Loading...
31 WASHINGTON SQ NO - BUILDING INSPECTION The Commonwealth of Massachusetts Department of Public Safety \lassachuNelts State Building Code(780 CXIR)Seventh Edition City of Salem �\1 Building Permit Application for any Building other than a I- or 2-Family Dwellin (this Section For Official Use Only) Building Permit Number: Date AppIied:W=4VLy= I Building Inspector: SECTION 1: LOCATION (Please indicate Block 0 and Lot 0 for locations for which a street address is not available) 5 1 Nu, and Street Cih• /Town Zip Catde Name of Building(if applicable) SECTION 2:PROPOSED WORK If New Construction check here❑or check all that apply in the two rows below Existing Building Repair❑ 1 Alteration ❑ 1 Addition ❑ 1 Demolition ❑ (Please fill out and submit Appendix 1) Change of Use ❑ 1 Change of Occupancy ❑ 1 Other ❑ Specify: Are building plans and/or construction documents being supplied as part of this permit application? Yes No ❑ Is an Independent Structural Engineering Peer Review required? Yes ❑ No Brief Description of Proposed.Work: ,4 Nfcl.l�2 !LF..62` SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Evaluation is enclosed(See 780 CMR 3402.0) 0 Existing Use Group(s): Proposed Use Group(s)- Existing Hazard Index 780 CMR 34: Proposed Hazard Index 780 CMR 34: SECTION 4:BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor(sq. ft.) Total Area(sq•ft.)and Total Height(ft.) ' SECTION Br USE GROUP(Check as applicable) A: Assembly A-1 ❑ A-2r ❑ A-2nc❑ A-3 0 A4 0 A-5 0 B: Business 0 E: Educational ❑ F: Facto F-1 ❑ F'2❑ H. Hi Hazard H-1 ❑ H-2❑ H-3 0 H4❑ H-5❑ 1: Institutional I.1 ❑ 1.2❑ 1-3❑ 1-4❑ MF Mercantile❑ R: Residential R-1❑ R-2 ❑ R-ow: R-4 Cl S: Storage S-1 ❑ S-2 ❑ U: Utility ClSpecial Use❑and lease describe bel Special Use: x'\a \ SECTION 6:CONSTRUCTION TYPE(Check as applicable) IA IB ❑ IIA0 111) 0 IIIA ❑ 1118 ❑ IV ❑ 1 VA V80 SECTION 7:SITE INFORMATION (refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public❑ C heck it uu tstde 19und Zone❑ btdicate mumaral ❑ A trench will not be Licensed Disposal Site❑ required ❑or trench urspecil 1'rivate❑ or indentik Zone: or on site scstem ❑ )+remit is encluseal ❑ Railroad right-of-way: Hazards to Air Navigation: \I,\ I h.b•n, l ,•mmi,sw.t (true.. I'n•.r�s: Nel ,\l'ldiieblc❑ Is Sirtioure w 1, their re%ieu annldcted.' .n l-,-n,avtlh, IiwWcncl,,r,10 I Ycs❑ or No Yes \n ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY I dawn ,a l ��dv: Lsv(:nnq*(s): ra pe of (Occupant Load per Fleur: Ihvs ihv l•ud.lut�ino.un an ti),nnklcr tit stem.': �pa•c ial Stirulauan. SECTION 9: PROPERTY OWNER AUTHORIZATION .Nam •.�+��\.Lti rr.v.H Pnyr jv r Name(Print) No.and Street Cih'/fawn Gp en tact I'rula•rtv'`hnrr( +miniurmauun: /. d K Ll /.� Sa�'3 $ fr KKK Title Telephone No. (busmen%) Telephone No. Icell) a-mad ad.lrms if applicable, the property owner hereby authorizes Name Street Addrem City/Town State Lip to act on the ro peril'orcner's behalf, in all matters relatiyr to work.udhorired by this butldin • +unit[a + +bcation. SECTION 10:CONSTRUCTION CONTROL (Please fill out Appendix 2) (it building is less than 35,txx)cu.it.of enclus vl s+ace and/or not under Comtructiun Contrul then check here 0 and sIcip Scdiun I0.1) 10.1 Registered Prof ssional Responsible for Construction Control -9_28. ?ys- sib 2 z/ 7 7 Name(R trant) Trlrphot)e N . e-mail address Registration NumOr ber Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor z /s' , r//9 . /rz CompanxName. �2.s rt4� -A�',-"ce 5'/ O T Name of Per unstruction_ License . and Type if Applicable /' 8 G/f-S *�/6t G w /¢✓`e ,SVi tvr�F i