64-463 - 15,25 WINTER ISLAND ROAD - CONSERVATION COMMISSION / �. �
la3 �
(� � .�� l�nfer Zsl�d �•
-_
.. o VVIP, ar1,
CITY OF SALEM
CONSERVATION COMMISSION
September 28, 2009
Doug and Jean Karam
25 Winter Island Road
Salem,MA 01970
Re: Certificate of Compliance—DEP H 64-463- 15 and 25 Winter Island Road,
Salem,MA
Dear Mr. and Mrs. Karam:
Enclosed, please find the Certificate of Compliance for the above referenced project. This
Document must be recorded at the Essex County Registry of Deeds, Shetland Park 45
Congress Street, Suite 4100 Salem, Massachusetts. Please fill out and return the Recording
Information on page 4 of the Certificate of Compliance, which will indicate to the Salem
Conservation Commission that the document has been recorded.
If you have any further questions please feel free to contact me at (978) 619-5685.
Sincerely,
Carey Duq es
Conservation Agent/ Staff Planner
Enclosures
CQ Ann and Paul O'Shea
DEP Northeast Regional Office
J
Massachusetts Department of Environmental Protection
i Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the Ann and Paul O'Shea and Douglas and Jean Karam
computer, use Name
only the tab
key to move 15 and 25 Winter Island Road (respectively)
your cursor- Mailing Address
do not use the Salem MA 01970
return key. City/Town _ State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to:
Ann and Paul O'Shea and Douglas and Jean Karam
Name
September 18, 2007 64-463
Dated DEP File Number
3. The project site is located at:
15 and 25 Winter Island Road Salem
Street Address Cityrrown
Map 44 23 and 25
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Ann and Paul O'Shea and Douglas and Jean Karam
Property Owner(if different)
Essex 27295-O'Shea and 27253- 26 and 136
County Karam respectively
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent, on:
September 23, 2009
Date
B. Certification
Check all that apply:
® Complete Certification: It is hereby certified that the work regulated by the above-referenced
Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the
above-referenced Order of Conditions have been satisfactorily completed.The project areas or work
subject to this partial certification that have been completed and are released from this Order are:
wpalorm 9b.Eoc•rev.7/13104 Page 1 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification (cont.)
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced
Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no
longer valid. No future work subject to regulation under the Wetlands Protection Act may
commence without filing a new Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any
conditions contained in the Final Order, such as maintenance or monitoring, that should continue
for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Salem ZFS 7,00
Conservati Commission Dat of Issuance
This Certifi to must b signLbyaority of the Conservation Commission and a copy sent to the
applicant an p op ate DE Office (See Attachment).
Signatures
l/ OlA
wpaform 8b.doc•rev.7113/04 Page 2 of 4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Authorization (cont.)
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
24 September 2009
On this Day Of Month Year
before me, the undersigned Notary Public, personally appeared
K. Cornacchio, D. Pabich, M. Blier, R. Christie, and C. McCauley,
Name of Document Signer
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged
to me that he/she signed it voluntarily for its stated purpose.
As member of Salem Conservation Commission
City/rows
CAREY Fi.DUOUES
MYcawd�fF+�
1.1.E
Signature f Notary Public
Care . Du ues
Printed Name of Notary Public
August 16, 2013
My Commission Expires(Date)
Place notary seal and/or any stamp above Signature of Notary Public
wpaferm 8b.doc•rev.7113/04 Page 3 of 4
lMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of
Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
---------------------------------------------------------------------------------------------------------------------------
To:
Salem
Conservation Commission -
Please be advised that the Certificate of Compliance for the project at:
15 and 25 Winter Island Road 64-463
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number T.
Signature of Applicant
wParorm 80,Occ-rev 7/13104 Page 4 0!4
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands
DEP Regional Addresses
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Mail transmittal forms and DEP payments,payable to:
Commonwealth of Massachusetts
Department of Environmental Protection
Box 4062
Boston, MA 02211
DEP Western Region Adams Colrain Han"en Monroe Pittsfield Tynngham
436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales
9 Alford Cummngton Hatfield Monterey Richmond Ware
Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick
Springfield,MA 01103 Ashneld Deerfield Heath Monson Russell Washington
Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell
Belchertown East Longmeadow Holland New Ashford Savoy Westfield
Fax:413-784-1149 Bemardston Egremont Holyoke New Marlborough Sheffield Westhampton
Blandford Erving Huntington New Salem Shelburne West Springfield
Bonifield Flonda Lanesborough North Adam Shueesbury West Stockbridge
Buckland Gill Lee Northampton Southampton Whaiely
Chademont Goshen Lenox Northfield South Hadley Wilbraham
Cheshire Granby Leverett Orange Southwick Williamsburg
Chester Granville Leyden Otis Springfield Williamstown
Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor
Chicopee Greenfield Ludlow Pelham Sunderland Worthington
Clarksburg Hadley Middlefield Peru Tolland
DEP Central Region Acton Chariton Hopkinton Millbury Rutland Uxbridge
627 Main Street Ashbumham Clinton Hubbardston Millville Shirley Warren
Ashby Douglas Hudson New Braintree Shrewsbury Webster
Worcester,MA 01608 Athol Dudley Holliston NoMborough Southborough Westborough
Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston
Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield
Bane Fitchburg Leominster Oakham Sterling Westford
TOD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster
Berlin Grafton Lunenburg Paxton Sturbridge Winchendon
Blackstone Groton Marlborough Pepperell Sutton Worcester
Bolton Harvard Maynard Petersham Templeton
Boxborough Hardwick Medway - Phillipston Townsend
Boylston Holden Mention - Princeton Tyngsborough
Brookfield Hopedale Milford Royalstm Upton
DEP Southeast Region Abington Dartmouth Freetown Madapoiseit Provincetown Tsbury
20 Riverside Drive Acushnet Dennis Gay Head Middleborough Paynham Truro
Attleboro Dighton Gosnold Nantucket Rehoboth Wareham
Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Welli l
Phone:508-946-2700 Barnstable Easthani Hanover North Atdeborough Rockland West Bridgewater
Fax:508-947-6557 Berkley East Bridgewater Hanson Notion Sandwich Westport
Bourne Easton Harwich Norwell Scituate West Tsbury
TDD:508-946-2795 Brewster Edganown Kngston Oak Bluffs Seekonk Whims,
Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham
Brockton Fall River Mansfield Pembroke Somerset Yarmouth
Carver Falmouth Mallon Plainville Stoughton
.Chatham Foxborough Marshfield Plymouth Swansea
Chllmark Franklin Mashpee Plyrtpton Taunton
DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield
1 Winter Street Andover Chelsea Holbrook Methuen Randolph Watpde
Arlington Cohassel Hull Middleton Reacting Waltham
Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown
Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland
Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley
Beverly Dover Lincoln Natick Salem Wenham
TDD:617-574-6868 Billedce Dracut Lowell Needham Salisbury West Newbury
Boston Essex Lynn Newbury Saugus Weston
Boxford Everett Lynnfield Newburyport Sherbom Westwood
Braintree Framingham Maiden Newton Somerville Weymouth
Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington
Burlinglon Gloucester Marblehead North Andover Sudbury Winchester
Cambridge Groveland Medfield North Reacting Swampscott Winthrop
Canton Hamilton Medford Norwood Tewksbury Woburn
Carlisle Haverhill Melrose Peabody Topsfield
wpaform9b doc•DEP Addresses•rev.928109 Page 1 of 1
�CONW'P
CITY OF SALEM
CONSERVATION COMMISSION
September 18, 2007
Ann and Paul O'Shea
15 Winter Island Road
Salem, MA 01970
Douglas and Jean Karam
25 Winter Island Road
Salem, MA 01970
Re: Order of Conditions—DEP#64463
Repairs to existing Rip Rap Wall,15 and 25 Winter Island Road
Salem,Massachusetts
Dear Mr. and Mrs. O'Shea and Mr. and Mrs. Karam:
Enclosed, please find the Order of Conditions for the above referenced project. Because
there are two properties involved I have sent the original to the O'Sheas and a true copy,
so attested by the City Clerk, to the Karam's.
Following the 10-day appeal period (as of September 28, 2007), the enclosed document
and attached Special Conditions must be recorded at the Essex County Registry of Deeds
(36 Federal Street, Salem, MA). Once recorded, please return a copy of Page 9 of the
Order,which will indicate to the Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing:
1. this Order must be recorded,
2. a sign shall be displayed showing DEP File#64463 within public view, and
3. contact me at least 48 hours prior to any activity to schedule a pre-construction
meeting to review the Order with your hired contractor.
If you have any further questions,please feel free to contact me 978-619-5685.
Since
GcP%�
Carey Du e1sNf
Conservation Agent/Staff Planner
Enclosures
CC: DEP Northeast Regional Office
7LMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 — Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your
cursor-do not Ann and Paul O'Shea Douglas and Jean
use the return a. First Name Karam c.Company
key. b.Last Name
15 and 25 Winter Island Road
y� d.Mailing Address
Salem MA 01970
e.City/Town f.State g.Zip Code
4. Property Owner (if different from applicant):
Ann and Paul O'Shea Douglas and Jean
a. First Name Karam c.Company
15 and 25 Winter Island Road
d. Mailing Address
Salem MA 01970
e.Cityrrown I.State g.Zip Code
s. Project Location:
15 and 25 Winter Island Road Salem
a.Street Address b.Cityrrown
44 Lots 23 and 25
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e. Latitude f.Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
(A) 16314 (A) 130
(B) 23597 (B) 239
7. Dates: July 10, 2007 September 13, 2007 September 18, 2007
a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Plan to Accompany Notice of Intent in Salem, MA
a. Plan Title
Hyes Engineering Richard Williams
b.Prepared By c.Signed and Stamped by
July 3, 2007 1"=10'
d. Final Revision Date e.Scale
I.Additional Plan or Document Title g.Date
naform5.doc• rev.3/1/05 Page 1 of 9
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
t. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g. ® Groundwater Supply It. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations.This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific information which is lacking and
why It Is necessary is attached to this Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
s. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and
wetland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
a. ❑ Bank a.linear feet b.linear feet c.linear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. El Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
wpaforvd.eoc• rev.3/1105 Page 2 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
7. ❑ Bordering Land
Subject t0 Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage e.cubic feet f.cubic feet g cubic feet h.cubic feet
e. ❑ Isolated Land Subject
to Flooding a.square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
9. ❑ Riverfront area a.total sq.feet b.total sq.feet
Sq ft within 100 ft c.square feet d.square feet e.square feet I.square feet
Sq ft between 100-200 ft g,square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet c.dy nourishmt. d.c/y nourishmt.
