Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13 SURREY RD - BUILDING INSPECTION (2)
the Commonwealth of Massachusetts ' Board of Building Regulations and Standards IN$PECTI NALc €SFtt�6CES !s\ Massachusetts State Building Code,780 CMR p nn''nn SALL�EgM fj y g Application P �tl��F1'd+V 2Uvise4l 11=Z(j 0 Building Permit A lication To Construct, Repair, Renovate Or De /� One-or Two-Family Dwelling (� This Section For Official Use Only ^� J Building Permit Number: Date lied: Building Official(Print Name) Signature Date SECTION 1:SITE INFORMATION 1.1 P'G erg Ad liF 1.2 Assessors Map&Parcel Numbers —� �) I.l a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq R) Frontage(R) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner of Record: Rodney Delegrin Salem, MA. 01970 Name(Print) City,State,ZIP 13 Surrey Road 978-766-6093 Rokfish@hotmail.com No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ I Addition ❑ Demolition ❑ 1 Accessory Bldg. ❑ 1 Number of Units_ I Other ❑ Specify: Brief Description of Proposed Work': to S V1'1 SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) I.Building $ 1. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ ` w\ ❑Standard City/Town Application Fee l.t/ ❑Total Project Cose(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Suppression) Total All Fees:$ 6.Total Project Cost: Check No. Check Amount: Cash Amount: Vv l �•W 0 Paid in Full 13 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 01 JGkMkS ShRreY�Y--) License Number Expiration Date Name of CSL Holder F-1A \I a� _, A List CSL Type(see below) U N Street \ [N` Type Description U Unrestricted(Buildings up to 35,000 cu.ft.) il./�✓ t I lL/l •'1 R Restricted 1&2 Family Dwelling Ciry/Towq Slate,ZI M Masonry RC Roofing Covering WS Window and Siding _ `,., SF Solid Fuel Burning Appliances 755I�OS 1��J N1.rnSc1�2(�G\1\UIitUY I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) V\V \nt scxcax \���su S \�hl1�n HIC Co me or,� [C R_e is nt Name HIC Registration Number Expiration Date No.an tree[ 1\ ff aA�� y ,LIB x. Email address R-DQCity/Town,State,ZIP t Telephone Y-� SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........❑ No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize V w\Yl t so\cky- to act on my behalf,in all pmattersJrelative to work authorized by this building permit application. UL— Print Owner's Name(Electronic Signature) .t SECTION 7b:OWNER`OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and understanding. Print Owner's or Authorized Ag:n a(Ele nic Signature) Date NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A. Other important information on the HIC Program can be found at www.mass'.eov/oca Information on the Construction Supervisor License can be found at www.mass.eowdpss 2. When substantial work is planned,provide the information below: Total Floor area(sq.ft.) (including garage,finished basementlattics,decks or porch) Gross living area(sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" A CERTIFICATE OF LIABILITY INSURANCE DATE B 31no1a12014 YYYY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. If SUBROGATION IS WAIVED,subject to the terns and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT MARSH USA INC. NAME' 122517TH STREET,SUITE 1300 PHONE FAXINC,No DENVER,CO 80202-5634 E-MAIL Attn:Denver.rertmquest@marsh.cem,Fax:212.948.4381 ADDRESS: INSURE S AFFORDING COVERAGE NAIC0 462738-STND-GAWUE-14-15 