Loading...
87 WASHINGTON ST - BUILDING INSPECTION (6) The Commonwealth of Massachusetts Il ,' Department of Public Safety V➢U Massachusetts State Building Code(780 CMR) Building Permit Application for any Building other than a One- r Tw -Family Pwel ' (This.Section:For Official Use Only) / Building Permit Number: Date Applied: Building O al: SECTION 1:LOCATION(Please indicate Block#and Lot#for locations for w c street ad re o available) 8ZWA5,qi,,:aro6i 5r :5� 0/9-70 No.and Street City/Town Zip Code Name of Building(if applicable) SECTION 2:PROPOSED WORK Edition of MA State Code used$_ If NewConstruction check here❑or check all that apply in the two rows below r Existing BuildingaN Repair❑ 1 Alteration>I Addition❑ 1 Demolition ❑ (Please fill out and subnut Appendix 1) Change of Use ❑ Change of Occupancy ❑ 1 Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes X No ❑ Is an Independent Structural Engineering Peer Review required? Yes ❑ No Q Brief Description of Proposed Work: �,&A2 E9rh r ;4c��rK oi� z1 R-E--i---AiAPA 1'r/3AIZ //=nAU An A) c5r A lF a srAiR3 7-0 P10Tr R.�rli n rr /e/n�C�i e7� /.i o-- A i.C7L7-jcAL //9FT ( �77Y�C.7�'•O M�1.�,'P.c _AP'PFat -D yARiAn/cf"),_` �oA7i<IljuaAT�o�V D1-- iY/OU s'JST i�1s ArJ'P snn4 SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed (See 780 CMR 34) ❑ Existing Use Group(s): _ I Proposed Use Group(s): SECTION 4:BUILDING HEIGHT AND AREA L Existing Proposed/xrfr OF- a�-K oA/ v No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) 2 't-ZS2`/5- 2 +/_3 245 Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2,V Nightclub ❑ A-3 ❑ A-4❑ A-5 ❑ 1 B: Business ❑ E: Educational ❑ F: Facto F-1 ❑ F2❑ I H: High Hazard H-1 ❑ H-2❑ H-3 ❑ H4 ❑ H-5 ❑ I: Institutional I-1 ❑ I-2❑ I-3❑ I-4.❑ M: Mercantile ❑ R: Residential R-1❑ R-2❑ R-3❑ R-4❑ S: Storage S-1 ❑ S-2❑ U: Utility❑ Special Use ❑and please describe below: Special Use: SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA ❑ _ IB ❑ IIA ❑ IIB ❑ IIIA ❑ IIIB .Q IV ❑ VA ❑ VB ❑ SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Debris Removal:i Permit:Water Supply: Flood Zone Information: Sewage Disposal: TrenchLicensed Disposal Site❑ Public Check if outside Flood Zone X Indicate municipalA A trench will not be P Private❑ or indentify Zone: or on site system❑ required❑or trench or specify: permit is enclosed❑ Railroad right-of-way: Hazards to Air Navigation: MA Historic Commission Review Process: Not Applicable❑ Is Structure witlin airport approach area? Is their review completed? or Consent to Build enclosed❑ Yes❑ or No D.fl Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Group(s): Type of Construction: Occupant Load per Floor: Does the building contain an Sprinkler System?: Special Stipulations: 1 SECTION.9:-PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner ,FjgRr'/ oodE k)A5MlAApk7 :5r �gc. LL/ 7 Ra,,r- Lx 5r. Name(Print) No.and Street City/Town Zip Property Owner Contact Information: 6N/A)5FF -014LiAN cj4wD K 978- 22- 0369 Title Telephone No. (business) Telephone No. (cell) e-mail resssc"W" If applicable, the property owner hereby authorizes Name Street Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this building ernut application. SECTION 10:CONSTRUCTION.CONTROL(Please fill out Appendix 2) (If building is less than M,000 cu.ft of enclosed space and/or not under Construction Control then check here❑and skip Section 10.1) 10.1 Re 'stered Professional Responsible for Construction Control �a ���taw ? -L$2 tg�,3a14G4QCaK 'Le3S Nazne Registrant) Telephone No. e-mail address Registration Number S9S3 GSS�slr.�tt� x M.4 oRso ,AHr�T Lol Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor __ D-aNlet of-P-46N 2 _ Company Name 'TN i E L No o 01 "S 60 Name of Person Responsible for Construction License No. and Typi if Applicable S 056> I 2D 6&eKt'!7 A16- o<'�-7/5 Street Address City/Town State Zip Telephone No. (business) Telephone No. cell e-mail address SECTION 11:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c:152..