14. ❑ Coastal Dunes a.square feet b.square feet c.cty nourishmt. d.dy nourishmt
15. ® Coastal Banks 72 72
a.linear feet b.linear feet
16. ❑ Rocky Intertidal Shores a.square feet b.square feet
17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet
ta. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
19. ❑ Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ® Land Subject to Coastal 409 409
Storm Flowage a.square feet b.square feet
"aforrr5.dcc• rev.3/1/05 Page 3 of 9
L1Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper,cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
B. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MA DER]
"File Number 64-463 "
wpaform5,dw• rev.31IJ05 Page 4 of 9
7LMassachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more See attached document
space for
additional
conditions,
select box to
attach a text
document
wpaforr .do - rev.311/05 Page 5 a19
LMassachusetts Department of Environmental Protection DEP File Number:
Bureau of Resource Protection - Wetlands
ei WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
t. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
2. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a.Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a. Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above.To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows:
additional The special conditions attached to this Order of Conditions relate to both the City of Salem's local
conditions,select box to ordinance and the Massachusetts Wetlands Protection Act.
attach a text
document
waform .do - rev.311/05 Page 6 of
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance q
This Order is valid for three years, unless otherwise specified as a special I 0
condition pursuant to General Conditions #4, from the date of issuance. 1.D to of ssuance
Please indicate the number of members who will sign this form: i" (M 4uy- q
This Order must be signed by a majority of the Conservation Commission. 2.Number of signerg
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Protection Regional Office, if not filing electronically, and the property owner, if different
from applican
Signatures, ,
(/ pl(/o az-el'o
No ary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 13 of September 2007
Day Month Year
Before me, the undersigned Notary Public, K. Cornacchio, da{4xfla0, D. Pabich, M. Blier, K.
personally appeared Glidden
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem
City/TownConservation Commission
aer n Duou
raft
arson
mor
Signature of Mary Public
Alm Carey R. Duques
Printed Name of Notary Public
16 13
Place notary seal and/or any stamp above August
My Commisssioonn Expires
pires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on [x by certifi d mail, return receipt requested,on
gx67T
Date Date
wpafor 5.doc• rev.3/1/05 Page 7 of
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection- Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, §40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpaform5.tloc• rev.91/05 Page 8 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
--------------------------------------------------------------------------------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
15 and 25 Winter Island Road 64-463
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wraformSAoc• rev.3/1/05 Page 9 of 9
Attachment to Order of Conditions# 64-463
Page lof 5
SALEM CONSERVATION COMMISSION
DEP FILE #64-463
15 and 25 Winter Island Road
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Veinal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
veinal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131,Section 40 and the City
of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13.
This Order permits the rebuilding a an existing rip rap seawall show on the approved plan. The approved
improvements include work that will occur within the 100 foot buffer zone, Coastal Bank, and Land Subject to
Coastal Storm Flowage. The work to occur on the wall includes repairing sections of the riprap wall within the
existing footprint. This coastal bank functions to control storm damage. The riprap stones are to be removed, filer
fabric will be placed on the embankment, and rip rap boulders (size: min.1/4 ton) will be replaced on the
embankment. The section of existing rip-rap to be repaired/rebuilt are located on 15 and 25 Winter Island Road and
is approximately 72 feet in length. A second section of approved work is located on 15 Winter Island Road and
abuts the City of Salem right of way. The Conservation Commission approved the installation of a concrete
abutment located to the south of an exiting dock. Proposed rip rap located to the west of the existing dock was also
approved to control erosion and stabilize the area to the south of the top of the coastal bank. The Conservation
Commission did not approve any work on the City of Salem's property under this Order of Conditions. The
Commission permitted the proposed work as described above, with additional conditions including that the existing
timbers located in the seawall be removed and properly disposed off. The Commission also noted that if the timbers
located on the beach become lose they shall be removed and properly disposed of as well.
GENERAL CONDITIONS
1. This Order of Conditions must be recorded in its entirety(all 5 pages) at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located,after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
Attachment to Order of Conditions#64-463
Page 2of 5
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-463, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant' as used in this Order of Conditions shall refer to the owner,any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act (P.L. 92-500, 86 stat. 816), U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Hoodplains under the State Building Code(780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Plan to Accompany Notice of Intent in Salem, MA
(Title)
Attachment to Order of Conditions # 64-463
Page 3of 5
July 3, 2007
(Dated)
Richard L. Williams
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s) or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Meeting between the project supervisor, the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted,if necessary, during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978) 745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
EROSION CONTROL
20. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
21. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
22. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
Attachment to Order of Conditions #64-463
Page 4of 5
23. The area of construction shall remain in a stable condition at the close of each construction day.
24. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps,silt filter bags or other means approved by the Commission or its
Administrator.
25. Within thirty(30) days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
26. If soils are to be disturbed for longer that two(2) months,a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
27. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
28. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
29. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
30. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
31. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
32. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
33. There shall be no pumping of water from wetland resource areas.
34. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
35. During construction,all drainage structures shall be inspected regularly and cleaned as necessary.
36. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21A,section 16.