INSURERA:Evanston Insurance Company 35378 INSURED INSURER B::Zurich American Insurance Company 16535 Mvint Solar,Inc: American Zurich Insurance Company Mvint Solar Developer LLC wsuRERc: P Y 40142 3301 North Thanksgiving Way Suite 500 INSURER D: Lehi,UT 84043 INSURER E: NSURER F: COVERAGES CERTIFICATE NUMBER: SEA-002368030-08 REVISION NUMBER:O THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILISR TYPE OF ADDLSUBR POLICY EFF POLICY EXP R POLICY NUMBER MMIDDIYYYY MM/UDIYYYY LIMITS A GENERAL LABILITY 14PKGWE00274 11/0112014 11/0112015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY MAGE 5Q000 TO RENTED PREMISES Ea occunenw $ CLAIMS-MADE EflOCCUR MED EXP(Any one person) $ 5,000 X $5,000 Ded.BI&PD PERSONAL a ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OPAGG $ 2,000,000 POLICY X PRO-ECTLOC $ B AUTOMOBILE LIABILITY BAP509601500 11/0112014 1110112015 CAMBINEDD LI SINGLE MIT BI I $ 1,000,000 Ix ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED AUTOS AUTOS (BODILY INJURY Per acd )dent $ HIRED AUTOS NON-OWNED PROPERTY AUTOS Peracdtlerrt DAMAGE $ X A UMBRELLA LAB X occuR 14EFXWE0008B 11/01/2014 11101/2015 EACH OCCURRENCE $ 5,000,000 X EXCESS LAB CLAIMS-MADE AGGREGATE $ 5,000,000 DED RETENTIONS $ C WORKERS COMPENSATION WC509601300 11/0112014 11/0112015 % YVC STATU- OTH- AND EMPLOYERS' AIT RY LIMITS LBILFTYITS ER B ANY PROPRIETORIPARTNEWEXECUTIVE YIN WC509601400 11/01/2014 11/01/2015 E.L.EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER EXCLUDED? F NIA (Mandatory In NH) E.L.DISEASE-EA EMPLOYE $ 1,000,000 If Yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ A Errors&Omissions& 14PKGWE00274 11/01/2014 11/0112015 LIMIT 1,000,000 Contractors Pollution DEDUCTIBLE 5,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES Udh ch ACORD 10,Additional Remarks Schedule,N more spew he required) The Certificate Holder and others as defined in the written agreement are included as additional insured where required by written contract with respect to General Liability.This insurance is primary and non. contributory over any existing insurance and limited to liability arising out of the operations of the named insured and where required by written contract.Waiver of subrogation is applicable where required by written contract with respect to General Liability and Workers Compensation. CERTIFICATE HOLDER CANCELLATION City of Salem SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 93 Washington Street THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Salem,MA 01970 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE or Marsh USA Inc. Kathleen M.Parstoe .J�teLUdic.7Jr. 44dlsc, ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD The Commonwealth of Massachusetts Department of IndustrialAccidents Office of Investigations I Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Le ibly Name (Business/Organization/Individual): Vivint Solar Developer, LLC Address:3301 North Thanksgiving Way,Suite 500 City/State/Zip: Lehi, UT 84043 Phone #:801-377-9111 Are you an employer? Check the appropriate box: Type of project(required): 1.■ 1 am a employer with I Q 4. ❑ I am a general contractor and I employees(full and/or part-time). have hired the sub-contractors 6. ❑New construction 2.❑ I am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have g. ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance comp. insurance.: required.] 