Loading...
7 CLARK STREET - BUILDING JACKET GYM 308 RECEIVED PFCTIONAI sF NICES The Commonwealth of Massachusetts Q Board of Building Regulations and Standards CITY OF Massachusetts State Building Code, 780 CMR 915 �E9,YLO A b; 43 l� � Revised iLlar 10!l Building Permit Application To Construct, Repair, Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Use Only Building Permit Number: Date Applied: (�(1 Building Official(Print Name) Signature Date/ SECTION 1:SITE INFORMATION 1.1 Property Address:�/'f p,�®_st 1.2 Assessors Map&Parcel Numbers I.la Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(R) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided. Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Check ifycs❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 owner ofRecor(dorge Delvalle Salem, MA. 01970 Name(Print) Cit '6' State ZIP 7 Clark st. 617-293- 64� A007728@fmr.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(cheek all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ❑ Demolition . ❑ Accessory Bldg. ❑ Number of Units_ I Other ❑ Specify: Brief Description of Proposed Work'': in S vy, SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Labor and Materials Official Use Only I.Building $ I. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ ❑Standard City/Town Application Fee ❑Total Project Cost'(Item 6)x multiplier x 3.Plumbing $ - 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ u Check No._Check Amount: Cash Amount:_ 6.Total Project Cost: $ ` 1w ❑Paid in Full ❑Outstanding Balance Due: l SECTION C N 5: CONSTRUCTION SERVICES 5.l Construction Supervisor License(CSL) - l !1`rV� 0�1�25� � � �J cll 1 Ip-� S Y'CYZ-�l`(� License Number Expiration Date Name of CSL Holder 1 n F J _ V�C)\1n o _e ^ List CSL Type(see below) �) No.and Street ` Type Description O .� I �� r A n- n. 0`�nU� U Unrestricted(Buildings u to 35,000 cu.tt. �f /u� r iL/l I R Restricted l&2 FamilyDwelling City/Towu,State,ZI M Mason ry RC Roofing Covering WS Window and Siding _ "��,, ��' SF Solid Fuel Burning Appliances �I$130S�1p� tAaS" \J\VIr *S6jtt,t'( I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) �\ I � \�o�s�8 \ \" `�� ar FIIC Registration Number Expiration Date HIC Corppany�N�i kor RIC.Registrant Name No.an street I, Uj,Ca>W � Email address City/Town,State,ZIP l Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuan,,pe of the building permit. Signed Affidavit Attached? Yes ......... No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize y ky m t S4)\-Ck1r to act on my behalf, in all matters relative to work authorized by this building permit application. 05/09/15 Print Owner's Name(Electronic Signature) Date SECTION 7b:OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained i application is true and accurate to the best of my knowledge and understanding. 05/09/15 Pont Owner's or Authorized Agent' me(Eleilignic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.e. I42A.Other important information on the HIC Program can be found at www.mass.sov.'oca Information on the Construction Supervisor License can be found at www.mass.eov-dns 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" 1� 1 ADA . solar 3301 North Thanksgiving Way, Suite 500 Structural Group Lehi, LIT 84043 P: (801) 234-7050 Scott E. Wyssling, PE Head o/Structural Engineering scoff.wysslingCo)vivintsolar.com May 11, 2015 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Delvalle Residence 7 Clark St, Salem MA 5-4239674 4.94 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of trusses for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is a prefabricated home with 2 x 4 and 2 x 6 dimensional lumber at 24" on center nailed connection for the roof system. The attic space is unfinished and the photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 24 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure `B", Zone 2 per(ASCE/SE17-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. vivent. soIar Page 2 of 2 B. Loading Criteria 10 PSF= Dead Load roofing/framing 40 PSF= Live Load (around snow load) 5 PSF= Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures and in accordance with the 2009 International Residential Code. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and truss system show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com). If during solar panel installation, the roof framing members appear unstable or deflect non- uniformly, our office should be notified before proceeding with the installation. 2. The solar panels are 1 1/2"thick and mounted 41/2"off the roof for a total height off the existing roof of 6". At no time will the panels be mounted higher that 6"above the existing plane of the roof. 3. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 1/2", is less than the maximum allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2' with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts will be adequate with a sufficient factor of safety. 4. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every other panel length when installed parallel to the trusses (portrait). No panel supports spacing perpendicular to the trusses shall be greater than two (2)trusses or 48"o/c, whichever is less. 5. Panel supports connections shall be staggered to distribute load to adjacent trusses. Based on the above evaluation, with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the 2009 International Residential Code, current industry standards and practice, and based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. �ZN OF CIVI �' Scott E.Wyssli PE 0.50 04 MA License No. 505 qOF eo,sr FSSIONAL vivint. solar C $ JUNCTION BOX ATTACHED TO ARRAY USING ECO HARDWARE TO KEEP JUNCTION BOX OFF ROOF a I N_mw PV SYSTEM SIZE --_ A<Z 4.94 kW DC i cu'E' 00 cc U Q N O I , eo I 50 OF 1"PVC CONDUIT I I •� FROM JUNCTION BOX TO ELEC PANEL N J Z a PV INTERCONNECTION POINT,INVERTER, i z < o LOCKABLE DISCONNECT SWITCH, I ' ANSI METER LOCATION, SHEET &UTILITY METER LOCATION NAME: _ __ _—___ W Z4 19)Tnna Solar TSM-250 PA05.18 MODULES J 7 Clark St, Salem MA 01970 SHEET NUMBER: PV SYSTEM SITE PLAN o r.� SCALE: 3132"= V-0" d w _IT IT AZ N~ AAA O m �0O oCW Sn_ .0 �1\0\\NEE O� El b� o N O-I OA mxNEINEEN N# cn V n D r C/) m —< w C/) ° m II X O o O —n y � z m Z C_ >i INSTALLER VIVINTSO AR �.�R��y�e Delvalle Residence LER PV 2.0 Ay ROOF Mm MA LICENSE.MANC710848NUMBER 4D44129 V Y V �nY. sO a� Salem,MA01970 V PLAN DRAWN BY:Jerry S AR 4209674 Last Modified.5/82015 UTILITY ACCOUNT NUMBER:D0867-15004 EcolibriumSolar Layout - 3 - Skirt o Coupling Note: If the total width of a continuous array exceeds 35 ft, break array to allow for thermal O Clamp expansion and contraction. See Installation Guide for details. Warning: PV Modules may need to be shifted with respect to roof trusses to comply with 0 Bonding Jumper maximum allowable overhang. 7 CLARK STR= CITY OF SALEM, MASSACHUSETTS PLANNING DEPARTMENT �o WILLIAM E. LUSTER6 ONE SALEM GREEN City Planner = , rr 019 = ' (508) 745-95955,, EXT. 311 FAX(508) 7445918 August 11, 1994 Leo Trembley Building Inspector One Salem Green Salem, MA 01970 RE: 7 CLARK STREET Dear Mr . Trembley : In review of a proposed house plan attached to a routing slip for 7 Clark Street which has circulated to the Planning Department , I offer the following comments. The applicant must first obtain from the Planning Board an approval for a Waiver from Frontage under the Subdivision Regulations due to the lot frontage being less than the required 100 feet of frontage . If you have any questions, please do not hesitate to contact me. Sincerely, i William E. Luster City Planner Ex\DH\7CLRK.WAIV of 1�ttlem, � ttssttcltusetts j � 9 %4� �oura of �,�enl FES 8 3 09 Fr'i 19q cir SS DECISION ON THE PETITION OF PAUL FERRAGAMO, TR. FERRAGAMO FAMILY TR. FOR VARIANCES AT 7 CLARK ST. , 20 BARNES CIRCLE & 22 BARNES CIRCLE (R-1) A hearing on this petition was held December 1, 1993 and continued until January 19, 1994 with the following Board Members present: Francis X. Grealish, Chairman; George Ahmed, Stephen Touchette and Stephen O'Grady. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner, owner of the property, is requesting a Variances to reconfigure the above three lots in order to create three buildable single family lots as follows: A variance from lot area from 15,000 sq. ft. to 11,400 sq.ft. and from lot width from the required 100 feet to 50 feet at 7 Clark St. A Variance from lot width from 100 feet to 59 feet at 22 Barnes Circle and from lot width from 100 feet to 66 feet at 20 Barnes Circle. Before hearing the merits of this petition, the Board of Appeal has to consider whether or not there is substantial and material change from a previous petition which was denied by this Board on June 17, 1992. The Board of Appeal, after hearing the evidence presented, and after receiving Consent from the City of Salem Planning Board, voted unanimously, 4-0, that there was substantial change, said change being the addition of land area from 5000 sq. ft. to 11,400 sq.ft. to 7 Clark St. The Board will hear the petition. The Variances which have been requested may be granted upon a finding by this Board that: 1. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures involved. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner. 3. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans. makes the following findings of fact: DECISION ON THE PETITION OF PAUL FERRAGAMO TR. , FERRAGAMO FAMILY TRUST FOR VARIANCE AT 7 CLARK ST. , 20 BARNES CIRCLE & 22 BARNES CIRCLE, SALEM page two FEB B 3 1. The plan submitted to the Board added a substantial amount (;'P' land to 7 Clark St. bringing the total land area to 11,406 'square feet as opposed to the 5,000 square feet originally submitted to the Board. This original petition was denied by the Board of Appeal. 