AFTER CONSTRUCTION
37. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
Attachment to Order of Conditions #64-463
Page 5of 5
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components,wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
38. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
39. If the completed work differs from that in the original plans and conditions,the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
40. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
41. Applicant shall remove existing timbers located in the seawall and properly disposed of off site.
42. Applicant shall remove and properly dispose of existing timbers located on the beach if they become
lose.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information 111IIIII IIIII I IIIIIIIIIIIII)
Important: Salem 2007110100215 Bk;27295 Pg;26
When filling 1.Conservation Commission From:, 11/01/2007 12:01:00 OTHER Ps 1/12
out forms on
the computer, 2. This issuance is for (check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3.To: Applicant:
move your
cursor-do not Ann and Paul O'Shea Douglas and Jean
use the return a. First Name Karam
key. b.Last Name c.Company
15 and 25 Winter Island Road
d. Mailing Address
Salem MA 01970
e.City/Town I.State g.Zip Code
4. Property Owner(if different from applicant):
Ann and Paul O'Shea Douglas and Jean
a. First Name Karam c.Company
15 and 25 Winter Island Road
d. Mailing Address
Salem MA 01970
e.City/Town I.State - g.Zip Code
e. Project Location:
15 and 25 Winter Island Road Salem
a.Street Address b.Citylrown
44 - Lots 23 and 25
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note:
electronic filers will click for GIS locator): e. Latitude f.Longitude
6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
(A) 16314 (A) 130
(B) 23597 (B) 239
7. Dates: July 10, 2007 September 13 2007 September 18, 2007
a. Date Notice of Intent Filed b. Date Public Hearing Closed c.Date of Issuance
a. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Plan to Accompany Notice of Intent in Salem MA
a. Plan Title
Hyes Engineering Richard Williams
b. Prepared By c.Signed and Stamped by
July 3, 2007 1"=10'
d. Final Revision Date e.Scale
f.Additional Plan or Document Title g.Date
wraform5.d=- rev.3/1/05
Page 1 of 9
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-463
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
15 and 25 Winter Island Road 64-463
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
wpaform5.do • rev.3/1/05 Page 9 of 9
1
1 Project File: SAL-0064
Ann & Paul O'Shea
1 #15 Winter Island Road
Salem, MA 01970
1 RECEIVED
1 JUL 1 0 Z007
DEPT.OF PLANNING&
COMMUNITY DEVELOPMENT
1 Notice of Intent
1 Application
1
1
Proposed Riprap Wall Repair
#15 and #25 Winter Island Road
1 Salem, MA
1 July 2007
1
1
1 603 Salem Street
Wakefield, MA 01880
Tel: (781) 246-2800 Nantucket, MA0#2554
Fax: (781) 246-7596 Tel: (508) 228-7909
1 Hayes Engineering, Inc.
' • e
Massachusetts Department of Environmental Protection ProYidedti o thln ,M".WIr
pi
Bureau of Resource Protection - Wetlands r
WPA Form 3 - Notice of Intent CEP File Number� ;
-��a +iR
.,``.'Document Teansactlon Numbed
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
Pi`�� SRlaw� We—�'.�.d. s � Yo�er�-��c„ �`�cl�.v�s...s.2- City/Town
Important:When filling out A. General Information
forms on the
computer,use 1. Project Location (Note: electronic filers will click on button for GIS locator):
only the tab key
to move your 15&25 Winter Island Road Salem
cursor-do not a.Street Address b.City/Town/Town c.Zip Code
use the return y P
key. Latitude and Longitude:
d. Latitude e. Longitude
°6 44 23 &25
f.Assessors Map/Plat Number g.Parcel/Lot Number
M 2. Applicant:
' Ann & Paul O'Shea
a.First Name b. Last Name c.Company
Note: 15 Winter Island Road
Before d.Mailing Address
completing this Salem MA 01970-5766
form consult
your local e.City/Town f.State g.Zip Code
Conservation (978) 745-0250
' Commission h. Phone Number i. Fax Number j.Email address
regarding any
municipal bylaw 3. Property owner(if different from applicant): ® Check if more than one owner
or ordinance.
(A)Ann & Paul (B) Douglas &Jean Karam
O'Shea b. Last Name c.Company
15 Winter Island Road 25 Winter Island Road
' d.Mailing Address
Salem MA 01970-5766
e.City/Town f.State g.Zip Code
1 h. Phone Number i. Fax Number j.Email address
4. Representative (if any):
' Hayes Engineering, Inc.
a.Firm
Elizabeth Wallis/ Rich Williams
' b.Contact Person First Name c.Contact Person Last Name
603 Salem Street
d.Mailing Address
Wakefield MA 01880
e.City/Town f.State g.Zip Code
(781)246-2800 (781)246-7596 Iwallis@hayeseng.com
h. Phone Number I.Fax Number j.Email address
' 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form):
$288.00 $131.50 $156.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
' 6. General Project Description:
The applicant proposes to rebuild the riprap seawall as shown on the accompanying plan and as
' described in the attached "Project Narrative".