§ 25C 6 A Workers Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the f uance of the building permit. Is a signed Affidavit submitted with this application? Yes the ❑ SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Estimated Costs: (Labor G� Item and Materials) Total Construction Cost(from Item 6) 1.Building $ Building Permit Fee=Total Construction Cost _o (Insert here 2.Electrical $ appropriate municipal factor) 1 Plumbing $ 4.Mechanical (HVAC) $ Note:Minimum fee=.$_ (contact municipality) 5. Mechanical Other $ Enclose check payable to "C Z.0 S,0 0 6.Total Cost $ NO (contact municipality)and write check number here SECTION 1 :SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the b�s"y of y know e ge and understanding. O)ONiCL NO(WMP 12 SDI - - 6 (� zv�z, Please print and sign name Title Telephone No. Date O(iC1Q rn Street Address City/Town - State Zip .Municipal Inspector to fill out this section upon application approval: _ . Name - Date 1 Appendix 1 For the demolition of structures the building permit applicant shall attest that utility and other service connections are properly addressed to ensure for public safety. Please fill in the information below and submit this appendix with the building permit application. The building permit applicant attests under the pains and penalties of perjury that the following is true and accurate. Property Location (Please indicate Block # and Lot # for locations for which a street address is not available) No. and Street City /Town Zip Name of Building (if applicable) For the above described property the following action was taken: Water Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑ Gas Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑ Electricity Shut Off? Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑ Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑ Other (if applicable) Yes ❑ No ❑ Provider notified and Release obtained? Yes ❑ No ❑ Other (if applicable) CITY OF Smy"NIV IN'IASSACHUSETTS • BCD.DING DEPARTNMNT ' 120 WASHINGTON STREET,3w FLOOR 4j TE1- (978)745-9595 FAX(978)740-9846 KIMBERLEY OPISCOLL MAYOR DIRECTOR ST.Pt>`ttR6 DIRECTOR OF PCBLIc PROPERTY/BL'R.DING CO',L%MIONER Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information y� Please Print Leeibly Name(9usim-saorganintiorvindividual): LCOX YL9<g-7 o Address: City/State/Zip: 6ae] C-!J i✓1/7 0I-'IIS Phone#: S-5`3 c)3 4 y Are you an amployerY Check theappropriate box: Type of project(required): 1.ER I am a employer with_� 4. ❑ 1 am a general contractor and 1 6. ❑New construction employees(full and/or part-tithe).' have hired the sub-contractors 2.❑ I am a sole proprietor nr partner. listed on the attached sheet.: 7• ® Remodeling ship and have no employees These sub-contractors have S. ❑ Demolition workingfor me in an capacity. workers'comp.insurance. Y P tY• 9. ❑Building addition (No workers'comp.insurance 5. ❑ We ate a corporation and its required.] officers have exercised their I0.❑Electrical repairs or additions 3.❑ 1 anti a homeowner doing all work right of exemption per MGL 11.❑Plumbing repairs or additions myself.[No workers'comp. c. 152,§1(4),and we have no 12.0 Roof repairs insurance required.]t employees. [No workers' 13.❑Other comp. insurance required.] "Any applicant that checks box#1 must also till out the section below slowing then workers'compensation policy information. t 1 kotteowrw•es who submit this affidavit indicating they are doing all work and then him outside commetors most submit a new affidavit indicating such: {ontratwn that cheek this box miry anachod an o witional sheet showing the name of ft subcontractors and their wodu ss'comp.policy infinoaion. I am an employer that Is providing workers'compensation lnsuranee for my employees. Below is the policy and Jab site information. n�/�//� e��/ // Insurance Company Name: �- l Vllf°IC V �Iv -NU&RA _ i WS• c Policy#or Self-ins.Lic.