesp/nhenvexemptions.htm; the NOI must still be sent to
' NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.)
2. ❑ Separate MESA review ongoing.
' a. NHESP Tracking Number b. Date submitted to NHESP
3. ❑ Separate MESA review completed.
' Include copy of NHESP "no Take'determination or valid Conservation & Management
Permit with approved plan.
* Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP
review(see www.nhesp.org regulatory review tab). Priority Habitat includes habitat for state-
listed plants and strictly upland species not protected by the Wetlands Protection Act.
** MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans
even if such plans are not required as part of the Notice of Intent process.
twpaform3.doc•rev.02/21/08 Page 5 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cityrrown
C. Other Applicable Standards and Requirements (cont'd)
' 2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
' a. ❑ Not applicable—project is in inland resource area only
b. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to either:
' South Shore-Cohasset to Rhode North Shore-Hull to New Hampshire:
Island, and the Cape&Islands:
Division of Marine Fisheries-
Division of Marine Fisheries- North Shore Office
1 Southeast Marine Fisheries Station Attn: Environmental Reviewer
Attn: Environmental Reviewer 30 Emerson Avenue
838 South Rodney French Blvd. Gloucester, MA 01930
New Bedford, MA 02744
' Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region,
please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact
' MassDEP's Southeast Regional Office.
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
Online Users: a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP
Include your Website for ACEC locations). Note: electronic filers click on Website.
document
transaction b.ACEC
number
(provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water
your receipt (ORW)as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00?
page)with all
' supplementary a. ❑ Yes ® No
information you
submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Department. Restriction Act(M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
' a. ❑ Yes ® No
6. Is this project subject to provisions of the MassDEP Stormwater Management Standards?
' a. ❑ Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management
Standards per 310 CMR 10.05(6)(k)-(q) and check if:
1.❑ Applying for Low Impact Development(LID) site design credits (as described in
' Stormwater Management Handbook Vol. 2, Chapter 3)
2. ❑ A portion of the site constitutes redevelopment
3.❑ Proprietary BMPs are included in the Stormwater Management System.
b.® No. Check why the project is exempt:
1.❑ Single-family house
2.❑ Emergency road repair
3.❑ Small Residential Subdivision (less than or equal to 4 single-family houses or less than or
equal to 4 units in multi-family housing project)with no discharge to Critical Areas.
' wpaform3.doc•rev.02/21/08 Page 6 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
Bureau of Resource Protection - Wetlands MassDEP File Number
WPA Form 3 - Notice of Intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Cilyrrown
D. Additional Information
' Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of the
' following information you submit to the Department.
1. 0 USGS or other map of the area(along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. 0 Plans identifying the location of proposed activities (including activities proposed to serve as a
Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to
the boundaries of each affected resource area.
1 3. 0 Identify the method for BVW and other resource area boundary delineations (MassDEP BVW
Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.),
and attach documentation of the methodology.
' 4. 0 List the titles and dates for all plans and other materials submitted with this NOL
Refer to attached "List of Plans and Documents".
a. Plan Title
1 Hayes Engineering Inc. Richard L. Williams. P.E.
b. Prepared By c.Signed and Stamped by
' d. Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date
' 5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
' 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
8. ® Attach NOI Wetland Fee Transmittal Form
g. ❑ Attach Stormwater Report, if needed.
E. Fees
1. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of
the Commonwealth, federally recognized Indian tribe housing authority, municipal housing
' authority, or the Massachusetts Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee
Transmittal Form)to confirm fee payment:
)r, �k3%a J � 1`c
2. Municipal Check Number 3.Check date
I& ' , 3C\\ s\,z\ a %
' 4.State Check Number 5.Check date
e-A-, (rA S Su ✓% �0,r A.A�
6. Payor name on check: First Name 7. Payor name on check: Last Name
' wpaform3.doc•rev.02/21/08 Page 7 of 8
Massachusetts Department of Environmental Protection Provided by MassDEP:
' Bureau of Resource Protection -Wetlands MassDEP File Number
WPA Form 3 - Notice of intent
Document Transaction Number
' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
F. Signatures and Submittal Requirements
' I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans,
documents, and supporting data are true and complete to the best of my knowledge. I understand that
the Conservation Commission will place notification of this Notice in a local newspaper at the expense of
' the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand
delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the
project location.
