Loading...
20 CLARK AVENUE - BUILDING JACKET Z , II IMIkM IMST-BE fflfD idD A?PROVED BY T+IE &SP CT'o_l3 ,PRXIR T-0 A.PERMIT.BSING GRANTED ��\� \ CITY OF SALEM full No. J V .:. .'� r'T^� Date a n Ward it j � crmNE�°n Zoning District Is Property Located in / Location of the Historic District? Yes_No V Building Is Property Located in the Conservation Area? Yes_No J� BUILDING PERMIT APPLICATION FOR: Permit to: (Circle whichever apply) Roof, Reroof, Install Siding, Construct Deck, Shed, Pool, Repair/Replace, Other: PLEASE FILL OUT LEGIBLY & COMPLETELY TO AVOID DELAYS IN PROCESSING TO THE INSPECTOR OF BUILDINGS: The undersigned hereby applies for a permit to build according to the following specifications: Owner's Name paxek�A ¢ Address & Phone ;w 451a4 (028 7Xi•36 Z6 Architect's Name Address & Phone ( ) Mechanics Name Address & Phone ( ) What is the purpose of building? Material of building? If a dwelling, for how many families? Will building conform to law? Asbestos? Estimated c st 65a City License# State License # W Home Improvement Signature of Appli an DER SIGNED UN NALTY OF PERJURY DESCRIPTION OF WORK TO BE DONE /;;60Ve- oA,va.-, cl ado MAIL PERMIT TO: No. APPLICATION FOR PERMIT TO LOCATION PERMIT GRANTED 19 APPRO�/1�3 INSPECTOR Or BUILDINGS A J Ave ..�� gncA i4oL4 � v x> c� V V —'nVw V v V V I i yy� 4-1, The Commonwealth of Massachusetts CITY OF 0 s 1 ) Board of Building Regulations and Standards SA EM \ / Massachusetts State Building Code,780 CMR Revised Mar 1017 Building Permit Application To Construct, Repair,Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Us my 1 ) Building Permit No I er: i I I) li Jlkj Building Official(Print Name) U7 gnature Da e SECTION 1:SITE INFORM N 1.1 Property Address• 1.2 Assessor ap&Parcel Numbers Zy Glares Nve- 1.l a Is this an accepted street?yes X no Map Number, Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check ifyesO SECTION 2: PROPERTY OWNERSHIP' 2.1 caner'of Record• P17�t1ae� , $�2arrla-*\ SaICwl "k / o Name(Print) City,State,ZIP 20 AatXk- kyti g7Ia-i413ot4(9 •ebO—Yl lar@IIVe •C)Vy\ No.and Street Telephone ail Address SECTION 3:DESCRIPTION OF PROPOSED WORK(check all that apply) New Construction j8(I Existing Building❑ Owner-Occupied ❑ 1 Repairs(s) ❑ Alteration(s) ❑ 1 Addition ❑ Demolition ❑ 1 Accessory Bldg. ❑ Number of Units Other ❑ Specify: Brief Description of Proposed Work': tVVS-F L p p pyto-VUV n 1-1-0.6G Sot0.r^ S 1s4exy15.- SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: (Labor and Materials) Official Use Only 1. Building $ 11201 1p 1. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ 3 I ❑Standard City/Town Application Fee ❑Total Project Cost (Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (IAVAC) $ List: 5. Mechanical (Fire $ Suppression) Total All Fees: $ Check No. Check Amount: Cash Amount: 6. Total Project Cost: $3'l.r t}00 0 Paid in Full 0 Outstanding Balance Due: � SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 1_� by- 2 554 �Lyvie--s S1neYfvLar, License Number Expiation ate Name of CSL Holder List CSL Type(see below) U No.and Street I Type Description SeLULe Us / A 1 OI(] O 1 ^ U Unrestricted(Buildings u to 35,000 cu.ft. �`�l _1 tY R Restricted 1&2 Family Dwellin City/ToO- OL60-s IP M Maso nav RC Roofin CoverinWS Window and Sidin-IS13 1)ICJ SD �y1Ul',�1 �` r SF Solid Fuel Burning Appliances v�.�'Dttt� I Insulation Telephone Email address C.prvl D Demolition 5.2 Registered Home Improvement Contractor(HIC) I—1 O�t-I$ t )µ \/lV1�fi SolarD2yelolp2Y IC HIC Registration Number Epira[onDate HIC Company Name or HIC Registrant Name 4a3 I f\I. ADO W . yy LasolGuCr�vtvt✓lA-so r. No.and Street Email address `t_ayvt Provo (1'r $4(DO4 1g13053o1pS City/Town.State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes.........:A No........... ❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize VI V I✓1t So I Cul- to act on my behalf,in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signa e) CD rVT1Zl.( ate SECTION 7b: OWNER'OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in th' pp Lion is true and accurate to the best of my knowledge and understanding. \/lylylt sD14P �J`23 13 Print Owt s r orized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program), will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.pov/oca Information on the Construction Supervisor License can be found at www.mass oR v/dDs 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost' f1 WCONSULTING Wyssling Consulting 255 Reserve Street Boonton, NJ 07005 Scott E. Wyssling, PE, PP, CME office (973) 601-3305 cell(201) 874-3483 wyssconsulting@aol.corn May 22, 2013 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Bozarjian Residence 20 Clark Avenue, Salem MA AR#3015647 6.48 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of trusses for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by Vivint Solar and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal prepared by Vivint Solar identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of truss system with top chord/rafter constructed of 2 x 6 dimensional lumber and the other members constructed of 2 x 4 dimensional lumber at 16" on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached ZEP calculations sheet for ASCE/SEI 7-05 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 21 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure"B", Zone 2 per(ASCE/SEI 7-05). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. 1 i Page 2 of 2 B. Loading Criteria • 10 PSF = Dead Load roofing/framing • 40 PSF = Live Load (ground snow load) 5 PSF = Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures and in accordance with the 2012 International Residential Code. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing truss system will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and truss system show that the framing is in good condition with no visible signs of damage caused by prior overstressing. 2. The dwelling owners shall be made aware that long term build-up of heavy snow conditions may produce deflections in the roof. If any deflection is noticed, then it is recommended that the solar panels be cleared of accumulated snow more than one (1) foot deep over a period of one week. If no deflections are visible under any snow loading over a period of time, then there is no need to clear the solar panels. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "ZEP Code Compliant Installation Manual", which can be found on the ZEP website (zepsolar.com). If during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir(North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 %', is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 '/" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than the panel length when installed parallel to the trusses (portrait). No panel supports spacing perpendicular to the trusses shall be greater than two (2) trusses or 64" o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent trusses. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is in conformance with the 2012 International Residential Code, current industry standards and practice, and based on information supplied to us at the time of this report. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. V truly yours, ,� Scott E. Wyssl' PE NJ'.Licens3'NoP419 TEMPORARY PERMIT MASSACWUSSETTS 2013-048-PE W CONSULTING The Commonwealth of Massachusetts Division of Professional Licensure 239 Causeway Street, Suite 500 Boston, MA 02114 www.pcshq.com If 877-887-9727 May 13, 2013 Mr. Scott Wyssling 255 Reserve Street Boonton,NJ 07005 RE: TEMPORARY PERMIT 2013-048-PE Dear Mr.Wyssling, In accordance with Section 81R-e of Chapter 112, of the General Laws, you are hereby granted permission to practice PROFESSIONAL ENGINEERING in the Commonwealth of Massachusetts for a period of thirty days from: MAY 13,2013 or until such time as the Board needs for final action on your application for registration in the Commonwealth of Massachusetts. The procedure for using your: NEW JERSEY SEAL on a plan or document in Massachusetts under this permit is to write under the seal the following. TEMPORARY PERMIT MASSACHUSETTS 2013-048-PE Sincerely Eb4L Tara D. Elkins Massachusetts Coordinator PV SYSTEM SIZE: N - - - N U s 65'OF 1"PVC CONDUIT V INTERCONNECTION POINT, C 6.48 kW DC FROM JUNCTION BOX TO ELEC PANEL LOCKABLE DISCONNECT SWITCH, � Ai ANSI METER LOCATION, - m &UTILITY METER LOCATION N waw Y m U—H C Nmz IO 0' U •L U IN z N O . � m I I L (27)TrinaSalar TSM 240-PA05.18 MODULES WITH A_r Enohase M215-60-2LL-S2x-ZC MICRO-INVERTER Ly MOUNTED ON THE BACK OF EACH MODULE �O V JUNCTION BOX ATTACHED TO / ARRAY USING ZEP ZS-GAB TO m KEEP JUNCTION BOX OFF ROOF N A •e n oc= N mo m K U ¢ O2 I I N ' zw ` � „ z m - w �U U~IN Z Z O SHEET NAME: wg I I � � a SHEET NUMBER: PV SYSTEM SITE PLAN 4 SCALE:3132"= V-0" d �� C1 �2K• �'u2nu--� . 1 20 CLARK AVENUE "I CERTIFY THAT THE DWELLING IS LOCATED a 100.00' AS SHOWN AND CONFORMS TO THE ZONING LAWS OF THE CITY OF SALEM." 2 STORY ./J.,1,/VINYL SIDED GAR515.5' — / `_ ^-- — 21.2' #20 RALPH W. REID P.L.S. DEC 9 ih L'C' GRAPHIC SCALE LOT 357 LOT 363 LOT 362 40 O ZO b DO ISO 15,421 f SF � IN "r ) 1 Inch = 40 ft SALEM , MASSACHUSETTS •�'"' NEW FOUNDATION PLAN \`? RALPH : N/F a WILLIAM Y , LOT 363 RcIC ARMQUIST ?2 0 20 CLARK AVENUE RE►D LAND SURVEYORS R 365 CHATHAM STREET NO "SPECIAL FLOOD HAZARD" AREA INVOLVED LYNN, MASSACHUSETTS COMMUNITY #250102 0056 FEMA 8/5/85 R96-030 LTS DATE: JAN. 25, 2000 SCALE: 1 " = 40'