-� wpaform3.doc•rev.4112/06 Page 1 of 7
' Massachusetts Department of Environmental Protection ro
Bureau "deabynEe:
i s
of Resource Protection -Wetlands
WPA Form 3 - Notice of Intent 'lu �:5,`
r Document Transaction Numbei
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem "96
' City/Town
A. General Information (continued)
7. Project Type Checklist:
a. ❑ Single Family Home b. ❑ Residential Subdivision
' c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. ❑ Utilities
g. ® Coastal Engineering Structure h. ❑ Agriculture—cranberries,forestry
i. ❑ Transportation j. ❑ Other
8. Property recorded at the Registry of Deeds for:
' Essex south (A)130
a.County (B)239
(A) 16314
(B) 23597 d.Certificate#(if registered land)
9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. ❑ Yes b. ® No
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance, whichever is later.
1
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
' inland bank, or coastal resource area?
a. ❑ Yes-answer 11 below,then skip to Section C.
b. ® No-skip to Section B.
11. Buffer Zone Setback— For projects that involve work only in the buffer zone, select the applicable
adjacent resource area (check one):
a. ❑ BVW b. ❑ inland bank c. ❑ coastal resource area
' The distance between the closest project disturbance and the associated resource area is:
N.A.
d.linear feet
' wpaform3.doc•rev.4/12/06 Page 2 of 7
' Massachusetts Department of Environmental Protection ProgidedbyUE—P
Bureau of Resource Protection - Wetlands
H DEP F61e Number Ring,�. -
� iE�•-
WPA Form 3 - Notice of Intent
Dowment Transaction NNumbe
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
' B. Resource Area Effects City/Town
' 1. Inland Resource Areas
' Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
' Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Bank 1.linear feet 2.linear feet
number b. ❑ Bordering Vegetated
(provided on Wetland 1.square feet 2.square feet
your receipt
page)with all c. ❑ Land Under 1.square feet 2.square feet
supplementary Waterbodies and
information you Waterways 3.cubic yards dredged
submit to the d. El Bordering Land
1 Department. Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
❑ For f. ❑ Riverfront area 1. Name of Waterway(if available)
projects
impacted by 1.Width of Riverfront Area (check one):
the riverfront
area and a ❑ 25 ft. - Designated Densely Developed Areas only
buffer zone of
another ❑ 100 ft. - New agricultural projects only
resource
area, add ❑ 200 ft. -All other projects
1 50%to the
total fee. 2.Total area of Riverfront Area on the site of the proposed project:
Square Feet
' 3. Proposed alteration of the Riverfront Area:
a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft.
' 4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
5.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No
' wpaform3.doc rev.4112/06 Page 3 of 7
' Massachusetts Department of Environmental Protection Pravded byaeP *ire ipi
Bureau of Resource Protection -Wetlands = `' 'E t
' µr`, DEP Ftie Num er
WPA Form 3 - Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 - °Salemnt7ran6actioo mbeGi
Salem
' City/Town
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
' project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
' Online Users:Include your Resource Area Size of Proposed Alteration Proposed Reolacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.Square feet
your receipt
page)with all 2.Cubic yards dredged
supplementary Indicate size under Coastal Beaches and/or Coastal Dunes
information you c. ❑ Barrier Beach below
submit to the
1 Department. d. ❑ Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1.Square feet 2.Cubic yards dune nourishment
f. ® Coastal Banks 1.Linear near feet
g. ❑ Rocky Intertidal Shores 1.Square feet
h.❑ Salt Marshes 1.Square feet 2.Sq ft restoration,rehab.,or creation
i. ❑ Land Under Salt Ponds 1.Square feet
2.Cubic yards dredged
' j. ❑ Land Containing
Shellfish- 1.Square feet 2.Square feet restoration,rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
' Ocean, and/or inland Land Under Waterbodies and Waterways,
above
' 1.Cubic yards dredged
i. ® Land Subject to Coastal 409 +/-
Storm Flowage 1.Square feet
3. Limited Project:
' Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
' a. ❑ Yes ® No If yes, describe which limited project applies to this project:
b. Limited Project
' wpaform3.doc•rev.4/12/06 Page 4 of 7
Massachusetts Department of Environmental Protection flrovldedbyDEPt� r,
Bureau of Resource Protection - Wetlands
,ij DEPFileNumber�, ��F�
WPA Form 3 - Notice of Intent �i`�,M
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F DocumentTransacbonNomber,
Salem
City/Town
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document
transaction 2. ElDEP BVW Field Data Form (attached)
number
(provided on 3 ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached)
your receipt
page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation):
supplementary
information you a. ❑ 50% or more wetland indicator plants
submit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ❑ Groundwater indicators
1 d. [IDirect observation
For all projects
affecting other e. ❑ Hydric soil indicators
Resource
Areas, please f. ❑ Credible evidence of conditions prior to disturbance
attach a Coastal Bank, Land Subject to Coastal Storm Flowage
narrative 5. Other resource areas delineated:
the explaining
ini s resource
D. Other Applicable Standards and Requirements
area was
delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
a. ❑ Yes M No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2006 Route 135, North Drive
b.Date of Map Westborough, MA 01581
2. For coastal projects only, is any portion of the proposed project located below the mean high water
1 line or in a fish run?
a.El Yes sh No If yes, include proof of mailing or hand delivery of NOI to:
Division of Marine Fisheries- Southeast Marine Fisheries Station
50A Portside Drive
Pocasset, MA 02559
b. ❑ Not applicable—project is in inland resource area only
r3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
' wpaform3.doc•rev.4/12/06 Page 5 of 7
' Massachusetts Department of Environmental Protection froVideabyDEl' « a
Bureau of Resource Protection - Wetlands ter? `
-DEP File Number,�E,� �3
WPA Form 3 - Notice of Intent Documen[Tra sactlonNumder
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 `u:4 N
' Salem
City(rown
D. Other Applicable Standards and Requirements
' Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes ® No
' number
(provided on
your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page)with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
' submit to the
Department. b. Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No
If yes, stormwater management measures are required. Applicants should complete the Stormwater
Management Form and submit it with this form.