' Q-D,� o "-) a-,-- 5) -7/69
1 ture of kp li ant 2. Date '
3.Signature of Property Owner(if different) 4. Date
5.Signature of Representative(if any) 6. Date
' For Conservation Commission:
Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents,
two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the
Conservation Commission by certified mail or hand delivery.
For MassDEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one
copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP
Regional Office (see Instructions) by certified mail or hand delivery.
Other:
If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section
and the Instructions for additional submittal requirements.
' The original and copies must be sent simultaneously. Failure by the applicant to send copies in a
timely manner may result in dismissal of the Notice of Intent.
' wpaform3.doc•rev.02/21/08 Page 8 of 8
HAYES ENGINEERING, INC. 603 SALEM STREET
' CIVIL ENGINEERING& �J
- WAKEFIELD,MA 01880
SUR
VEYORS RVEYORS HgVE9 ENpINEERINp• I (781)246-2800
--��� �c� �'- � f a ��if J ''_-,.ram r' >n�fr '` ,t�""`•';v.' =2 � t.. `J � .. 4 _
f a ry Y r •.. I'a I t {- ' . : r. •"q' �. '.t,. � Y 1 v K 3y�` o v h .)
Y,.. ] T !t< 1 ,. f✓ 1 i 1 Y✓ ,} _}; jt riVCb�+wal r, � y`1 Ill9
tt r � i � if�} •� > a �t f , � I �0� S,lltuusr 'Y w3 zi x�1,�s y ��v=., y.:.
t`fall�0-7 E i ' ... /' •a l rtlr a �pKel Yor t,y-�.� ,..'ss.'/,.�cty °-.
It� aA��r�i = �t �ti x� x , - t �: � t i 'B�cPr�f`� �r.""y*t�''``�ro sr•�p ';t�*r'� .•'t� M
rv �r f x . , r' ! •• .? 9 a 3 VJO N `� r.. r$'� rt y5 "d^ly ,.
.d„'`"�:'J PZ-t C.^ 11x• 'Y'• S Y' r+ ,3r TL ,���.
N(��yByI�l u. } �. {J •�)�"A -�i Z.-- T
sHUU�...��
r^
iY
--...7�frt�^.^.,V' .�.+ i v ' �yr n ``rl .yr 1n) \}�a�LM1+•' �5k t` :7'� � y 5,I
t �3x'w ! >Es ` .��t!�l r� C {.� ,�. Yi' �� a'^�'t ��'`.4+- f 1�TM T L}y"��J a,T1 �' sA";• Ir "` 1.. .YJ_.'.y
+-r+,! t y
-: � a �` R +^ • _y.� �t'3 �. , y.,"-*- s, � Girt/l/a6fe t
Al
!'_ ,per .y a JF/w.'. �.i°t «.'.ti to . ''hr��r�P' •-,��r' ����k � � Fri A �c+.a r xy,r .
,�. bya'i+ Atli:l "t � ! 7` 3�R.'. rr � l•.,-..yv��,.
' Y �y w f �t ..}}��-J�nl 1 ^(� •~ E'fe`W'Jr SITE f'` , .r' v 'x'- l ',�' u. a tr = a�A 'A•` .
In' , £� a1`a•Y� V lf�� vY �. fir Jf 'V.w' rt! ' �} . i w1 i'r•d ,�' '�
Si
-
a.y 9 a ` : a 1 c, x ���li a'. OPk.' r• �_„ �- �t '.. Y +11—'d# T
{ c �
�%?I f�..1 a /I', <• rppf �,} Yy 4 H76J, ,. ✓ j 1.�e�1� s -,.A�tp��Ss CJ= u =• "r'`..
I +VL
�` C 1 ! a�' r. T �&6 �{:/ ! 1 3`a r f. ^L � ° yL�, `•^I 'fi f4,� 4� #:'� ?t^c:
4 -
' /radpOX
J�, i r ( �� j / -'s. iYI'fll ✓ q7 litui {.; C{r 5 1 l. .a,.++"L_
aL
MRVP y ✓"" �i� }' ri! ° 3� ! G Tr?Bnp1A x=,
f§- `.►. r. t ' • 1 Sa Te minal .[
vF # I OUTH Wailmsn; ` `fi � Enacow�
LA
Er•'deabn�171�. d�.. � , . \•t10'D' *v y�`-g."`vur-'ne 'w , -f3 {•n .Z'�F. •,. 'Point v 4r •(,
v�i�l9tf e ,. Sy T 1' f i T '` vft ♦ �• #"^`O Ai r } ✓, f
x` t� szG',x 4t�, r i� ��• ' :ry /t• .Wn�f 16
aalBl 3y`;. �`.+^ f, >� ,-.
