Loading...
12 ROCKDALE AVE - BUILDING INSPECTION (3) • t[ T- q ck�' zrq '1 Z 'Z� The Commonwealth of Massachusetts RECEIy p FOR I—>G Board of Building Regulations and Standards INSPECTIONAL $ I�t >kLITY Massachusetts State Building Code,780 CMR U �— Building Permit Application To Construct, Repair,Renovate O}I C)isl eyes 5 i ar 2011 _^ One-or Two-Family Dwelling `� 1` J This Section For Official Use Only Building Permit Number: Date A lied: Building Official(Print Name) Signature - Date _^ SECTION 1:SITE INFORMATION 1 � �t8 Poec dd ess: 1 r Map&Parcel Numbers ic a`�e dve b 1Llla Its this an accepted street?yes no Map Number Parcel Number (Sa(' ng I—°�an t V Solar l b Yrogerty Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(it) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone? Municipal❑ On site disposal system ❑ Check if yes❑ SECTION 2: PROPERTY OWNERSHIP' 1 O per of Recgr cynt.7 Javernic& Salem, MA 01970 Name(Print) - City,State,ZIP 12 Rockdale Ave 9789797928 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building® Owner-Occupied ® Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ❑ Demolition ❑ 1 Accessory Bldg. ❑ Number of Units I Other ® Specify: Brief Description of Pro sed Work - ns a a ion o a sae an co a comp ian gridtiedSO ar system on an existing rest17.60 kW SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and Materials 1.Building $6,000 1. Building Permit Fee: $ Indicate how fee is determined: 2. Electrical $21,000 ❑Standard City/Town Application Fee ❑Total Project Cost'(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire Suppression) $ Total All Fees: $ 27 000 Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ ❑Paid in Full ❑Outstanding Balance Due: mfatt--�--"O Co SK¢�t..tn1� t0(20 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) CS-027047 Phil Chouinard License Number Expiration Date Name of CSL Holder U 124 Turnpike St. List CSL Type(see below) No. and Street Type Description W. Bridgewater MA 02379 U Unrestricted(Buildings up to 35,000 cu.ft. R Restricted 1&2 Family Dwelling City/Town,State,ZIP M Masonry RC Roofing Covering WS Window and Siding 7323543111 phuffmah@skylinesolar.net SF Solid Fuel Burning AppliancesI Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 172284 6/7/2016 Skyline Solar LLC Cory y�a ,q4 Rig HIC Registration Number Expiration Date HICC IUffl tnneJIHgUI[eistrantName p 1 V jc@skylinesolar.net less ridgewater, MA 02379 732-354-3111 Email address City/Town, State,ZIP Telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L. c. 152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .......... 12 No ........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Skyline Solar LLC to act on my behalf, in all matters relative to work authorized by this building permit application. Print Owner's Name(Electronic Signature) - Date SECTION 7b.OWNER` OR AUTHORIZED AGENT DECLARATION By entering my me be , hereby attest under the pains and penalties of perjury that all of the information contained in thi� ppl' ation s true and accurate to the best of my knowledge and understanding. 