64-403 - 2 SMITH AVENUE - CONSERVATION COMMISSION � `l—ya3 a S w•�t+� qucv►Ue — CITY OF SALEM CONSERVATION COMMISSION October 3, 2008 Patrick and Carol Farrell 1 Smith Avenue Salem, MA 01970 Re: Certificate of Compliance—DEP #64-403`Reconstruction of a single family house at 2 Smith Avenue,Salem, MA Dear Mr. and Mrs. Farrell: Enclosed, please find the Certificate of Compliance for the above referenced project. This Document must be recorded at the Essex County Registry of Deeds, Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts. Please fill out and return the Recording Information on page 4 of the Certificate of Compliance, which will indicate to the Salem Conservation Commission that the document has been recorded. If you have any further questions please feel free to contact me at (978) 619-5685. Sincerely, Carey Duqu s Conservatio Agent/ Staff Planner Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §4O Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the Patrick and Carol Farrell computer, use Name only the tab key to move 1 Smith Avenue your cursor- Mailing Address do not use the Salem MA 01970 return key. Cityrrown Stale Zip Code m 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Patrick and Carol Farrell Name September 22, 2005 64403 Dated DEP File Number 3. The project site is located at: 2 Smith Avenue Salem Street Address City/Town Map 36 Lots 224 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Patrick and Carol Farrell Property Owner(if different) Essex 25003 1 County Book Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: September 16 2008 Date B. Certification Check all that apply: ® complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are: wpaform Bb.doc-rev.7/13/04 Page 1 of 4 l J Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification (cont.) ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring,that should continue for a longer period). Condition Numbers: C. Authorization Issued by: Salem 04. Z�� Conservation Commission Date of lssuafhoe This Certificate mus be signed by a majority of the Conservation Commission and a copy sent to the applicant and r riat P Regional (See Attachment). Signatures:, v fa MAM•rev.7H3Q4 Page 2 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Authorization (cont.) Notary Acknowledgement Commonwealth of Massachusetts County of Essex On this 25 Of September 2008 Day Month Year before me, the undersigned Notary Public, personally appeared K. Cornacchio, D. Pabich, M. Blier, K. Glidden, and A. Hamilton, Name of Document Signer proved to me through satisfactory evidence of identification, which was/were personally known Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of Salem Conservation Commission Cityrrown CAREY R.DUCU Pubic OOfWOn2MILjo i YA/MOIN MyCamNNlon 1� Signature ofiques ry Public Carey R. Printed Name of Notary Public August 16, 2013 My Commission Expires(Date) Place notary seal and/or any stamp above Signature of Notary Public w form Bb.dw•rev.7/11M4 Page 3 of 4 r Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. -------------------------------------------------------------------------------------------------------------------------- To: Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: 2 Smith Avenue 64-403 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpalorm Bb doc•rev.7/13/04 Page 4 of 4 ElMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Regional Addresses Massachusefts Wetlands Protection Act M.G.L. c. 131 40 Mall transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adam Colrain Hampden Monme Pittsfield Tynngham 436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales Suite 402 Afford Cumrrington Hatfield Monterey Richmond Were Afterst Dalton Hawley Montgomery Rowe Warrick Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell Belchenown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bemardstan Egremonl Holyoke New Marlborough Sheffield Westhampton Blandford Erring Huntington New Salem Shelburne West Springfield Bnrnfield Florida Lanesborough North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southampton Whately Chademont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leveret) Orange Southwick Wrlliarrsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sundedand Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Anon Chariton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashbumham Clinton Hubbardston Milmlle Shirley Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester,MA01608 Athol Dudley Holliston Northamough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston Fax: 508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Standing Westford TDD: 508-767-2788 Bellingham Gardner LiNeton Oxford Slow Wesininser Berlin Grafton Lunenburg Paxton Sturbridge Winchendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Philtipstan Townsend Boylston Holden Mandan Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Matu poisett Provincetown Tlsbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Tmro Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Wellfleet Phone:508-946-2700 Bamstabfe Easthem Hanover North Altleborough Rockland West Bridgewater erkley East Bridgewater Hanson Norton Sandwich West Fax:508-947-6557 B port Bourne Easton Harwich Norwell Se West Tisbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plympton Taunton DEP Northeast Region Amesbury Chelmsford Hingham Memmac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Boston,MA 02108 Arlington Cohasset Hull Middleton Reading Waltham Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley Bawdy Dover Lincoln Natick Salem Warren, TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburypon Sherbom Westwood Braintree Framingham Malden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpaformgb.doc-DEP Addresses-rev.10008 Page 1 of 1 , 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: Salem When filling From: 1.Conservation Commission out forms on the computer, 2.This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions use only the tab key to 3.To: Applicant: move your cursor-do not Patrick&Carol Farrell use the return a.First Name b.Last Name c.Company key. 1 Smith Avenue d.Mailing Address m Salem MA 01970 e.City/Town I.State g.Zip Code i �^ra 4. Property Owner(if different from applicant): a. First Name b.Last Name c.Company d.Mailing Address e.City/Town I.State g.Zip Code 5. Project Location: 2 Smith Avenue Salem a.Street Address b.City/rown MAP 36 LOTS 224 c.Assessors Map/Plat Number d. Parcel/Lot Number Latitude and Longitude, if known (note: electronic filers will click for GIS locator): e.Latitude I. Longitude s. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex a.County b.Certificate(if registered land) 21675 346 c.Book d.Page 6/26/05 9/22/05 9/22/05 7. Dates: a.Date Notice of Intent Filed b.Date Public Hearing Closed C.Date of Issuance e. Final Approved Plans and Other Documents (attach additional plan or document references as needed): Site Plan to accompany NOI, 2 Smith Avenue a. Plan Title Griffin EngineeringGroup, LLCLLC Robert H. Griffin b.Prepared By c.Signed and Stamped by August 26, 2005 1"= 10, d. Final Revision Date e.Scale I.Additional Plan or Document Title g.Date wpat0m5.dm• rev.311/05 Page 1 o/9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings 1. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing,this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: a. ® Public Water Supply b. ® Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheries f. ® Protection of Wildlife Habitat g. ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control 2. This Commission hereby finds the project,as proposed, is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations.This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions, and any other special conditions attached to this Order.To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet Is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific Information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 3. ❑ Buffer Zone Impacts: Shortest distance between limit of project disturbance and wetland boundary(if available) a.linear feet Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a linear feet b.linear feet c.linear feet d.linear feet 6. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet 6. El Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet and Waterways e.cu.yd dredged f.cu.yd dredged wipafomi5.00a• rev.3/V03 Page 2 of Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet K.-cubic feet 6. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet e. ® Riverfront area 4,265 4,265 a.total sq.feet b.total sq.feet Sq ft within 100 It 2245 2245 2,245 2245 c.square feet d.square feet e.square feet f.square feet Sq ft between 100-200 ft 800 800 800 500 g.square feet h.square feet i.square feet i.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) 10. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below it. ❑ Land Under the Ocean a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. ❑ Coastal Beaches a.square feet b.square feet c,c/y nourishmt. d.cly nourishmt. 