' UNITED STATES GEOLOGICAL SURVEY MAP LOCUS MAP N
SALEM QUADRANGLE #26 WINTER ISLAND ROAD T
SCALE: 1:26,000 (metric contours) SALEM, MASSACHUSETTS
City of Salem, MA 5/2/2008
' Parcel Map with Aerial Photo
' 44_0147
44_01411 440146
1
I44_0149
4_ 50
0151
440019 440020
� _ —
t'.
''+ e � y ' • +t4_0075
a
44. )037-
N
' 0 166
feet
Property Information ❑ Surrounding Towns
Property ID 44 0025 0 ❑ Town Boundary
Location 25 WINTER ISLAND ROAD 0 Ocean
— Streams
MAP FOR REFERENCE ONLY G Water Bodies
' NOT A LEGAL DOCUMENT ❑ Parcels
8 Selection:Parcels
Street Names
Because n afferent update srecent s,current Property
assessments may no reflect recent Menges to preperty
hourdades.Check with the asses of Assessors to confirm
' Sourdades used at time of assessment.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' Important: A. Applicant Information
When filling out
' forms on the 1. Applicant:
computer,use
only the tab key Douglas &Jean
to move your Karam
a.First Name
' do not b.Last Name
use the
use the return
key. c.Organization
25 Winter Island Road
d.
Y� d.Mailing Address
Salem MA 01970o5766
e.City/Town I.State
(978)741-2179 g.Zip Code
' In.Phone Number i.Fax Number 1.Email Address
2. Property Owner(if different):
Same as applicant.
a.First Name b. Last Name
c.Organization
d.Mailing Address
' e.CityFrown f.State
g.Zip Code
h.Phone Number i.Fax Number I.Email Address
' 3. Project Location:
25 Winter Island Road Salem
' To calculate a.Street Address b.Cityrrown
filing fees,refer B. Fees
to the category
' fee list and The fee should be calculated using the following six-step process and worksheet. Please see
examples in the Instructions before filling out worksheet.
instructions for
filling out WPA Form 3(Notice of activity Step 1/Type of Activity: Describe each type of activi that will occur in wetland resource area and
' Intent). buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
' Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
Wpaform3 doc•Wetland Fee Transmittal Form•rev.2/21108 Page 1 of 2
' Massachusetts Department of Environmental Protection
' Bureau of Resource Protection -Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' B. Fees (continued)
' Step Irrype of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
' Seawall Repair(Category 5 ) $4 x 25 l.f. $100.00
' Step 5/Total Project Fee: $100.00
Step 6/Fee Payments:
Total Project Fee: $100.00
a.Total Fee from Step 5
State share of filing Fee: $37.50
' b. 1/2 Total Fee less$12.50
City/Town share of filling Fee: $62.50
c. 1/2 Total Fee plus$12.50
' C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to
the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;a copy of
this form;and the city/town fee payment.
' To MassDEP Regional Office(see Instructions):Send a copy of the Notice of Intent or Abbreviated Notice of
Intent;a copy of this form; and a copy of the state fee payment.(E-filers of Notices of Intent may submit these
electronically.)
' Wpaform3.doc•Wetland Fee Transmiflal Form•rev.2121108 Page 2 of 2
i
' S! JEAN OLSSON KARAM 53-179-113 4389
DOUGLAS J. KAMM
25 WINTER ISLAND RD. —20a
SALEM, MA 01970
' Fay r $ Lm�
The Order
Order Of—b— Lh -�1,-� L
61 w1�o 56" Dollars L o+
EASTERN BANK 316
SALEM,MA 01970
1 800-EASTERN /
' EASTERNBANK.COM /5
For
1:0LL30098l: 04 01089 411• 4389
JEAN OLSSON KARAM 53-179-113 4 3.91,
DOUGLAS J. KARAM 6' 25 WINTER ISLAND RD. .. 1• ,� 7 20 AM
SALEM,MA 01970 - :, ^� 1
' Pay - 4
The Ord
Ord rer Of t�v /r r-//l, (.U-P A
lL 4 Zf A7 a e 0
' EASTERN BANK 316
SALEM,MA 01970
i 1-800-EASTERN
EASTERNBANK.COM' For _ _ Y/Y�LIy ✓Y7/� <�� .►�.
