Loading...
64-366 - SALEM WILLOWS - CONSERVATION COMMISSION Massachusetts Department of Environmental Protection ureau of R,asource Protection -Wetlands DEP File Number. WPA Form 8B — Certificate of Compliance 64-366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information Important: 111111111111111111111116111IIIIIIIIIIIIIIIIII When filling out 1. This Certificate of Compliance is issued to: forms on the City of Salem, Department of Parks and Recreation 200,6030400453 8 Bk 27581 computer, use Name 03/04/200 pg;44 only the tab 16,Z 5 Broad Street dress Pa 1/3 key to move _ your cursor- Mailing Address do not use the Salem MA 01970 return key. City/Town - State zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: City of Salem, Department of Parks and Recreation Name April 22, 2004 64-366 Dated DEP File Number 3. The project site is located at: Salem Willows Park; 200 Fort Avenue Salem Street Address Cityfrown Map 45 Lot 0089 Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Property Owner(if different) Essex 26765 257 -,County Book - Page Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: February 28, 2008 Date B. Certification Check all that apply: Z Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed.The project areas or work subject to this partial certification that have been completed and are released from this Order are:-" wpaform Badoc-rev.7113104 _ Page 1 of 4 Massachusetts Department of Environmental Protection Bureau of Rbsource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance � 64-366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: Salem Conservation Commission Please be advised that the Certificate of Compliance for the project at: Salem Willows Park, 200 Fort Ave 64-366 Project Location DEP File Number Has been recorded at the Registry of Deeds of: Essex County for: City of Salem, Department of Parks and Recreation Property Owner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpaferm Bb.dcc•rev.7113104 Page 4 of 4 nA, � `,>ITY OF SALEM R��rnve CONSERVATION COMMISSION February 29, 2008 City of Salem Department of Parks and Recreation 5 Broad Street Salem, MA 01970 Re: Certificate of Compliance—DEP#64-366—Salem Willows Park, 200 Fort Avenue, Salem, MA Dear Mr)! f1 Enclosed, please find the Certificate of Compliance for the above referenced project. This Document must be recorded at the Essex County Registry of Deeds, 36 Federal Street Salem, Massachusetts. Please fill out and return the Recording Information on page 4 of the Certificate of Compliance, which will indicate to the Salem Conservation Commission that the document has been recorded. If you have any further questions please feel free to contact me at(978) 619-5685. Sincerely, Careeu ues Conservation Agent/ Staff Planner Enclosures CC: DEP Northeast Regional Office Department of Planning and Community Development �7t o ryry 4 1 Ag T4 447 r �q ^j1i y a s a �,_ ,•1 . � fix', � �"d, OVA ` Oa � f 'F �'1 1 )x � qT�� �+ c� ;• ' SKY e cent f/�r��q � ��f+. 1� s� � k • � y� •.t f�.,. �/- �4 �I` c v; I T r •� ��z� �.i � e '� P �.� ° k a -. 1f LF I g . 9 F V1f l-. r F} e tR [ 4 vy F r f ,rx R, ••IF Ilk, b 41 ol ill, �F R v' "`f ,• • - Az . 1 -r �,j{F fffttt .. 4 4l m Et '.riNgF rig ! 1Il R �� m � lti A'Mr° { T �� tj[ ��It 1f lrr iii ��n S SfF I • • i�i; . '+ 1�. T'i 'r Y � 5 n Al r �r �i i y 9n. °i3dl iEyEt }ar `arY ryrM� ,t. .M eit it jf rl � r f�l. •+' o.4q m.. � �` • .E � = ; i i .j: i xX�':.�Y a�'"r 1 t � r �' • i � 1' t t �` ' .r��Yi: I . Jii 0.i. l r' �41 ; '� N i• l ( ? g-y 9 #PS i -Y+ a j Al �. '. Chi '.i'k � o,-, _ -' " ;�• J �a F • }}��,, � v t , �yy + j +�i 7� x�.• - ap',� 7 1 a Y �a' 44 dr { ' yit 'F- k at le'l`j f` 1 ' � Ifi� y t' r a of a P # I y t i 4 P F 4 Y .e-•1 ANY. � r t n,E y�5:nk'S � '�^`z � r >c t r 'Y� ,ward "���` i #g !K� ''•—w—. '-��"F.'�,- ry ,�, r:. p ``r '� ��,; ^ k xv w,p {T�'. �y �a 14- �, . •�ti r'a �'����Y;«yj�� 3 h a1�� r ANA r �`�' .. .ri� '" * �` � �, r 1 x P �#� # a. t dP } E� .x., �4*` �" fir" 1 1• // A lr 7 - R.` ¢ Y x J t✓ Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection -Wetlands WPA Form 8A — Request for Certificate of Compliance #64-366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Ll A. Project Information Important: When filling out 1. This request is being made by: forms on the City of Salem, Department of Parks and Recreation computer, use Name only the tab key to move 5 Broad Street your cursor- Mailing Address do not use the Salem Massachusetts 01970 return key. City/Town State Zip Code (978) 744-0180 1m Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to: ° City of Salem, Department of Parks and Recreation Applicant _April 22, 2004 and extended until April 22, 2010 #64-366 Dated DEP File Number Upon completion of the work 3. The project site is located at: authorized in Salem Willows Park, 200 Fort Avenue Salem an Order of Street Address City/Town Conditions,the property owner MAP 45 LOT 0089 must request a Assessors Map/Plat Number Parcel/Lot Number Certificate of Compliance g y 4. The final Order of Conditions was recorded at the Registry of Deeds for: from the issuing City of Salem, Department of Parks and Recreation authority stating Property Owner(if different) that the work or Essex 26765 257 portion of the work has been County Book Page satisfactorily completed. Certificate(if registered land) 5. This request is for certification that (check one): ® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above-referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. waaform3a.doc•rev.7/13/04 Page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance #64-366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see Attachment). wpaform8a.doc•rev.7113/04 Page 2 of 2 k V Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tynngham 436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales Alford Cummington Hatfield Monterey Richmond Were Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashfield Deerfeld Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfeld Wendell Belcherl East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton Blandford Erving Huntington New Salem Shelburne West Springfield Brimfield Flodda Lanesboreugh North Adams Shutesbury West Stockbridge Buckland Gill Lee Northampton Southampton Whately Chademont Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Leverett Orange Southwick Williamsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashbumham Clinton Hubbardslon Millville Shirley - Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester, MA 01608 Athol Dudley Holliston Nouhborough Southborough Westborough Phone:508-792-7650 Auburn Dunstable Lancaster Northbridge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Benin Grafton Lunenburg Paxton Sturbridge Winchendon Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Phillipston Townsend Boylston Holden Maroon Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetown Tisbury 20 Riverside Drive Acushnet Dennis Gay Head Middleborough Raynham Truro Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Welifeet Phone:508-946-2700 Barnstable Eastham Hanover North Aldeborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tisbury TDD:508-946-2795 Brewster Edgartown Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxbcrcugh Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plymplon Taunton DEP Northeast Region Amesbury Chelmsford Hingham Mernmac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Airington Cohasset Hull Middleton Reading Waltham Boston, MA 02108 Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD: 617-574-6868 affiance Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburyport Sherborn Westwood Braintree Framingham Malden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpatorm8a.dgc•DEP Addresses•rev.7/13104 Page t of 1 q Massachuseas Department of Environmental Protection Bureau of Resource Protection - Wetlands oEP File Number: WPA Form 7 — Extension Permit for Orders of Conditions 64.366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP ' A. General Information IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Important: 1. Applicant: 2007042300594 806165 P9:251 When filling out City of Salem, Department of Parks and Recreation o---- eon 14 (m co s 112 forms on the OTHER P computer, use Name only the tab - key to move 31 Grove Street, P.O. Box 465 your cursor- Mailing Address ' do not use the Salem MA 01970 return key. City/Town State Zip Code 2. Property Owner (if different): Name nnen Mailing Address City/Town - State Zip Code B. Finding Information The Order of Conditions (or Extension Permit) issued to the applicant or property owner listed above on: , 4/22/04 Date for work at: Salem Willows Park 45 0089 Street Address Assessor's Map/Plat Number Parcel/Lot Number recorded at the Registry of Deeds for: Essex 22733 243 County Book Page Certificate(if registered land) - is hereby extended until: April 22, 2010 Date This date can be no more than 3 years from the expiration date of the Order of Conditions or the latest extension. Only unexpired Orders of Conditions or Extension may be extended. Date the Order was last extended (if applicable): N/A Date Issued by: N/A Conservation Commission - - wpaformZdoc•rev.7/14/04 Page 1 of 3 LlMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 7 — Extension Permit for Orders of Conditions 64-366 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP C. Recording Confirmation The applicant shall record this document in accordance with General Condition 8 of the Order of Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the Registry of Deeds, and return it to the Conservation Commission. Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under the name of the owner of the land upon which the proposed work is to be done. In the case of registered land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. Detach page 3 of Form 7 and submit it to the Conservation Commission prior to the expiration of the Order of Conditions subject to this Extension Permit. To: Salem Conservation Commission Please be advised that the Extension Permit to the Order of Conditions for the project at: Salem Willown 64-366 Project Location DEP File Number has been recorded at the Registry of Deeds of: Essex County for: City of Salem Property Owner and has been noted in the chain of title of the affected property in accordance with General Condition 8 of the original Order of Conditions on: L4 l a-367 co-76 s Date Book Page If recorded land the iDalrum t number which identifies this transaction is: Instrument Number �� (/.� If registered land, the document number which identifies this transaction is: AJ i- Document Number Kgnature of Applicant wpaforrnTdoc•rev.7/14/04 Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Regional Addresses Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Mail transmittal forms and DEP payments,payable to: Commonwealth of Massachusetts Department of Environmental Protection Box 4062 Boston, MA 02211 DEP Western Region Adams Colrain Hampden Monroe Pittsfield Tynngham 436 Dwight Street Agawam Conway Hancock Montague Plainfield Wales Alford Domination Hatfield Monterey Richmond Ware Suite 402 Amherst Dalton Hawley Montgomery Rowe Warwick Springfield,MA 01103 Ashiield Deerfield Heath Monson Russell Washington Phone:413-784-1100 Becket Easthampton Hinsdale Mount Washington Sandisfield Wendell Belcherl East Longmeadow Holland New Ashford Savoy Westfield Fax:413-784-1149 Bernardston Egremont Holyoke New Marlborough Sheffield Westhampton Blanal Ervag Huntington New Salem Shelburne West Springfield Brine ield Florida Lanesborough North Adams Shutesbury West Stockbridge Rockland Gill Lee Northampton Southampton Whately Chaderni Goshen Lenox Northfield South Hadley Wilbraham Cheshire Granby Levered Orange Southwick Williamsburg Chester Granville Leyden Otis Springfield Williamstown Chesterfield Great Barrington Longmeadow Palmer Stockbridge Windsor Chicopee Greenfield Ludlow Pelham Sunderland Worthington Clarksburg Hadley Middlefield Peru Tolland DEP Central Region Acton Charlton Hopkinton Millbury Rutland Uxbridge 627 Main Street Ashburnham Clinton Hubbamston Millwille Shmey Warren Ashby Douglas Hudson New Braintree Shrewsbury Webster Worcester, MA 01605 Athol Dudley Holliston Nouhborough Southborough Westborough Phone:508-792-7650 Auburn Constable Lancaster Nonhbndge Southbridge West Boylston Fax:508-792-7621 Ayer East Brookfield Leicester North Brookfield Spencer West Brookfield Barre Fitchburg Leominster Oakham Sterling Westford TDD:508-767-2788 Bellingham Gardner Littleton Oxford Stow Westminster Berlin Grafton Lunenburg Paxton Sturbridge Winchendcn Blackstone Groton Marlborough Pepperell Sutton Worcester Bolton Harvard Maynard Petersham Templeton Boxborough Hardwick Medway Phillipston Townsend Boylston Holden Mendon Princeton Tyngsborough Brookfield Hopedale Milford Royalston Upton DEP Southeast Region Abington Dartmouth Freetown Mattapoisett Provincetowa Tisbury 20 Riverside Drive Acoshbet Dennis Gay Head Middleborough Raynham Tram Attleboro Dighton Gosnold Nantucket Rehoboth Wareham Lakeville,MA 02347 Avon Duxbury Halifax New Bedford Rochester Well Phone:508-946-2700 Barnstable rostra. Hanover North Attleborough Rockland West Bridgewater Fax:508-947-6557 Berkley East Bridgewater Hanson Norton Sandwich Westport Bourne Easton Harwich Norwell Scituate West Tsbury TDD:508-946-2795 Brewster Edged.. Kingston Oak Bluffs Seekonk Whitman Bridgewater Fairhaven Lakeville Orleans Sharon Wrentham Brockton Fall River Mansfield Pembroke Somerset Yarmouth Carver Falmouth Marion Plainville Stoughton Chatham Foxborough Marshfield Plymouth Swansea Chilmark Franklin Mashpee Plympton Taunton DEP Northeast Region Amesbury Chelmsford Hingham Merrimac Quincy Wakefield 1 Winter Street Andover Chelsea Holbrook Methuen Randolph Walpole Arlington Cohasset Hull Middleton Reading Waltham Boston,MA 02108 Ashland Concord Ipswich Millis Revere Watertown Phone:617-654-6500 Bedford Danvers Lawrence Milton Rockport Wayland Fax: 617-556-1049 Belmont Dedham Lexington Nahant Rowley Wellesley Beverly Dover Lincoln Natick Salem Wenham TDD:617-654-6868 Billenca Dracut Lowell Needham Salisbury West Newbury Boston Essex Lynn Newbury Saugus Weston Boxford Everett Lynnfield Newburyport Sherborn Westwood Braintree Framingham Maiden Newton Somerville Weymouth Brookline Georgetown Manchester-By-The-Sea Norfolk Stoneham Wilmington Burlington Gloucester Marblehead North Andover Sudbury Winchester Cambridge Groveland Medfield North Reading Swampscott Winthrop Canton Hamilton Medford Norwood Tewksbury Woburn Carlisle Haverhill Melrose Peabody Topsfield wpaforial•DEP Addresses•rev.228/07 Page 1 of 1 Massachusetts Department of Environmental Protection DEP File Number: lBureau of Resource Protection - Wetlands 64-366 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling From: out forms on Salem the computer, Conservation Commission use only the tab key to This issuance if for(check one): move your cursor-do ® Order of Conditions not use the return key. ❑ Amended Order of Conditions To: Applicant: Property Owner(if different from applicant): City of Salem, Dept., of Parks and Recreation Same Name Name 31 Grove Street, P.O. Box 465 Mailing Address Mailing Address Salem MA 01970 Cityrrown State Zip Code city/ own State Zip Code 1. Project Location: Salem Willows Park Salem Street Address City/Town NA NA Assessors Map/Plat Number Parcel/Lot Number 2. Property recorded at the Registry of Deeds for: Essex NA NA County Book Page NA Certificate(if registered land) 3. Dates: April 5, 2004 April 22, 2004 April 22,2004 Date Notice of Intent Filed Date Public Hearing Closed Date of Issuance 4. Final Approved Plans and Other Documents (attach additional plan references as needed): Seawall Repair Plan& Profile Seawall Improvement Project Salem Willows Park, April 2004 Sheets 1 of 2 and 2 of 2 Date 5. Final Plans and Documents Signed and Stamped by: Peter J. Williams Name 6. Total Fee: Exempt (from Appendix B:Wetland Fee Transmittal Form) WPA Fam 5 Rev.02100 Paget or 7 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-366 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that apply: ❑ Public Water Supply ❑ Land Containing Shellfish ❑ Prevention of Pollution ❑ Private Water Supply ❑ Fisheries ❑ Protection of Wildlife Habitat ❑ Groundwater Supply ® Storm Damage Prevention ® Flood Control Furthermore,this Commission hereby finds the project,as proposed, is:(check one of the following boxes) Approved subject to: ® the following conditions which are necessary, in accordance with the performance standards set forth in the wetlands regulations, to protect those interests checked above. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above, the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. Denied because: ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations to protect those interests checked above. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect these interests, and a final Order of Conditions is issued. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). General Conditions (only applicable to approved projects) 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. WPA Form 5 Rev.02/00 Page 2 of 7 r Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-366 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 W B. Findings (cont.) 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years,from the date of issuance. If this Order is intended to be valid for more than three years,the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster,wire, lath, paper, cardboard, pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. 8. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located,within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to this Conservation Commission on the form at the end of this Order, which form must be stamped by the Registry of Deeds, prior to the commencement of work. 9. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection" [or, "MA DEP'J "File Number 64-366 " 10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before DEP. 11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance (WPA Form 8A)to the Conservation Commission. 12. The work shall conform to the plans and special conditions referenced in this order. 13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 14. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. WPA Form 5 Page 3 of Rev.07/00 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands 64-366 WPA Form 5 - Order of Conditions Provided by DEP r Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) 15. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. 17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. Special Conditions (use additional paper, if necessary): 18. See Attached Special Conditions Findings as to municipal bylaw or ordinance Furthermore, the Salem hereby finds (check one that applies): Conservation Commission ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw specifically: n r Name Municipal Ordinance o Bylaw Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or bylaw, specifically: Name Municipal Ordinance or Bylaw The Commission orders that all work shall be performed in accordance with the said additional conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. ZI Form 5 Page a of 7 Rev.07/00 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Findings (cont.) Additional conditions relating to municipal ordinance or bylaw: This Order is valid for three years, unless otherwise specified as a special condition pursuant to General Conditions#4, from the date of issuance. Date This Order must be signed by a majority of the Conservation Commission. The Order must be mailed by certified mail (return receipt requested)or hand delivered to the applicant.A copy also must be mailed or hand delivered at the s me time to the appropriate Department of Environmental Protection Regional Office (see Ap dix )an property owner(if different from a licant). Signatures: On 77v�'•''�t'y SC c syAL Of -2,o 6`t Day Month and Year before me personally appeared ' Above V�1�„M . 5 to me known to be the person described in and who executed the foregoing instrument and ack nowl5aged that he/she executed the same as his/her free act and deed. D J:CEFALO Notary Public My Commission Expires o flry u to Commonwealth of Massachusetts This Order is issued to the applicant as follows: My Commission Expires Au List 30,2007 by hand delivery on ❑ by certified mail, return receipt requested,on 21 2a�y Date Date WPA Form 5 Rev.02100 Page 5 of 7 Massachusetts Department of Environmental Protection DEP File Number: Y � . Bureau of Resource Protection - Wetlands 64-366 k � 4 WPA Form 5 - Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 w C. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Appendix E: Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. The request shall state clearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act, (M.G.L. c. 131, §40)and is inconsistent with the wetlands regulations (310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. D. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on Page 7 of Form 5 shall be submitted to the Conservation Commission listed below. Salem Conservation Commission WPA Form 5 Page 6 of 7 Rev.02100 r� Massachusetts Department of Environmental Protection DEP File Number: i r Bureau of Resource Protection - Wetlands 64-366 - p � WPA Form 5 — Order of Conditions Provided by DEP Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Recording Information (cont.) Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. ----------------------------------------------------------------- -------------------------------------------------------- To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: Salem Willow Park 64-366 Project Location DEP File Number Has been recorded at the Registry of Deeds of: County Book Page for: Property Owner and has been noted in the chain of title of the affected property in: Book Page In accordance with the Order of Conditions issued on: Date If recorded land the instrument number identifying in this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number Signature of Applicant WPA Form 5 Page 7 of 7 Rev.02100 Salem Conservation Commission SPECIAL CONDITIONS—DEP FILE # 64-366 Salem Willows Park, Salem, MA 1. The Conservation Agent will be notified 48 hours prior to commencement of construction activities(978-745- 9595 ext. 311). Members and agents of the Salem Conservation Commission(Commission)shall have the right to enter and inspect the premises to evaluate and ensure compliance with the conditions and performance standards stated in this Order,the Notice of Intent,the referenced plans, the Act, and 310 CMR 10.00, and may require any information,measurements,photographs,observation and/or materials or may require the submittal of any data or information deemed necessary by the Commission,agent,or DEP determines that any of the work is not in compliance with this Order of Conditions. Work shall not resume until the Commission is satisfied that the work will comply,and has so notified the applicant in writing. 2. Approval of this application does not constitute compliance with any law or regulation other than MGL Chapter 131, Section 40,and Wetlands Regulations 310 CMR 10.00. 3. This Order shall apply to any successor in control or successor in interest of the property described in the Notice of Intent and accompanying plans. These obligations shall be expressed in covenants in all deeds to succeeding owners or portions of the property. 4. The form provided at the end of this Order shall be completed and stamped at the Registry of Deeds after the expiration of the 10-day appeal period and within 30 days of the issuance if no request for appeal has been filed with the Department of Environmental Protection. This form shall be returned to the Commission within 21 days of recording accordance and prior to commencement of any activities subject to the Order of Conditions. 5. Prior to any work commencing, a sign shall be displayed showing DEP file#64-366 and not placed on a living tree. 6. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of Intent,supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 7. It is the responsibility of the applicant to procure all other applicable federal,state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S.Army Corp of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified (3) Flood Plain (4) Grading Ordinance 8. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 9. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 10. The Commission and its Administrator shall have the discretion to modify the erosion/siltation control methods and boundary during construction if necessary. 11. All work shall be performed in accordance with this Order of Conditions and approved site plans(s). No alteration of wetland resource areas or associated buffer zone,other than that approved in this Order,shall occur on this property without prior approval from the Commission. 12. If any changes are made in the above-described plan(s)which may or will alter an area subject to protection under the Wetlands Protection Act,or any changes in activity subject to regulations under G.L. Ch. 131, Section 40,the applicant shall inquire from this Commission in writing,prior to their implementation in the field, whether the change(s) is significant enough to require the filing of a new Notice of Intent. Any error in the plans or information submitted by the applicant shall be considered changes and the above procedures shall be followed. A copy of such request shall at the same time be sent to the Department of Environmental Protection. 13. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a signed statement by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 14. Conditions number_as indicated shall continue in force beyond the Certificate of Compliance, in perpetuity, and shall be referred to in all future deeds to this property. PRIOR TO CONSTRUCTION 15. Prior to commencement of any activity on this site,there shall be a PRECONSTRUCTION MEETING between the project supervision;the contractor responsible for the work or its administrator to and phone numbers of all responsible parties shall be registered with the Commission at the pre-construction meeting. 16. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commssion and/or its Administrator shall inspect and approve such installation at the pre-construction meeting. 17. Prior to the commencement of any activity on this site,the applicant or current landowner shall submit to the Commission in writing a construction schedule/sequence of work to complete this project. 18. Prior to any work on site,the proposed limits of work shall be clearly marked with stakes or flags and shall be confirmed by the Commission or its Administrator. Such markers shall be checked and replaced as necessary and shall be maintained until all construction is complete. Workers shall be informed that no use of machinery, storage of machinery or materials, stockpiling of soil or construction activity is to occur beyond this line at anytime. 19. Prior to commencement of construction on site,the limits of wetland resource areas closest to construction activity shall be flagged with surveyor's tape and shall remain in place during construction. The limits of areas to be impacted and the limits of work in the replication area(s)shall be clearly flagged. 20. There shall be_hay bales and wooden staked stored under cover on the site to be used only for emergency erosion control. EROSION CONTROL 21. Appropriate erosion control devices shall be in place prior to the beginning of any phases of construction,and shall be maintained during construction in the wetland areas and buffer zones. The erosion control specification provided in the Notice of Intent and the erosion control provision in the Order will be the minimum standards for this project;additional measures may be required by the Commission. 22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 24. The areas of construction shall remain in a stable condition at the close of each construction day. 25. Any de-watering of trenches or other excavations required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharges from de-watering activities shall be filtered through haybale sediment traps, silt filter bags or other means approved by the Commission or its Administrator. 26. Within thirty days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover,using sufficient top soil to assure long-term stabilization of disturbed areas. 27. If soils are to be disturbed for longer than two months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,exposed surfaces shall be stabilized by other appropriate erosion control measures,firmly anchored,to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 28. A copy of the Order of Conditions,construction plans,and copies of the documents and reports cited in Condition# 11,shall be on the site upon commencement and during any site work for contractors to view and adhere to. 29. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 30. Only clean fill,free of masonry, stumps,asphalt,and any other kind of waste material shall be used on the site. 31. All waste products,grabbed stumps,slash,construction materials,etc.shall be deposited at least 100 feet from wetland resource areas and 200 feet from rivers. 32. All filling or removal of waste material from the site shall be done in accordance with the regulations of the City of Salem Health Department. 33. Cement trucks shall not be washed out in any wetland resource or buffer zone area. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be removed by hand. 34. No fuel,oil,or other pollutants shall be stored in any resource area or the buffer zone thereto,unless specified in this Order of Conditions. 35. There shall be no pumping of water from wetland resource areas. 36. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 37. The project shall not cause an increase in nun-off onto adjacent properties,either during construction or when completed. 38. The applicant is hereby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including,but not limited to,civil administrative penalties under M.G.L.Chapter 21A,section 16. POST CONSTRUCTION 39. All disturbed areas, slopes and proposed landscape areas shall be loamed and seeded or stabilized through the use of erosion control blankets or other approved means. All disturbed areas will be graded, loamed,and seeded prior to November I of each year, if possible. No disturbed areas or stockpiled material will be left unprotected or without erosion controls during the winter. 40. Upon completion of construction,the applicant or current landowner shall submit the following to the Commission to request a Certificate of Compliance: (1) A letter requesting a Certificate including the following information: a. Name and address of current landowner; b. Name and address of the individual/trust or other entity to whom the Certificate is to be issued: c. Street address and lot number for the project;and d. DEP file number (2) A letter from a Registered Professional Engineering or Land Surveyor certifying compliance of the property with this Order of Conditions (3) An"As-Built'plan signed and stamped by a Registered Professional Engineer showing post-construction conditions and: a. As-built elevations of all drainage ways constructed within 100 feet of any wetland resource area; b. As-built elevations and grades of all filled or altered wetland resource areas,buffer zones and replicated areas;and c. Distances to all structures within 100 feet of any wetland resource area. 41. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds. 42. If the completed work differs from that in the original plans and conditions,the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 43. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Commission and/or its Administrator has authorized their removal. ADDITIONAL CONDITIONS 44. All construction vehicles shall be equipped with emergency spill kits during the duration of the project. 45. No excavated materials shall be left on site at the end of each working day.In the event that excavation materials used for back fill should remain on site,the pile shall be covered with a protective sheeting at all times. 46. There shall be no overnight parking of construction vehicles within the resource area and the 100-foot buffer zone. ' SALEM WILLOWS PARK SEAWALL IMPROVEMENT PROJECT ' SALEM, MASSACHUSETTS NOTICE OF INTENT 1 Submitted to: ' SALEM CONSERVATION COMMISSION 120 Washington Street — City Hall Annex Salem, Massachusetts 01970 UW1. tw�w Applicant: t CITY OF SALEM PARK AND RECREATION COMMISSION ' 31 Grove Street P.O. Box 465 Salem, Massachusetts 01970 � ��wilbr��ud e'DR 0 5 2004 r, '.. Prepared by: ' VINE ASSOCIATES, INC. 190 Old Derby Street, Suite 311 Hingham, Massachusetts ' 02043 APRIL 2004 J w w April 2, 2004 ' Salem Conservation Commission 190 Old Derby Street 120 Washington Street—City Hall Annex ' Salem, MA 01970 Suite 311 RE: Seawall Improvement Project ' Salem Willows Park Hingham Salem,Massachusetts Massachusetts ' Dear Commission Members: 02043 On behalf of the City of Salem Park and Recreation Commission,Vine Associates, Inc. (VAI)is pleased ' to submit this Notice of Intent for the subject project. This application is being filed in accordance with the requirements of the Massachusetts Wetlands Protection Act and the City of Salem Wetlands Protection By-laws and includes seven(7)copies of the following documents: ' • Notice of Intent Form 3 • Figures ' • Abutter Notification Forms • Project Narrative • Project Drawings ' Proposed work includes repairs and rehabilitation to approximately 440 linear feet of the existing stone seawall located on Salem Harbor,along the northwesterly shoreline of Salem Willows Park. Additional information on the proposed site improvements, including wetland impacts and mitigation,is presented in the Project Narrative included in the Notice of Intent. As required, one(1) copy of the Notice of Intent has been submitted to the Northeast Regional Office ' of the Department of Environmental Protection. It is our understanding that the City will advertise this application prior to the public hearing in the Legal Advertisement Section of the Salem Evening News. ' We look forward to meeting with the Commission to discuss the proposed improvements. Should you have any questions or comments regarding this submittal,or if you require any additional information, please contact our office at (781) 749-2530. 