14. El Coastal Dunes a.square feet b.square feet c.dy nourishmt. d.c/y nourishmt 15. ❑ Coastal Banks a.linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet b.square teat 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.cu.yd dredged d.cu.yd dredged 19. ❑ Land Containing - Shellflsh a.square feet b.square feet c.square feet d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cu.yd dredged b.cu.yd dredged 21. ® Land Subject to Coastal 2,350 2,350 Storm Flowage a.square feet b.square feet wpalorm5Am rev.3/1/05 Page 3 of 9 LlMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land,the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done.The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"(or,"MA DEP"] "File Number #64-403 " mafomd.doc• rev.3/1/95 - Page 4 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 C. General Conditions Under Massachusetts Wetlands Protection Act 10. Where the Department of Environmental Protection is requested to issue a Superseding Order,the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition #12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. 18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy Standards. Special Conditions: If you need more See Attached space for additional conditions, select box to attach a text document wpalamt m• rev.3n/05 Page 5 of 9 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Findings Under Municipal Wetlands Bylaw or Ordinance i. Is a municipal wetlands bylaw or ordinance applicable? ❑ Yes ❑ No z. The hereby finds (check one that applies): Conservation Commission 3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: a.Municipal Ordinance or Bylaw b.Citation Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. 4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: a.Municipal Ordinance or Bylaw b.Citation The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans,specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. If you need more space for c. The special conditions relating to municipal ordinance or bylaw are as follows: additional conditions, select box to attach a text document ❑ wpafor iUm• ray.3/1105 Pape 6 of 9 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 — Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 E. Issuance This Order is valid for three years, unless otherwise specified as a special 9/22/05 condition pursuant to General Conditions#4,from the date of issuance. 1. Date of Issuance Please indicate the number of members who will sign this form: 6 This Order must be signed by a majority of the Conservation Commission. 2.Number of signers The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A copy also must be mailed or hand delivered at the same time to the appropriate Department of Environmental Protection Regional Office, if not filing electronically, and the property owner, if different from applicant. Signatures- / 1 c l(/ aAAAAIA Notary Acknowledgement Commonwealth of Massachusetts County of Essex On this 22nd of September 2005 Day Month Year Before me,the undersigned Notary Public, Kevin Cornacchio,Joe Furnari, David Pabich, personally appeared Keith Glidden, Michael Blier;&Kevin Carr proved to me through satisfactory evidence of identification,which was/were Personally Known Description of evidence of identification to be the person whose name is signed on the preceding or attached document, and acknowledged to me that he/she signed it voluntarily for its stated purpose. As member of SALEM Conservation Commission City/Town „ui nitury FRANKTAORMINA Notary Publlo CommomyealthofMassachu b My Commission Expires Si ature o ota Public Ap6127,2012 K �' /�h 't,' ) �l •' ,'.,': rinted Name of Notary Public Place notary seal and/or any stamp above My corn fission Expire (Date) This Order is issued to the applicant as follows: ❑ by hand delivery on 19 by certified mail, return receipt requested,on Date Date wpafomt.doc• W.311/05 Page 7 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department,with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Order.A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or Determination, or providing written information to the Department prior to issuance of a Superseding Order or Determination. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations,the Department has no appellate jurisdiction. Section G, Recording Information is available on the following page. wpafonr5.da• rev.311/05 Page 8 of 9 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: j WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line,have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 2 Smith Avenue #64-403 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant wpafom6.dw• rev.3n/05 Page 9 or 9 Attachment to Order of Conditions # 64-403 Page Of SALEM CONSERVATION COMMISSION DEP FILE #64-403 2 Smith Avenue City of Salem,Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural Heritage&Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vernal pools. This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131,Section 40 and the City of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1—34-13. This Order permits the reconstruction of a single-family house and deck/porch with associated driveway, utilities, and site grading within 4,265 sq ft of Riverfront Area(2,245 permitted in the inner riparian zone and 800 sq fr in the outer riparian zone),2,350 sq tt of Land Subject to Coastal Storm Flowage,and a buffer zone to a Coastal Bank. SPECIAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety(all 5 pages) at the Essex Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property;and recording information must be submitted to the Salem Conservation Commission in writing,before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1—34-13. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones,other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing,a sign shall be displayed showing DEP File#64-403,and not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or documentation that it deems necessary for that evaluation. Attachment to Order of Conditions # 64-403 Page of 8. The term"Applicant" as used in this Order of Conditions shall refer to the owner, any successor in interest or successor in control of the property referenced in the Notice of intent, supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G.L. Ch. 21A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s) shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans Site Plan to accompany NOI 2 Smith Street Title August 26 2005 - Dated Robert H. Griffin Signed and Stamped by City of Salem Conservation Commission On file with 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend Attachment to Order of Conditions # 64-403 Page of this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. Condition Number as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity,and shall be referenced to in all future deeds to this property. PRIOR TO CONSTRUCTION 18. Prior to the commencement of any activity on this site other than activities listed above, there shall be a PRE-CONSTRUCTION MEETING between the project supervisor,the contractor responsible for the work,and a member of the Conservation Commission or its Administrator to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted, if necessary,during the pre-construction meeting. Please contact the Conservation Commission Agent at(978)745-9595 ext 311 at least forty-eight(48)hours prior to any activity to arrange for the pre-construction meeting. 19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 21. There shall be twenty(20)hay bales and wooden stakes under cover on the site to be used only for emergency erosion control. EROSION CONTROL 22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specifications provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project; the Commission may require additional measures. 23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment form entering wetland resource areas. 24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 25. The area of construction shall remain in a stable condition at the close of each construction day. 26. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered through hay bale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. Attachment to Order of Conditions #64-403 Page lof 27. Within thirty(30)days of completion of construction on any given portion of the project, all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 28. If soils are to be disturbed for longer that two(2)months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet from wetland resource areas and 200 feet from river. 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale barriers and/or silt bags to filter silt from stormwater before it enters the drainage system. 35. There shall be no pumping of water from wetland resource areas. 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L Chapter 21A,section 16. AFPER CONSTRUCTION 39. Upon completion of construction and final soil stabilization,the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(COC): (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. Attachment to Order of Conditions #64-403 Page of (3) An "As-Built"plan signed and stamped by a Registered Professional Engineer or Land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances, structures and best management designs,including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- "structures"include,but are not limited to,all buildings, septic system components,wells, utility lines,fences,retaining walls,and roads/driveways; (d) A line delineating the limit of work-"work"includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; 40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 41. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs; at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission, may the applicant request in writing a Certificate of Compliance as described above. 42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has authorized their removal. ADDITIONAL CONTIONS 43. Five feet off the deck/porch toward the North River, the lawn shall be graded at elevation 9ft and gradually sloped to the approved 8ft elevation at the timber seawall. Patrick Farrell 1 Smith Avenue Salem,MA 01970 978-745-8373 g.PProved as Submitted To: Salem Board of the Conservation Commission Date: May 17, 2006 Dear Board Members, I would like the commission to review a proposed change to my project at 2 Smith Avenue to determine if this change is minor in scope or if it needs an amendment or a future filing. Along the southern edge of my property I propose to remove the existing railroad timbers measuring 22 1/2"high x 22" deep by 24' long and replace them with granite blocks of the same dimensions within the same footprint. Thank you, Patrick Farrell E ap.rc✓ _ ! s r ' f i t " r. ry A l Y7e' w+ +H I Y" �r ♦� r�!> T 'ri"�;(.Kkp'F.,�y `�', i " ,( t�y2 L'. r� `� , '; � �,L�d^'l'r��1.- .7.a �.* g ��� 1 a ♦ V 7 4�•� 1' � AN ITT�Ir LI�! w -,� '� {. 111 r tee. l , :''- Tr .r r�•n��� {,{ i Y� j�Tfl 9js r �11 Psi f e w s ' I *' .v, y!� n�_L a� ♦ r. t '�'k 4-r � �T•`�''�x ' s 1 1 T ckaSyYP�qiii-{i5`taS�i Y j »S rt�r�kr.'y} j�tit i d^", ty k }, sf �r-r1 >k'X;-.� iW k +i+ {L� b• `{�� �o"`•,, .— i .�'fi '" s lTy yYP n• � 1t ,a1 At PO t �tr ; tx 1 idr �I In 1 , _ 01 ;fir ��P� -,.�' rr ♦ r� ,0 1/��YrvJ p.rr,�a YT'rA 1 ., t}=) i;.rR f iJtY w R xk � '. � !.« - _ c F • � Y�v f. hY? z .F tt tY a 4.3 ~t 2 .' { I� � Y x -ti f f,f 4"Iar 1 f tgt A 1 1 t 't. It I^Ir 44, �, nz -1:ii .MAC JF - �$`� k 9s.xtkv '7 sF- 1 n {icTl1 ** C 1'< _ af�. ,�a �e. 5r 'Na t '"' 1✓-•'e T f x:.,^<{ i s y, 1 "e.`�� s± — ,} . .i-,< (.r..; _ i 1`t r• ,ta{ '.nar:ni' �J'.+ ^.arr�`uaiM;'xa" '4 '.a,� y ri Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 5 - Order of Conditions #64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land,the Final Order shall also be noted in the Registrys Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land,this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of this form shall be submitted to the Conservation Commission listed below. Salem Conservation Commission Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: r Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 2 Smith Avenue #64-403 Project Location DEP File Number Has been recorded at the Registry of Deeds of: i-f F, -Ju,ih )-roo i3 County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land, the instrument number identifying this transaction is: 4116 Instrument Number If registered land,the document number identifying this transaction is: Document Number Signature of Applicant ., wpaform5 w• rev.311105 Page 9 of 9 y Y � Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-403 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. --------------------------------------------------------------------------------------------------------------------------- To: Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: 2 Smith Avenue 64-403 Project Location DEP File Number Has been recorded at the Registry of Deeds of: r��fk county, for. Property Owner I and has bete/n noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaform 8b.doc•rev.7113/04 Page 4 of 4 t 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provide by DEP A. Project Information Important: When filling out 1. This request is being made by: forms on h the �PAfiCR��c L I�R-LL only computer, r, use e tab N��aa7me 1n 6 yp key to move ?_ `'ug 1"�\� your cursor- Myll�ddress do not use the S E\\y.\y�\ �_I�` V� return key. City own State Zip Code 11. 74� 373 +� Phone Number 2. This request is in reference ro work regulated by a final Order of Conditions issued to: A11-can ]_ 6 -( ' / o� Dated DEP File Number Upon completion of the work 3. The project site is located at: f �t �l authorized in Jk ( (l (e,�>r ,1 /'�lq an Ordons, Street Address \ �1'Y� n y `� Conditions,the Citylrown property owner must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of 4. T e final Order of Conditions was recorded at the Registry of Deeds for: Compliance 1, � L from the issuing hlLk,� r_�.IL U . authority stating P carer@(if dlffer�ent) M� ' that the work or (Y�VC S portion of the County work has been Book Page satisfactorily completed. Certificate(if registered land) 5. This request is for certification that (check one): lithe work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. RECEIVED SEP 0 4 2008 wrafonnftecc•rev.7113104 DEPT.OF PLANNING& Page 1 of 2 COAM.,?L'�.•fTf rwE(,�!,?ENT f Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape 7arc ' ect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing at deviation, if any, exists from the plans approved in the Order.(0 rullOO.-j ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see Attachment). naform8a.doc•rev.7113/04 Page 2 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131 §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tynngham 436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales Alford Cummington Hatfield Monterey Richmond Ware Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deerfield Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell Belchertown East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton Blandfard Erving Huntington New Salem Shelburne West Spnngfield Brimfield Florida Lanesborough North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southampton Whately Chanemont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leverett Orange Southwick Williamsburg Chester Granville Leyden Otis Spnngfeld Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashburnham Clinton Hubbardston Millville Shirley Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester,MA 01608 Athol Dudley Holliston Northborcugh Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Berlin Grafton Lunenburg Paxton Sturbridge Wmchendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Phillipslon Townsend Boylston Holden Meriden Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Mattairmseft Provincetown Tisbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro Attleboro Dighton Gasnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Wellfleet Phone:508-946-2700 Barnstable Eastham Hanover North Attleborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tisbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plymplon Taunton DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Arington Cohasset Hull Middleton Reading Waltham Boston, MA 02108 Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD:617-574-6868 Billerica Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburyport Sherborn Westwood Braintree Framingham Malden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambridge Gmveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpaform8a.doc•DEP Addresses•rev.7/13/04 Page 1 of t RICHARD W. GRIFFIN ARCHITECT 37 Turner Street,Salem, MA 01970 Tel.(978)740-9979 Fax.(978)740-2352 Certificate on Compliance Salem Conservation Commission City Hall Annex 120 Washington Street Salem, MA September 4, 2008 Dear Salem Conservation Commission: I am writing to certify the compliance of the construction and landscape work at 2 Smith Avenue with the plans submitted by Griffin Engineering dated, August 26, 2005 as part of the notice of intent and referenced in the Order of Conditions dated October 27, 2005 The building was survey located by Rural Land Survey of Essex, Massachusetts based on the record site plan of Griffin Engineering. Deviations from the plan include the omission of the outdoor deck on the South Side of the building closest to the North River, and the installation of a perimeter granite retaining wall replacing the footprint of the omitted deck and raising the grade to approximately Elevation 11.5' within its perimeter. Elevation 10' on the Griffin Engineering Plan represented land subject to coastal storm flowage. The as-built condition, because of the deletion of the deck, and its replacement with the granite retainage, should have a lesser impact on drainage toward the North River and provide greater resistance to flooding. Therefore, I certify the construction and landscaping to be within the requirements of the Order of Conditions issued by the Salem Conservation Commission. Sincerely yours, c c Richard Griffin Project architect 1 Notice of Intent under the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Ordinance Reconstruction of a 1 Single-Family Residence at 2 Smith , Avehv2 Salem, Massachusetts August 26, 2005 1 " w� 4 Applicant: Patrick & Carol Farrell Submitted to: ' - City of Salem Conservation Commission 1 and Massachusetts Department of Environmental Protection 19m Prepared by: e Griffin Engineering Beverly, MA y ' Griffin P.O.Box 7061, 100 Cummings Center, Suite 224G, Beverly, MA 01915 August 26, 2005 Engineering Phone:978-927-5111 • Fax: 978-927-5103 Group, LLC Salem Conservation Commission ' City Hall Annex 120 Washington Street Salem, MA 01970 ' By Hand Delivery Subject: Notice of Intent for the Reconstruction ' of a Single-Family Residence. 