G StS t,�raessL __4&33 City/Town StateZip a Telephone No. (business) Telephone No. (cell) e-mail address SECTION 11:WOKERS!COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.fi 25C(Q) A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? Yes 0 No 0 SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor J/ and Materials) Total Construction Cost(from Item 6) =$ / 1. Building $ Building Permit Fee-Total Construction Cost x_(Insert here 2. Electrical $ appropriate municipal factor)_$ 3. Plumbing $ 4. Mechanical (HVAC) $ Note: Minimum fee=$ (contact municipality) 5. Mechanical (Other) $ G G Enclose check payable to 6. Total Cost - $ J/, p! 0 a' (contact munici alit )and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering my name below, I hereby attest under the jai 'a en It of perjury that all of the information contained in this applicalwn is true aredd.C rate to the best off my knot 1 •e under tanddiri,.. ! LN (Q U�L� " U I'Iva.e print and �il;n n, me s fide fcicphnnr No. Ualy �=ea Zce. a /Ift P ����l/� i�/ f l6 �trvcl :\JJm.. Ci d"-- // state Zip Slunicipal Inspector to fill out this section upon application approval: w f/ Name U,oe � 5 J RICHARD W. GRIFFIN ARCHITECT 37 Turner Street, Salem, MA 01970 Tel.(978)740-9979 Fax.(978)740-2352 Thomas St. Pierre Building Instpector 128 Washington Street Salem, MA 01970 June 11, 2010 Dear Mr. St. Pierre: I am attaching to this letter a budget for the proposed renovations at 31 Washington Square North in Salem to be completed by Michael Shea. The budget is for the purpose of establishing that the renovations do not exceed an amount that would trigger a requirement to install a sprinkler system in the building as required under 780 CMR Chapter 34 Section 3401.1. That section of the code defines a substantial renovation as one where the cost of installing such a fire protection system is less than 15% of the total cost of proposed renovations. You will see from the attached budget that the cost of installing a sprinkler system would amount to approximately 43.4% of the cost of the renovations — exceeding that percentage by almost three fold. 15% of our construction cost is $22,332 which is much less than it would cost to sprinkler the building. Mr. Shea does intend to provide all of the required smoke, heat, and CO detection devices hardwired as required by the Salem Fire department. Any new ceiling construction will provide a one hour rating between floors per 780 CMR section 711.3. Sincerely yours, "4 w � Richard Griffin or Project Architect � . MA License #7814 Richard Griffin Architect Construction Budget 6/11/2010 31 Washijngton Square North Renovations Line Item Cost Carpentry 15,400.00 Drywall and Plaster 2 LRs 3,000.00 Interior Painting Units and Hall 13,475.00 Exterior Painting 6,845.00 Kitchens 1 st floor Drywall walls and ceilings 3,000.00 Cabinets 3,500.00 Cabinet Installation and Trim 1,400.00 Granite Countertop 2,000.00 Sink 500.00 Appliances 3,000.00 HW Floor 1,450.00 2nd floor Cabinets 3,300.00 Cabinet Installation and Trim 3,500.00 Granite Countertop 1,450.00 Sink 500.00 Appliances 3,000.00 HW Floor 2,000.00 Baths 1st and 2nd floor 13,500.00 Plumbing 2 kits, 2 baths, 2 HW htrs, gas piping) 25,500.00 HVAC install new furnaceBAC units 2 floors 20,760.00 existing Ductwork to remain Electrical (Replace panels for 2 units, 8,200.00 elec. For 2 kits and 2 baths General Conditions 10% 13,600.00 Total 148,880.00 Metroswift Sprinkler Proposal 29,603.00 T.Mackey Water Line Installation 12,500.00 Carpentry Estimate for Sprinkler Installation 21,500.00 Total