1 Sincerely, VINE ASSOCIATES, INC. ( ht't'1 t R �_n • _P�c4 eiy Christine M. Player 0 Project Manager (781) 799-2530 cc: DEP Northeast Region ' Joe Nerden,DPW Engineering Fax Douglas Bollen, Park&Recreation Commission (781) 749-2751 1 ' SALEM WILLOWS PARK ' SEAWALL IMPROVEMENT PROJECT SALEM, MASSACHUSETTS TABLE OF CONTENTS COVER LETTER OF TRANSMITTAL TABLE OF CONTENTS FORM 3 NOTICE OF INTENT ' FIGURES FIGURE 1 - LOCUS PLAN FIGURE 2 - FEMA FLOOD MAP ' FIGURE 3 - ESTIMATED HABITAT MAP FIGURE 4 - PRIORITY SITE/NATURAL COMMUNITIES MAP ' APPENDIX A WETLAND FEE TRANSMITTAL FORM ATTACHMENT A PROJECT NARRATIVE ATTACHMENT B ABUTTER NOTIFICATION ' ATTACHMENT C PROJECT DRAWINGS i ' Provided b DE?: Massachusetts Department of Environmental Protection ,y ; Bureau of Resource Protection - Wetlands r �bEP File Number', �.� ;� a WPA Form 3 - Notice of Intent �` Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 `Document Transact on Numbers ,, �SALEM Cityfrown A. General Information ' 1. Project Location (Note: electronic filers will click on button for GIS locator): Salem Willows Park Salem 01970 ' a.Street Address b.Citylrown c.Zip Code Latitude and Longitude, if Known: d.Latitude e. Longitude N/A f.Assessors Map/Plat Number g. Parcel/Lot Number Important: When filling out 2. Applicant: forms on the City of Salem Park& Recreation Commission computer, use a.First Name b.Last Name - c.Company only the tab key to move 31 Grove Street, P.O. Box 465 your cursor- d.Mailing Address do not use the Salem MA 01970 return key. e.City/Town f.State g.Zip Code ' 978-744-0180 978-740-9299 DBOLLEN@SALEM.COM In.Phone Number i. Fax Number j.Email address 3. Property owner(if different from applicant): ❑ Check if more than one owner ' Same a. First Name b. Last Name c.Company d. Mailing Address ' Note: Before e.City/Town f.State g.Zip Code completing this form consult h.Phone Number L Fax Number j.Email address your local Conservation 4. Representative (if any): Commission Vine Associates, Inc. regarding any a. Firm municipal bylaw Christine Player or ordinance. b.Contact Person First Name c.Contact Person Last Name 190 Old Derby Street—Suite 311 d. Mailing Address Hingham MA 02043 ' e.City/Town f.State g.Zip Code 781-749-2530 781-749-2751 cplayer@vineassociates.net h. Phone Number i. Fax Number j.Email address ' ❑ Select if you want to see 5 Total WPA Fee Paid (from Appendix A,Wetland Fee Transmittal Form): Wetland Fee Municipal Project- Exempt Transmittal a.Total Fee Paid b.State Fee Paid c.City[Town Fee Paid Form. 6. General Project Description: Repair& rehabilitation of existing granite stone seawall, including installation of a new concrete cap, ' weepholes, and sub-drain system. 1 wpeform3 doc•rev.06/03 Page 1 of 8 Massachusetts Department of Environmental Protection Provided by DER Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town A. General Information (continued) ' 7. Project Type Checklist: ' a. ❑ Single Family Home b. ❑ Residential Subdivision c. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial e. ❑ Dock/Pier ' f. ❑ Utilities g. ® Coastal Engineering Structure ' h. ❑ Agriculture—cranberries, forestry i. ❑ Transportation 1 I. ❑ Other ' 8. Property recorded at the Registry of Deeds for: Essex— N/A a.County ' b.Book c.Page Number d.Certificate#(if registered land) 9. Buffer Zone Only ' Is the project located only in the Buffer Zone of a bordering vegetated wetland, inland bank, or coastal bank, coastal beach, coastal dune, or salt marsh? a. ❑ Yes If yes, skip to Section C. b. ® No If no, check the resource areas to be affected by this project, directly below. ' Wp form3.doc•rev.06/03 Page 2 of 8 Massachusetts Department of Environmental Protection Provided by DER Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town B. Resource Area Effects 1. Inland Resource Areas Check all that apply below. Attach narrative and any supporting documentation describing how the. project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. 1 online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any document ttransaction a. ❑ Bank 1.linear feet 2.linear feet number b. ❑ Bordering Vegetated (provided on Wetland 1.square feet 2.square feet your receipt ' page)with all c. ❑ Land Under 1 supplementary Waterbodies and .square feet 2.square feet information you Waterways 3.cubic yards dredged submit to the d. ❑ Bordering Land ' Department. Subject to Flooding 1.square feet 2.square feet 3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced ' e. ❑ Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced f. ❑ Riverfront area 1. Name of Waterway(if available): 2.Width of Riverfront Area (check one): ' ❑ 25 ft. - Designated Densely Developed Areas only ❑ 100 ft. - New agricultural projects only ❑ 200 ft. -All other projects 3. Total area of Riverfront Area on the site of the proposed project: Square Feet 4. Proposed alteration of the Riverfront Area: a.Total Square Feet b.Square Feet within 100 ft. c.Square Feet between 100 ft.and 200 ft. ' 5. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No 6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No ' wpafcrm3.dcc•rev.06/03 Page 3 cf 8 ' Massachusetts Department of Environmental Protection Pmyded by DEP. W w r ' Bureau of Resource Protection -Wetlands x,DEP File Numb Y WPA Form 3 — Notice of Intent ). ;y Document Transacbop'Number;' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town B. Resource Area Effects (continued) 2. Coastal Resource Areas: ' Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean,below number b. ❑ Land Under the Ocean (provided on 1.Square feet your receipt page)with all 2.Cubic yards dredged supplementary Indicate size under Coastal Beaches and/or Coastal Dunes information you c. ❑ Barrier Beach below submit to the 6,750 SF (Temporary) Department. d. ® Coastal Beaches 1.Square feet 2.Cubic yards beach nourishment e. ❑ Coastal Dunes 1.Square feet 2.Cubic yards dune nourishment f. ❑ Coastal Banks 1. Linear feet g. ❑ Rocky Intertidal Shores 1.Square feet h.❑ Salt Marshes 1.Square feet 2.Sq ft restoration,rehab.,or creation i. ❑ Land Under Salt Ponds 1.Square feet 2.Cubic yards dredged - j. ❑ Land Containing Shellfish 1.Square feet 2.Square feet restoration,rehab. k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the ' Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.Cubic yards dredged i. ® Land Subject to Coastal 9,100 SF (Temporary) Storm Flowage 1.Square feet 3. Limited Project: ' Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 or 310 CMR 10.53? a. Yes ® No If yes, describe which limited project applies to this project: b. Limited Project ' wpaform3Aoc•rev.06/03 Page 4 of 8 ' Massachusetts Department of Environmental Protection Provided by DEP: ' Bureau of Resource Protection -Wetlands DEP File Number WPA Form 3 - Notice of Intent Document Transaction Number ' Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town C. Bordering Vegetated Wetland Delineation Methodology ' Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary: Online Users: 1. ❑ Final Order of Resource Area Delineation issued by Conservation Commission or DEP ' Include your (attached) document transaction 2. ❑ DEP BVW Field Data Form (attached) ' number (provided on s. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached) your receipt page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation): ' supplementary information you a. ❑ 50% or more wetland indicator plants submit to the Department. b. ❑ Saturated/inundated conditions exist ' c. ❑ Groundwater indicators 1 d. [-IDirect observation .For all projects affecting other e. ❑ Hydric soil indicators Resource Areas, please f. ❑ Credible evidence of conditions prior to disturbance attach a narrative ' explaining how the resource area was Applicable D. Other A Standards and delineated. PP � Requirements 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent ' Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program? a. Yes ® No If yes, include proof of mailing or hand delivery of NOI to: ' Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife Route 135, North Drive Westborough, MA 01581 1997-98 b.Date of Map 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in a fish run? ' ® Yes❑ No If yes, include proof of mailing or hand delivery of NOI to: Massachusetts Division of Marine Fisheries 251 Causeway Street, Suite 400 ' Boston, MA 02114 ❑ Not applicable—project is in inland resource area only wpaform3.00c•rev.06103 Page 5 of 8 Massachusetts Department of Environmental Protection Provided by DEP: ' Bureau of Resource Protection - Wetlands DEP File Number WPA Form 3 — Notice of Intent Document Transaction.Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town D. Other Applicable Standards and Requirements (continued) 3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? ' a. Yes E No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b.ACEC ' Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Include your Restriction Act (M.G.L. c. 131, §40A)or the Coastal Wetlands Restriction Act (M.G.L. c. 130, § 105)? document transaction a. ❑ Yes E No number ' (provided on your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the page)with all wetlands regulations, 310 CMR 10.00. supplementary information you a.Yes E No If yes, describe which exemption applies to this project: submit to the Department. b.Exemption 6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes E No ' b. If yes, Stormwater management measures are required. Applicants should complete Appendix B: Stormwater Management Form and submit it with this form. ' c. If no, explain why the project is exempt: Coastal project with no site improvements. ' E. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number(provided on your receipt page)for any of the following information you submit to the Department. ' 1. E USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) ' z. E Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to ' the boundaries of each affected resource area. wpaform3.00c•rev.06103 Page 6 of 8 1 Massachusetts Department of Environmental Protection Provided byDEP." y Bureau of Resource Protection - Wetlands ' WPA Form 3 - Notice of Intentr . �# Document Transaction Numberl Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 sALEM ' _ _ ' City/Town E. Additional Information (continued) ' 3. 0 Other material identifying and explaining the determination of resource area boundaries shown on plans (e.g., a DEP BVW Field Data Form). Online Users: ' Include your 4. ® List the titles and dates for all plans and other materials submitted with this NOI. document 5. ❑ If there is more than one property owner, please attach a list of these property owners not transaction listed on this form. ' number (provided on 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. your receipt page)with all 7. 0 Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. ' supplementary information you 6. ® Attach Appendix A, see next page. submit to the ' Department. s. ❑ Attach Appendix B, if needed. ' F. Fees The fees for work proposed under each Notice of Intent must be calculated and submitted to the Conservation Commission and the Department (see Instructions and Appendix B. Wetland Fee Transmittal Form). No fee shall be assessed for projects of the federal government, the Department, or cities and towns ' of the Commonwealth. Applicants must submit the following information (in addition to pages 1 and 2 of Appendix B)to confirm fee payment: ' Municipal Project- EXEMPT 1. Municipal Check Number 2.Check date 3.State Check Number 4.Check date ' 5. Payor name on check:First Name 6.Payor name on check:Last Name ' wpaform3.tloc•rev.06103 Page 7 of a ' Massachusetts Department of Environmental Protection Provided by DEP: Bureau of Resource Protection -Wetlands DEP File Number ' ( WPA Form 3 - Notice of Intent Document Transaction Number Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 SALEM City/Town G. Signatures and Submittal Requirements ' I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the ' expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of .G.L. c. 131, §40. Not' a must be made in writing by hand delivery or certified mail (return recer quested all w{ in 100 feet of the property line of t e pr je t location. �, Signatur of Applicant D e ' Signature'of Property Owner(if different) Date 31 Signature of Representative(if any) Date For Conservation Commission: ' Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents; two copies of pages 1 and 2 of Appendix B; and the city/town fee payment must be sent to the Conservation Commission by certified mail or hand delivery. ' For DEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one copy of pages 1 and 2 of Appendix B; and a copy of the state fee payment must be sent to the DEP ' Regional Office (see Instructions) by certified mail or hand delivery. (E-filers may submit these electronically.) Other: ' If the applicant has checked the"yes" box in any part of Section D, Item 3, above, refer to that section and the Instructions for additional submittal requirements. ' The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. 1 .wpaform3.Ioc•rev,16/03 Page 8 of 8 i 1 1 SALEM WILLOWS PARK i SEAWALL IMPROVEMENT PROJECT 1 SALEM, MASSACHUSETTS NOTICE OF INTENT 1 � i 1 i 1 1 FIGURES 1 1 1 1 1 i i 1 1 �11 `, � 'I rG�r� f• +� � r � r 1✓�� j � Athlenc� r{� `' y �' Sch o � o ( •� �� .�� s • tf ' " �`C � 2 D ���a31N ,\pa�arr `� �✓ � 8¢°e ��� ,� ' ♦.� e r, ,. � n y� pxbr'� e � at i t Q� C ` rR> 71 :� �r M1�;.t ar al' e ::. °F.1'#�:• WNW—, ., t�hthouse x ? , Cfl e ca U9rlospital Poi it �... r 3 O n Point, H ste Sheol :. ra ii (t. S Point �(.' s Lpbar�r g f ' ,J \ SITE _._ / r X_ {k e Salg Neck ti ,_- ; r` t "d C - F .lPo nt = �r { aUr� �,to9. w L. y �iR r en� J.• ���� ` *' � ' ub5 V r / u 1 ' ru row^ U bnPiyken .Halft�de ,Ft �� r�! Kneppi.* ( n + r S�al7em 1', 4 iS°L� *Rook SH,,< Coma a �.�� • Sal rt Terminal s, 1 / S O U T H!C Wellman- r •e s:tat,, , {„ .y>' s ��::>- / cloutman Ledger O' "9�j� isftzttcat5i e a 1 olnt 'ez s Dolliber �Nh'erf r.". �Y I�=Q, o _.oint Light I s Folgel ' G Pointy To Point S J�L E tO oue H, R'g p n?tee s & l Palmer nt ' LOCUS PLAN FIGURE 1 NNE ASSOCIATES MC. HINGHAM. MASSACHUSET75 A w„�r'tt �'9id:1+�uf�( f4f SITE }' gr ; 0EE NK -P, r1d ZONE C l9 ' 1OTEr ZONE AO -, � v .1Q,.,,tIEL'�,21^� ,�. (DEPTH 1 ) y fl ors ak ., t ZONE A25 (EL 15) r RM 7 ONE A J E , + RO x (DEPTH 2') me'µ v- �'� A� � . t � T „ ?ONE y ZONE C A4 m a e "se , • i� ' '{;ELt11 l ` ps'�L*° '(� � . +z v �r�l7NE V2 IEL14) ZONE V2 l E L 17) /ZONE C v WINTER r a� ' ZONE V2 k?'hF ZONE t 1EL161 �, e�✓ a C w, ~ » tis - ZONE V2 ZONE V2 G �y✓y � .;�, � `' -� "� ZONE V2 '''�'° "•*�' IEL 181 O '. RM8 ZONE C ZONE C { t € ZONE A2 " f �,,. (�—F� (EL 14) ZONE EL2 14) FEMA FLOOD MAP FIGURE 2 V IVE ASSOCIATES, INC. HINGHAA1,, M,45SALHUSEUS b`- ESTIMATED HABITATS OF RARE WILDLIFE AND CERTIFIED VERNAL POOLS ' 1 � Far use with the MA Wetlands Protection Act regulations (m. A D visi — Produced by Natural Heritage d Endangered Species Program, MA Division of Fisheries d Wildlife � x Y� r\ i� ' a� 3 e �`� a �`•' a l� . 1 � t n 'C'� neW'T' I , � SITE I e,,,,,.� I b + f 1 WIN } Edd Wd 5F tta— Iys °m w: r I ' My F B L E-H.m..AB _ VV-- � I un ' ESTIMATED HABITAT MAP FIGURE 3 ONE ASSOCIATES, INC. HINGHAM. A/ASSACHUSETTS Se 1 PRIORITY SITES OF RARE SPECIES HABITATS AND F%EMPLARY NATURAL COMMUNITIES Note: NOT equivalent to SIGNIFICANT HABITATS as designated under MA Endangered Species Act [7}' NOT for use with MA Wetlands Prulection Act regulations. Produced by Natural Heritage & Endangered Species Program, MA Division of Fisheries & Wildlife f \'\ ti:i�^ �,�, rid' �•, � t1's ''' � '`Y�.�#r 3.t.m. y� al - ova. 51F kRt'rJ »a i S j c' a F _" F2 '`, s 5 Sj S.Icw $ •�a+l ^cam r '�� j . •'�T-. 7 * �e.:cyfr�` 'f' -,1 �'"�� d"s s ,n .J ✓ T` .