#: 1,n U(� - J &, Expiration Date: c ZY 1 Job Site Address: ki W 5T City/State/Zip: S19CV" en 9'__ Attach a copy of the workers'compensation policy declaration page(showing the policy number and eirplration date} Failure to secure coverage as required under Section 25A of MOIL c. 152 can lead to the imposition of criminal penalties of a fine up to S 1,500.00 and/or one-year imprisonment.as wall as civil penalties in the form of a STOP WORK ORDER and a tine of up to S250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of . Investigations of the DIA for insurance coverage verification. I do hereby certify a the p Ins and pens of perjury that the faformadon provided above Is true and correct Sinnature: Date: r #' Sod �3 OJJlcial use only. Do not write in this area,to be completed by city or town o0wird City or Town: PermitiLleense# Issuing Authority(circle one): I.Board of Heailh 2.Building Department 3.Cilyffown Clerk 4.Electrical inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Appendix 2 Construction Documents are required for structures that must comply with 780 CMR 107. The checklist below is a compilation of the documents that may be required for this. The applicant shall fill out the checklist and provide the contact information of the registered professionals responsible for the documents. This appendix is to be submitted with the building permit application. Checklist for Construction Documents* Mark"x"where applicable No. Item Submitted Incomplete Not Required 1 Architectural -FR/a i 51,c -r T X 2 Foundation X 3 Structural 4 Fire Suppression 5 Fire Alain(may require repeaters) 6 HVAC 7 Electrical X 8 Plumbing include local connections) X 9 Gas Natural,Pro p ane,Medical or other) 10 Surveyed Site Plan (Utilities,Wetland,etc.) )( 11 Specifications X 12 Structural Peer Review 13 Structural Tests&Inspections Program 14 Fire Protection Narrative Report 15 Existing Building Survey/Investigation 16 Energy Conservation Report 17 Architectural Access Review 521 CMR 18 Workers Compensation Insurance 19 Hazardous Material Mitigation Documentation 20 Other(Specify) 21 Other(Specify) 22 Other(Specify) 'Areas of Design or Construction for which plans are not complete at the time of application submittal must be identified herein.Work so identified must not be commenced until this application has been amended and the proposed construction document amendment has been approved by the authority having jurisdiction.Work started prior to approval may be subjected to triple the original permit fee. y Registered Professional Contact Information Mt-,//gVr icWqu1A,C,'+l 203S/ �Name(Registrant) Telephone No. e-mail address Registration Number 4m , Fr 24iAF Az&&r�� Street Address City/Town State Zip Discipline Expiration Date �.lo .l CJ�o i5 7$/-729- 4644- )acgeooefhIo-&o; Gam 30774 Name(Registrant) ,Tel�ephone No. e-mail address Registration Number 9 -r F-r -DRIVE W/AJ4�F2 T a/ 90 JcvrzAr (3 /14 Street Address City/Town State Zip Discipline Expiration Date Name(Registrant) Telephone No. e-mail address Registration Number Discipline Expiration Date Street Address City/Town State Zi CITY OF S.kLE11, N-LksSACHUSETTS BUILDING DEPART%MNT e 120 WASHINGTON STREET, 3' FLOOR TLi. (978) 745-9595 F.*.r(978) 740-9846 IU%.IBEFJ RY DRISCOLL 1b1,AYOR Tt-tOh4As ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BUU.DR9G CO`•(! IISSI0NER CONSTRUCTION CONTROL DOCUMENT Project"rifle: �g P/J� / Date: / � /2 _ Project Location: O7 WASI�Jn��9r�Q1 _�_ Scope of Project: Lo_.1� ._..� zT� d �/R37 �Loe� TFg7Ll01/ U2&) In accordance with SECTION 116.0-116.4.2 of the 6th edition of the Massachusetts State Building Code Mass. Registration Number being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised the preparation of all design plans,computations and specifications conceming: ( ] Entire Project pQ Architectural [ ] Structural [ ] Mechanical ( ] Fire Protection [ ] Electrical [ ] Other(specify) for the above named project and that to the best of my knowledge,such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices and all applicable laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to determine that the work is proceeding in accordance with the documents approved by the building permit and shall be responsible for the following as specified in section 1 16.2.2: 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction contract documents as submitted for the building permit, and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. I shall submit periodically, in a form acceptable to the building official,a progress report together with pertinent comments. Upon completion of the work, I shall submit to the building official a final report as to the satisfactory completion and readiness of the project for occygd 4444 ®�ESet)ARCyies; Signature and Seal of registered professional: �v �Af`� C �. 