Cost of Sprinkler Installation 63,603.00 (equals 47.7% of total cost of renovations O Joseph T. McCall Carpenter & Builder 65 Eastman Avenue Swampscott, MA 01907 Mass. Builders Lic. No. 051018 Home Improvement Contractor's Reg. #103478 Tel. No. 781 599-7591 Fax No. 781 596-3713 May 15, 2010 MR. MICHAEL SHEA 5 BRENTWOOD AVENUE SALEM, MASSACHUSETTS 01970 TELN 978 745-8313 --------------------------------------------------------------------------------------------------------- ESTIMATE FOR: 31 WASHINGTON SQUARE NO. SALEM, MASS. 01970 OPEN UP WALLS AND CEILINGS AS NEEDED FOR INSTALLATION OF SPRINKLER SYSTEM. REMOVE ANY MOULDINGS IN THE WAY AND SAVE. DO WHATEVER FRAMING IS NEEDED TO COMPLETE THE JOB. BLUEBOARD AND PLASTER ANY AFFECTED AREAS. REINSTALL SAVED MOULDINGS. TOTAL LABOR AND MATERIALS $21,500.00 'R wl'% New Hampshire Massachusetts 9_51 wry 58R Pulaski St. SPRINKLERTU CORPORATION 722 East Industrial Park P.O. Box 3007 PROTECTING PROPERTIES SINCE 1903 Dr. Peabody,MA 01960 Unit#12 Tel: (978)5322907 Fire Protection Contractors Manchester,NH 03109 Fax: (978)531-2433 www.metroswiftcom Tel: (603)626-7520 Fax: (603)626-7524 May 21, 2010 Mr.Mike Shea 5 Brentwood Avenue Salem,Ma 01970 RE: 3 lWashington Square Salem,Ma Gentlemen: We are pleased to quote a BUDGET price of twenty-nine thousand six hundred three dollars($29,603.00)for the installation of a NFPA 13D wet pipe sprinkler system at the above referenced location shown our representative on a recent site visit. Our work would start at a 3/4" or V2" outlet(after cross connection control provided by others)and include a NFPA 13D pump and tank,exposed black steel pipe with residential brass pendent sprinkler heads for the basement, concealed CPVC pipe(where possible)and exposed CPVC pipe with residential white sidewall sprinkler heads for the first, second and third floors and a single inlet fire department pumper connection. Our proposal is based on NFPA 13D, an adequate water supply, all areas where wet sprinkler pipe is installed to be heated by owner and regular working hours Monday-Friday. We include the following: - Fire Department permit to install - One(1) zone, shop drawings, hydraulic calculations,fabrication, pipe, hangers, earthquake sway bracing for sprinkler pipe, trucking, coordination and supervision - Properly licensed open shop labor - Standard insurance coverage with 5 million dollar excess liability umbrella We have not included the following: - Underground water supply to building(flushing and testing of same) (we start at outlet provided by others) - All electrical Airing or fire alarm wiring - Finish or prime painting of pipe or hangers, custom painting of sprinkler heads or equipment - Standpipes,Fire extinguishers or cabinets, access panels,Knox box - Structural penetrations - Cutting and patching - Building permit, inspection or review fees - Off hours working conditions - Jurisdictional disputes(Installation by Metro-Swift Sprinkler Corp employees only) - Additional requirements imposed by insurance companies or other regulatory authorities exceeding that of NFPA 13D - Professional Engineering stamps INSPECTIONAL SERVICES,FIRE PUMP TESTING,BACKFLOW INSTALLATION,24-HOUR EMERGENCY SERVICE - Page I of 2 The Owner's Engineer is responsible for: - Determining the adequacy of the heating system and building insulation to prevent the system from freezing as installed - Ensuring that the building structure will accommodate the hanging and seismic loads imposed by the fire sprinkler system Our design services are as provided in M.G.L. c. section 