10/8/15 Print Owner' or' thorized A is Name(Electronic Signature) Date NOTES: I. An Ckwo who obtains a building permit to do his/her own work, or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A. Other important information on the HIC Program can be found at www.mass.eov/oca Information on the Construction Supervisor License can be found at www.mass.eov/dps 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" DEBRIS DISPOSAL AFFIDAVIT In accordance with the provisions of M.G.L. c. 40, s. 54, Building Permit # was issued with the condition that all debris resulting from this work shall be disposed of in a properly licensed solid waste disposal facility as defined by M.G.L c. 111, s. 150A. The debris will be disposed of in: E.O.M.S Name of Waste Facility 318 Manley Street West Bridgewater, MA 02720 Address of Waste Facility 111.5 Debris: As a condition of issuing a permit for the demolition, renovation, rehabilitation or other alteration of a building or structure, M.G.L. c. 40 s. 54 requires that the debris resulting therefrom shall be disposed of in a properly licensed solid waste disposal facility as defined by M.G.L.c. I I 1 s. 150 A. Signature of the permit applicant, date and number of the building permit to be issued shall be indicated on a form provided by the Building Department and attached to the office copy of the building permit retained by the Building Department. If the debris will not be disposed of as indicated, the holder of the permit shall notify the building official, in writing, as to the location where the debris will be disposed. 780 CMR—61" Edition r1 ig re of Permit Applicant 10/8/15 Date uocu Jign Cnveiope iu: [I /A-//4uay4'14141 sunGEVITY' Homeowner's Agent Authorization Form State of Massachusetts CYNTHIA D JAVERNICK and David McCarthy (print name) am the owner of the property located at address: 12 Rockdale Ave Salem MA 01970 (print address) 1 hereby authorize Sungevity or its subcontractor to act as my Agent for the limited purpose of applying for and obtaining local building and other permits from the Authority Having Jurisdiction as required for the installation of a Photovoltaic System located on my Property. aocuSignM hy: Customer Signature: �(,f.(Ni;g v jgvf'mcL a'l va4 htc(aril�y _ rnrgnze�nez__ Date: 8/26/2015 Print Name: CYNTHIA D JAVERNICK and David McCarthy Sungevlty MA Home Improvement Contractors Licen se # 168430 66 Franklin Street, Suite 310 R 510.496.5500 866.SUN.4ALL- Oakland,CA 94607 USA If 510.496.5501 www.iungevfty.com Nommmmommm�,=ZSTRU(TURALENGINEERS September 24, 2015 Sungevity �-NH of 6Lq 66 Franklin Streetq Oakland, CA 94607 PA K. TEL: (510)496-5621 ZACHER TRUCTURAL ti 50100 Subject: Structural Certification for Installation of Solar Panels o �isTE� Job Number: 20156184 Client: Javemick-2001933 ss/oNAL ' Address: 12 Rockdale Ave, Salem, MA 01970 Arm.: To Whom It May Concern, A field observation of the condition of the existing framing system was performed by an audit team from Sungevity. From the field observation of the property, the existing roof structure was observed as follows: The existing roof structure consists of composition shingles over plywood sheathing that is supported by 2x4 roof trusses at 24" on center at Arrays 1 &2. The rafters at all arrays are sloped at approximately 21 degrees and have a maximum projected horizontal span of 6'-3" at Array 1 and 6'-5" at Array 2 between load bearing supports. All attached structural calculations are based on these observations and the design criteria listed below: Design