4 Q¢ c0 No o.-20 3A5S1 r &LEST /! J 'aX (b OFM � l APPPPP� R.W. Sullivan Engineering HVAC . Electrical . Plumbing . Fire Protection . Code November 26, 2012 Poore & Co. 315 Washington St. Gloucester, MA, 01930 Attn: Tim Curtis Re: Opus Restaurant 87 Washington Street Salem, MA 01970 Dear Tim: This letter is regarding the renovations to the Lower Level and First Floor of 87 Washington Street in Salem and our review of the progress documents dated November 16 and 26, 2012. The project is required to comply with Massachusetts State Building Code, 8th Edition (780 CMR) which adopts the 2009 International Building Code (IBC) and 2009 International Existing Building Code (IEBC) with amendments. Since the renovation does not result in a change of use, tho work is classified as Level 2 alterations, which includes the reconfiguration of spaces, the addition or elimination of doors and windows, the reconfiguration or extension of systems, and/or the installation of additional equipment in less than 50% of the aggregate area of the building. Therefore, the work must comply with IEBC Chapters 6 and 7. The altered portions of the floors as shown on the architectural design documents meet the code for new construction as required by IEBC 701.3. Since the work area includes the entire floor, the remainder of the requirement of IEBC Chapters 6 and 7 are also satisfied since the work area includes a complete new fit-out. The renovation also complies with IEBC MA Amendment Section 102.2.2.1 since the floors will have sufficient exit capacity for the number of occupants. Since the floors are being completely renovated, it is assumed they will also be provided with updated exit signs, emergency lighting, and fire protection systems to protect the new floor layout. If you have any questions please do not hesitate to contact us. Very truly yours, SULLIVAN CODE GROUP i DON E. CONTOIS, P.E. 010 Sc IMM i;enler.529 Main Sirea*1,Suite 203,Boeicn. MA 02129-1107.617.523.8227(p) 617,5218016 if). www.rwau0hdansom r Deval L.Patrick "" '' '""'""'""'"""""""" b aolnp- exp. Governor - �/ ry�Q�n ThomaC mm ssisiioner P E Timothy P.Murray Lieutenant Governor �,%2p- � ���Qp�j� Thomas P.Hopkins Director Mary Elizabeth Heffernan / Secretary Uss'a`Lfi`'.sltlLdtltf TO: Local Building Inspector Docket Number V 12 266 Local Disability Commission Independent Living Center FROM: ARCHITECTURAL ACCESS BOARD RE: Opus Restaurant 87 Washington Street Salem Date: 11/6/2012 Enclosed please find the following material regarding the,-above location: Application for VarianceDecision of the Board Notice of Hearing _Correspondence Letter.of Meeting The purpose of this memo is to advise you of action taken or to be taken by this Board. If you have any information which.may assist the Board in reaching a decision in this case, you may call this office or you may submit comments in writing. n , d Deval L.Patrick ' Governor 'A y yo Thomas G.Gatzunis,P.E. c/ ��/-/G����� Commissioner Timothy P:Murray - (��' �y y y �+�+ Lieutenant Governor 5%� 4j/,-- -OWef - Thomas P.Hopkins Director Mary Elizabeth Heffeman secretary eVtU"'��'«'� / Docket Number V 12 266 NOTICE OF ACTI RE: Opus Restaurant, 87 Washington Street Salem 1. A request for a variance was filed with the Board by Mark McDonough (Applicant) on October 12, 2012 The applicant has requested variances from the following sections of the 06 Rules and Regulations of the Board: Section: Description: 28.12.1 Petitioner seeks a variance to allow the installation of a vertical wheelchair lift to serve the first floor and lower level of a proposes restaurant. The petitioner does