54A and c. 112 sections 60L and 81R, no cost for Professional Engineering services or stamps are included. Payment Schedule: To be Determined Our price is contingent on the owner providing one full set of building plans(including architectural,electrical, mechanical, and structural),both hard copy and in an Auto Cad 2004 compatible format at no expense to Metro Swift Sprinkler Corp. This proposal may be withdrawn by its if not accepted within 30 days. All invoices for progress payments are due in 30 days. Late payments are subject to 1.5%interest per month plus the cost of collection and attorney fees. If you have any questions or desire a meeting to discuss our proposal, please do not hesitate to call. Best regards, METRO-SWIFT SPRINKLER CORP. �Z7iee Richard P.Renick Sales Representative Acceptance of Proposal The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Authorized Signature: Date of Acceptance: Print Name: If acceptable please sign, date and return a copy of this proposal to Metro-Swift Sprinkler Corp. If you use a letter of intent please refer to this quotation in that document.Final contract provisions must not conflict with this proposal once the work has been authorized. 31Washington Square, Salem,Ma, May 21, 2010 Page 2 of 2 Inc. GENERAL CONTRACTORS �J/. µCRQp & �71Di137� n SEWER&DRAINPIPE CLEANING-VIDEO PIPE INSPECTION 58 BROADWAY•P.O.BOX 366 TRUCKING&EXCAVATING•DEMOLITION WORK SALEM, MA 01970•978 744-3849 GRAVEL•LOAM•FILLING•BLACKTOP EQUIPMENT RENTALS E MICHAEL SHEA JUNE 8, 2010 5 BRENTWOOD AVENUE SALEM, MA 01970 i DEAR MR. SHEA: IN REPLY TO A REQUEST FOR QUOTATION TO INSTALL 2 INCH SPRINKLER PIPE AT 31 WASHINGTON SQUARE NORTH FROM CITY MAIN TO INSIDE OF HOUSE FOR A FIRE SUPPLY LINE. WE WISH TO QUOTE THE SUM OF $12,500.00. HOPING TO HEAR FROM YOU FAVORABLY. THANK YOU, V DANIEL J. MAWKEY THOMAS MACKEY & SONS, INC. Michael J Bellante Home Services 50 astman Ave SwRpscott, MA 01907 Date 2/152010 Estimate # 9 Name PAddress Joe McCall 57 Eastman Ave Swampscott, Ma 01907 P.O. # Terms Due Date 2/15/2010 Other yp� $ " +y - 1 Descnptwn, $ < Qb _ , Rate g -X Total-��2 Living Rm. 975.001 975.00 Prepare all surfaces.Apply 2 coats of paint to all walls, ceiling, trim, and windows I Hall between Living Rm and Dining Rm i 425.00 425.00 Prepare all surfaces. Apply 2 coats of paint to all j walls, ceiling, trim, and windows Price includes closet I Dining Rm 900.00 900.00 Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows i Hall between Dining Rm and Kitchen 475.00 475.00 Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows j Price includes closet Bathroom 400.001 400.00 Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows i I I Subtotal Sales Tax (0.096) - _ Total Michael J Bellante Home Services mjb06d@aol.com 1 781 307 0148 Page 1 Michael J Bellante Home Services : 50 Eastman Ave ,,,,. t4, r ' ,,� Swampscott, MA 01907 Date 2/15/2010 Estimate # 9 3 Joe McCall 57 Eastman Ave Swampscott, Ma 01907 P.O. # Terms Due Date 2/15/2010 Other Dining Rm 2nd Level Prepare 625.00 625.00 all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows Kitchen 2nd Level Prepare 475.00 475.00 all surfaces. Apply 2 coats of paint to all walls, ceiling,trim, and windows Living Rm Prepare ( 900.00 900.00 all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows Price includes closet with window j i Bathroom Prepare 375.001 375.00 all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows Hall to bedroom Prepare 450.00 450.00 all surfaces. Apply 2 coats of paint to all walls, ceiling,trim, and windows Bedroom Prepare 