Criteria: • Applicable Codes= 2009 IBC, ASCE 7-05 and 2005 NDS • Ground Snow Load =45 psf • Roof Dead Load— 7.5 psf(All Arrays) • Basic Wind Speed= 110 mph Exposure Category C • Solar modules=as indicated in attached drawings. As a result of the completed field observation and design checks: • Arrays 1 &2 are adequate to support the loading imposed by the installation of solar panels and modules. Therefore, no structural upgrades are required. I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements in accordance with the 2009 IBC. If you have any questions on the above, do not hesitate to call. Prepared By: PZSE, Inc. —Structural Engineers Roseville, CA 8150 Sierra College Blvd, Suite 150—Roseville,CA 95661 —916.961.3960 p —916.961.3965—www.pzse.com STRU(TURALENGINEERS September 24, 2015 Sungevity 66 Franklin Street Oakland, CA 94607 TEL: (510) 496-5621 FAX: Attn.: To Whom It May Concern re: Job 20156184: Javernick- 2001933 The following calculations are for the Structural Engineering Design of the Photovoltaic Panels located at 12 Rockdale Ave, Salem, MA 01970. After review, PZSE, Inc. certifies that the roof structure has sufficient structural capacity for the applied PV loads. If you have any questions on the above, do not hesitate to call. Prepared By: PZSE, Inc. - Structural Engineers Roseville, CA �.SH OFMgS�. 9 PAUL K. ZACHER TRUCTURAL y 50100 POD /STE� SS/ONAV. 8150 Sierra College Boulevard,Suite 150 • Roseville,CA 95661 • 916.961.3960 P • 916.961.3965 • www.pzse.com 1 of 6 Gravity Loading Roof Snow Load Calculations p9=Ground Snow Load= 45 psf Ce=Exposure Factor= 0.9 (ASCE7-Table 7-2) C,=Thermal Factor= 1 (ASCE7-Table 7-3) 1= Importance Factor= 1 p,=0.7CeC,lp9 28psf (ASCE7-Eq 7-1) where pB<_20 psf, Pf min = I x pg= N/A min snow load Immsiope<is°I where pe>20 psf, Pf min =20 x I= N/A min snow load Imm slope<fs°I Therefore,p,=Flat Roof Snow Load= 28 psf ps=Cspi (ASCE7-Eq 7-2) Cs=Slope Factor= 1 ps=Sloped Roof Snow Load= 28.4 psf F PV Dead Load=3 psf(Pea Sungevity) F'�'�rRoof Dead Load(ARRAY 1) �� Composition Shingle 4.00 Roof Plywood 2.00 2x4 Top Chords @ 24"o.c. 0.73 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.27 Total Roof DL(ARRAY 1) _ 7.0 psf DL Adjusted to 21 Degree Slope 7.5 psf Roof Dead Load(ARRAY 2) Composition Shingle 4.00 Roof Plywood 2.00 2x4 Top Chords @ 24 o.c. 0.73 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.27 _ Total Roof DL(ARRAY 2) -7.0 psf . DL Adjusted to 22 Degree Slope 7.5 psf 2of6 Javernick Structural Calcs 1 Wind Calculations Per ASCE 7-05 Components and Cladding r'Input variables Wind Speed 110 mph Exposure Category C Roof Shape Gable/Hip Roof Slope 21 degrees Mean Roof Height 12 It Building Least Width loft Effective Wind Area 17.5 ft F-Design Wind Pressure Calculations Wind Pressure P=qh*(G*Cp) qh=0.00256*Kz*Kzt*Kd*VA2*I (Eq_6-15) Kz(Exposure Coefficient)= 0.85 (Table 6-3) Kzt(topographic factor)= 1 (Fig. 6-4) Kd(Wind Directionality Factor)= 0.85 (Table 6-4) V(Design Wind Speed)= 110 mph Importance Factor= 1 (Table 6-1) qh= 22.38 Standoff Uplik Calculations Zone 1 Zone 2 Zone 3 Positive GCp= -0.85 -1.45 -2.30 0.40 (Fig.6-11) Uplift Pressure= -19.02 psf -32.45 psf -51.47 psf 10.0 psf (Minimum) X Standoff Spacing= 4.00 4.00 4.00 Y Standoff Spacing= 3.25 3.25 3.25 Tributary Area= 13.02 13.02 13.02 Footing