Loading...
0155 WASHINGTON STREET - BPA-8-534 DEMO 155-159 What fs 00 arrant us•d ? Dew LOAN filarial d 9u a 'arc k dws&gl.ttow nst�i wa dw addlrw Ca"M to L&W7 ���� Aaeaatos9 Atdftcft N c�i i Madwies Nam Addraas and Phona Aua h_ " Canso atpaniaors l.foaao d e�,c�71 \`cc>4 me Rapbtta0 n EaWnalad Coat Of P`'►oj�aot f Pam*FM Cala+laf>on Parma Fee Eatlmaead Coat X$741000 Raaidendal EsUmated Coat f41/f100s Canrna�li ---An AddOWW S&OO to added as an Admk*Vativa e.AarOa. me" sure that as name are proparb and wo"wriltan to avoid detwe In Tt,undersigned do"WOW APPiY for a Suk*V W'liuld spec andons. Signed under pang ft of PSIJUM Date 9 .. c L CITY OF-% PUBLIC PROPERTY DEPARTMENT wwa DEKOLITION.OR CHANGR O/USZ 02 OCCU*•Nry FOR •xY ZZUSMG 1.0 an INFORMATION Pnw"Is kxwted In a;Conssrvalon Arse YIN Flbmft OlsMld VM 2.0 OWNEROW INFORMATION 11 Owner of Land Name: Telephone. 3-000MPLM THIS SECTION FOR WORK IN 9xWMW BUILDINGS ONLY Addition E)d" Renovation ENumberofSt*rlee Renovated Change 1n Use Neu► Oemoudon Exis&"q Approximate you of Area per floor (e}} Renovated construcdM or renovation of axis" building New Bad Descripdcn of Proposed Work; cZCL:1 is ti ---- - ---Mail Permit ta. - - - SS - $°l �a`huu�fat cif., 4 NGvv Z 31 ><ic ODCITY OF SALEM, MASSACHUSETTS PUBLIC PROPERTY DEPARTMENT 120 WASHINGTON STREET, 3RD FLOOR SALEM, MASSACHUSETTS 01970 TELEPHONE: 978-745-9595 EXT. 380 FAX: 978-740-9846 KIMBERLEY DRISCOLL MAYOR Section 116.0 DEMOLITION OF STRUCTURES Structures over fifty(50) years old must have approval of the Salem Historic Society UTILITY DISCONNECTIONS REQUIRED Authorized Agent Date of Disconnection Water / (see attached requirements) QtJ �1� lA���(� -'74 Alwt-jd r+e..d Electrical Fire (0 &p (D-- Health /6 - 3 4- D "I Sewer ,��. �u��l�u, kbl4-i. q ate•-o P�l� le.l Salem Historic Commission ca p Dig Safe Number ZGpp�-I (�C� \ / Pest Control: DOl/� l"e. 6al �/v Se�VI�e Gus to/ °�#Ol- DDT o�7a 7 { ***DOCUMENTATION OF ALL THE ABOVE MUST BE ATTACHED BEFORE PERMIT CAN BE ISSUED*** I Fee for Demolition $5.00 application fee plus $2.00 per 100 square ft gross area, Minimum $25.00 l Salem News Buildings Demolition Plan October 31, 2007 Page 2 2. Plumbing certification stated all water, sewer and gas service enters/leaves through Edgewater cafe. Where are services in the other buildings, how do they connect to the pipe leaving/entering Edgewater cafe? 3. Plumbing certification references permits pulled for capping A/C drain lines, what lines doe this refer to where are they on the drawing. 4. Demo regulation requires engineered stamped plan, if utilities are to be re-used immediately and not capped at the city's main. Provide engineered stamp drawing depicting proposed re-use of existing utilities. 5. Not in City review perview; however, the Keyspan Certification letter only references #155-189 Washington street bldg, not #31 Front and#26 New Derby Street. Sewer: 1. what connections exist (assumed) north of India sewer connection on sidewalk of wash street mall? Can this be abandoned? 2. where is existing sewer service in #155-189 Washington street bldg. to be abandoned? What does it connect to? Where is it to be abandoned? 3. same question for #31 Front and #26 New Derby Street. Where is existing sewer? What does it connect to? Where is it to be abandoned? Water: 1. drawing notes sprinkler line in Edgewater cafe to be cut and capped on 10/31/07. This conflicts with plumbing certification. 2. If existing water and fire service in #155-189 Washington street bldg. to be abandoned in Edgewater cafe, show connecting of existing piping in the building and pipe to be Demolished. 3. Same comment for#31 Front and #26 New Derby Street. 4. If water service system outside #26 Front Street was previously abandoned, note on drawing, if not should it be abandoned now? At City main? Drainage: 1. What is the 4-inch drain at the refrigeration building? What is connected? What is it connected to? 2. Same comment on HVAC units on back of#31 Front Street? Drains exist? Connected to what? 3. What is connected to the 4-inch drain connected to the drain system in the Artist Row area? 4. Where are the roof drains to all buildings? Where do they go? 5. What is CB in driveway, off parking lot on #31 Front Street. The City awaits responses to these comments, prior to signing off on the Demolition Permit. \\Salemde0I\WaterAdmin\DKnowlton\My Documents\miscellaneous\salem