825.00 825.00 all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows Subtotal Sales Tax (0.0%) Total Michael J He//ante Home Services mjb06d@aol.com 1 781 307 0148 Page 3 Michael J Bellante Home Services 50 Eastman Ave Swampscott, MA 01907 Date 2/15/2010 Estimate * 9 Joe McCall 57 Eastman Ave Swampscott, Me 01907 P.O. # Terms Due Date 2/15/2010 Other ` s , ° Descrl LIorLA Rdte P Kitchen 550.001 550.00 Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows I � j Bathroom 375.001 375.00 Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling,trim, and windows I, Bedroom 950.00 950.00 j Prepare all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows Front Entry All Levels Prepare 800.001 800.00 all surfaces_ Apply 2 coats of paint to all walls, ceiling, trim, and windows Price does not include walls(wall paper to remain.) i I Entry 2nd Level Prepare 350.00 350.00 all surfaces. Apply 2 coats of paint to all walls, ceiling, trim, and windows i i I Subtotal Sales Tax (0.0%) Total Michael J Bel/ante Home Services mjb06d@aol.com 1 781 307 0148 Page 2 Michael J Bellante Home Services 50 Eastman Ave b Swampscott, MA 01907 Date 2/15/2010 Estimate # 9 [NamAddress ' '; Joe McCall 57 Eastman Ave Swampscott, Ma 01907 P.O. # Terms Due Date 2/15/2010 Other ROE =7$ SG '"l..d fi'� {t1.w rv1R.r c.:".^'� 13 yr" .r. .�'A ..ab , )TM'}�..:n,..:d. .r -•.34 1� c �0. n�cJaxvt Office Prepare all 450.00 450.00 surfaces. Apply,2 coats of paint to all walls, ceiling, trim,and windows. i Back Hall Prepare 975.00 975.00 all surfaces. Apply 2 coats of paint to all walls, ceiling,trim, and windows. Estimate of cost of paint $1900 I 2,200.091 2,200.00 Estimate of resin paper, caulk,filler, sand paper. $300 i I � I i I � I I i I li Subtotal $13,475.00 Sales Tax (0.0%) $0.00 Total $13,475.00 Michael J Bellante Home Services mjb06d@aol.com 1 781 307 0148 Page 4 0 Joseph T. McCall Carpenter & Builder 65 Eastman Avenue Swampscott, MA 01907 Mass. Builders Lic. No. 051018 Home Improvement Contractor's Reg. #103478 Tel. No. 781 599-7591 Fax No. 781 596-3713 May 15, 2010 MR- MICHAEL SHEA 5 BRENTWOOD AVENUE SALEM,MASSACHUSETTS 01970 TEL.# 978 745-8313 ------------------------------------------------------------------------------------------------------------ ESTIMATE FOR: 31 WASHINGTON SQUARE NO. SALEM, MASS. 01970 CARPENTRY: REMOVE FLOORING AND JOISTS IN COLD ROOM ON FIRST FLOOR. DISPOSE OF ALL DEBRIS. FRAME UP COLD ROOM FLOOR BY USING 2"X 8"FRAMING INSTALLED 16" ON CENTER WITH A PRESSURE-TREATED RIBBON. INSTALL ''/2" WEDGE BOLTS TO FASTEN WOOD TO MASONRY WALLS. SHEATH FLOOR WITH'/d'CDX PLYWOOD. STUD UP WALLS TO CREATE A FULL BATH AND LAUNDRY. INSULATE WALLS TO CODE AFTER WIRING AND PLUMBING HAS BEEN INSPECTED. FRAME THE SECOND FLOOR ROOM ABOVE IT IN THE SAME MANNER. INSTALL '/2"BLUEBOARD TO CEILING AND WALLS, THEN APPLY THIN-COAT PLASTER. INSTALL DOUBLE DOORS TO LAUNDRY ENTRANCES. DOORS WILL BE HINGED LOUVERED-DOOR UNITS, BOTH DOORS OPENING OUT. INSTALL ALL TRIM AND BASEBOARDS. FRAME UP FOR SECOND BEDROOM IN SECOND FLOOR UNIT. INSULATE, BLUEBOARD AND PLASTER. INSTALL KITCHEN CABINETS IN TWO UNITS. CABINETS TO BE SUPPLIED BY OWNER. TOTAL LABOR AND MATERIALS $15,400.00 X Estimate TALBOT ELECTRIC, INC. Date Estimate# 26 HERSEY STREET SALEM, MA 01970-2919 3/4/2010 1so1 (978) 744-3311 MA LIC. # A17458 Name/Address Mike Shea Shea Roofing 5 Brentwood Ave. Salem,MA 01970 Project Item Description Cost Total Labor&Material 8,200.00 8,200.00 Install(3) 100 amp circuit breaker panels and(1)disconnect switch in basement. Install(3)existing circuit breaker panels to replace(3)existing fuse panels in units using existing feeder. Repair(3)existing boilers. 