2 Smith reet (Map 36 Lot 224) Akxvt ' Dear Commission Members: On behalf of the property owners, Patrick and Carol Farrell, we are pleased to provide ' seven (7) copies of a Notice of Intent (NO])for the subject property. The proposed project involves the reconstruction of a-single-family residence with associated driveway, utilities and site grading. ' The wetland resource areas located on the subject property that are protected under the Wetland Protection Act include the Riverfront Area, Land Subject to Coastal Storm Flowage, and Coastal Bank. As shown on the enclosed plans, minimal alteration of wetland resource areas are proposed. ' We look forward to discussing the project with the Commission. Please do not hesitate to contact the undersigned with any questions or comments. Very truly yours, ' Griffin Engineering oup, LLC Robert H. Griffin, P.E. enclosures: NOI (7 copies) ' cc: Massachusetts DEP Northeast Region (2 copies) Patrick & Carol Farrell (1 copy) ' P:\Projects\Salem\Farrell-SmithAve\NOI-2 Smith St\TranLtr.wpd ' Civil & Environmental Engineering • Permitting • Design a Construction Management i TABLE OF CONTENTS Notice of Intent Application (WPA Form 3) ' Notice of Intent Wetland Fee Transmittal Form and Fee Calculation Sheet Attachment A Project Description 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.0 WETLAND RESOURCE AREAS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.1 Riverfront Area . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . A-1 2.2 Land Subject to Coastal Storm Flowage . . . . . . . . . . . . . . . . . . . . . . . . . A-3 ' 2.3 Coastal Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3 2.4 Additional Information . . A-3 ' 3.0 PROPOSED PROJECT/WETLAND RESOURCE AREA WORK . . . . . . . . . . . . A-3 3.2 Land Subject to Coastal Storm Flowage . . . . . . . . . . . . . . . . . . . . . . . . . A-5 ' 3.3 Coastal Bank . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 4.0 MITIGATION MEASURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5 5.0 CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-6 Figure 1 - Site Locus Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2 Attachment B Plan to Accompany NOI ' Attachment C Riverfront Form Attachment D Erosion Control Specifications ' Attachment E Affidavit of Service, Notice to Abutters & Certified List of Abutters 1 1 ' NOTICE OF INTENT APPLICATION ' (WPA FORM 3) ilt � 1 1 1 1 1 1 1 ' Massachusetts Department of Environmental Protection ProwdedbyDEP: Bureau of Resource Protection -Wetlands � - x s,DEP File Numbers WPA Form 3 - Notice of Intent ..Document Transaction Number: Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem atylTown A. General Information ' 1. Project Location (Note: electronic filers will click on button for GIS locator): 2 Smithffif1loet P'wot.- Salem 01970 ' a.Street Address b.City/Town c.Zip Code N42d 31'59" W70d 53' 28" Latitude and Longitude: d.Latitude e.Longitude ' Map 36 Lot 224 f.Assessors Map/Plat Number g. Parcel/Lot Number Important: 2 Applicant: When filling out pp ' forms on the Patrick& Carol Farrell computer, use a. First Name b.Last Name c.Company only the tab key to move 1 Smith StIlli frtegG ' your cursor- d.Mailing Address do not use the Salem MA 01970 return key. e.City/Town f.State g.Zip Code 978.745.8373 ' h.Phone Number i. Fax Number j.Email address 3. Property owner(if different from applicant): ❑ Check if more than one owner a.First Name b.Last Name c.Company ' d.Mailing Address Note: Before e.City/Town f.State g.Zip Code completing this ' form consult h.Phone Number i.Fax Number j.Email address yourlocal Conservation 4. Representative (if any): ' Commission Griffin Engineering Group LLC regarding any a.Firm municipal bylaw Robert H. Griffin, P.E. or ordinance. b.Contact Person First Name c.Contact Person Last Name ' P.O. Box 7061 100 Cummings Center Suite 224 G d.Mailing Address Beverly MA 01915 e.City/Town f.State g.Zip Code 978.927.5111 978.927.5103 GriffinEng@aol.com h. Phone Number i. Fax Number j.Email address ' ❑ Select if 5. Total WPA Fee Paid (from NOI Wetland Fee Transmittal Form): you want to see Wetland Fee $ 750.00 $ 362.50 $ 387.50 Transmittal a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid ' Form. 6. General Project Description: Reconstruct single-family residence with the associated driveway, utilities and site grading. ' (See Attachment A) ' woafory .doc•rev.311105 Page i of 7 Massachusetts Department of Environmental Protection Pro dedbyDEP rx �F Bureau of Resource Protection -Wetlands �DEP File Number,-, WPA Form 3 - Notice of Intent -Document Transaction Number) Sal Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 al " ' Salem Citylrown A. General Information (continued) 7. Project Type Checklist: a. ® Single Family Home b. ❑ Residential Subdivision ' c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial ' e. ❑ Dock/Pier f. ❑ Utilities ' g. ❑ Coastal Engineering Structure ' h. ❑ Agriculture—cranberries, forestry i. ❑ Transportation ' j. ❑ Other 8. Property recorded at the Registry of Deeds for: Essex(South) 346 a.County c.Page Number 21675 ' b.Book d.Certificate#(if registered land) 9. Buffer Zone Only Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal resource area? a. ❑ Yes If yes, please answer Questions 10 and 11 below, then skip to Section C. ' b. ® No If no, check the resource areas to be affected by this project in Section B. 10. Has work been performed on the property under an Order of Resource Area Delineation involving Simplified Review within 3 years of the date of this application? a. ® No b. ❑ Yes If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the 50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of Compliance,whichever is later. ' 11. Buffer Zone Setback If the project involves only work in the buffer zone, the distance between closest project disturbance and the a. ❑ BVW b.❑ inland bank c.❑ coastal resource area associated with the buffer zone is: d.linear feet ' woaforrr .doc•rev.3/1/05 Page 2 of 7 Massachusetts Department of Environmental Protection ProwdedbyDEP:j _ -� ' Bureau of Resource Protection -Wetlands ' _DEPSi File Number S WPA Form 3 - Notice of IntentDocument Transaction"Numbe? Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem city/TownB. Resource Area Effects ' 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the ' project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Resource Area Size of Proposed Alteration Proposed Replacement(if any) ' Include your document transaction a. ❑ Bank 1.linear feet 2.linear feet number b. ❑ Bordering Vegetated (provided on Wetland 1.square feet 2.square feet your receipt page)with all c. ❑ Land Under 1.square feet 2.square feet ' supplementary Waterbodies and information you Waterways 3.cubic yards dredged submit to the d. ❑ Bordering Land ' Department. Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced ' e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced ' f. E Riverfront area North River 1.Name of waterway(if available) ' 1.Width of Riverfront Area (check one): ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only E 200 ft. -All other projects 2.Total area of Riverfront Area on the site of the proposed project: 4,265 t Square Feet 3. Proposed alteration of the Riverfront Area: 3,225± 2,425 t 800± a.Total Square Feet b.Square Feet within 100 R c.Square Feet between 100 ft.and 2 00 ft. 4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes E No 5.Was the lot where the activity is proposed created prior to August 1, 1996? E Yes❑ No i ' wpaform3.do •rev.311105 Page 3 of 7 ' Massachusetts Department of Environmental Protection Prod b9 DEP Bureau of Resource Protection - Wetlands DEP F11e Number Y WPA Form 3 — Notice of Intent m Document Transaction-Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ' " Salem -- ' City/town B. Resource Area Effects ' 2. Coastal Resource Areas: Check all that apply below. Attach narrative and supporting documentation describing how the ' project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users:' Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below ' number (provided on b. ❑ Land Under the Ocean 1.square feet your receipt page)with all 2.Cubic yards dredged ' supplementary Indicate size under Coastal Beaches and/or Coastal Dunes information you c. ❑ Barrier Beach below submit to the ' Department. d. ❑ Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1.Square feet Y 2.Cubic yards dune nourishment ' f. ❑ Coastal Banks 1.Linear feet g. ❑ Rocky Intertidal Shores 1.square feet ' h.❑ Salt Marshes 1.Square feet 2.Sq ft restoration,rehab.,or creation i. ❑ Land Under Salt Ponds 1.Square feet 2.Cubic yards dredged ' j. ❑ Land Containing Shellfish 1.Square feet 2.Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the ' Ocean, and/or inland Land Under Waterbodies and Waterways, above ' 1.Cubic yards dredged i. ® Land Subject to Coastal 2,350 t Storm Flowage 1.Square feet 1 3. Limited Project: Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. ❑ Yes ® No If yes, describe which limited project applies to this project: b.Limited Project ' vryaloro3Aoc•rev.3/1I05 Page 4 of 7 ' Massachusetts Department of Environmental Protection Provided by-D>`P s= Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent R K, t) _ + Document Transaction Number; Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem _ ' Cityrrown C. Bordering Vegetated Wetland Delineation Methodology ' Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: NOT APPLICABLE Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP ' Include your (attached) document transaction 2. ❑ DEP BVW Field Data Form (attached) number (provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation): ' supplementary ❑ information you a. 50% or more wetland indicator plants submit to the Department. b. ❑ Saturated/inundated conditions exist ' c. ❑ Groundwater indicators ' d. ElDirect observation For all projects affecting other e. ❑ Hydric soil indicators ' Resource Areas, please f. ❑ Credible evidence of conditions prior to disturbance attach a narrative 5. Other resource areas delineated: ' the res explaining 9 eow D. Other Applicable Standards and Requirements area was ' delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? ' a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife ' Ju1y2003 Route 135, North Drive b. Date of Map Westborough, MA 01581 2. For coastal projects only, is any portion of the proposed project located below the mean high water I ' line or in a fish run? a.❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries ' 251 Causeway Street, Suite 400 Boston, MA 02114 b. ❑ Not applicable—project is in inland resource area only 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP ' Website for ACEC locations). Note: electronic filers click on Website. b.ACEC ' wpaform.doc•rev.311/05 Page 5 of ' Provided by DEP ` 'c".-v ' Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands DEP File Numbers WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Doha ment Transact oMn Numberi ' Salem Citylrown D. Other Applicable Standards and Requirements ' Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act(M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? document transaction a. ❑ Yes ® No ' number (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the ' page)with all wetlands regulations, 310 CMR 10.00. supplementary information you a. ❑ Yes ® No If yes, describe which exemption applies to this project: ' submit to the Department. b.Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No ' If yes, stormwater management measures are required. Applicants should complete the Stormwater Management Form and submit it with this form. ' b. If no, explain why the project is exempt: Stormwater Management Standards do not apply to single-family house construction. 1 E. Additional Information ' Applicants must include the following with this Notice of Intent(NOI). See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page)for any of ' the following information you submit to the Department. 1. 0 USGS or other map of the area (along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. ' (Electronic filers may omit this item.) See Attachment A z. ® Plans identifying the location of proposed activities (including activities proposed to serve as ' a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure)relative to the boundaries of each affected resource area. See Attachment B 3. ❑ Other material identifying and explaining the determination of resource area boundaries ' shown on plans(e.g., a DEP BVW Field Data Form). Not Applicable 4. 0 List the titles and dates for all plans and other materials submitted with this NOI. See Table of Contents ' 5. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. Not Applicable s. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. Not Applicable ' 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. Not Applicable s. ® Attach NOI Wetland Fee Transmittal Form. See Next Section. s. ❑ Attach Stormwater Management Form, if needed. Not Applicable twpatorm3.doc•rev.T1105 Page 6 of 7 1 . Massachusetts Department of Environmental Protection Pro dedey DEa�` ' \ — Bureau of Resource Protection -Wetlands N � .�^DEPFIeNumberx WPA Form 3 - Notice of Intent , '-. Document 7ransactlori Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem ' Cityrrown F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal Form). ' No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form)to confirm fee payment: ' 2272 8/25/05 1.Municipal Check Number 2.Check date 2271 8/25/05 3.State Check Number 4.Check date Griffin Engineering Group, LLC Griffin Engineering Group, LLC 5.Payor name on check:First Name 6.Payor name on check:Last Name G. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge..I understand ' that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the ' requirements of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail (return r quested)ttcrall abutters within 100 feet of the property line of the t'oject location. ' Signature of Applicant Date Signa Property er i 'fferen Date t 1. Zr. ar Signature of Representative(if an Date For Conservation Commissi . Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents;two copies ' of pages 1 and 2 of the NOI Wetland Fee Transmittal Form;and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. For DEP: t One copy of the completed Notice of Intent(Form 3), including supporting plans and documents;one copy of pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to the DEP Regional Office(see Instructions)by certified mail or hand delivery. (E-filers may submit these electronically.) Other: If the applicant has checked the"yes"box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. ' wpaforrrodoc•rev.3/1/05 Page 7 of 7 1 1 ' NOTICE OF INTENT WETLAND FEE TRANSMITTAL FORM & ' FEE CALCULATION SHEET 1 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands ' NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ' Important: A. Applicant Information When filling out ' forms on the 1. Applicant: computer, use Patrick & Carol Farrell only the tab key to move a. First Name b.Last Name c.Company ' your cursor- 1 Smith Street do not use the d. Mailing Address return key. Salem MA 01970 t e.City/Town f.State g.Zip Code 978.745.8373 In.Phone Number 2. Property Owner(if different): a.First Name b.Last Name c.Company ' d.Mailing Address ' e.City/rown f.State g.Zip Code h.Phone Number ' 3. Project Location: 2 Smith Street Salem a.Street Address - b.City/town ' To calculate B. Fees filing fees, refer ' to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4): fee list and examples in the The fee should be calculated using the following six-step process and worksheet. Please see instructions for' filling out WPA Instructions before filling out worksheet. Form 3 (Notice of Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. ' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. ' Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone,the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. ' Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract ' $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. ' Wpaform doc-N01Wetland Fee Transmittal Form rev.311/05 Page t of ' Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands ' NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 ' B. Fees (continued) ' Step lrrype of Activity Step 21Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee ' Cat. 2.a—Construction of a Single- Family Residence 1 $ 500.00 x1.5 $750.00 1 1 Step 51rotal Project Fee: $750.00 Step 6/Fee Payments: t Total Project Fee: $ 750.00 a.Total fee from Step 5 State share of filing fee: b.362.50 b. 1/2 total fee less$12.50 City/Town share of filling fee: $387.50 c.1/2 total fee plus$12.50 C. Submittal Requirements ' a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 ' b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent; a copy of this form; and the city/town fee payment. c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated ' Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of Intent may submit these electronically.) ' Wpaform3 Eoc•N01 Wetlaod Fee Tmnsmtlal Form•rev.311105 Page 2 of 2 1 ' FILING FEE CALCULATION SHEET ' Massachusetts Wetland Protection Act 310 CMR 10.03(7) ' Category 2.a: Construction of a Single-Family Residence $ 500.00 Construction in the River(ront Area $ 250.00 ' Total $ 750.00 ' State Share = (50% of Amt - $ 12.50) _ $750/2 - $12.50 = $ 362.50 City Share = (50% of Amt + $12.50) _ $750/2 + $12.50 = $ 387.50 II t t s Danvers Savings Bank 2271 GRIFFIN ENGINEERING GROUP,I W ONE CONANT ST.,DANVERS,MA 01921 P.O.BOX 7061 53-7116/2113 8/25/2005 BEVERLY,MA 01915 a (978)9275111 y PAY o TO THE $ "362.50 ORDER OF Commonwealth of Massachusetts a DOLLARS 2, Three Hundred Sixty-Two and 50/100' a RN L'J Comm. of Mass. / Dept.of Environmental Protection Box 4062 5 aaaSSS[[[ AUrHORI IGNATURE MEMO Boston, MA 02211 Farrell-2 Smith Street — 11•00227411' 1: 2LL37Li621: 35 101, 311008 Danvers Savings Bank 2272 GRIFFIN ENGINEERING GROUP,LLC ONE CONANT ST.,DANVERS,MA 01923 P.O.BOX 7061 53-7116/2113 8/25/2005 BEVERLY,MA 01915 (978)927.5111 PAY TO THE $ ''387.50 ORDER OF City of Salem a DOLLARS +„+++„+.««+.