5. [71 We are a corporation and its 10.❑ Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their I LE] Plumbing repairs or additions i myself. o workers' com right of exemption per MGL Y (N P 12.❑ Roof repairs insurance required.]t c. 152,§I(4),and we have no � employees. [No workers' 13.❑ Other Solar Installation comp. insurance required.] 'Any applicant that checks box#1 most also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. ;Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:Zurich American Insurance Company Policy#or Self-ins. Lic. #:WC 509601300 Expiration Date: 11/1/2015 Job Site Address: ' v��� ����t .0 I City/State/Zip: So�0 1 r 1 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties ofperjury that the information provided abovle(i�s�true (and correct Sign re: Date• Phone#: 801-2296459 Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Office of Consumer Affairs ftnd Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170848 Type: Supplement Card VIVINT SOLAR DEVELOPER LLC. Expiration: 1/5/2016 JAMES SHERMAN 4931 NORTH 300 WEST PROVO, UT 84604 Update Address and return card. Mark reason for change. sCA 1 0 2OM-06111 Address Renewal Employment Lost Card tit Massachusetts -Department of Public Safety Board of Building Regulations and Standards Construction Supervisor License: CS-045254 A . JAMES R SHER1Y AN - 6 Fox Hollow Drife SAUGUS MA 019% s�V . Jay Expiration Commissioner 08/28/2016 V 4vo Y Yto solar 3301 North Thanksgiving Way,Suite 500 Structural Group Lehi,uT84043 P: (801)234-7050 Scott E. Wyssling, PE Head of Structural Engineering scott.wyssling9vivintsolar.com November 6, 2014 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Dahlgren Residence 13 Surrey Road, Salem MA 5-4047027 4.08 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 16" on center. The attic space is unfinished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir#2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category "B" and 22 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure "B", Zone 2 per (ASCE/SEI 7-f 0). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. vivint. solar Page 2 of 2 B. Loading Criteria 10 PSF= Dead Load roofing/framing 40 PSF=Live Load (around snow load) 5 PSF= Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com). If during solar panel installation, the roof framing members appear unstable, deteriorated, structurally compromised or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation, the pullout value, utilizing a penetration depth of 2 Yi', is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2" with a minimum size of 5/16" lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every fourth roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than four(4) rafter spaces or 64"o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is based on information supplied to us at the time of this report and current industry standards and practices. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. ery truly yours, ZN OF MqS'Q9 `e / 40 Scott E.Wy ling, cm MA License No. so 90F FGISTEQ'� FSSIONA� eodont. solar 13 Surrey Rd, Salem MA 01970 u g .N m� -4_ "O PV SYSTEM SIZE: \_ 4.08 kW DC Q I I JUNCTION BOX ATTACHED TO ARRAY USING ECO HARDWARE TO KEEP JUNCTION BOX OFF ROOF I I 50 OF 1"PVC CONDUIT FROM JUNCTION BOX TO ELEC PANEL ry I I m •O o J PV INTERCONNECTION POINT, ry LOCKABLE DISCONNECT SWITCH, ANSI METER LOCATION, I I o ^ &UTILITY METER LOCATION ? � ^ a - N0 � o � U ¢ I Z m 2 Z 0 K y (16)Yingii Ener9Y YL255P.29b MODULES WITH AI w i Enphase M215-60-2LLS2x-2C MICRO-INVERTER I MOUNTED ON THE BACK OF EACH MODULE I m y ¢ SHEET NAME: I I w J H —_—___—_— (na SHEET NUMBER: PV SYSTEM SITE PLAN o SCALE: 3/32"= V-0" > a m m 4 ti O m wa O o o.Z1 0 00 N 3 n_ O rn> C m z L) m Z C -1 m y m 30 a O,O O m I my m� U) D r Cj) m w � °= m I I X O O n D Z mey Rd c i D i INSTALLER:VNINT SOLAR P" n o ` ROOF m y INSTALLERNUMBER:1 8]].4044129 �o�o�� s4 a r Dahlgren 13 aResidence V L a PLAN MA LICENSE:MANIC 1]0848 Salem,MA 019]0 PLA V DRAWN BY:JPB AR 404]02] Last Mocified 10/9/2014 UTILITY ACCOUNT NUMBER 5068152004 CLAMP ,? MUNTING SEALING4- 1 C in t\o DETAIL WASHER �'; N LOWER0 mw SUPPORT �m'om wv�� w z CmEz mD �`m0 PV MODULES, TYP. MOUNT OF COMP SHINGLE ROOF, FLASHINGPARALLEL TO ROOF PLANEIN 0 5 5/16"0 x 4 1/2" MINIMUM PV ARRAY TYP. ELEVATION STEEL LAG SCREWS NOT TO SCALE TORQUE= 13±2 ft-Ibs CLAMP ATTACHMENT (/) NOT TO SCALE o m �C CLAMP+ ATTACHMENT CANTELEVER U4 OR LESS oG COUPLING L=PERMITTED CLAMP ECO SPACING SEE CODE COMPLIANT m COMPATIBLE LETTER FOR MAX ALLOWABLE MODULE CLAMP SPACING. E y o PERMITTED COUPLING 5 m p CLAMP+ CLAMP CLAMP h ATTAC MEN+ w COUPLING SPACING PHOTOVOLTAIC MODULE m < mm w .. J J W m Z m m Z Z 2 p SHEET NAME: L=PORTRAIT F-: J CLAMP SPACING Z Q ECO 2 O L=LANDSCAPE COMPATIBLE SHEET MODULE PV SYSTEM MOUNTING DETAIL NUMBER: CLAMP SPACING (MODULES IN PORTRAIT/LANDSCAPE NOT TO SCALE 1 M NOT TO SCALE a r Inverter Ratings(Guide Section 4) Invader MakMMmal Eaphaae M215e 21ULECx-2c 0 Conduit and Conductor Schedule MODULE DETAIL Max DC volt name 45 Volt, Tag Der-prin Wire Gaage ai Conductress conduit sloe �. Max Power 040-C 215 Were 1 Enphase engage mail-THWN-2 12 AWGWA-Free Air U Nominal AC Voltage 240 Volls 6AWG WA-Free Air N Yingli Energy YL2551bi Miss AC Current CA Amps t Bare CopperGmuntl(EGCIGEC) C^` N SOLAR MODULE Max OCPD Redng p pmpg 2 THWN-2 10 AWGa-1' se Max NumberolPardenCrwil 1] 2 THWN-2-Ground 6AWG 0'-1' � oJ THWN-2 OAor WG 01- mNOTESFORINVERTERCIRCUR$(Gultla Section aantl 9l: 9AwG 0't' A���W _J_iNwN-2_Gfopn /NW p m 1.)IF UTILITY REQUIRES VISIBLE-BREAK SWITCH,DOES THIS PV Module Ratings Q STC(Guide Section 5) L.L v'2 Enphase M21580-2LL-S2x-ZC SWITCH MEET THE REQUIREMENTS? Z MICRO-INVERTER AT YES NO XNA Model Makellimel Yingli Enemy YU55P-29b yEH Max Power-Point Current(imp) 032 Amp. ACA�C]NZ EACH MODULE,ATTACHED 2.)IF GENERATION METER REQUIRED,DOES THIS METER Max Powerfoint Voltage(imp) 3a.8 Volts W f N O WITH ECO HARDWARE SOCKET MEET THE REQUIREMENTS? Open,Cmdet Voltage(Voc) 307 Vale; L U YES NO %NA Short-Lidded Current(Ise) 8.88 Amps Q 3.)SIZE PHOTOVOLTAIC POWER SOURCE DC)CONDUCTORS Max Series Fuse OCPD) 15 Amps BASED ON MAX CURRENT ON NEC 690.0 SIGN OR OCPD Nominal Maximum Power at SIC(Prnax) 255 Walls RATING AT DISCONNECT. MICROINVERTER CONNECTION Voc Temeyslem Collage t000llECy8o0032 Q TO ENGAGE TRUNK CABLE 4.)SIZE INVERTER OUTPUT(AC)CONDUCTORS ACCORDING Vw Temperature Coe6¢lent _b 32 °U'C TO INVERTER OCPD AMPERE RATING(See Guide Speech 9). 