1ST.Floor: Install(1)owner supplied vanity light,(1)Panasonic fan light,(3) single pole switches,(1)20 amp circuit for laundry,(1)20 amp circuit for(2)island receptacles and install(6)owner supplied light fixtures. 2ND.Floor: Install kitchen wiring with(5)20 amp circuits with(5)counter receptacles,microwave receptacle,refrigerator receptacle and stove receptacle. Install(6)owner supplied light fixtures. 3RD.Floor: Install(6)owner supplied light fixtures. Total This estimate is good for 30 days from the date of issue. Page 1 S,= Estimate tiY TALBOT ELECTRIC, INC. Date estimate# 26 HERSEY STREET k SALEM, MA 01970-2919 3/a/2oto 1go1 (978) 744-3311 MA LIC. # A17458 Name/Address Mike Shea Shea Roofing 5 Brentwood Ave. Salem,MA 01970 Project Item Description Cost Total This quote does not include any Permit Fees,Inspections,No Boiler Controls,Dimmers and No Boiler Thermostat Add$2,200.00 for upcharge to 100 amp feeders in units. $10,400.00 P.S. Mike,Need to change appliances to gas to avoid new service. May have to. Total $8,200.00 This estimate is good for 30 days from the date of issue. Page 2 Proposal ESSEX COUNTY CRAFTSMEN, INC. Sheet Metal Contractors - HVAC 60 Ward Street SALEM, MASSACHUSETTS 01970 "Your Comfort Craftsmen" (978) 745-8028 or (978) 745-7372 FAX (978) 745-0113 submitted o: Mike Shea one 508-328-8888 a e March 12, 2010 Street 5 Brentwood Ave. Job Name 31 Washington Sq. North Salem,Ma urty, M State,Zip Salem, A 01970 0 oce ion First Floor rc i e an uate Fax o one We propose hereby to furnish material and labor—complete in accordance with specification below, For the sum of: dollars and SEE BELOW ($) PAYMENT TO BE MADE AS FOLLOWS SIGNATURE UPON ACCEPTANCE AND DEPOSIT Provide and install (1) one York 13 SEER, 4 ton high efficiency central air conditioning unit. System includes the indoor air handling unit which shall be located in basement and shall include condensate pump with overflow protection, trap, frost control and safety float switch to prevent water damage. Outdoor unit includes pre cast condenser pad, all A.C.R. refrigeration piping, armorflex insulation and an inline refrigeration line filter dryer. All trunk duct shall be galvanized steel insulated in bubblewrap foil face insulation. Supply and return plenums shall be acoustically lined on the interior to ensure quiet operation. All registers and grills shall be brown finished metal. Return duct and intakes shall be provided within the 1st floor hallway or other open area. Low voltage control wiring and new digital programmable energy star thermostat are included. New system will be evacuated, charged with R-410A precisely per manufacturer recommendations. Start and check for proper temperatures and system pressures. Provide a complete parts and labor warranty for (1) one year. TOTAL FOR ABOVE..... $9,265.00 OPTION #1: Provide and install (1) one 90%+ gas fired furnace in place of above listed air handler. Provide cased A/C coil for air conditioning. Provide PVC flue for furnace, condensate drain and necessary safeties. Add for Option#1 = $1,405.00 Work not included: Cutting, patching, painting, coring, power wiring, gas piping, co system, roofing, lead paint removal, make safe/clean up. Important Note—Essex County Craftsmen, Inc is fully insured for your protection. Insurance certificat s are available at your request. Warranty valid on paid up accounts only. This proposal expires 15 days from date of proposal. VVV Thank you for this