2. The two remaining lots, 20 Barnes Circle and 22 Barnes Circle will have the required 15,000 square feet of lot area and the frontage of these lots will remain as they currently exist. 3. The proposed use, single family house lots, is consistent with the existing zoning. 4. The existing neighborhood consists mainly of single family homes and a substantial number of these homes are on lots that are significantly smaller that the lots proposed by the petitioner. 5. The topography of the land is irregular and such irregularity does not exist generally in the district. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1. Special conditions exist which especially affect the subject property but not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship to the petitioner. 3. Desirable relief can be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted unanimously, 4-0, to grant the variance requested, subject to the following conditions: 1. Petitioner shall comply with all city and state statutes, ordinances, codes and regulations. 2. The proposed lots shall be reconfigured in strict accordance with the plans and dimensions submitted with the original petition dated September 30, 1993. 3. Petitioner shall comply with all requirements of the Salem Fire Department relative to smoke and fire safety. 4. Petitioner shall obtain a building permit from the City of Salem Building Inspector prior to beginning any construction . 5. Petitioner shall obtain the approval of the City of Salem Planning Board. DECISION ON THE PETITION OF PAUL FERRAGAMO, TR. FOR VARIANCES AT 7 CLARK ST. , 20 BARNES CIRCLE & 22 BARNES CIRCLE, SALEM page two FF 6 A pre-blast survey is to be conducted on Barnes Cix' &,�BaAeW � n and Clark St. CIT t5S Variance Granted January 19, 1994 Francis X. Grealish, Chairman Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal BUILDING CITY OF SALEM SALEM, MASSACHUSETTS 01970 PERMIT DATE 12/6 19 94 PERMIT NO. 582-94 APPLICANT Patrick McGrath ADDRESS 42 Oakville St. Lynn, Mass. 391 (NO.) (STREET) (CONTR'S LICENSE) CITY Lynn STATEMa ZIP CODE TEL.NOOF. PERMIT TO New dwelling Single NU STORY (TYPE OF IMPROVEMENT) ( N0. ) (PROPOSED USE) DWEELLINGLLING UNITS 1 ZON AT(LOCATION) 7 Clark Street Ward 3 DISTRICT R1 (NO) (STREET) BETWEEN AND (CROSS STREET) (CROSS STREET) LOT SUBDIVISION LOT BLOCK SIZE BUILDING IS TO BE FT.WIDE BY FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION (TYPE) REMARKS: Build single family, prefab dwelling w/footings & foundation AREA OR 85BOO PERMIT VOLUME ESTIMATEDCOST$ FEE $ 521 .00 (CUBIGSOUARE FEET) OWNER Paul Ferragamo BUILDING DEPT. ADDRESS 419 Highland Ave. Salem, Mass. BY Leo F. Tremblay THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY OR SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR PERMANENTLY,ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE JURISDICTION,STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAYBE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS. MINIMUM OF THREE CALL INSPECTIONS APPROVED PLANS MUST BE RETAINED ON JOB AND THIS CARD KEPT WHERE APPLICABLE SEPARATE REQUIRED FOR ALL CONSTRUCTION WORK: POSTED UNTIL FINAL INSPECTION HAS BEEN MADE. WHERE A PERMITS ARE REQUIRED FOR 1.FOUNDATIONS OR FOOTINGS. CERTIFICATE OF OCCUPANCY IS REQUIRED,SUCH BUILDING SHALL ELECTRICAL,PLUMBING AND 2.PRIOR TO COVERING STRUCTURAL MECHANICAL INSTALLATIONS. MEMBERS(READY TO LATH). NOT BE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. 3.FINAL INSPECTION BEFORE OCCUPANCY. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTION APPROVALS PLUMBING INSPECTION APPROVALS ELECTRICAL INSPECTION APPROVALS Fi�Ll�a<Is_A 2 O 2 / •�....s Oo %< � y// C S 2 BOARDO EALTH GAS INSPECTION APPROVALS FIRE DEPT.INSPECTING APPROVALS 7�t cJ l 3//4/i5 {7 G✓✓Ute- R l aN— OTHER CITU ENGINEER 2 2 WORK SHALL NOT PROCEED UNTIL THE FASNOTED T WILL BECOME NULL AND VOID IF CONSTRUCTION WORKIS INSPECTIONS INDICATED ON THIS CARD INSPECTOR HAS APPROVED THE VARIOUS ARTED WITHIN SIX MONTHS OF DATE THE PERMIT IS ISSUED CAN BE ARRANGED FOR BY TELEPHONE STAGES OF CONSTRUCTION. OR WRITTEN NOTIFICATION. ABOVE. TY � CERTIFICATE ISSUED 5 DATE March 15, 1995 CITY OF SALEM SALEM, MASSACHUSETTS 01970 BUILDING PERMIT - a�� CERTIFICATE OF OCCUPANCY DATE / 19 "�- PERMIT NO. APPLICANT Patric � Mc-Graf: ADDRESS 4L O'Y.l-'i Lilo Ci" - '"R'L . ?'a '3ni 1x0.) ISTREETI ICONIR'S LICENSEI 'Wi A.iiNUMBER OF PERMIT TO F[^ 1'' I_1 STORY DWELLING UNITS (1.PE O. IMPPOVE-ExiI MC.' IPPOPOSED ISE) .'.i _ ZONING " . AT (LOCATION;. 