Uplift= -2481b -422lb -6701b Standoff Uplift Check- Maximum Design Uplift= -670 lb Standoff Uplift Capacity = 700 lb 700 Ib capacity>670 lb demand Therefore,OK Fastener Capacity Check Fastener= 1 -5/16"dia Lag Number of Fasteners= 1 Minimum Threaded Embedment Depth = 2.5 Pullout Capacity Per Inch= 2051b Fastener Capacity= 820 Ib 820 lb capacity>670 lb demand Therefore,OK 3of6 Javernick Structural Calcs 2 Framing Check (ARRAY 1) PASS w=78 plf Dead Load 7.5 psf PV Load 3.0 psf Snow Load 28.4 psf i` `° 2x4 Top Chords @ 24 o c 0 Governing Load Combo=DL+SL Member Span =6'-3" Total Load 38.9 psf Member-Properties Member Size S(103) 1(inA4) Lumber Sp/Gr Member Spacing 2x4 3.06 5.36 SPF#2 @ 24"o.c. Check'Bending Stress Fb(psi) = fb x Cd x Cf x Cr (NDS Table 4.3.1) 875 x 1.15 x 1.5 x 1.15 Allowed Bending Stress=1735.7 psi Maximum Moment = (wLA2)/8 = 379.883 ft# = 4558.59 in# Actual Bending Stress=(Maximum Moment)/S =1488.6 psi Allowed>Actual--85.8%Stressed -- Therefore,OK Check Deflection Allowed Deflection (Total Load) = L/180 (E= 1400000 psi Per NDS) = 0.416 in Deflection Criteria Based on = Simple Span Actual Deflection(Total Load) _ (5*w*LA4)/(384*E*I) = 0.356 in = U211 > U180 Therefore OK Allowed Deflection (Live Load) = U240 0.312 in Actual Deflection(Live Load) _ (5*w*LA4)/(384*E*I) 0.260 in U289 > U240 Therefore OK Check Shear Member Area= 5.3 inA2 Fv(psi)= 135 psi (NDS Table 4A) Allowed Shear = Fv*A = 709 lb Max Shear(V)=w*L 12 = 243 lb Allowed>Actual--34.4%Stressed -- Therefore,OK 4of6 Javernick Structural Calcs 3 Framing Check (ARRAY 2) PASS w=78 plf Dead Load 7.5 lost PV Load 3.0 psf Snow Load 28.4 psf Q� 2x4 Top Chords @ 24"o_c. O Governing Load Combo=DL+SL Member Span=6'-5" Total Load 38.9 psf Member Properties Member Size S(inA3) I(inA4) Lumber Sp/Gr Member Spacing 2x4 3.06 5.36 SPF#2 @ 24"o.c. Check Bending Stress Flo(psi)= fb x Cd x Cf x Cr (NDS Table 4.3.1) 875 x 1.15 x 1.5 x 1.15 Allowed Bending Stress= 1735.7 psi Maximum Moment = (wLA2)/8 = 400.413 ft# = 4804.96 in# Actual Bending Stress=(Maximum Moment)I S = 1569 psi Allowed>Actual-90.4%Stressed -- Therefore,OK Check Deflection Allowed Deflection(Total Load) = L/180 (E=1400000 psi Per NDS) = 0.427 in Deflection Criteria Based on = Simple Span Actual Deflection (Total Load) _ (5*w*LA4)/(384*E*I) = 0.396 in = L/195 > U180 Therefore OK Allowed Deflection(Live Load) = U240 0.32 in Actual Deflection (Live Load) _ (5*w*LA4)/(384*E*I) 0.289 in U267 > U240 Therefore OK Check Shear Member Area= 5.3 inA2 Fv(psi)= 135 psi (NDS Table 4A) Allowed Shear = Fv*A = 709 lb Max Shear(V)=w*L/2 = 250 Ib Allowed>Actual--35.3%Stressed -- Therefore,OK 5 of 6 Javernick Structural Calcs 4 L Lateral Per 2009 IBC Chapter 34 Existing Weight of Effected Building Level Area Weight(psf) Weight(lb) Roof 533 sf 7.5 psf 4001 lb Ceiling 533 sf 6.0 psf 3201 lb Vinyl Siding 128 it 2.0 psf 3076lb (8'-0"Wall Height) Int.Walls 128 ft 6.4 psf 9843 lb Existing Weight of Effected Building _ 20121 lb Proposed Weight of PV System Weight of PV System(Per Sungevity) 3.0 psf Approx.Area of Proposed PV System 524 sf Approximate Total.Weight of PV System 1572 lb 10%.Comparison 10%of Existing Building Weight(Allowed) 2012 lb Approximate Weight of PV System(Actual) 1572 lb Percentlncrease 7.8% 2012 lb>1572 lb,Therefore OK 6 of 6 Javernick Structural Calcs 5