opportunity to bid this project. If you have any questions or commis, please call anytime. Acceptance of Proposal — The above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do Signature Date the work as specified. Payment will be made as outlined above. All equipment and merchandise remains the property of Essex County Craftsmen,Inc.,until the account is paid in full. The buyer agrees to surrender possession of the equipment in the Signature Date event of default in payment. The buyer further agrees to pay 1 1/2%interest per month on the unpaid balance and to pay all of the cost of collection including attorney fees. Proposal ESSEX COUNTY CRAFTSMEN, INC. Sheet Metal Contractors - HVAC 60 Ward Street SALEM, MASSACHUSETTS 01970 "Your Comfort Craftsmen" (978) 745-8028 or (978) 745-7372 FAX (978) 745-0113 Submitted TO: one Date Mike Shea 508-328-8888 March 12, 2010 i street 5 Brentwood Ave. Job Name 31 Washington Sq. North Salem, MA '. City, state,zip Salem, MA 01970 0 oca ron Second Floor rc i e an Date ax o one We propose hereby to furnish material and labor—complete in accordance with specification below, For the sum of: dollars and SEE BELOW ($) PAYMENT TO BE MADE AS FOLLOWS SIGNATURE UPON ACCEPTANCE AND DEPOSIT Provide and install (1) one York 13 SEER, 3 ton high efficiency central air conditioning unit. System includes the indoor air handling unit which shall be located in the second floor closet and include condensate pump with overflow protection, trap, frost control and safety float switch to prevent water damage. Outdoor unit includes pre cast condenser pad, all A.C.R. refrigeration piping, armorflex insulation and an inline refrigeration line filter dryer. All trunk duct shall be galvanized steel insulated in bubblewrap foil face insulation. Supply and return plenums shall be acoustically lined on the interior to ensure quiet operation. All registers and grills shall be white finished metal. Return duct and intakes shall be located close to unit room. Also included is low voltage control wiring and a new digital programmable energy star thermostat. New system will be evacuated, charged with R-410A precisely per manufacturer recommendations. Started and checked for proper temperatures and system pressures. Provide a complete parts and labor warranty for (1) one year. (All cutting work down by others.) TOTAL FOR ABOVE: $9,170.00 OPTION #1 -- Provide and install (1) one 90%+ gas fired furnace in place of above listed air handler. Provide cased a/c coil for air conditioning. Provide PVC flue for furnace, condensate drain and necessary safeties. Add for Option#1 = $920.00 OPTION #2 -- Provide complete 2 zone system including 2 zone dampers, 2 zone panel, t-stats, by pass damper, and all control wiring. Add for Option#2 = $1,285.00 (Note: Option#2 is highly recommended for proper temperature throughout space.) Work not included: Cutting, patching, painting, coring, power wiring, gas piping, co system, roofing, lead paint removal, make safe/clean up. Important Note—Essex County Craftsmen, Inc is fully insured for your protection. Insurance certificates are available at your request. Warranty valid on paid up accounts only. � � This proposal expires 15 days from date of proposal. Thank you for this opportunity to bid this project. If you have any questions or comments, please call anytime. Acceptance of Proposal —— The above prices,specifications and conditions are satisfactory and are hereby accepted. You are authorized to do Signature Date the work n specified. Payment will be made as outlined above. All equipment