5)TOTAL OF 1 INVERTER OCPD(sI.ONE FOR EACH NOTES FOR ARRAY CIRCUIT WIRING(Guide Section 6 and 0 and Appendix DI, PV CIRCUIT.66EB TOTAL SUPPLY BREAKERS COMPLY WITH 120%BUSBAR EXCEPTION IN 1.)Lowest expected ambient temperature based on ASHRAE minimum mean extreme NEC 69e6ildh(2)(a)? XYES NO dry bulb temperature for ASHRAE location most similar to installation bcarmn: -19-C (G BAREROUNDIN GROUND (GROUNDING ARRAY) Signs(See Guide Section 7) 2)Highest raph for ASousambient temostsim based on ASHRAE highest month 2%dry bulb ��' lempareture for ASHRAE Iocotion most similar to installation lacotian: 391 Sign for inverter OCPD and AC Disconnect: 3.)2005 ASHRAE fundamentals 2%design temperatures do not exceed 47°C in the 0 Urged Stales(Palm Springs,CA is 44.1 CT For less than 9 cuvent-carrying conductors Solar PV System AC Point of Connection in mcfmounted sunlit Conduit at least OF above mof and using the outdoor design ACOulput Currant 1 14400000 1 Amp. Rotterdam of 47"C or less(all of United States). Nominal AC Voltage I .o Volts a.)12 AWG,90-C conductors are generally acceptable for modules with Ise of 7.6a Amps THIS PANEL FED BY MULTIPLE SOURCES or less when pmteded by a 12-Amp or smaller fuse. 9 m (UTILITY AND SOLAR) b)10 AWG, conducto are general acceptable for modules with of 9.6 Amps prof rs c or less when protected by a I 5L&rnp or smaller fuse. �O NOTE:NEUTRAL CONDUCTOR(S)OMITTED FOR CLARITY - ._ ALL INVERTER OUTPUT CIRCUITS WILL HAVE A NEUTRAL CONDUCTOR re N O ENVOY BOXpar $ e, m c 0 . o a R W m U` _ a de POINT OF DELIVERY w c AND INTERCONNECTION of auw z m \SO PO SIEMENS ¢ ¢ U \G G 60AJ240V N y PO\iPm% MURRAY UNFUSED NEMA3 M ad z E ° O\\n ( COMBINER LNF222R OR PV CIRCUIT 1: 16 MODULES/PARALLEL '1\\/>FL PANEL 125A/240V SREC/ANSI EQUIVALENT SHEET Oq\F'P! LWOD4NR METER NAME: \�O EXISTING e le e 2 1 \'A OR EQUIVALENT 120A 240V1100A W 6 — O 0 1 \\\\ 2oA se a asM LOAD-CENTER M a O S S \ SHEET A__ _______ _ NUMBER: \\ MILBANK VISIBLEILOCKABLE 1 JUNCTION BOX Q \\ 3 1ODA OR 3 'KNIFE'A/C 3 � WITH IRREVERSIBLE \ EQUIVALENT DISCONNECT NEC 2014 Compliant GROUND SPLICE E 1.0 \ E 1.0 U5934-XL-BLG E 1.0 E 1.0 W Vivint Solar - PV Solar Rooftop System Permit Submittal 1. Project Information Project Name: Rodney Dahlgren Project Address: 13 Surrey Rd,Salem MA A.System Description: The array consists of a 4.08 kW DC roof-mounted Photovoltaic power system operating in parallel with the utility grid.There are(16) 255-watt modules and(16)215-watt micro-inverters,mounted on the back of each PV module.The array includes(1) PV circuit(s).The array is mounted to the roof using the engineered racking solution from EcoLbrium Solar. B.Site Design Temperature: (From Boston Logan INT'L ARPT weather station) Average low temperature: -21.1 °C (-5.98°F) Average high temperature: 38.4°C (101.12°F) C. Minimum Design Loads: Ground Snow Load: 40 psf (State Board BR&S) Design Wind Speed: 100 mph (State Board BR&S) 2. Structural Review of PV Array Mounting System: A.System Description: 1.Roof type: EcoX Comp. Shingle 2.Method and type of weatherproofing roof penetrations: Flashing B.Mounting System Information: 1.Mounting system is an engineered product designed to mount PV modules 2.For manufactured mounting systems,following information applies: a.Mounting System Manufacturer: Ecollbrlum Solar b. Product Name: Ecorail c.Total Weight of PV Modules and mounting hardware: 673.7 Ibs d.Total number of attachment points: 34 e.Weight per attachment point: 19.81 Ibs f.Maximum spacing between attachment points: • See attached engineering calcs g.Total surface area of PV array: 281.34 square feet h.Array pounds per square foot: 2.39 Ibs/square foot i.Distributed weight of PV array on roof sections: -Roof section 