7 C-I C'- DISTRICT 1X0.1 ISTREETI BETWEEN KAND RO55 STREET)iI (CROSS ST REFTI ' LOT S UBOIVISiQN'-' LOT BLOCK SIZE BUILDING IS TV'BE -FT. WIDE P.. FT. LONG BY FT. IN HEIGHT AND SHALL.:CONFORM iN CONSTRUCT ION E. TO TYPE "= - USE GROUP BASEMENT WALLS OR FOUNDATION ITYPEI REMARKS build ^u'_:1g.Lc fami11 A Dic-fpb dweili-ris -W/ 'lPOti: wpyE11 AREA ORIns VOLUME C :BIC.SOULRE:FEETI INBORN P&Ul Ferragamo -'+loi nsewsrn eenoT,le,+bei TO BE POSTED ON PREMISES srnorno OWNEq TD &E POSTED ON PREMISES ADDRESS 419 Iii,4ht:.nIA Ayc;. SLie 4. MA SEE R�VyERSEi£�E;��CONDIT IONS OF CERTIFICATE DEPARTMENTAL APPROVAL FOR CERTIFICATE 1 of OCCUPANCY and COMPLIANCE To be filled in by each division indicated hereon upon completion of its final inspection. BUILDINGS Permit No. 582-94 Approved by JOHN JENNINGS Date 3/15/95 Remarks PLUMBING Permit No. i Approved by DENNIS ROSS Date --3/14/95 i i Remarks ELECTRICAL Permit No. Approved by AL FAL OWRSI Date 2/15/95 ti Remarks - s , OTHER Fire Permit No. Approved by Wm- HUDSON Date 3/14/95 Remarks OTHER Permit No. . Approved by Date H 1 Remarks I s. 1 Titv of �tclem, ��ttssttCltus,�t�� . `sl Board of Au}rezil or, PFr _ CITY OF c, 1 CLF�K;J'(E , REMANDED DECISION ON THE PETITION OF PAUL FERRAGAMO FOR A VARIANCE AT iCLARK STREET A hearing on this petition was held June 3, 1992 with the following Board Members present: Richard Bencal, Chairman; Richard Febonio, Francis Grealish, Edward Luzinski and Stephen Toucette. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner is requesting Variances to allow the construction of a single family home in this R-1 district. This petition was denied by the Board of Appeal on March 18, 1987 and again on July 5, 1989. The latter denial was appealed and subsequently remanded back to the Board by the Court. The Variance which has been requested may be granted upon a finding of the Board that: a. Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings or structures in the same district. b. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioner. c. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing and after viewing the plans, makes the following findings of fact: 1. The petitioner failed demonstrate or to meet the burden of proof relative to legal hardship. 1 DECISION ON THE PETITION OF PAUL FERRAGAMO JUN 17 $ oa F) '91 FOR AtVARIANCE AT 7 CLARK STREET, SALEM CITY page CLERK ;. Ff k :' 'S On the basis of the above findings of fact, and on the evidence presented at the hearing, the Board of Appeal concludes as follows: 1. Special conditions do not exist which especially affect the subject property and not the district in general. 2. Literal enforcement of the provisions of the Zoning Ordinance would not involve substantial hardship to the petitioner. 3. The relief requested cannot be granted without substantial detriment to the public good or without nullifying and substantially derogating from the intent of the district or the purpose of the Ordinance. Therefore, the Zoning Board of Appeal voted three (3) in favor two ( 2) opposed to the motion to grant, having failed to garner the required four affirmative votes to pass, the motion is defeated and the petition is denied. VARIANCE DENIED June 3, 1992 Francis X. Grealish, Jr. , Secretary Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK APPEAL FROM THIS DECISION, IF ANY, SHALL BE MADE PURSUANT TO SECTION 17 OF THE MGL CHAPTER 40A AND SHALL BE FILED WITHIN 20 DAYS AFTER THE DATE OF FILING OF THIS DECISION IN THE OFFICE OF THE CITY CLERK. PURSUANT TO MGL CHAPTER 40A, SECTION 11, THE VARIANCE OR SPECIAL PERMIT GRANTED HEREIN SHALL NOT TAKE EFFECT UNTIL A COPY OF THE DECISION BEARING THE CERTIFICATION OF THE CITY CLERK THAT 20 DAYS HAVE PASSED AND NO APPEAL HAS BEEN FILED, OR THAT, IF SUCH APPEAL HAS BEEN FILED, THAT ITK HAS BEEN DISMISSED OR DENIED IS RECORDED IN THE SOUTH ESSEX REGISTRY OF DEEDS AND INDEXED UNDER THE NAME OF THE OWNER OF RECORD OR IS RECORDED AND NOTED ON THE OWNER'S CERTIFICATE OF TITLE. BOARD OF APPEAL of alem' tt�s�atliuse# � F Poxrb of �ppvd _ '87 MAR 31 P3 :00 DECISION ON THE PETITION OF DAVID FERRAGAMO (PETITIONER) , FERRAGAMO FAMILY TRUST (OWNERS) FOR VARIANCE AT'7 CLARK STREET G TY tL OFFICE SS A hearing on this petition was held March 18, 1987 with the P`611owing Board Members present: Edward Luzinski, Vice Chairman; Messrs. , Bencal, Fleming, Strout and Associate Member Dore. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. Petitioner is requesting variances from frontage, lot size and area per dwelling unit to allow construction of a single family dwelling in this R-1 district. Said property is owned by the Ferragamo Family Trust. The Variances which have been requested may be granted upon a finding of the Board that: a. special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings or structures in the same district; b. literal. enforcement of the provisions of the Zoning Ordinance would in- volve substantial hardship, financial or otherwise, to the petitioner; c. desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district or the purpose of. the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1 . Opposition was voiced by the abutters; 2. A concern regarding blasting on the site was noted; 3. The traffic problems would be. increased by the building; 4. Further development of the neighborhood would be detrimental. On the basis of the above findings of fact, and on the evidence presented at the hearing the Board of Appeal