news building demo permits comments 10-31-07.doc City of Salem, Massachusetts ` Department of Public Services 120 Washington Street, 4th Floor Kimberley Driscoll Tel. (978) 745-9595 Ext. 5670 Mayor Fax (978) 745-0349 David H. Knowlton, P.E. City Engineer MEMORANDUM October 31, 2007 To: Jason Downing and Alex Schip, RCG A plaT tes From: David H. Knowlton, P.E.; City Engineer Re: Salem News Buildings Demolition Plan Agreement Memo of Conditions to Approve Demolition Plan This memo has been prepared to summarize the conditions of approval agreed upon by RCG and the City of Salem Engineering Department. The writer met at 9:15 AM on October 31, 2007 with the above referenced representatives of RCG in the Engineering Department to review the Engineering Department's comments on the plan that are summarized in the attached memo dated the same day. It is understood by the City that due to the age and type of construction of the buildings, it has been impossible for the owner to ascertain the location and condition of all water, sewer and drain lines leaving and/or entering the buildings to be demolished. Therefore, that information is incomplete on the plan submitted. All comments were reviewed and the following was agreed by all: 1. Incomplete information will be provided n a revised plan, stamped by a professional engineer, who completes a survey of piping entering and leaving the buildings in a reasonably short period of time after the buildings have been removed. RCG agreed to require their demolition contractor to take care not to bury or cover any pipes during his work and to overall assist in the process of providing an accurate plan of utilities. This agreement satisfies a majority of the comments as follows: overall comments: 2, 3, 4; sewer: 2, 3; and water: 2, 3. 2. As part of the survey by a professional engineer, the existing sewer in the Washington Street Mall and drainage system in the same mall and other locations on the property Agreement Memo of Conditions to Approve Demolition Plan October 31, 2007 Page 2 will be cleaned and inspected to ascertain condition and connectivity. Any defects found will be repaired by the owner. This agreement satisfies the following comments: overall comments: 1; sewer 1; and drainage: 1, 2, 3, 5. 3. RCG stated the certification by Keyspan is accurate. Keyspan told them there is only one service into the buildings through the Edgewater cafe. This satisfies the following comment: overall comment: 5. 4. RCG stated the City had shutoff the water to #26 Front Street years ago. The writer will confirm with DPW. This satisfies the following comment: water comment: 4. 5. RCG stated all roof drains spill to the ground and are not connected to anything underground. This will be confirmed with the engineer survey following demolition. This satisfies the following comment: drainage: 4. 6. RCG stated the Salem Fire Department required the fire service to be capped today, as close as possible to the day of demolition. This satisfies the following comment: water: 1. With all the comments in the City's attached memo addressed and agreed upon herein. The City engineering Department approves the Demolition Plan for water and sewer. \\SalemdcOI\WaterAdmin\DKnowllon\My Documents\miseellaneous\salem news building demo permits follow-up agreement memo 10-31-07.doc III DUST CONT11OL Dust suppression,control from this demolition operation is a high priority for this Salem project. Wetting with hand held hoses shall be used to control, mitigate and maintaina f reasonable level of dust_During the demolition process a labor will fix a steam Of water on the demolition impact-and surrounding area. The controlled piles of concm:e,brick and wood debris will also receive a steam of water to maintain and control a reasonable level of dust. Sufficient water shall be applied to meet Federal, State and local air quality regulations. All trucks will be covered when transporting debris from this demolition zone. Testa Corp will cooperate with Local agencies to insure and maintain a safe and clean site. STREEP SWEEPING m A bobcat wlsweeper attachment or a street sweeper will be utilized at equipment and truck exiting locations as necessary to control and maintain a clean and workable I condition. f r I 360 Audubon Ro ad Wakefielc„ MA 01880-1204 (781.) 