Loading...
27 SALEM ST - BUILDING INSPECTION Y • What is the current use of the Building? �Q� Material of Building? a`� If dwelling,how many units?. Will the Building Conform to Law? Asbestos?. Architeds Name Address and Phone l ) Mechanic's Name Address and Phone ll Construction Supervisors License 5 HIC Regis>fatbn f/ � Permit Fee Calculedw Estimated Cost 1OflProjed Ste_ Permit Fee S Estimated Cost X$71S1000 Residential Estimated Cost X S111S1000 CommerCW An Additional$5.00 is added as an Administrative charge. Make sure that all fields are properly and legibly written to avoid delays In proceeeing. The undersigned does hereby apply for a Building Permit to bull to the above stated specifications. Signed under penally of pe jury ,&=/= Date bl s4< N o � F Z ,� N a — - - - w 4- .� — -- ErrroF- PUBLIC PROPERTY DEPART1IEINT K1%QWA fiV ONSC aL MAWS 130 WASMNG nm SnLEfT 'y11iK%IASSAOA'St11S 01970 976749-9s"9 FAX 976740"" IR.APPLICATION FOR THE REPA RENOVATION. CONSTRUCTION. DEMOLITION. OR CHANGE OF USE OR OCCUPANCY, FOR ANY EXISTING, STRUCTURE OR BLTMDIING 1.0 SITE INFORMATION Location Name: Building: Property Address Property Is Waded in a;Conservation Area Y/jg Historic Dletrict Y/fl 2.0 OWNERSHIP INFORMATION 2.1 Owner of Land Name: Address: Telephone: 3.0 COMPLETE THIS SECTION FOR WORK IN EXIST G BUILDINGS ONLY Addition Existing Renovation Number of Stories Renovated Change in Use Now Demolition Existing Approximate year of Area per floor(so Renovated construction or renovation of existing building New Brief Description of Proposed Work: — - - -- Mail Permit to: JA ) j�,V