concludes as follows: 1 . Special conditions and circumstances do not exist which especially affect the subject property and not the district generally; 2. Literal enforcement of the provisions of the Ordinance would not involve substantial hardship to the petitioner; 3. The relief requested cannot be granted without substantial detriment to the public good or without nullifying or substantially derogating from the intent of the district or the purpose of the Ordinance. i DECISION ON THE PETITION OF DAVID FERRAGAMO (PETITIONER), FERRAGAMO FAMILY TRUST (OWNER) FOR VARIANCE FOR, 7 CLARK ST., SALEM page two Therefore, the Zoning Board of Appeal voted 'unanimously, 5-0, against granting the Variances requested. VARIANCES DENIED. Peter Strout, Member, Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH"THE PLANNING BOARD AND THE CITY CLERK ( is 2 APPEAL FROM THIS DECISION, IF ANY. SHALL BE MADE PURSUANT TO SECTION 17 OF THE MASS. GENERAL LAWS,CHAPTER 808. AND SHALL BE FILED WITHIN 20 DAYS AFTER THE DATE OF FILING OF THIS DECISION IN THE OFFICE OF THE CITY CLERK. PURSANT TO !ASS. GENERAL LAWS, CHAPTER 808, SECTION 11, THE VARIANCE OR SPECIAL PERMIT GRANTED HEREIN, SHALL NIT TAPE EFFECT UNTIL A COPY OF THE DECISION, BEARING THE CERT" GRATIED OF THE CITY CLERK THAT 20 DAYS HAVE ELAPSED AND NO APPEAL HAS BEEN FILED, FICAOR THAT, IF SUCH AN APPEAL HAS BEEN FILE. THAT IT HAS BEEN DIS':ISSED OR DENIED IS ISTRY B OF OED UNDER THE RDS DIORT HE S ROUTH EANDSSRNOTED ONFDEEDS THEOWNER'SI NDCER FICATE OF TITLE NAME OF THE C';i::;.'. BOARD OF APPEAL X r 4 i, i michni S. Dukakis AotttwsQa�c .Cali etas uJdiw�. Goveemor 000 Q444awo. J%W - gooses i10! Kentaro Tsutsumt oalOw, ..sfaO"aoisissd& 0$108 Chairinan t6171 Charies J. Dineaoo Administrator MEMORANDUM TO: All Building Dep2rtmcntst5tate Building Inspectors FROM: Charles J. Dinah. Administrator DATE: October JI. 1988 SUBJECT. Met. c30S54 Added av r54C S9 elf the Acts of 1997 The abospe-mcntioneu statute requires that ucbris resulting train the demolition. renovation. fchabflftatlon or other aucration tit a building or structure he disposed tit in a proWty pcciiscii NOW vraste disposal iacnluv as dcfincd by MGL 6111. S150 anu that budding permits or licenses arc to indicate the 1X211104 0( the tacoav at which the saw debris is to he disposed. THIS REOUIREMENT DOES' NOT r1PPL.Y TO NEW CONSTRUCTION. in order to stmotifv the process and to prtmde uniformity. we arc attaching a copy tit a torm-whfeh you can either reproduce anu use as it is since the completed form will be attached to the otlicc copy Of butwing- permis or licenses: or reproduce it on your Icnerheau. In ase of municipal.commerctal.industrial.or multiunit housing construction. the contractor mat not know the dumpster sti13COntraitot at the tame of the building permit application. in such ascL the attacked copy of an Affidavit an be used. The complete taw is c intaincd in the Novembcr issue of CODEWORD which will he matial to van in the neat two weeks. If you should have anv question. please let us know. CJD11cm In accordance with the provisions of MGL c 40, S 54, a condition of Building Permit Number is that the debris resulting from this work shall be disposed of in a properly licensed solid waste disposal facility as defined by MGL c 111, S 150A. The debris will be disposed off in: / }— (L.ocat on of Facility) Signature of Permit Applicant Date AOR 4�NP4 Sa zem F Z to Department p4p1N�M MUST Ew���C F 48 Labayet.tenS-ttee# INSPECTION Suteau Xy FOR FINAL VA ST BE loop 01\0 $1 pN+' Salem, Ma 01970 MADE AT LEAST ONE WEEk t IMPD� AS (508) 745-7777 AHEAD FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT In accordance w-lth the prov-"Zons o6 the Ma.s.sachwset-t-s State su-ttd4i.ny C• and the Salem F z Code, appZic.a -ion t.2 heteby made {iv.. app:oval 06 pLar and the ,ssuance o6 a vb app�cvvat bot a bu,. ,Cdznq pe.'uni't by SaZem F:-,e Depa,+ctmer t. (Rely. Section 1 13. ;, Ma S State Bldg. Cod--) Joh I ocatr.on: ��SpOi Owner/Occupant: Pa v ( r-a r r �, r, in �Fg 'hl✓�Ohs E.Cecttica2 Contracto X / ( L /C G F C, O 8 r'e lk� 4c F.i. te Suppn,es,ton Conttactoa: Y Y Sagnatute v� Appt�canw: h��G ��/7 Phone # : th//J'' 6175 S�o�. 7 AdG--l-e-:,.5 06 App2 cant: a � Town: N y Appnova-0 date: J� � j91 Ce.tt-ip,•.cate o4 appnovae 1..5 hen.eby 9rxnted, on appr.vved pZar vn SLLbtn-v,tt- o6 p.toject detaZZ-6, by the SaZem Ft/Le Department. AZZ pCan-5 are app cove. aoZeCu 6o-z Zdenti4 catZon off, type and Zocatton o4 4,4-ze p•tctec.t. on dev-ice and equ, pment. AZC plan-s aAe .subject to approval o� any othet authority ha ung ,juai,6d-ictLon. Upon comptet.i.on, the appZ.cant on Znata?,CZA(,) •5hc reque't an tn,specti.on and/or, te.,t o4 the 4tte pr.otecttjn device and equipment. ( ** FOR ADDITIONAL REQUIREMENTS, SEE REVERSE SIDE ** ) New cvrwt-tucti,vn. Pnvper.ty Zucat�i.on ha, no cvmpZi.artce w-i,tN, the p�evv;,.di,vn-s .v:J Cha.pteA 148, Section 26 C/E, M. G. L. , teZattve to the tn,taZatZon o4 approved 4.ite alarm dev.icea. The owner of this pnopenty 4--s negcuAed to obta, n compt-i.ance a-5 a cond i t l.on o6 obtain Zng a Su i..2 tnq Perm/..t. Pzopertty ZucatZon Z4 in comp Zance w.i,th the pcvvv iotz-s oL Cha.pteA 148 , Sect.Zon 26 C/E, M. G. L. ^�.tatf-on date: -- �) F'�c d.c undcz . . 