and merchandise remains the property of Essex County Craftsmen,Inc.,until the account is paid in full. The buyer agrees to surrender possession of the equipment in the Signature Date event of default in payment. The buyer further agrees to pay 11/2%interest per month on the unpaid balance and to pay all of the cost of collection including attorney fees. Michael J Bellante Home Services 50 Eastman Ave "m4 Swampscott, MA 01907 Date 5/25/2010 Estimate # 80 Name / Addr ssesse r' Joe McCall 57 Eastman Ave Swampscott, Me 01907 P.O. # Terms Due Date 5/2 512 0 1 0 Other '13 , 3 Y i�`� & g. 0 :1/ Descrip't' � ,�, , >`� ,� } .: ,; .a'e QtyJ; "` .`ate �x 3TOtal ry str, itn...�., a '� k 3e = r^s a..,a, .r ..1�.a_., a.. '.' .._ T:�-�•. _xJ .,. - - ..0 ..r Apply 1.coat of paint to the trim on all 57 windows. 1,595.00 1,595.00 Apply 1 coat of paint to all dentil molding around the 3,375.00 3,375.00 building Apply primer and finish coat to front entry. 375.00 375.00 Apply primer and finish coat to side entry. 1 215.00 215.00 Apply primer and finish coat to three other doors 185.00 185.00 beside side and front entry. Apply primer and finish coat to side porch. 375.00' 375.00 Apply primer and finish coat to widows walk. 725.00 725.00 VIA, �6 SG Subtotal $6,845.00 Sales Tax (0.0%) $0.00 Total $6,845.00 Michael Bel/ante Home Services mj.b06d@aol.com 1 781 307 0148 J i a •' • f ,DF_&CR PT,1O N'OF WORK.PERFORMED,';: r .Cv milt 11111:101. 0-: N A T I O N A L L U M B E R Jun. 11/10 7 :29 AM P] 33 Mason St Salem ma 01970 * Original * Cust. (6366551-50) (978) 744-8800 fax (978) 744-7076 by briand on TDs ----------------------------------- Q U O T E No. 36926 from Jun. 11/10 BILL TO: UNITED ROOFING ---------------- ----------------- Expires --ires on Jun. 16/10 5 BRENTWOOD AVE SALEM MA 01970 Yard (S) SALEM Inside Slsm. (BPD) B DERRIVAN SHIP TO: WASHINGTON SQUARE CONDOS Entered by (BPD) BRIAN P DERRIVA WASHINGTON SQUARE Spc.Sls.Pers (BPD) BRIAN DERRIVAN O/S Salesman (50) HOUSE-SALEM Remarks SALEM MA 0197C , We are pleased to be able to quote the following items for your use at the designated location. This quote is valid for five (5) days .Substantial shipping must commence within fourteen (14) days . Each shipment allows up to four hours, round trip freight included. Quote is valid for shipments taking place within sixty (60) days from quotation date. This quote is an estimate. ------------------------------------------------------------------------------- Pieces Item Description U/M U.Qty Unit Price Extensior. ---------------------------------------------------------------------------- 2 QMERIL MERILLAT KITCHEN CABINETS EAC 2 sub-total : 6600 . 00 MAPLE SHAKER STYLE DOOR WITH A STAIN FINISH. PRICE INCLUDES VANITY CABINETS AS WELL AS ALL FINISH STOCK AND MOULDINGS. MERILLAT HAS A THREE WEEK LEAD TIME . 2 QGRANI BUILDERS GRADE GRANITE COUNTER EAC 2 sub-total : 2900 . 00 COLOR TO BE SELECTED BY CUSTOMER. -------------------------- This Quote Expires on Jun.16/10 Sub-Total : $9, 500 .00 TAX ADDED AT CUSTOMER REQUEST. Tax (6 .25% : $593 . 75 * * * T h a n k Y o u * * * T O T A L $10, 093 . 75 Quote No.36926 THIS IS A NON-RETURNABLE SPECIAL ORDER. PRODUCTION WILL NOT BEGIN WITHOUT A SIGNED AUTHORIZATION FROM CUSTOMER. UPON SIGNED RECEIPT OF THIS QUOTE YOU WILL HAVE A 48 HOUR GRACE PERIOD IN WHICH ANY CHANGES TO THE ORDER MAY BE MADE. UNFORTUNATELY, NO CHANGES MAY BE MADE AT ANY LATER DATE. WE THANK YOU FOR YOUR PROMPT ATTENTION TO THIS ACKNOWLEDGEMENT. PLEASE REVIEW, SIGN AND RETURN. Customer Signature: Date: Customer Name (PLEASE PRINT) :