+,«+++« 2, Three Hundred Eighty-Seven and 50/100' a N City of Salem 8 City Hall 93 Washington Street Salem, Ma 01970 qu ryoaaeD i E MEMO Farrell-2 Smith St NOI Fee -- - - - - -- 11-00 2 2 7 21i' 1: 211371L621: 35 104340110 1 1 1 ' ATTACHMENT A ' PROJECT DESCRIPTION 1 1 1 1 1 1 1 1 1 ' 1.0 INTRODUCTION ' The project site is located at 2 Smith Street (Map 36, Lot 224), in Salem, Massachusetts. The site is presently developed with a single-family residence. The lot size is approximately 4,265 square feet. The property is bounded to the east by ' Smith Street, North River to the south, and residential properties to the north and west. Figure 1 - United States Geological Survey (USGS) Locus Map depicts the general location of the proposed project. ' The applicant propose to raze the existing dwelling and reconstruct a single-family ' residence in approximately the same location. This Notice of Intent is for the associated work within the Riverfront Area, in the buffer zone to a Coastal Bank and on Land Subject to Coastal Storm Flowage. The resource areas are further described in Section 2.0. A detailed description of the proposed work is provided in Section 3.0. Mitigation measures associated with the project are described in Section 4.0. The reader is referred to Attachment B for a site plan showing the tproposed work. 2.0 WETLAND RESOURCE AREAS Griffin Engineering Group reviewed information regarding the 2 Smith Street property to determine if the area of proposed work is located within resource areas ' regulated under the Massachusetts Wetlands Protection Act (MA WPA) and the City of Salem Wetlands Ordinance. The review included an on-site inspection, topographic survey, and a review of pertinent published information regarding the ' area. Information reviewed included: USGS Topographic Quads (Salem, MA 1:25,000 - Metric - 1985); FEMA Flood Insurance Rate Maps, City of Salem, (Comm. Panel 250102 ' 0001 B), August 5, 1985; Massachusetts Natural Heritage Atlas, July 2003 Edition, Salem Quad; and ' National Wetlands Inventory Map - West Half of Salem, Mass., 1995. Based on the review, there are several resource areas and associated buffer zones ' on the property regulated under the Massachusetts Wetland Protection Act (MA WPA) and the City of Salem Wetlands Ordinance. The resource areas are: Riverfront Area (310 CMR 10.58); Coastal Bank (310 CMR 10.30); and Land ' Subject to Coastal Storm Flowage (310 CMR 10.21). Therefore, the proposed work requires filing a Notice of Intent in accordance with the MA WPA and the City of Salem Wetlands Ordinance. 2.1 Riverfront Area ' Based on the aforementioned review, the entire site is located within the Riverfront Area (310 CMR 10.58) to the North River (located along the south property line). ' A - 1 �n s SITE �• ` `� i y w t + + �S 1 1n� �.. 3 - � � i • G j 1 � j 1 . •� � 1 i fie.. + '�• sch yy 5'.aA it ca. � a �, n•' � • a � *'u .5 �"{�"'�Y .. _ It kt ' 0 250500 1,000 1,500 2,000 Figure 1 Feet Site Locus Plan Ref: USGS Scanned Topo Maps(MassGIS). N Notice of Intent Griffin Engineering Group, LLC A PATRICK&CAROL FARRELL Beverly, MA 2 Smith Street Salem, MA A-2 r The Riverfront Area extends 200 feet landward from the upper boundary of Mean High Water (El. 4.7 1929 NGVD). 1 2.2 Land Subject to Coastal Storm Flowage (LSCSF) LSCSF is defined by the Act as land subject to any innundation caused by coastal storms up to and including the 100-year storm. The FEMA Flood Insurance Rate Map for the City of Salem indicates that the portion of the property adjacent to North ' River is within Zone A2, which is defined as an area of 100-year flood and is identified as the land below elevation 10 feet (1929 NGVD datum). The site survey, conducted by Rural Land Surveys of Danvers, MA, locates a portion of the existing building and the land between the building and the river as ' being within the flood zone. 2.3 Coastal Bank ' As defined by the Act, the Coastal Bank corresponds to the seaward edge of the existing timber and stone walls located adjacent to the North River. The walls are ' assumed to prevent storm damage and control flooding of the subject property. The top of the Coastal Bank was delineated by a wetland scientist from the Gulf of Maine Research Center and located by an instrument survey (see Site Plan). ' 2.4 Additional Information According to the Massachusetts Natural Heritage Atlas 2003 Edition, the project site is not within an area mapped as having Estimated Habitat of Rare Wildlife or Vernal Pools. The National Wetlands Inventory Map indicates the project area as being landward of a regularly flooded intertidal area. 3.0 PROPOSED PROJECT /WETLAND RESOURCE AREA IMPACTS ' The proposed project is the reconstruction and expansion of the existing residence. The residence plans have been prepared by Richard W. Griffin, AIA, architect of Salem, Massachusetts (no relation to engineer preparing this NOI). The existing residence is in very poor condition, and has been neglected for many years by prior property owners. There is no practicable way to renovate the structure, so its reconstruction is proposed. The proposed residence construction will be ' conventional, with a wood frame structure on a cast-in-place concrete foundation. The reader is referred to Attachment B for a site plan showing the proposed work. ' Specific elements of the project include: I , A - 3 (1) raze the existing dilapidated two-story dwelling, including foundation; (2) constructing a two-story dwelling with an attached garage, porch and deck; ' (3) constructing a narrow driveway and apron; (4) connecting existing utilities to the proposed dwelling; and (5) re-grading around the foundation so as the dwelling is outside the flood zone. ' The proposed building footprint is approximately 1,375 square feet. Additionally, a small (8' x 16') wooden deck is proposed on the south side (the river side) of the structure. Approximately 65% (2,750 square feet) of the site will be disturbed during the ' project. As indicated in the site plan, the proposed disturbance is located as far from the North River as possible. The location of the house is the same distance from the north, west and east lot lines as the existing structure. This placement was ' required because the existing structure does not conform to current Salem zoning setbacks for this zone. Generally speaking, the reconstructed residence is thus ' "grandfathered" as long as it does not encroach further toward the property lines. During construction, erosion control measures are proposed as specified in ' Attachment D. Haybales or silt fence will be placed downgradient of the proposed construction activities. All disturbed area are intended to be re-vegetated, and/or restored to pre-disturbance conditions as soon as possible. ' 3.1 Riverfront Area ' As noted in Section 2, the entire parcel is within the Riverfront Area. The building footprint has been located as far from the North River as possible. Nonetheless, within the Inner Riparian Zone (0-100 feet) of the Riverfront area there will be ' approximately 2,000 square feet of disturbance. Approximately 800 square feet of disturbance is projected within the Outer Riparian Zone (100-200 feet). ' The performance standards for Riverfront Area in the Wetlands Protection Act regulations allow for construction of a single family residence on a parcel of land created prior to August 7, 1996 (see 10.58(4)(d)(3)) provided (1)that the lot can be developed under municipal and state law; and, (2)that the Riverfront Area performance standards are met to the maximum extent feasible. In this case, the lot can be developed, as evidenced by the presence of the existing structure. There ' are no provisions in the Salem Zoning Ordinance that would prohibit reconstruction of the residence as proposed herein. Insofar as the Riverfront Area performance standards are concerned, we note the following: ' (1) The size of the proposed disturbance (approximately 2,800 square feet) is well less than the 5,000 square foot maximum disturbance referred to in the regulations. ' A - 4 (2) The house has been located as far from the river as possible, and existing vegetation is proposed to be maintained between the reconstructed ' residence and the river. No tree removal is proposed. Any existing wildlife habitat functions provided on the parcel will continue to be provided. ' (3) Appropriate erosion control measures are proposed to protect the Riverfront Area. ' (4) Stormwater management provisions are consistent with DEP policy for single family residence projects. ' For these reasons, we conclude that the project meets the performance standards for the Riverfront Area to the maximum extent feasible. t3.2 LSCSF ' The proposed project includes raising the elevation of the proposed residence so that it is above the 100-year flood elevation. The concrete foundation will be above the flood elevation. A small amount of fill will be placed along the foundation of the ' building as part of this work. Under the Wetlands Protection Act, there are no performance standards for work in ' LSCSF. Therefore, there are no specific requirements for work in this zone. 3.3 Coastal Bank ' The proposed project is located within the 100-foot buffer zone to the Coastal Bank resource area. The project is located at least 20 feet from the edge of the bank at tits closest point. The performance standard for work within 100 feet to a Coastal Bank is that the ' work shall have no adverse effects on the stability of the coastal bank. By installing erosion control measures between the bank and the proposed residence, and by maintaining construction activities away from the bank, the stability of the bank will ' not be changed due to the project. ' 4.0 MITIGATION MEASURES Proposed mitigation measures are included to minimize the potential impacts to the ' wetland resource area throughout the construction process. Prior to work commencing on the Site, there will be a preconstruction conference ' with the contractor. The purpose of this meeting will be to coordinate the best methods for erosion and sedimentation control, protection of the wetland resource ii ' A- 5 ' areas, and other construction-related issues. The implementation of a comprehensive soil and erosion control plan will occur prior any construction ' activities within