5-00 Sq. Ft. X 10. 00 F`. o+ £ tgzz - S_ 0 Fovn I Y J w z LU FIRE DEPARTMENT CERTIFICATE OF APPROVAL FOR BUILDING PERMIT � mw i O O i 'L =) k-_ ; In compliance with the provision of Section 113.5 of the Massachusetts z ¢ State Building Code, and under guidelines agreed upon by the Salem Bldg. 2 oz _ Inspector and the Salem Fire Chief, the applicant for a building permit F- - - shall obtain the Certificate of Approval (see reverse side) and stamped Z ¢ o �` „U o plan approval from the Salem Fire Prevention Bureau. 0- 1 ¢ -11 z ¢ Said application and approval is required before a building permit may be a u issued. The Massachusetts State Building Code requires compliance Z w 3 approval of the Salem Fire Department, with reference to provisions of fr m z Articles 4 and 12 of the Building Code, the Salem Fire Code, Massachusetts o U) o General Laws, and 527 Code of Massachusetts Regulations. F- g 0 UJ The applicant shall submit this application with three (3) sets of plans, z w drawn in sufficient clarity, to obtain stamped approval of the Salem Fire 2: (-) ¢ Department. This applies for all new construction, substantial a alterations, change of use and/or occupancy, and any other approvals a " required by the Massachusetts General Laws, and the Salem Fire Code. ¢ ` Exception: Plans will not be required for structural work when the proposed work to be performed under the building permit will not, in the opinion of the Building Inspector, require a plan to show the nature and character of the work to be performed. Notice: Plans are normally required for fire suppression systems, fire alarm systems, tank installations, and Fire Code requirements. a 7� z a Under the provisions of Article 22 of the Massachusetts State Building = -. .,, m Code, certain proposed projects may not require submission of plans or p '-' complete compliance with new construction requirements. In these -> cases, provisions of Article 22, Appendix T, and Tables applicable Mz n shall apply. This section shall not, however, supersede the Z_ provisions outlined in the Salem Fire Prevention Regulations, Chapter '-, N T 148, MGL, or 527 Code of Massachusetts Regulations. All permits for Z i fire code use and/or occupancy shall apply for the entire structure; W IE fire alarm and/or smoke detector installation shall apply to the M y entire structure based upon current requirements as per Laws and/or M Codes, but the existing structure may comply with regulations applicable for existing structures. Notice: Sub-contractors may also be required to file individual applications for a Fire Department Certificate of Approval for the area of their work. Such sub-contractors shall file an Application to Install with the Fire prevention Bureau prior to commencing any work for those areas applicable. Form 81X ( 10/90) APPOINTMENT FOR FINAL INSPECTION MUST BE MADE AT LEAST ONE WEEK AHEAD...__----------------_ — of �ttfzni, C a tt�hu f nkj u U SLIP% REVIEW AND PASS ON AS INDICATED LOCATION: DATE APPLICANT: INSERT DATE WHEN PASSING ON Date Assessor CONTACT PERSON: Peter Caron " l2 2 R 2UPARTMENT.: Fire Department Capt, Turner or Insp. LaPointe ,3 a Department of Public Services ;x- Director or t4 DEPARTMENT: Water DepartmentCONTACT PERSON: y/HelenJiadosz S a Planning Dept. CONTACT PERSON- Beth Debski DEPARTMENT: City Clerk (if involving new streets) CONTACT PERSON: 7 DEPARTMENT: E1=1C DEPT. PAUL TTUTTLE 8 DEPARTMENT: CONTACT PERSON: RETURN TO WILLIAM F.WELD uL � �d ��c��� STANLEY SH�UeMAN,P.E. Governor THOMAS C.RAPONE - THOMAS L.ROGERS Smor tory TEL: (617) 727-3200 FAX: (617) 227-1754 Administrator May 4, 1994 New England Homes, Inc. 270 Ocean Rd Greenland, NH 03840 RE: Annual Re-certification in the Massachusetts Manufactured Buildings'Program MC# 050 To Whom It May Concern; This letter is to confirm that your certification in the Massachusetts Manufactured Buildings Program as a producer of Manufactured Buildings has been renewed for the period of May 1, 1994 through April30, 1995. This renewal is contingent upon compliance with all previously listed conditions of your approval, and compliance with the provisions of the Massachusetts State Building Code, Electrical Code, and Fuel/Gas Code. Yours truly, STATE BOARD OF BUILDING REGULATIONS AND STANDARDS Thomas L. Rogers Administrator cc: MA Board of Examiners of Plumbers and Gas fitters MA Board of Examiners of Electricians t l ;7 No. 1" City of Salem Ward 3 r7 9 94 DEC -5 A;i 9 45 ASSESSOR" CRY OF S.&LFH APPLICATION FOR PERMIT TO BUILD ADDITION, MAKE ALTERATIONS OR NEW CONSTRUCTION IMPORTANT-Applicant to/complete all items in sections:1, It, Ill, NX. ,and/ 1. AT(LOCATION) 7 G!