' b. If no, explain why the project is exempt:
Project is repair of seawall accessory to two single family houses.
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of
the following information you submit to the Department.
1. ® USGS or other map of the area (along with a narrative description, if necessary)containing
' sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. 23 Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure)relative
to the boundaries of each affected resource area.
3. ❑ Other material identifying and explaining the determination of resource area boundaries
' shown on plans (e.g., a DEP BVW Field Data Form).
4. ® List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
' 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
6. ® Attach NOI Wetland Fee Transmittal Form
g. ❑ Attach Stormwater Management Form, if needed.
' wpaform3.doc•rev.4112106 Page 6 of 7
Uzi 10/U'/ Ue:U4 C9.1 rCAL401 ba0 _ e+xno nakaurnnnt��'u
' Massachusetts Department of Environmental Protection Provided by DER:
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 — Notice of intent
' Massachusetts Wetlands Protection Act M.G.L. c, 131, §40 Document Transaction Number
Ciry/Town
' F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
' Conservation Commission and the Department(see Instructions and NOI 1Netland Fee Transmittal
Form).
No fling fee shall be assessed for projects of any city, town, county, or district of the Commonwealth,
' federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts
Say Transportation Authority.
Applicants must submit the following information(in addition to pages 'I and 2 of the NO]Wetland
' Fee Transmittal Form)to confine fee payment:
1.Munldpal Ceck N humber 2,pheok date
' X SLS 1 e e
3.State Check Number a.Check date
5.Payor name on check:First Name 6, Payor name on check:Last Name _—
' G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents,and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 Cl 10.05(5)(a),
' I further certify under penalties of perjury that all abutters were notified of this oppiication, pursuant to the
requireme L.c. 131, §40.Notice must be made in writing by hand delivery or certified mail
(r ur oeipt e- est o but in 100 feet of the property line of the arci.e9t to Lion.
r1cor r Of different bate
' Signature of Representative(if any) bate
For Conservation Commission:
' Two copies of the completed Notice of Intent(Form 3). including supporting plans and documents:two copies
of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the
Conservation Commission by certified mail or hand delivery.
' For DEP:
One copy of the completed Notice of Intent(Form 3),including supporting plans and documents;one copy of
pages 1 and 2 of the NO!Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to
the DEP Regional Office(see Instructions)by certified mail or hand delivery. (E-filers may submit these
electronically,)
Other:
if the applicant has checked the "yes"box in any part of Section D,Item 3,above, refer to that section and the
' Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent.
vryaiwrn1doc•rev.4112f06 Rage 7 of 7
Z0rZe 39t1d 30I330 D3X3 S31-1 tGZSLZ88L8 ZV :80 L00Z/0t/L0
To: Rich Williams
' Hayes Engineering, Inc.
From: Douglas and Jean Karam
' Date:July 4, 2007
' Re: 25 Winter Island Rd, Salem Massachusetts
We give you and Hayes Engineering, Inc. permission to represent
' us in the filing of the notice of intent for construction of a sea wall
at 25 Winter Island Road, Salem Massachusetts.
ee/ee 3Jtid 30Idd0 03X3 S3H VGZTTZ6846 Z7 :80 L00Z/0I/[0
r
s /p
Y
NN
INoil
AMPA
�y� •�..,.��l� f , �a
`"' J d is
Vag
R• :• ° 'NIA
WAIN
On
IN
Ko
� : j@�y�� •`,`.� \* � ',� ���� \ / � / ,� .e'. • .ram" � ••+,..
\�^�J � �� Id�� 'gip C�® t "• U e
cc ✓ i Uzi ,
Ma
91
Elm
.fi ky$",Yn 'y' m'si'a� �� 1=. �S' �,��, tou i i M `4� -� �--s"•'"- �'�. � ,�'
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
' forms on the 1. Applicant:
computer, use
only the tab Ann & Paul O'Shea
key to move a.First Name b. Last Name c.Company
your cursor- 15 Winter Island Road
do not use the d.Mailing Address
return key. Salem MA 01970-5766
' e.City/Town f.State g.Zip Code
h.Phone Number
2. Property Owner(if different):
Same as applicant and Douglas &Jean Karam
a.First Name b.Last Name c.Company
25 Winter Island Road
d.Mailing Address
Salem MA 01970
e.Cityrrown f.State g.Zip Code
h.Phone Number
3. Project Location:
15 &25 Winter Island Road Salem
a.Street Address b.City/Town
' To calculate B. Fees
filing fees, refer
' to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4):
fee list and
examples in the The fee should be calculated using the following six-step
instructions for 9 9 p process and worksheet. Please see
' filling out WPA Instructions before filling out worksheet.