not meet any of the"By Right" allwances of 521 CMR Section 28.12.1 a thru e. The vertical wheelchair lift will meet the requirerments of 521 CMR Section 28.12.2 2. The application was heard by the Board as an incoming case on Friday, November 2, 2012 3. After reviewing all materials submitted to the Board, the Board,voted as follows: GRANT: the variance to Section 28.12.1 as proposed for the reason that impracticability(see definitions of impracticability in Section 5 of 521 CMR) has been proven in this case and on the condition that the vertical wheelchair lift is permited and inspected by the Commowealths Elevator Division, and a copy of the inspection certificate is provided to the Board upon completion of the work. _PLEASE NOTE:All documentation(written and visual) verifying that the conditions of the variance have been met must be submitted to the AAB Office as soon as the required work is completed. . Any person aggrieved by the above decision may request an adjudicatory hearing before the Board within 30 days of receipt of this decision by filing the attached request for an adjudicatory hearing. If after 30 days, a request for an adjudicatory hearing is not received, the above decision becomes a final decision and the appeal process is.through Superior Court. Date: November 6, 2012 ,. '� cc: . Local Disability Commission Chairperson Local Building Inspector ARCHITECTURAL ACCESS BOARD Independent Living Center CITY OF SM.&M, TN'LA SSACHUSETTS BUILDING DEPARI"NEENT • 130 WASHNGTON STREET, 3' FLOOR a . 'ILL (978) 745-9595 FAX(978) 740-9846 [U-,{gFRt FY DRISCOLL MAYOR T�-IoNw ST.PIERRE DIRECTOR OF PUBLIC PROPERTY/BI;ILDL*IG CONLMSSIONER Construction Debris Disposal Affidavit (required for Tall demolition and renovation work) In accordance with the sixth edition of the State Building Code, 780 CMR section 111.5 Debris, and the provisions of MGL c 40, S 54; Building Permit At is issued with the condition that the debris resulting from this work shall be disposed of in a properly licensed waste disposal facility as defined by MGL c 111, S 150A. The debris will be transported by: P14L (name of hauler) The debris will be disposed of in : BFI (name of facility) Fo/1e5T Jr. P&,V1360-7 (address of facility) a/; sr re of permit appli ant A / / z to JebriutTJcx The Commonwealth of Massachusetts Department of Public Safety �i. Massachusetts State Building Code (780 CMR) Building Permit Application to Construct, Repair, Renovate or Demolish any V4ssbw �„'QC4' Building other than a One- or Two-Family Dwelling f Code and Other Requirements for Building Permits The Department of Public Safety has issued these building permit application forms so that municipalities across the state can move toward use of a single permit form and consistent permit application process. The MA State Building Code specifies the requirements of building permits and the applicant is advised to review and be familiar with these requirements in order to avoid some of the common permit application problems. Likewise the applicant should be aware that some municipalities require that the owner confirm, even prior to acceptance of the building permit application, that no outstanding property taxes, water fees, etc. exist. Filing Instructions 1.Please contact the city or town where the work will be done to ensure that the city or town will accept this application form and if any additional information is required, and obtain the correct mailing address. After doing so, print the application, fill in completely and then submit to the local city or town where the work will be done. 2.All applications shall be considered complete and will be reviewed if construction documents, specifications, fee, and other materials that may be required as indicated in the Building Permit Application are included with the application. 3.Please include a check for the Building Permit fee. The fee may be calculated using the information to be supplied in section 12 of the Building Permit Application. The check is to be made payable to the local city or town where the work will be done.