'J:0I & 30i7481: 04 01089i V 4391 g
1
1
AFFIDAVIT OF SERVICE
' Under the Massachusetts Wetlands Protection Act
' (to be submitted to the Massachusetts Department of
Environmental Protection and the Conservation Commission
' when filing a Notice of Intent)
��' - , hereby certify under the pains
and penalties of perjury that on S\-&\'�5 g I gave notification to
' abutters in compliance with the second paragraph of Massachusetts General Laws,
' Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8,
1994, in connection with the folPowing matter: Riprap wall repair and stabilization.
A Notice of Intent filed under the Massachusetts Wetlands Protection Act by
' Douglas and Jean Karam with the Salem Conservation Commission on
for property located at #25 & #27 Winter Island Road.
' The form of the notification, and a list of the abutters to whom it was given and
' their addresses are attached to this Affidavit of Service.
s:-\
Name Date
1
1
' Notification to Abutters and City Agencies Under the
Massachusetts Wetlands Protection Act
' And
City of Salem Wetlands Protection Ordinance
1 In accordance with the second paragraph of Massachusetts General Laws Chapter 131,
Section 40, you are hereby notified of the following.
1
A. A Notice of Intent application has been filed with the Salem Conservation Commission
' seeking permission to work within an Area Subject to Protection Under the Wetlands
Protection Act (General Laws Chapter 131, Section 40) and Salem Wetlands protection
Ordinance.
B. The name of the applicant is: Douglas and Jean Karam.
C. The address of the lot where the activity is proposed: #25 and #27 Winter Island Road
(Map 44, Lot 25 and 26).
' D. The activity proposed on the site: Riprap wall repair and stabilization.
E. Copies of the Notice of Intent may be examined/obtained at:
' Hayes Engineering, Inc., 603 Salem Street, Wakefield, MA, 01880 between the hours
of 8 a.m. and 4:30 p.m. on the following days of the week: Monday through Thursday
by appointment only. For more information, call: (781) 246—2800
' Check one: This is the _ applicant, X representative, or _ other (please
specify).
*F. Information regarding the data, time and place of the public hearing may be obtained
from: The Salem Conservation Commission (office hours vary)
Check one: This is the _ applicant, _ representative, or _ other (please
' specify).
' *NOTE: Notice of the public hearing, including its date, time and place, will be published
at least five (5) days in advance in a newspaper with general circulation in Salem.
*NOTE: Notice of the public hearing, including its date, time and place, will be posted in
' the City or Town Hall not less than forty-eight (48) hours in advance.
NOTE: You also may contact your local Conservation Commission or the nearest
' Department of Environmental Protection Regional Office for more information about this
application or the Wetlands Protection Act. To contact the DEP, call:
' *Northeast Region- Wilmington: 978-694-3200
978-740-0404 p.2
.o Cnti�''7i
�r
CITY OF SALEM
CONSERVATION COMMISSION
MEMORANDUM
TO: Assessor's Office
' FROM: CareyDuques, Conservation Agent/Planner
' DATE: May 1, 2008
RE: Certified Abutters List
' The Salem Conservation Commission is requesting a certified abutters list for the properties located
on 25 Winter Island Road (Map 44—Lot D025).
' The following are the 100-foot abutters to the project site:
' Map 44—Lots 0022, 0023, 0024,0033, 0025, 0026,0027,0031, 0020.
The addresses for each lot is attached.
When list is Certified please return to:
Carey Duques
' The Planning Department
' Thank you for your attention to this matter. If you have any questions, please contact me at
extension 5682.