245-3555 FAX (781) 245-8700 www.testaeorp-con INTEGRATED PEST MANAGEMENT SERVICES MAIN COILC 1:01 MILL FN SIX-Fr,LOWPLI.MA M101"1 A? TEL:147914i1+1611 FAY:{Y76144'}31W Q yd � e October 15, 2007 To Whom it May Concern: Please be informed that Bain Pest Control has been servicing the properly of RCG-LCC, located at 155— 185 Washington St., Salem,MA 01970 weekly for rodent control prior to demolition. Our initial start date was August 29, 2007. Thank you, Joan Bouchard Bain Pest Control Representative k i �i nLn[H OHI[itr IN W NN 9^'.0.MORlIH�N0.,M1.a't�l IWIHIN,NH IIPI.p1�M4NI HPRp.•Nry�Jl Plttl•RMIMNIIYiIH,NN�ImiTiwM[HIM1RN IryP�]:•N^i uvR.n+DNkI I\t NRV6f11NL tlul-11-euuI Inu uu. is Hn hniornn rnn nv, vice vl�i ...0 • . �• r45ffWfiWN New England r A Operations North Shore Division Energy elmery 0.4 River Street La Beverly, Ma. 01915 Thursday,October 11,2007 To Whoni it may concern: `Phis letter is in regards 155-189 Washington Street, Salem. Please be advised that there is no gas service to the section of this building that is being demolished. Should you have any questions or concerns you can call me at 781-466-5782. Sincerely, 4eoyt ge G'. 0 ell Ficid Coordinator North Shore Divisions i I I e • intended sole! for the person to whom it is addressed. If you Mccive this This is a confidential m ssag�, t t� Y message in cirnr,please forward it to the correct person,or back to us at fax 978 927 7459 Aspinwall 723 Washington Street Baystate PH)617.472?8265 PLUMBING • HEATING • AIR CONDITIONING (FAX) 617.471.1301 October 15,2007 City of Salem,Massachusetts Department of Public Services 120 Washington Street Salem,MA 01970 Re: Utility investigation and disconnect for Demolition of 155-189 Washington Street, 26 New Derby Street and 31 Front Street We completed a full investigation of utilities at 155-189 Washington Street,26 New Derby Street and 31 Front Street on Monday October 8,2007. Water,sewer and gas service all enter the building off Front Street under Edgewater Cafd. The water and sewer connection have been cut and capped excluding services for the remaining restaurants. All A/C units refrigeration have been reclaimed and plumbing permits have been sent to plumbing inspector for capping drain lines. If you need any other information please call me. �-�- r- Lou Mazzini Master Plumber License#8140 PLUMBING o HEATING ,, AIR CONDITIONING • DESIGN/BUILD Z'd LL 6L4LL9 jeydo;su40 ewoL LO 9L too � a Salem Historical Com mission mISS iOn 120 WASHINGTON STREET,SALEM,MASS ACHUSETTS 01970 (978)745-9 595 EXT.311 FAX (978)740-0404 WAIVER OF THE DEMOLITION DELAY ORDINANCE It is hereby certified that the Salem Historical Commission has waived the Demolition Delay Ordinance for the proposed demolition as described below, as per the requirements set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. Address of Property: 159-189 Washington Street I Name of Record Owner: Washington at Derby LLC Description of Demolition Work Proposed: Demolition o 2 o 4 buildings including 3 story wood framed,amed,far right building at corner of Washington & D f f le in rear with 1 story addition. Main 3-story wood framed building (middle New Derby and 2 story building ry Ca e 2 story building housing Edgewater f Passage to India to remain. ry g Street) housing g building on Washington S ) g g on corner of Washington and Front Street to remain. Approval of the waiver is conditional that:• pP m Historical o the interior and exterior and provided to the Sale Archival quality photographs be taken f R n'p Commission prior to demolition; • Historic details, specifically, careful removal of the corbels (architectural cornice brackets) should be salvaged and reused in the new development; • For any historic details that cannot be incorporated into the new design (i.e. tun ceilings) be offered to the Peabody Essex Museum; e owner work diligently to design an appropriate perimeter fence (the Commission encour th theages that • The g copped to wi 'hi h atboard wood fence with a p ence not be chain link but be a whitewashed, 6 g ,f .f .f 10" wide boards); and • The owner consider seeking approval for signage to be placed on the fence which will illustrate the future development concept. Dated: 8/16/07 SALEM HISTORICAL COMMISSION By: � fain the a ro Hate ermrts from the Inspector Please be sure to ob p P T. P PP THIS IS NOT A DEMOLITION PERMIT. of Buildings (or any other necessary permits or approvals)prior to commencing work.