1: (16)modules,(34)attachments 19.81 pounds vivint solar 3. Electrical Components: A.Module (UL 1703 Listed) Qty Yingli Energy YL255P-29b 16 modules Module Specs Pretax-nominal maximum power at STC - 255 watts Vmp-rated voltage at maximum power - 30 volts Voc-rated open-circuit voltage - 37.7 volts Imp-rated current at maximum power - 8.49 amps Ise-rate short circuit current - 9.01 amps B. Inverter (UL 1741 listed) Qty Enphase M215-60-21J—S22 16 inverters Inverter Specs 1. Input Data (DC in) Recommended input power(DC) - 260 watts Max.input DC Voltage - 45 volts Peak power tracking voltage - 22V-36V Min./Max.start voltage - 22V/45V Max. DC short circuit current - 15 amps Max.input current - 10.5 amps 2. Output Data (AC Out) Max.output power - 215 watts Nominal output current - 0.9 amps Nominal voltage - 240 volts Max.units per PV circuit - 17 micro-inverters Max.OCPD rating - 20 amp circuit breaker C.System Configuration Number of PV circuits 1 PV circuit 1 - 16 modules/inverters (20) amp breaker 2011 NEC Article 705.60(B) vivin4. solar D. Electrical Calculations 1.PV Circuit current PV circuit nominal current 14.4 amps Continuous current adjustment factor 125% 2011 NEC Article 705.60(B) PV circuit continuous current rating 18 amps 2.Overcurrent protection device rating PV circuit continuous current rating 18 amps Next standard size fuse/breaker to protect conductors 20 amp breaker Use 20 amp AC rated fuse or breaker 3.Conductor conditions of use adjustment(conductor ampacity derate) a.Temperature adder Average hightemperature 38.4°C (101.12°F) Conduit is installed 1" above the roof surface Add 22°C to ambient 2011 NEC Article 705.60(B) Adjusted maximum ambient temperature 60.4 cC (140.72°F) b.PV Circuit current adjustment for new ambient temperature Derate factor for 60.4°C (140.72°F) 71% 2011 NEC Article 705.60(B) Adjusted PV circuit continuous current 25.3 amps c.PV Circuit current adjustment for conduit fill Number of current-carrying conductors 3 conductors Conduit fill derate factor 100% 2011 NEC Article 705.60(B) Final Adjusted PV circuit continuous current 25.3 amps Total derated ampacity for PV circuit 25.3 amps Conductors (tag2 on 1-line)must be rated for a minimum of 25.3 amps THWN-2(90°C) #14AWG conductor is rated for 25 amps (Use#14AWG or larger) 2011 NEC Anide 705.60(B) 4.Voltage drop(keep below 3%total) 2 parts: 1.Voltage drop across longest PV circuit micro-inverters(from modules to j-box) 2.Voltage drop across AC conductors (from j-box to point of interconnection) 1.Mirco-inverter voltage drop: 0.48% The largest number of micro-inverters in a row in the entire array is 10 inCircuit 1.According to manufacturer's specifications this equals a voltage drop of 0.48%. 2.AC conductor voltage drop: =I x R x D (=240 x 100 to convert to percent) _ (Nominal current of largest circuit)x (Resistance of#14AWG copper)x (Total wire run) _ (Circuit 1 nominal current is 14.4 amps)x(0.00319Q) x(100� -(240 volts)x(100) 1.91% Total system voltage drop: 2.39% vivin4. solar EcolibriumSolar Customer Info Name: Email: Phone: Project Info Identifier: 14888 Street Address Line 1: 13 Surrey Rd Street Address Line 2: City: Salem State: MA Zip: 01970 Country: United States System Info Module Manufacturer: Yingli Solar Module Model: YL255P-29b Module Quantity: 16 Array Size (DC watts): 4080.0 Mounting System Manufacturer: Ecolibrium Solar Mounting System Product: EcoX