✓'lc �V ZONING GDISTRICT•v / LOCATION ,/ 1N/O1 /! //!� s REE l OF BETWEEN �Y1�-Z 1661(/ C/ L.0 e AND BUILDING (CROSS SIRE" 7p (CROSS STREET) I SUBDIVISION LOT/ / BLOCK SIZE ( II. TYPE AND COST OF BUILDING -All applicants complete Parts A-D A. TYPE OF IMPROVEMENT D. PROPOSED USE-FOR"DEMOLITION"USE MOST RECENT USE 1 RfNew building Reeidentlel Nonreskientlal IC.I 2 ❑ Addition(If residential,enter number of new 12 One family 18 ❑ Amusement,recreational housing units added,it any,in pan D,13) 19 ❑ Chruch,other religious '• 13 ❑ Two or mo.F1 Alteration ................................................ 20 ❑ Industrial 21 ❑ Parking garage 0 E] Repair replacement 14 ❑ Transient b motel,or dormitory- 22 ❑ Service station,repair garage Enter numberer o of units ........................... 5 [3 Wracking(h multdamity residential,enter number 23 ❑ Hospital,institutional of units in building in Part A 13) 15 ❑ Garage 24 ❑ Office,bank,Professional 6 ❑ Moving(relocation) 16 ❑ Carport 25 ❑ Public utility 7 ❑ Foundation only 26 ❑ School,library,other educational 17 ❑ Other-Specify 27 ❑ Stores,mercantile B.OWNERSHIP 28 ❑ Tanks,towers 8 Private(individual,corporation,nonprofit 29 ❑ OMer-Specity institution,etc.) 9 ❑ Public(Federal,State,or local government C.COST (Omit cents) Nonresidential-Describe in detail proposed use of buildings,e.g.,food processing plant, machine shop,laundry building at hospital,elementary school,secondary school,college, 10. Cost of improvement ......................................._."""'_"' $ parochial school,parking garage for department store,rental office building,office building ip �+ `' oo at industrial plant It use of existing building is being changed,enter proposed use. f I To be installed but not included in the above cost f a. Electrical.............................................._.........._._............ 1 .200 f; b. Plumbing......................................._............_................ 00 c. Heating,air conditioning........................._.................. 5 d. Other(elevator.etc.)...........................-..............._....... i 11. TOTAL COST OF IMPROVEMENT $ D III. SELECTED CHARACTERISTICS OF BUILDING -For new buildings and additions,complete Parts E-L;demolition, complete only Parts J&M, all others skip to IV E.\PRINCIPAL TYPE OF FRAME F. PRINCIP TYPE OF HEATING FUEL G. TYPE OF SEWAGE DISPOSAL 1. TYPE OF MECHANICAL 30 ❑ Masonry(wall bearing) 35 7Gas 40 [EfPublic or private company Will there be central air 31 Wood name 36 C] Oil 41 E] Private(septic tank etc.) conditioning? 32 ❑ Structural steel 37 ❑ Electricity 44 ❑ Yes 45 No 33 ❑ Reinforced concrete 38 ❑ Coal H. TYPE OF WATER SUPPLY Will there by an elevator! r 34 ❑ Other-Specify 39 ❑ Other-Specify 42 ❑Public or private company 46 ❑ Yes 47 ❑ No 43 ❑ Private(well,cistem) / I J-DI NENSIONSol stories ..............!. ..................__............. M. DEMOLITION OF STRUCTURES: as. Tow square feet Of 1100*area, Has Approval from Historical Commission been received j ait Boars based on exterior /u�7� for any structure over fifty(50)years? Yes_ No— II dimensions ...........................................•.......... $0. Total land area,sq.K...._elf...�V-Q................. Dig Safe Number i K.NUMBER OF OFF•STRE/Er PARKING SPACES Pest Control: 51. Encbsed ....__....._,t-......._.—.................__....._..........., i HAVE THE FOLLOWING UTILITIES BEEN DISCONNECTED? 52. outdoors...............>/................._..._..................._...__..... Yes No L RESIOEN nAL BUILDINGS ONLY Water: 53. Enclosed............................................................................. Electric: Gas: Full.............._j........,.............. Sewer: 54. Number of batn,00,,,sDOCUMENTATION FOR THE ABOVE MUST BE ATTACHED Partial_......L........................ BEFORE A PERMIT CAN BE ISSUED. IV, COMPLETE THE FOLLOWING: I Historic District? Yes_ No_ (If yes,Please enclose documentation from Hist.Com.) Conservation Area? Yes_ No-L/ (If yes,please enclose Order of Conditions) Has Fire Prevention approved and stamped plans or applications? Yes f' No_ Is property located in the S.R.A. district? Yes— No L Comply with Zoning? Yes ✓ No— (if no,enclose Board of Appeal decision) 1 Is lot grandfathered? Yes_ No_ (If yes,submit documentationfif no,submit Board of Appeal decision) If new construction,has the proper Routing Slip been enclosed? Yes ✓ No Is Architectural Access Board approval required? Yes_ No_ (if yes,submit documentation) Massachusetts State Contractor License# 0 0 Salem License# �� t Home Improvement Contractor# / 2. Homeowners Exempt form(if applicable) Yes_ No_ CONSTRUCTION TO BE COMMENCED WITHIN SIX(6) MONTHS OF ISSUANCE OF BUILDING PERMIT ,If an extension is necessary,please submit CONSTRUCTION IS TO BE COMPLETED BY: ;2���7,f� in writing to the Inspector of Buildings. V. IDENTIFICATION• To be completed by all applicants Name Mailing address-Number,street,city,and state ZIP Code Tel.No. i 01970 .,do/ Oforner or Lessatf LJ/976 2. Cmtractor Sumer's 7j Limnse No. Z 3. W 116V3 Architect or Engel . 