Authorized Signature
1
may ut vo ua:aza UF-UU 978-740-0404 p.3
' 44 0022 0
K&LOWSKI FILED T
I I WINTER ISLAND RD
SALEM,MA 11170
44 1123 0
' OSHEAPAULC
15 WINTER ISLAND RD
SALEM,MA 01970
44 0024 0
K, LGREN TERI
' 19 WINTER ISLAND RD
SALEM,MA 01970
44 0033_0
PAGE• Il ARY F
20 W INTER ISLAND RD
SALEM,MA 01970
44_0025_0
' KARAM DOUGLASI
25 WINTER ISLAND ROAD
SALEM,MA 01970
' 44 00260
KARAM_DOUGLASI
25 WINTERIS LAN D ROAD
SALEM,MA 01910
44_0027_0
MORIARTY EDWARD M
29 W INTER ISLAND RD
SALEM,MA 01970
44 0031 0
MORIARTY EDWARD M
29 WINTER ISAAND RD
SALEM,MA 01970
' 44 0020 0
PFCEVICFI ANN
9 WINTER ISLAND ROAD
SALEM,MA OL970
NOTICE OF INTENT
' PROJECT DESCRIPTION
#25 WINTER ISLAND ROAD
SALEM, MASSACHUSETTS
' May 2, 2008
' LIST OF PLANS AND DOCUMENTS
Identifying Number/ Letter Title / Date
' PLAN Plan of Land in Salem, Mass., #25 Winter Island Road, Hayes
Engineering, Inc.; May 8, 2008 (1 sheet).
' A Project Narrative, #25 Winter Island Road, Salem, MA; May 8,
2008
1
PROJECT NARRATIVE
#25 WINTER ISLAND ROAD
SALEM, MASSACHUSETTS
' May 8, 2008
Existing Conditions
The subject locus is at the riprap seawall running along the coastline at the northerly portion of
' the property on the properties at #25 and #27Winter Island Road, as well as the City—owned
unpaved portion of Winter Island Road located adjacent to the property. The residential
property contains a single family house with associated driveway, and other accessory
structures and surrounding lawn. The area within the layout of Winter Island Road contains a
pathway and seawall along the beach. Resource areas consist of Coastal Bank (defined by
topography and wall face, approximately at elevation 10', per DEP Coastal Bank Policy), Land
Subject to Coastal Storm Flowage (FEMA elevation 10.0), Rocky Intertidal Shore (natural rock
' area between mean high water and mean low water), and Salt Marsh.
' Proposed Conditions
Work will occur within the100-foot buffer zone as well as Coastal Bank and Land Subject to
' Coastal Storm Flowage (L.S.C.S.F) resource areas.
Portions of the riprap wall have become dislodged or otherwise damaged and need to be rebuilt
' and repaired to ensure that the riprap wall performs its continuing role as a storm water buffer
protecting the properties well into the future. Since most work will occur within the footprint of
existing structures or within existing areas of disturbance, the project should have an
' insignificant impact upon the resource areas and buffer zone.
Existing and proposed site features, resource areas and buffer zone boundaries are shown on
' the attached Hayes Engineering, Inc. plan titled," Plan of Land in Salem, Mass." and dated May
8, 2008.
' Regulations
Wetlands Protection Act (310 CMR 10.00 et. all
These activities are subject to performance standards contained in the Massachusetts
Wetlands Protection Act Regulations. These standards and how the project will meet them are
' outlined below.
' Buffer Zone
Portions of the 100' Buffer Zone will be temporarily disturbed due to the need for an equipment
' and material staging area and for personnel access to the work area. There may be a small
amount of landscaping performed in order to re-establish lawn grass or other vegetation along
the rebuilt riprap.
' 1
' Project Narrative, #25 Winter Island Road, Salem, MA
' May 8, 2008
' Coastal Bank— 310 CMR10.30
The extent of the coastal bank resource area is represented by the top of the riprap wall, and
1 generally by the elevation 10' contour. This riprap wall functions only to control storm damage
prevention to the properties as a vertical buffer to storm waters and does not contribute
sediment through erosion. Proposed repair work within the Coastal Bank will entail
reconstructing or repairing portions of the riprap wall within the same existing footprint as shown
on the accompanying plan. Backhoe and other necessary equipment will be positioned landside
of the wall during construction activities, thereby minimizing disturbance to the adjacent beach.
' Impact to this resource area from the proposed activities will be insignificant since repair work
will take place within the same footing as the existing portion of wall. A review of the Natural
Heritage & Endangered Species Program Atlas (2006 edition) revealed that the project is not
within any estimated habitat of rare or endangered species or priority habitat, and thus will not
have any adverse effect on such species. Best practical measures have been used in the
design of the structure to ensure the coastal bank's storm damage prevention role will be
' preserved. Refer to the attached plan for repair details.
Land Subject to Coastal Storm Flowage (L.S.C.S.F.)
There will be the same disturbances to the LSCSF as described above for the buffer zone and
described for Coastal Bank. There are no Performance Standards specified for Land Subject to
' Coastal Storm Flowage.
1
1
2