Inverter Manufacturer: Enphase Energy Inverter Model: M215 Project Design Variables Module Weight: 40.8 Ibs Module Length: 65.0 in Module Width: 39.0 in Basic Wind Speed: 100.0 mph Ground Snow Load: 40.0 psf Seismic: 0.0 Exposure Category: B Importance Factor: II Exposure on Roof: Partially Exposed Topographic Factor: 1.0 Wind Directionality Factor: 0.85 Thermal Factor for Snow Load: 1.2 Lag Bolt Design Load- Upward: 820 Ibf Lag Bolt Design Load- Lateral: 288 Ibf EcoX Design Load - Downward: 493 Ibf EcoX Design Load - Upward: 568 Ibf EcoX Design Load - Downslope: 353 Ibf EcoX Design Load -Lateral: 233 Ibf Module Design Moment—Upward: 3655 in-lb Module Design Moment— Downward: 3655 in-lb Effective Wind Area: 20 ft2 Min Nominal Framing Depth: 2.5 in Min Top Chord Specific Gravity: 0.42 1 EcolibriumSolar Plane Calculations (ASCE 7-05): 1 Roof Shape: Gable Edge and Corner Dimension: 3.7 ft Roof Type: Composition Shingle Stagger Attachments: No Average Roof Height: 25.0 ft Include Snow Guards: No Least Horizontal Dimension: 37.0 ft Roof Slope: 22.0 deg Truss Spacing: 16.0 in Snow Load Calculations Description Interior Edge Corner Unit Flat Roof Snow Load 33.6 33.6 33.6 psf Slope Factor 0.88 0.88 0.88 Roof Snow Load 29.6 29.6 29.6 psf Wind Pressure Calculations Description Interior Edge Corner Unit Net Design Wind Pressure Uplift -16.0 -26.4 -39.6 psf Net Design Wind Pressure Downforce 9.4 9.4 9.4 psf Adjustment Factor for Height and Exposure Category 1.0 1.0 1.0 Design Wind Pressure Uplift -16.0 -26.4 -39.6 psf Design Wind Pressure Downforce 16.0 16.0 16.0 psf ASD Load Combinations Description - Interior Edge Corner Unit Dead Load 2.3 2.3 2.3 psf Snow Load 29.6 29.6 29.6 psf Downslope: Load Combination 3 11.1 11.1 11.1 psf Down: Load Combination 3 27.6 27.6 27.6 psf Down: Load Combination 5 18.1 18.1 18.1 psf Down: Load Combination 6a 33.2 33.2 33.2 psf Up: Load Combination 7 -14.7 -25.1 -38.3 psf Down Max 33.2 33.2 33.2 psf Spacing Results(Landscape) Description Interior Edge Corner Unit Max Allowable Spacing Between Attachments 54.8 54.8 53.1 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 48.0 48.0 48.0 in Max Cantilever from Attachment to Perimeter of PV Array 18.3 18.3 17.7 in Spacing Results(Portrait) Description Interior Edge Corner Unit Max Allowable Spacing Between Attachments 32.9 32.9 32.8 in Max Spacing Between Attachments With Rafter/Truss Spacing of 16.0 in 32.0 32.0 32.0 in Max Cantilever from Attachment to Perimeter of PV Array 11.0 11.0 10.9 in EcolibriumSolar Layout Skirt e Coupling G Clamp Warning: PV Modules may need to be shifted with respect to roof trusses to comply with Bonding Jumper maximum allowable overhang. EcolibriumSolar Distributed Weight (All Planes) In Conformance with Solar ABC's Expedited Permit Process for PV System (EPP) Weight of Modules: 653 Ibs Weight of Mounting System: 68 Ibs Total System Weight: 721 Ibs Total Array Area: 282 ft2 Distributed Weight: 2.56 psf Number of Attachments: 34 Weight per Attachment Point: 21 Ibs Bill Of Materials Part Name Quantity ECO-001_101 EcoX Clamp Assembly 34 ECO-001_102 EcoX Coupling Assembly 17 ECO-001_105B EcoX Landscape Skirt Kit 7 ECO-001 105A EcoX Portrait Skirt Kit 0 ECO-001_103 EcoX Composition Attachment Kit 34 ECO-001_109 EcoX Electrical Assembly 1 ECO-001_106 EcoX Bonding Jumper Assembly 4 ECO-001_104 EcoX Inverter Bracket Assembly 16 ECO-001 338 EcoX Connector Bracket 16