310- I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to make this application as his authorized a ent and we agree to conform to all applicable laws of this jurisdiction. Signature of i icarrt Address© Application date 7 D!D NOT WRITE BELOW THIS LINE VI. VALIDATION v Building G ✓ FOR DEPARTMENT USE ONLY Permit number U !/ Building � �y/ Use Group Permit issued �� t 9� Fire Grading Building l ' / Permit Fee $ i�rJ�-! �� Live Loading Certificate of Occupancy $ Approved by: Occupancy load Drain Tile $ Plan Review Fee $ TITLE tl NOTES AND Data-(For department use) 0 PERMIT TO BE MAILED TO: Z DATE MAILED: Construction to be started by: Completed by: VI ZONING PLAN EXAMINERS NOTES / r DISTRICT USE FRONT YARD SIDE YARD SIDE YARD REAR YARD NOTES SITE OR PLOT PLAN -For Applicant Use O N x (gity of lj�ttlem, �4ttssttcltusetts ja4 ' �Rnttra of peal y4R ciT rZ 53 '? O P ,9S 14 4 H4S DECISION ON THE PETITION OF PATRICK McGRATH FOR A VARIANCE AT CLARK"s S Or�N1rF SS 7 rSTREETy(R-1) ._.,___— A hearing on this petition was held February 15, 1995 with the following Board Members present: Stephen Touchette, Chairman; Gary Barrett, Arthur LaBrecque, Nina Cohen and Albert Hill. Notice of the hearing was sent to abutters and others and notices of the hearing were properly published in the Salem Evening News in accordance with Massachusetts General Laws Chapter 40A. The Petitioner, represented by William DiMento, is the building contractor for the owner of the property, (Paul Ferragamo) , requesting Variances from side and front setbacks to allow a single family dwelling to be built at 7 Clark Street. The Variances which have been requested may be granted upon a finding by this Board that: 1 . Special conditions and circumstances exist which especially affect the land, building or structure involved and which are not generally affecting other lands, buildings and structures involved. 2. Literal enforcement of the provisions of the Zoning Ordinance would involve substantial hardship, financial or otherwise, to the petitioners. 3. Desirable relief may be granted without substantial detriment to the public good and without nullifying or substantially derogating from the intent of the district of the purpose of the Ordinance. The Board of Appeal, after careful consideration of the evidence presented at the hearing, and after viewing the plans, makes the following findings of fact: 1. Patricia and Henry Rutkowski, 5 Clark Street, voiced their disappointment noting that the contractor is not being held to the same standards which they were held too. 2. The City Zoning Officer, Mr. Leo Tremblay, stated that the Contractor came forward to notify him that an error had been made in positioning the foundation at 7 Clark Street. On the basis of the above findings of fact, and on the evidence presented at the hearing, the Zoning Board of Appeal concludes as follows: 1. Special conditions exist which especially affect the subject property but not the district in general. r DECISION ON THE PETITION OF PATRICK MCGRATH FOR A VARIANCE FOR THE PROPERTY LOCATED AT 7 CLARK STREET (R-1) page two ��ff 2. Literal enforcement of the provisions of the Zoning Orffkaq�e lgould involve substantial hardship to the petitioner. CST„ v1 32 , 3. Desirable relief can be granted without substantial detridOnt�, to t � �3 . public good and without nullifying or substantially der fat ggffro�n the intent of the district or the purpose of the Ordinance. ' Cf%7("`4SS Therefore, the Zoning Board of Appeal voted unanimously, 5-0 to grant the variance requested, subject to the following conditions: 1. Petitioner shall comply with all city and state statutes, ordinances, code and regulations. 2. All construction shall be done in strict accordance with the plans and dimensions submitted. 3. Petitioner shall comply with all requirements of the Salem Fire Department relative to smoke and fire safety. 4. A Certificate of Inspection is to be obtained. Variance Granted February 15, 1995 Albert C. Hill, Jr. Member, Board of Appeal A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK Appeal from this decision, if any, shall be made pursuant to Section 17 of the Massachusetts General Laws Chapter 40A, and shall be filed within 20 days after the date of filing of this decision in the office of the City Clerk. Pursuant to Massachusetts General Laws Chapter 40A, Section 11, the Variance or Special Permit granted herein shall not take effect until a copy of the decision bearing the certification of the City Clerk that 20 days have elapsed and no appeal has been filed, or that, if such appeal has been filed, that it has been dismissed or denied is recorded in the South Essex Registry of Deeds and indexed under the name of the owner of record or is recorded and noted on the owner's Certificate of Title. Board of Appeal