the project area. In general, the following sequence of events will occu r: ' Erosion and sedimentation control devices will be installed along the edge of the down gradient side of the project area prior to construction as depicted on the site plan (Attachment B). In addition to providing for sedimentation ' deposition and reducing runoff during storm events, this barrier will limit the work area for the equipment operators. ' Erosion and sedimentation control devices will be inspected daily during periods of active construction and bi-weekly during the remainder of the construction period. Sediments will be removed from the barriers as soon as ' they reach a depth of 6 inches. • Runoff from the site will be directed through sedimentation control barriers. ' During construction, disturbed areas will be kept to a minimum and vegetative stabilization of these areas will occur as soon as possible. ' Temporary seeding, mulching, or other suitable stabilization measures will be ' used to protect exposed critical areas should unprotected soils remain exposed for prolonged periods. ' Construction activities shall be monitored on-site by the construction supervisor to ensure that the soil erosion and sediment control features are installed properly, maintained, and to evaluate the need for additional erosion control and/or tstabilization measures. The inspector will perform the following tasks: • Supervise the installation and maintenance of the soil erosion and sediment ' control features. • Evaluate the need for additional soil erosion and sediment control features. ' Scheduled inspections of erosion control features, including construction entrance, haybales, and dust control. ' Supervise and monitor temporary and permanent stabilization activities. ' 5.0 CONCLUSION The proposed reconstruction of a single-family dwelling at 2 Smith Street is t designed to comply with both state and local wetland regulations and to minimize impacts on the surrounding and adjacent wetland resource areas. The proposed ' A - 6 ' work meets the applicable performance standards for work to be performed within the pre-disturbed Riverfront Area, Land Subject to Coastal Storm Flowage, and the ' buffer zone to the Coastal Bank. Permanent unavoidable impacts and temporary impacts have been minimized. Adequate mitigating measures are proposed as to not compromise the function of the resource areas. The proposed project with it's ' mitigation measures meet the performance standards and protect the interests of the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Ordinance. 1 1 t ' A - 7 1 I' 1 Ilii 1 ' ATTACHMENT B ' PLAN TO ' ACCOMPANY NOI 1 1 1 1 1 1 1 1 1 1 t ' ATTACHMENT C ' RIVERFRONT FORM 1 1 1 1 1 1 1 1 ' Notice of Intent Supplemental Form for Riverfront Area The Notice of Intent Supplemental Form for Riverfront Area is recommended for use with the Notice of Intent (Form 3)in the wetland regulations(310 CMR 10.99). This form should be used for activities that are located in ' the Riverfront Area. See instructions for information about completing this form.Applicants also may refer to the "Checklist for Review of Activities in the Riverfront Area"issued by the Department of Environmental Protection in November 1996. The checklist should not be submitted with the form;it is included to indicate how a conservation commission may evaluate application information.Attach the completed supplemental form to the Notice of Intent, including any appropriate documentation as needed. Use additional pages if necessary. 1. Mean annual high-water line determined by: 1 ❑Changes in soil,vegetation;water marks;scouring ❑Top of bank(inland rivers) ❑First observable break in slope ' ❑Mean annual flood level FJ Mean high water(for coastal rivers only) (Identify the mean annual high-water line on the Notice of intent plans) ' 2. Width of Riverfront Area: Er 200 feet ❑25 feet (Identify the Inner and Outer Riparian Zones on the Notice of Intent plans) 3. Activity is not subject to Rivers Protection Act because: ❑ Expansion of publicly owned structures,airports,marine cargo terminals begun before November 1, 1996 ❑ Draft EIR filed on project before November 1, 1996 ' ❑ Building permit filed before October 1,1996 and granted before April 1, 1997 -- _ ❑ Roads,utilities,drainage structures under a definitive plan approved or endorsed on or before August 1, 1996 pursuant to the subdivision control law(MGL c.41 §81U) t ❑ Subject to Chapter 91 waterways license or permit - ❑ Other-describe: ' 4. Project type: V Single family home ❑ Residential subdivision ❑ Commercial development ' ❑ Industrial development ❑ Transportation ❑ Other-describe: ' S. Amount of alteration in Riverfront Area: a. If Riverfront Area is 200 feet wide,identify amount of alteration: 2,425 square feet of Inner Riparian Zone (0-100 feet from river) ' 800 square feet of Outer Riparian Zone (100-200 feet from river) ' b. If Riverfront Area is 25 feet wide,identify amount of alteration: square feet of Inner Riparian Zone (0-15 feet from river) 11196 (over) I ' 6. Describe why the proposed project needs to be located in the Riverfront Area. Address the following questions in your answer: • Can the project be moved out of the Riverfront Area?Can the project be located further away from the ' river or stream?If not,why? • How do costs and logistical constraints(e.g.,physical site conditions,local zoning requirements)limit the alternatives? • What alternatives were considered? ' The lot was created prior to August I, 1996. The lot is very small,containing only 4,265 sq.ft.,all of which is within the Riverfront area. Thus,it is not possible to move the project out of the Riverfront area. The proposed house has been located as far from the river as zoning constraints allow. The t alternatives considered were limited to the existing lot. Due to the small size,there are no feasible alternative locations for the proposed dwelling. (Use additional pages if necessary.) 7. Does the proposed project meet the criteria for no significant adverse impacts? a.Check criteria that apply: ' Q'meets performance standards for all other wetland resource areas ❑undisturbed vegetation in the 100-foot Inner Riparian Zone(15 feet in 25-foot Riverfront Area) P alteration in the 100-foot Outer Riparian Zone limited to 5,000 square feet or 20%of zone,whichever is greater* ' }meets performance standards for stomrwater management** *This performance standard is waived for the 10-foot Outer Riparian Zone when the Riverfrom Area is 25 feet. **Stormwater management is not required for single family houses and small subdivision projects as described in I ' the Department's Stormwater Management Policy. b. Is the project site located in estimated rare species habitat or in a certified vernal pool as noted on the Massachusetts Natural Heritage Atlas? _yes ✓no ' If yes,has a copy of the Notice of Intent and this form been sent to the Natural Heritage and Endangered Species Program according to Notice instructions? _yes no If any of the criteria listed in(a.) above are not met,describe why the project will have no ' significant adverse impacts on the Riverfront Area. (Note:forsingle family house projects on lots recorded as of August 1,1996 which cannot meet the performance standards,describe how the project minimizes all impacts.) The project is restricted to the 100-foot Inner Riparian Zone due to the size of the project site. Impacts will be ' minimized by the use of erosion control during construction and the net increase in impervious area is not a significant increase in regards to this general area of the North River. t ' (Use additional pages if necessary) 1 ' 1 � 1 1 1 1 1 � 1 I' 1 ATTACHMENT D 1 EROSION CONTROL 1 SPECIFICATIONS 1 i 1 1 1 1 1 1 ' Section 01568 Erosion Control, Sedimentation and ' Containment of Construction Materials Part 1 - General 1.1 Provide all work and undertake all measures necessary to control soil erosion from the work site throughout the Construction Phase and continuing until removal of siltation controls are authorized by the Engineer or Local Authority. This work shall be continuous throughout the project, regardless of the construction schedule undertaken by the Contractor. The contractor must ensure that controls perform as specified even when he is not present at the work site. ' 1.2 Prevent soil and construction materials from the work area from reaching wetlands or waterways at all times. 1.3 Install and maintain erosion controls as shown on the drawings and as specified. Should additional controls or measures be necessary to control erosion, as determined by the Owner or Engineer, then provide and maintain same. 1.4 Controls installed and maintained must prevent movement of soil and construction ' materials from the work areas at all times. Controls must be capable of performing adequately during normal and severe storm events. ' 1.5 Controls are to be installed prior to disturbing earth or vegetation at the project. 1.6 Compliance with all requirements of the Order of Conditions issued by the Local Authority is the responsibility of the Contractor, with the following exceptions: ' Filing of the Order on the property deed. Requirements for actions at the property after the authorized removal of erosion ' controls. Part 2 - Quality Assurance ' 2.1 All erosion controls to be constructed of new materials approved by the Engineer and consistent with these specifications. Replace inadequate or worn controls with new tmaterials. 