Form 3(Notice of
Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per
category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
' Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
' $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
Wpaform3.doc•1,101 Weiland Fee Transmittal Farm•rev.3/1/05
Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
' NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
' B. Fees (continued)
Step 1/Type of Activity step 2/Number Step step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
' Seawall Repair(Category 5 ) 1 $4 x 72 I.f.= $288.00
Step 5/Total Project Fee: $288.00
Step 6/Fee Payments:
Total Project Fee: 288.00
a.Total fee from Step 5
State share of filing fee: $131.50
b. 1/2 total fee less$12.50
City/Town share of filling fee: $156.50
c. 112 total fee plus$12.50
C. Submittal Requirements
' a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee,
payable to the Commonwealth of Massachusetts.
' Department of Environmental Protection
Box 4062
Boston, MA 02211
' b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent;
a copy of this form; and the city/town fee payment.
C.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated
' Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of
Intent may submit these electronically.)
Wpaform3.doc•N01 Wetland Fee Transmittal Farm-rev.311105 Page 2 of 2
1
S „° 5498
PAUL C. OSHEA 71000011o0o01az00
15 WINTER ISLAND RD.
' SALEM, MA 01970
DATE
W
PAY 9'O'1'HE `
ORDEROF
DOLLARS �,na.m
LJ
Sovereign Bank
' soverelgnbarvle com
I L
a MEMO
' I:Oii075i50l: 7L000Oi420011' 5498
5-7515/110
' PAUL C. OSHEA 71000014200 5499
15 WINTER ISLAND RD.
SALEM, MA 01970
� DATE.
' S PAYTOTHE
ORDER OF I $ M f0
� DOLLARS
' Sovereign Bank
o
soverelgnbank.com
' MEMO _ Np
-1:01 i075150I: 7 i0000 i4 20011' S499
I
AFFIDAVIT OF SERVICE
' Under the Massachusetts Wetlands Protection Act
' (to be submitted to the Massachusetts Department of
Environmental Protection and the Conservation Commission
when filing a Notice of Intent)
1, R!< , hereby certify under the pains
' and penalties of perjury that on 1.�`O� 01 1 gave notification to
' abutters in compliance with the second paragraph of Massachusetts General Laws,
Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8,
' 1994, in connection with the following matter: Riprap wall repair and concrete abutment
' installation.
' A Notice of Intent filed under the Massachusetts Wetlands Protection Act by
Ann & Paul O'Shea with the Salem Conservation Commission on -L( It l off_ for
property located at #15 and #25 Winter Island Road
' The form of the notification, and a list of the abutters to whom it was given and
their addresses are attached to this Affidavit of Service.
to
Name Date
1
1 Notification to Abutters and City Agencies Under the
Massachusetts Wetlands Protection Act
And
City of Salem Wetlands Protection Ordinance
' In accordance with the second paragraph of Massachusetts General Laws Chapter 131,
Section 40, you are hereby notified of the following.
' A. A Notice of Intent application has been filed with the Salem Conservation Commission
' seeking permission to work within an Area Subject to Protection Under the Wetlands
Protection Act (General Laws Chapter 131, Section 40) and Salem Wetlands protection
Ordinance.
' B. The name of the applicant is: Ann & Paul O'Shea.
C. The address of the lot where the activity is proposed: #15 and #25 Winter Island Road
(Map 44, Lot 23, #25)_
' D. The activity proposed on the site: Riprap wall repair and concrete abutment installation
E. Copies of the Notice of Intent may be examined/obtained at:
' Haves Engineering Inc 603 Salem Street Wakefield MA 01880 between the hours
of_8 a.m.and 4:30 p.m. on the following days of the week: Monday through Thursday
by appointment only. For more information, call: (781) 246 — 2800
Check one: This is the _ applicant, X representative, or _ other (please
specify).
*F. Information regarding the data, time and place of the public hearing may be obtained
from: The Salem Conservation Commission (office hours vary)
Check one: This is the _ applicant, _ representative, or _ other (please
specify).
*NOTE: Notice of the public hearing, including its date, time and place, will be published
' at least five (5) days in advance in a newspaper with general circulation in Salem.
*NOTE: Notice of the public hearing, including its date, time and place, will be posted in
tthe City or Town Hall not less than forty-eight (48) hours in advance.