�1��.a � t a� }�� � J i crw,. +ey _ ac L Iury Wutl \ Ia,au y., �R• •n o: L _ ' PRIORITY SITES/NATURAL COMMUNITIES MAP FIGURE 4 tVINE ASSOCIATES, INC HINGHAM,, df4SS4CHUSETTS 1 SALEM WILLOWS PARK ' SEAWALL IMPROVEMENT PROJECT SALEM, MASSACHUSETTS NOTICE OF INTENT 1 1 ' APPENDIX A WETLAND FEE TRANSMITTAL FORM 1 t Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Appendix A — Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Applicant: computer, use only the tab City of Salem Park&Recreation Commission ' key to move a. First Name b.Last Name c.Company your cursor- 31 Grove Street, P.O. Box 465 do not use the d. Mailing Address return key. Salem MA 01970 r� e.City/Town f.State g.Zip Code �f 978-744-0180 h. Phone Number t2. Property Owner(if different): Same ' a. First Name b. Last Name c.Company d.Mailing Address e.City[Town f.State g.Zip Code h. Phone Number ' 3. Project Location: Salem Willows Park Salem a.Street Address b.City/Town To calculate B. Fees ' filing fees, refer to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4): fee list and ' examples in Section D of The fee should be calculated using the following six-step process and worksheet. Please see this form. Instructions before filling out worksheet. Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and ' buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. ' Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. ' Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be ' multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. ' Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. Wpaform3.doc•Appendix B•rev.3I5I04 Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Appendix A — Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step II/Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/Individual Fee Activity Fee 1 ' Step 517rotal Project Fee: Municipal Project Step 6/Fee Payments: ' Total Project Fee: EXEMPT a.Total fee from Step 5 State share of filing fee: b. 1/2 total fee less$12.50 City/Town share of filling fee: c. 1/2 total fee plus$12.50 ' Abbreviated Notice of Resource Area Delineation (Form 4A): The fee is calculated as follows (check applicable project type): ' 1. ❑ single family house project a.feet of BVW x$1.00= b.Total fee not to exceed$1,000 2. ❑ all other ' projects a.feet of BVW x$1.00= J.Total fee not to exceed$1,000 State share of filing fee: 3. 1/2 of total fee less$12.50 ' City/Town share of filing fee: 4, 1/2 of total fee plus$12.50 ' WpaformIdoc•Appendix B•rev.9116103 Page 2 of 3 SALEM WILLOWS PARK SEAWALL IMPROVEMENT PROJECT SALEM, MASSACHUSETTS NOTICE OF INTENT 1 1 1 1 ATTACHMENT A PROJECT NARRATIVE 1 PROJECT NARRATIVE ' SEAWALL IMPROVEMENT PROJECT SALEM WILLOWS PARK SALEM,MASSACHUSETTS ' A. INTRODUCTION The project will consist of the repair and rehabilitation of approximately 440 total linear ' feet (LF) of the existing granite stone seawall located on Salem Harbor along the northwesterly shoreline of the Salem Willows Park (see Figure 1). The project is limited to the existing structure and all work will be maintained within its current footprint. The site is located in FEMA Velocity Zone V3. As such, this area is subjected to wave action and located within the 100-year coastal flood elevation (see Figure 2). The 100- ' year flood elevation is 12.0 feet NGVD. B. EXISTING CONDITIONS Based upon available records provided by the City, the existing granite stone seawall was originally constructed in 1931. The seawall was constructed to protect the upland area ' from erosion resulting from northeasterly storms. In August 2003, VAI conducted a visual inspection of the project area. The existing ' seawall was observed to contain areas with small and/or large voids as well as areas with mortar loss between stones. As a result of mortar loss and voids, sinkholes have propagated at various locations along the backwall of the structure, particularly within the mid-section of the wall. A granite stone knee wall extends approximately 65t LF along the face of the north end of the seawall. Since original construction photographs do not show the presence of a knee wall, it is assumed that these stones were installed at a prior ' time to help stabilize a previously compromised section of the seawall. Upon inspection, it was observed that areas of the knee wall contained shifted and/or settled stones. A deteriorated concrete footing, which appears to be the remains of an old stairway, abuts the north corner of the stone seawall. C. PROPOSED WORK All proposed work will be conducted within the current footprint as established by ' existing structures and will include the following work as described below and as shown in the attached plans: 1 Station 0+48 to Station 0+86 Work within the upper 4-feet of the wall will include the removal, resetting, and mortaring ' of stones and the installation of a new 12-inch thick, reinforced concrete cap. Existing Salem Willows Park-Seawall Improvement Project ' Salem,Massachusetts 1 ' backfill material will be removed and replaced with clean, free-draining granular material. Filter fabric will be installed along the backwall and limits of excavation to prevent the loss of backfill material. Weepholes will be installed 10-feet on-center below the concrete cap. The voids located in the lower wall section will be chinked and/or mortared, as required. Station 0+86 to Station 1+30 ' Backfill material will be excavated to a minimum depth of 3 feet behind the existing seawall and replaced with clean, free-draining granular material. Filter fabric will be ' installed along the backwall and limits of excavation to prevent the loss of backfill material. The top row of existing stones will be removed and replaced with a new 12-inch thick, reinforced concrete cap. All remaining stones will be chinked and/or mortared, as ' required. Weepholes will be installed 10-feet on-center below the concrete cap. Station 1+30 to Station 3+07 ' The existing granite stone wall will be removed and reconstructed. Work will utilize existing and supplemental stone and will include the installation of a reinforced concrete footing and a 12-inch, thick reinforced concrete cap. Existing fill will be removed and replaced with clean, free-draining granular material. Filter fabric will be installed along the backwall and limits of excavation to prevent the loss of backfill material. Weepholes ' will be installed along the top and bottom of the new wall and will be spaced 10-feet on- center. A new sub-drain system will be installed along the base of the backwall. The deteriorated 12-inch diameter, vitrified clay pipe existing at Station 2+80 will be removed and replaced. Station 3+07 to Station 3+30 ' Station 4+08 to Station 4+34 The existing granite stone knee wall located in front of the seawall will be removed and 1 reset. Voids existing in the seawall behind the knee wall will be filled with concrete. Backfill material will be excavated to a minimum depth of 3 feet behind the existing seawall and replaced with clean, free-draining granular material. Filter fabric will be installed along the backwall and limits of excavation to prevent the loss of backfill material. The top row of existing stones will be removed and replaced with a new 12-inch thick, reinforced concrete cap. Voids in the lower portion of the wall will be chinked ' and/or mortared, as required. Weepholes will be installed 10-feet on-center below the concrete cap. Station 3+30 to Station 4+08 Station 4+34 to Station 4+88 Backfill material will be excavated to a minimum depth of 3 feet behind the existing seawall and replaced with clean, free-draining granular material. Filter fabric will be installed along the backwall and limits of excavation to prevent the loss of backfill Salem Willows Park-Seawall Improvement Project ' Salem,Massachusetts 2 ' material. The top row of existing stones will be removed and replaced with a new 12-inch ' thick, reinforced concrete cap. All remaining stones, including the granite knee wall, will remain in-place and voids will be chinked and/or mortared, as required. Weepholes will be installed 10-feet on-center below the concrete cap. ' Station 4+88 to Station 5+00 ' The remnants of the stairway will be removed down to the sound concrete footing. The existing footing will be re-used to support a new low grade concrete retaining wall. ' The proposed work will stabilize and restore shoreline protection to the abutting parkland, help minimize scour and undermining along the base of the seawall as well as provide for the free draining of water from behind the seawall. D. WETLANDS PROTECTION ACT RESOURCE AREAS ' This project has been designed and will be constructed using the best available measures to minimize adverse impacts to the resource areas as defined by the Wetlands Protection Act. The following paragraphs will provide definitions of the wetland resource areas, ' potential impacts and proposed mitigation measures. 