2.2 Inspect and maintain as necessary erosion controls within 24 hours following every ' storm event. 2.3 Disturbance of soils or vegetation and construction activities of any type beyond the limits of work shown on the drawings are prohibited. Do not disturb adjacent vegetation. 2.4 The Contractor is solely responsible, at no additional cost to Owner, for repairs, replanting, remediation, or reconstruction or other any actions ordered by the Local Authority resulting from non-compliance with these requirements. Non-compliance includes, but is not limited to, failure to prevent soil and construction materials from reaching a wetlands or waterbody. 01568-1 1 2.5 The Contractor is required to keep on-site, throughout the project, 12 additional haybales and 50 feet additional silt fence. These additional erosion control materials are to be ' available for use solely at the project site and are to be installed immediately upon direction of the Engineer or the Local Authority. t 2.6 Follow preventative erosion control practices established by the United States Soil Conservation Service. ' 2.7 Do not allow litter or construction materials to blow from the work area and enter wetlands. Immediately remove by hand any such materials entering wetlands. Part 3 - Submittals ' 3.1 Two weeks prior to disturbing soil at the project site, submit to Engineer for review and approval, catalog cuts showing the proposed materials to be used during construction. 1 Part 4 - Materials t 4.1 Haybales shall be made of straw or hay, tightly bound with string, and measure approximately 18" x 18"'x 3' or larger. 4.2 Silt Fence - shall be made of a woven geotextile with a metal reinforcing mesh fully integrated during the manufacturing process into the geotextile. ' 4.3 Stakes - Stakes for securing haybales and silt fence shall be made of oak, and shall have nominal dimensions of 2" x 2" x 4'. Metal fence posts for silt fence acceptable. Part 5 - Dewatering Discharges ' 5.1 Water discharged from the construction area must be completely free of petroleum products. ' 5.2 The maximum rate of pumping, without special approval of the Engineer, shall be 150 gallons per minute. 5.3 Dewatering waters shall pass through a silt removal chamber having an overflow rate less than 3,500 gallons per square foot per day and a depth of at least three feet, and ' then be filtered through haybales prior to being allowed to flow to a wetlands or waterbody. Effluent shall have turbidity less than 10 NTU. I ' Part 6 -Additional Requirements ' 6.1 Install silt fence around all stockpiles of soil placed within 200' of a wetlands. 6.2 Controls are to be removed after vegetation in the work area has been established, and is determined by the Engineer or Local Authority as being effective at controlling erosion. 01568-2 i ' 1 1 ' ATTACHMENT E ' AFFIDAVIT OF SERVICE, NOTICE TO ABUTTERS, & CERTIFIED LIST OF ABUTTERS. 1 1 ' Affidavit of Service ' Under the Massachusetts Wetlands Protection Act (to be submitted to the Massachusetts Department of Environmental Protection and the ' local Conservation Commission when filing a Notice of Intent) I, Robert Griffin, hereby certify under the pains and penalties of perjury that on ' k•lG•O , notification was given to abutters in compliance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the ' following matter: A Notice of Intent filed under the Massachusetts Wetlands Protection Act and ' the City of Salem Wetlands Ordinance by Patrick& Carol Farrell with the Salem Conservation Commission on $- U•os' , for the construction of a single-family dwelling with the associated driveway, utilities and site grading. ' The work is to be performed on a previously developed lot located at 2 Smith Street in Salem, Massachusetts. ' The form of notice, and a list of the abutters to whom it was given and their addresses, are attached two this Affidavit of Service. Robert H. Griffino4VE. Date t 1 1 1 11 ,II ' ' Notification to Abutters Under the Massachusetts Wetlands Protection Act and the ' City of Salem Wetlands Ordinance In accordance with the second paragraph of Massachusetts General Laws Chapter 131, ' Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, you are hereby notified that: A. The name of the applicant is Patrick & Carol Farrell ' B. The applicant is filing a Notice of Intent with the Salem Conservation Commission seeking permission to reconstruct a single-family dwelling with the associated driveway. ' utilities and site grading, such work is within wetland resource areas subject to protection under the Wetlands Protection Act (Mass. General Laws Chapter 131, Section 40) and the City of Salem Wetlands Ordinance. ' C. The address of the property where the work is proposed is 2 Smith Street (Mal) 36 Lot 224) in Salem. ' D. Copies of the Notice of Intent may be examined at the Salem Conservation Commission Office, 3rd Floor of the City Hall Annex, 120 Washington Street, Salem. MA between the ' hours of 8:00 AM and 4:00 PM. Monday through Wednesday: 8:00 AM and 7:00 PM Thursday, and 8:00 and 12:00 PM Friday. ' E. Copies of the Notice of Intent may be obtained from (check one) either the applicant_ or the applicant's representative X by calling this telephone number: 978-927-5111. F. Information regarding the date, time, and place of the public hearing may be obtained ' from the Salem Conservation Commission Office, 3rd Floor of City Hall Annex, 120 Washington Street, Salem, MA by calling this telephone number (978-745-9595) between the hours of 8:00 AM and 4:00 PM, Monday through Wednesday: 8:00 AM and ' 7:00 PM Thursday, and 8:00 and 12:00 PM Friday. Note: Notice of this Public Hearing, including its date, time, and place, will be published at least 1 1 5 days in advance in the Salem Evening News . Note: Notice of the Public Hearing, including its date, time, and place, will be posted in the City ' or Town Hall not less than 48-hours in advance. The tentative date for the hearing will be September 8, 2005. lilt Note: You may also contact your local Conservation Commission or the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact DEP call: Central Region: (508) 792-7650 mr Northeast Region: (617) 292-5500 Southeast Region: (508) 946-2714 Western Region: (413) 784-1100 1 ' List of Property Owners and Abutters The Notification to Abutters Form has been forwarded by Certified Mail (return receipt ' requested) to the following abutters and property owners within one hundred feet of the property line of the land where the activity under the jurisdiction of the Wetlands Protection Act and the City of Salem Wetlands Ordinance is proposed: ' THE FOLLOWING LISTING WAS OBTAINED FROM THE CITY OF SALEM ASSESSORS OFFICE AT SALEM CITY HALL. 1 1 MD Location Owner Co-Owner Mailing Address City State Zip MA . 9 M �I 21-0 41 MARCH STREET PARSONS WILLIAM H KAREN L 41 MARCH ST SALEM MA 01970 22-0 37 MARCH STREET MCCUISH STEVEN L MCCUISH BETH M 37 MARCH ST SALEM MA 01970 23-0 35 MARCH STREET CASSIDY JOEL W DEVINE LOIS R 35 MARCH ST SALEM MA 01970 24-0 2 SMITH AVENUE FARRELL PATRICK J BRUNACCINI-FARRELL CAR 2 SMITH AVENUE SALEM MA 01970 25-0 33 MARCH STREET FARRELL PATRICK J FARRELL CAROL 1 SMITH AVE SALEM MA 01970 26-0 31 MARCH STREET MASS COMMONWEALTH OF MA 27-0 1 SMITH AVENUE FARRELL PATRICK J BRUNACCINI CAROL A 1 SMITH AVE SALEM MA 01970 28-0 27 MARCH STREET REAR FARRELL PATRICK J FARRELL CAROL 1 SMITH AVE SALEM MA 01970 :29-0 27 MARCH STREET MASS COMMONWEALTH OF MA s End of Report 1 5 �• y ua% 9y Lo- a50o,o 36r&14 -36- 7 36-, 6 ' + 36- 1 36 j 3 364 9 , 4p A 4z 2g N 36-M15 59/ 65 74 �e 3 Q� A so. - . 36-9sb8 ,47 �t•r a 36-(71W8 Ty 36 1i 368 3626 zi - z ?e zq 36a- 18 AMA o Yea 42 e1 36i �9 k h rA S z2 9 Is77' 3690 A i9 6N 39�28 � s 'j e Rs ' 36 l; 36w � ',ri" a3� �� Yr 5 3 ✓�, a,'' b2q. C 6 36- 36& 3W6- /DO — Foo T 5z �-2�b6 i r � 164 36jRjjO F RHS�DF.S� la y4�a . 166 /z < 6 W rC r � . ki r n .44 36Mwo _(� ' Y�i. �•f Y 36 5 u /0 n 36M5 .36592155 ' 36- �1454 36- 4 ti 1 36 n1 fi 36�� 19 Jlas 36�Q44 ,� " io_,? `o Jam and Smudge Free Printing www.avery.com Use Avery®TEMPLATE 5162® t 1-800-GO-AVERY t 9 AVERY® s16z® ' Loc:35 MARCH STREET Parcel ID#: 36-0223-0 BURNSIDE STREET Parcel ID#: 36- LUC: 101 LUC: 903 ' CASSIDY JOEL W/DEVINE LOIS R MASS COM TH OF/D BLIC WORKS 35 MARCH ST ' SALEM MA 01970 27 MARCH STREET REAR Parcel ID#: 36-022 Loc:31 MARCH STREET Parcel ID#: 36-0226-0 ' : 132 LUC: 924 FARRELL PATRICI RRELL R L MASS COMMONWEALTH OF ' 1SMITHAVE jp Par p/4�C1 SALE 01970 ' 2 SMITH AVENUE Parcel ID#: 36-0224-0 Loc: 27 MARCH STREET Parcel ID#: 36-0229-0 LUC: 1 LUC: 924 ' FARRELL PATRICK J/ ACCINI-F LL CAROL A MASS COMMONWEALTH OF 2 SMITH AVENUE nro ' k D L4zC` JUiipr , VA A- 0-1' G ' SALEM M 0 Loc: 33 MARCH STREET Parcel ID#: 36-0225-0 Loc: 37 MARCH STREET Parcel ID#: 36-0222-0 LUC: 104 L-C: 101 FARRELL PATRICK J/FARRELL CAROL MCCUISH STEVEN L/MCCUISH BETH M 1 SMITH AVE 37 MARCH ST ' SALEM MA 01970 SALEM MA 01970 ' Loc: 1 SMITH AVENUE Parcel ID#: 36-0227-0 Loc:41 MARCH STREET Parcel ID#: 36-0221-0 LUC: 104 LUC: 10' FARRELL PATRICK J/BRUNACCINI CAROL A PARSONS WILLIAM H/KAREN L 1 SMITH AVE 41 MARCH ST SALEM MA 01970 SALEM MA 01970 tL : 4 56 BRIDGE STREET Parcel ID M 36-0170- ---' 9 MARCH STREET Parcel ID#: 36-0181 UC: 031 LUC: 92, ' M.V.A.M. NOM tr/PREN 1/0 REALTY TRUST SALE CURTIS PLAYGR 17N� 56 BRIDGE STREET ' S�L AA 01970 ARCH STREET Parcel ID#: 36-0505-0 ' 924 MASS COMMONIY.EAL /DEPT OF Pl)BLIG'•WQ!RtCS 1 r - .,n n.._nn_nnn_, „701 C 11 leOP6 ai zas in