NOTE: You also may contact your local Conservation Commission or the nearest
' Department of Environmental Protection Regional Office for more information about this
application or the Wetlands Protection Act. To contact the DEP, call:
' *Northeast Region- Wilmington: 978-694-3200
1
'Sale1 - Pagel of 1
w
reIID Location Owner Co-Owner Mailing Address JUNit1I 4 2007state zip
020-0 9 WINTER ISLAND ROAD 1, PECEVICH ANN 9 WINTER ISLAND ROAD SALEM MA 01970
022-0 11 REAR WINTER ISLAND ROAD 2, KOZLOWSKI FRED T 11 WINTER ISLAND RD SALEM MA 01970
,023-0 15 WINTER ISLAND ROAD OSHEA PAUL C OSHEA ANNE L 15 WINTER ISLAND RD SALEM MA 01970
1024.0 19 WINTER ISLAND ROAD 3. KALGREN TERI 19 WINTER ISLAND RD SALEM MA 01970
1025.0 25 WINTER ISLAND ROAD `{: KARAM DOUGLAS J KARAM JEAN OLSSON 25 WINTER ISLAND ROAD SALEM MA 01970
1026.0 27 WINTER ISLAND ROAD LKARAM DOUGLAS J KARAM JEAN OLSSON 25 WINTERISLAND ROAD SALEM MA 01970
)027-0 29 WINTER ISLAND ROAD 5. MORIARTY EDWARD M SCOTT JOANNE 29 WINTER ISLAND RD SALEM MA 01970
)031-0 31 WINTER ISLAND ROAD MORIARTY EDWARD M SCOTT JOANNE 29 WINTER ISALND RD SALEM MA 01970
)033-0 20 WINTER ISLAND ROAD lo, PAGE MARY F 20 WINTER ISLAND RD SALEM MA 01970
)034-0 12 WINTER ISLAND ROAD JOHNSTON SCOTT R JOHNSTON TAMMY 1 12 WINTER ISLAND RD SALEM MA 01970
)035-0 4. WINTER ISLAND ROAD HARVEY KEVIN R HARVEY ROBIN A 4 WINTER ISLAND ROAD SALEM MA 01970
)036-0 37 WINTER ISLAND ROAD R TRS OF PLUMMER FARM SCHOOL 37 WINTER ISLAND ROAD SALEM MA 01970
End of Report
NOTICE OF INTENT
PROJECT DESCRIPTION
#15 AND#25 WINTER ISLAND ROAD
SALEM, MASSACHUSETTS
' July 3, 2007
' LIST OF PLANS AND DOCUMENTS
' Identifying Number/ Letter Title / Date
PLAN Plan to Accompany Notice of Intent in Salem, Mass., Hayes
Engineering, Inc.; July 3, 2007 (1 sheet).
A Project Narrative, #15 and #25 Winter Island Road, Salem, MA;
July 3, 2007
1
' PROJECT NARRATIVE
#15 AND #25 WINTER ISLAND ROAD
' SALEM, MASSACHUSETTS
July 3, 2007
Existing Conditions
' The subject locus is comprised of two residential properties situated off of Winter Island Road,
at the coastline of Juniper Cove. These properties contain single family houses with associated
' driveways, and other accessory structures and surrounding lawn. A riprap wall runs along the
coastline at the northerly portion of the property. Resource areas on both properties consist of
Coastal Bank (defined by topography and wall face, approximately at elevation 10', per DEP
Coastal Bank Policy), Land Subject to Coastal Storm Flowage (FEMA elevation 10.0), Rocky
Intertidal Shore (natural rock area between mean high water and mean low water), and Salt
Marsh.
Proposed Conditions
' Work will occur within the100-foot buffer zone as well as Coastal Bank and Land Subject to
Coastal Storm Flowage (L.S.C.S.F). resource areas.
' Portions of the riprap wall have become dislodged or otherwise damaged and need to be rebuilt
to ensure that the riprap wall performs its continuing role as a storm water buffer protecting the
properties well into the future. Additionally, storms have caused eroded conditions at the
' entrance to the existing dock. This eroded area, a potential safety hazard for dock users, will be
stabilized as part of the project through installment of a concrete abutment and riprap to
preserve the dock structure entrance. Since most work will occur within the footprint of existing
structures or within existing areas of disturbance, the project should have an insignificant
impact upon the resource areas and buffer zone.
Existing and proposed site features, resource areas and buffer zone boundaries are shown on
the attached Hayes Engineering, Inc. plan titled," Plan to Accompany Notice of Intent in Salem,
Mass." and dated July 3, 2007.
' These activities are subject to performance standards contained in the Massachusetts
Wetlands Protection Act Regulations. These standards and how the project will meet them are
outlined below.
Regulations
Wetlands Protection Act f310 CMR 10.00 et all
' Buffer Zone
Portions of the 100' Buffer Zone will be temporarily disturbed due to the need for an equipment
and material staging area and for personnel access to the work area. There may be a small
' 1
Project Narrative, #15 and #25 Winter Island Road, Salem, MA
July 3, 2007
' amount of landscaping performed in order to re-establish lawn grass or other vegetation along
the rebuilt riprap and new abutment structures.
t
Coastal Bank—310 CMR10.30
' The extent of the coastal bank resource area is represented by the top of the riprap wall, and
generally by the elevation 10' contour. This riprap wall functions only to control storm damage
' prevention to the properties as a vertical buffer to storm waters and does not contribute
sediment through erosion. Proposed repair work within the Coastal Bank will entail two general
activities: reconstructing or repairing portions of the riprap wall within the same existing footprint
such that it will blend into existing walls on adjacent properties and stabilizing the existing dock
entrance by installing a concrete abutment and riprap as shown on the accompanying plan.
Backhoe and other necessary equipment will be positioned landside of the wall during
' construction activities, thereby minimizing disturbance to the adjacent beach. Impact to this
resource area from the proposed activities will be insignificant since repair work will take place
within the same footing as the existing portion of wall. A review of the Natural Heritage &
Endangered Species Program Atlas (2006 edition) revealed that the project is not within any
estimated habitat of rare or endangered species or priority habitat, and thus will not have any
adverse effect on such species. Best practical measures have been used in the design of the
structure to ensure the coastal bank's storm damage prevention role will be preserved. Refer to
' the attached plan for repair details.
' Land Subject to Coastal Storm Flowage (L S C S F )
There will be the same disturbances to the LSCSF as described above for the buffer zone and
' described for Coastal Bank. There are no Performance Standards specified for Land Subject to
Coastal Storm Flowage.
, 1