1. Coastal Beach (310 CMR 10.27) ' A coastal beach is defined as an area of"unconsolidated sediment subject to wave, tidal and coastal storm action, which forms the gently sloping shore of a body of salt water and includes tidal flats". This area will be temporarily impacted by the repairs and improvements made to the existing granite stone seawall. The proposed work is significant to storm damage prevention and flood control. This work will not adversely impact the beach's ability to respond to wave action. Mitigation Measures to minimize adverse impacts to this resource area include the ' following: • Work shall be coordinated during r ' g intervals of low wa ter.. The contractor-shall not leave equipment, materials debris, or any other item within the work area that will be affected by rising water. Work areas shall be left in a condition so that the rising water shall not cause any damage to on going work and adjacent existing areas. 1 • Contractor shall promptly remove and properly dispose of any debris or other ' excess materials within the designated work area. 1 2. Land Subject To Coastal Storm Flowage (310 CMR 10.27) Land Subject to Coastal Storm Flowage (LSCSF) is defined as "land subject to ' any inundation caused by coastal storms up to and including that caused by the Salem Willows Park-Seawall Improvement Project Salem,Massachusetts 3 ' 100-year storm, surge of record or storm of record, whichever is greater." The ' entire project site is within LSCSF, which will be temporarily impacted by work required to repair the seawall, install a new concrete cap, replace the existing 12- inch drain pipe, and install weepholes and the backwall subdrain system. This area ' is significant to storm damage prevention and flood control. The proposed work will not alter existing grades or drainage patterns. The proposed seawall repairs and drainage improvements will improve the land's ability to buffer storm waves. ' 3. Rocky Intertidal Shores ' Rocky intertidal shores are defined as the `naturally occurring rocky areas, such as bedrock or boulder-strewn areas between the mean high water line and mean low water line. Rocky intertidal shores are likely to be significant to storm damage prevention, flood control, protection of marine fisheries and wildlife habitat. No ' work is anticipated to occur within this resource area. ' 4. 100 Foot Buffer Zone The Buffer Zone is defined as that area of land extending 100 feet horizontally ' outward from the boundary of any resource area defined by the Wetlands Protection Act. Work to be performed in this area includes staging of construction equipment, material storage and excavation as required to reconstruct the seawall, revetments, and public access locations. All areas disturbed will be restored to their pre-construction conditions. 1 Salem Willows Park-Seawall Improvement Project ' Salem,Massachusetts 4 t SALEM WILLOWS PARK ' SEAWALL IMPROVEMENT PROJECT ' SALEM, MASSACHUSETTS NOTICE OF INTENT 1 1 1 1 ' ATTACHMENT B ABUTTER NOTIFICATION t 1 ' AFFIDAVIT OF SERVICE ' Under the Massachusetts Wetlands Protection Act And the Marshfield Wetland Protection By-law ' (to be submitted to Massachusetts Department of Environmental Protection and the Conservation Commission when filing a Notice of Intent) I, Christine M. Player, hereby certify under the pains and penalties of perjury that on ' APB' 2"40 , 2004 I gave notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter ' Notification dated April 8, 1994, in connection with the following matter: ' A Notice of Intent filed under the Massachusetts Wetlands Protection ' Act by the City of Salem Park & Recreation Commission with the City of Conservation Commission on JPR ri. 2�'O ,2004 for property ' at the Salem Willows Park for the repair and rehabilitation of the existing granite block seawall located to the northwest of Restaurant ' Row. The form of the notification, and a list of the abutters to whom it was given and their ' addresses, are attached to this Affidavit of Service. yC.lil i(.i ,:).HL.n.t`-1'1'j C.�' Name Date 1 ' NOTIFICATION TO ABUTTERS UNDER THE ' MASSACHUSETTS WETLANDS PROTECTION ACT ' In accordance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following: ' A. The name of the applicant is the City of Salem,Park &Recreation Commission. B. The applicant has filed a Notice of Intent with the Salem Conservation Commission seeking ' permission to repair and rehabilitate the existing granite block seawall in an Area Subject to Protection Under the Wetlands Protection Act(MGL Chapter 131, Section 40). C. The address of the lot where the activity is proposed is at the Salem Willows Park. D. The Notice of Intent may be examined at the Salem Conservation Commission Office, at 120 ' Washington Street, City Hall Annex. Information regarding the time, date and place of the public hearing may also be obtained from the Salem Conservation Commission, for information call (978) 745-9595 x303. E. Copies of the Notice of Intent may be obtained from the applicant's representative, Vine ' Associates, Inc. 190 Old Derby Street, Hingham, MA,by calling (781) 749-2530, between 9 AM and 5 PM Monday through Friday. ' NOTE: ' Notice of the public hearing, including its date, time, and place, will be published at least five (5) days in advance in the Salem Evening News - Legal Ad Section. Furthermore, notification will be posted in the City Hall not less than forty-eight (48)hours in advance. You also may ' contact your local Conservation Commission or the nearest Department of Environmental Protection Regional Office for more information about this application or the Wetlands Protection Act. To contact the Department of Environmental Protection, call: ' DEP-Northeast Region: (617) 654-6500 1 MCIPatriot Properties Salem 08/28/2003 RECEIVES Abutters fist 11:51:39AM - AUf DEPT OF PLANNING A -OMMUN®�TY DEVELOPMENT - s Filter Used: DataProperty.ParcellD='45-0089-O' OR DataProperty.ParcellD='45-0001-O'OR DataProperty.ParceIID='45-0002-0'OR DataProperty.ParmIID= '45-0003-0'OR DataProperty.ParcellD='45-0004-0.. - q a n � r 'r "�is * "� .>•n«s:--„ �x& ��' � .: �2' 5��� „£�,' £€ F.re �ze zt.'�y �" � x-x, u Page 1 of 1 ?arcellD Location Owner Co-Owner Mailing Address City State Zip 42-0020-0 100 MEMORIAL DRIVE SALEM CITY OF 42-0021-0 90 MEMORIAL DRIVE MACARTNEY WARREN MACARTNEY CLAIRE 82 MEMORIAL DRIVE SALEM MA 01970 42-0022-0 80 MEMORIAL DRIVE MOORE GEORGE L C/O POWERS MARY 11 STUART ROAD PEABODY MA 01960 42-0102-0 85 MEMORIAL DRIVE SALEM CITY OF NAUMKEAG CAMP MEMORIAL DRIVE SALEM MA 01970 45-0001-0 3 RESTAURANT ROW SALEM CITY OF 45-0002-0 190 FORT AVENUE SALEM WILLOWS YACHT CLUB IN P 0 BOX 143 SALEM MA 01970 45-0003-0 205 FORT AVENUE HOBBS EVERETT W 7 ISLAND AVENUE SALEM MA 01970 450004-0 197 FORT AVENUE WILLOWS REALTY TRUST YEE KWOK B 193 WINCHESTER STREET BROOKLINE MA 02146 45-0005-0 191 FORT AVENUE ZAK ENTERPRISES INC 2 BRENTWOOD DRIVE PEABODY MA 01960 45-0006-0 187 FORT AVENUE LINARDOS COSTAS 2 BRENTWOOD DRIVE PEABODY MA 01960 - 45-0007-0 183185 FORT AVENUE CAMPBELL REALTY TRUST CAMPBELL JOHN J TR 18 SUTTON AVENUE SALEM MA 01970 45-0008-0 177 FORTAVENUE GENGHIS SALEM,INC 177 FORT AVENUE SALEM MA 01970 45-0010-0 -159 FORT AVENUE HANSON KENNETH S DONNA M 159 FORT AVE SALEM MA 01970 45-0019-0 2 BAY VIEW AVENUE MAHONEY MATTHEW CARUSO-MAHONEY DOLO 2 BAY VIEW AVENUE SALEM MA 01970 45-0028-0 7 ISLAND AVENUE HOBBS EVERETT W PATRICIA A 7 ISLAND AVE SALEM MA 01970 45-0029-0 3 ISLAND AVENUE SOLOVICOS THEODORE JENNIE 3 ISLAND AVE. SALEM MA 01970 45-0030-0 1 ISLAND AVENUE BURNS MARY LOUISE 1 ISLAND AVE SALEM MA 01970 45-0031-0 4 SUTTON AVENUE WATSON ANDREA L 4 SUTTON AVE SALEM MA 01970 45-0032-0 2 SUTTON AVENUE NESTOR PAUL C/O MELIN SUZANNE 50 MOON ROAD LYNN MA. 01904 45-0059-0 4 BEACH AVENUE PELLETIER LEO 0 JOAN M - 4 BEACH AVE SALEM MA 01970 45-0060-0 1 BEACH AVENUE HENTOSH JOHN J MAUREEN F 1 BEACH AVE SALEM MA 01970 45-0061-0 3 BEACH AVENUE SULYNTY REALTY TRUST THE STOVER JUDITH TR 3 BEACH AVE SALEM MA 01970 45-0062-0 7 BEACH AVENUE ATKINS GERALDINE S SAVOY RICHARD E 7 BEACH AVE SALEM MA 01970 45-0089-0 200 FORT AVENUE SALEM CITY OF SALEM WILLOWS PARK MA 45-0090-0 167 FORT AVENUE CAMPBELL REALTY TRUST CAMPBELL JOHN J TR 18 SUTTON AVENUE SALEM MA 01970 45-0096-0 RESTAURANT ROW SALEM CITY OF PARK DEPARTMENT MA 45-0098-0 175 FORT AVENUE SIASIOS ARTHUR C/O CAPPYS 175 FORT AVENUE SALEM MA 01970 45-0100-0 195 FORT AVENUE ZAK ENTERPRISES INC 2 BRENTWOOD DRIVE PEABODY MA 01960 End of Report i 1 SALEM WILLOWS PARK ' SEAWALL IMPROVEMENT PROJECT ' SALEM, MASSACHUSETTS NOTICE OF INTENT 1 1 1 1 ' ATTACHMENT C PROJECT DRAWINGS 1 1