Loading...
14 PLEASANT ST - BUILDING INSPECTION Rf.CE1VF� The Commonwealth of Massachusetts I SERVIUS I. Board of Building Regulations and Standards CITY OF�(S-qri�sEM Massachusetts State Building Code,780 CMR Building Permit Application To Construct, Repair,Renovate Or Demolish a n One-or Two-Family Dwelling nY This Section For Official Use Only Building Permit Number: Date plied: ' -lt 3�301 Building Official(Print Name) Signature Dat 1 SECTION 1: SITE INFORMATION 1.1 Property-Address: 1.2 Assessors Map &Parcel Numbers 14 Pleasant Street I.la Is this an accepted street'?ves no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property-Dimensions: Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: Outside Flood Zone? Public❑ Private❑ Check if yes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Record: ,toe Patti Salem, MA 01970 Name(Print) City,State.ZIP 14 Pleasant Street 978-741-4667 No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units Other 1N Specify: Solar Brief Description of Proposed Work`: Install 2.86 kw solar panels on roof.Will not exceed roof panel, but will add 6" to roof height. 11 panels total. SECTION 4:ESTIMATED CONSTRUCTION COSTS Estimated Costs: Item Official Use Only Labor and Materials) 1.Building $ 1,000 1. Building Permit'Fee: $ Indicate how fee is determined: 2_Electrical $ 10,000 ❑ Standard Citv/fown Application Fee ❑Total ProjecT Cost'(Item 6)x multiplier x 3_Plumbing $ 1 Other Fees: $ 4.Mechanical (FfVAC) .$ List: 5. Mechanical (Fire $ Su ression Total All Fees: $ Check No. Check Amount: Cash Amount: 6. Total Project Cost: $ 11,000 ❑Paid in Full ❑Outstanding Balance Due: 1 SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 103631 8/30/17 Gregg LaCasse License Number Expiration Date Name otCSL Holder List CSL`fype(see below) U 20 Patterson Brook Rd. Unit 1 No.and Street Type Description U Unrestricted(Buildings ue to 35,000 cu.ft. W.Wareham, MA 02576 R Restricted I&2 Family Dwelling Cih�Jonst,St to ZIP M Masonn RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances (508)291-0007 1 Insulation Telephone Email address 1) ion 5.2 Registered Home Improvement Contraggpr(HIC) I,`/y�Jq' 170355 10/1 Z17 Gregg LaCasse/Trinity Solar )„en7 HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 20 Patterson Brook Rd. Unit 1 No.and Street Email address W. Wareham, MA 02576 (508)291-0007 Citv/Town,State,ZIP Telephone SECTION 6: WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152. § 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..._..._1f No........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize Gregg LaCasse to act on my behalf,in all matters relative to work authorized by this building permit application. Please see attached letter. 3/23116 Print Owner's Name(Electronic Signature) Date; SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and aQctjoate to o best of my knowledge and understanding. Gregg LaCasse 3/23/16 Print Owner's or Authorized Agent's Name W etronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her oven work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HTC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A. Other important information on the HIC Program can be found at www.mass. ove /oca Information on the Construction Supervisor License can be found at www.masseov/dps 2. When substantial work is planned,,provide the information below: Total floor area(sq. ft) (including garage,, finished basement/attics.decks or porch) Gross living area('sq.ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of beating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" acoRO® CERTIFICATE OF LIABILITY INSURANCE DATE IMMIDDIYYYY) ��- 1 11/2/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Barbara Hayden NAME: y DITTMAR AGENCY PHONE (732)462-2343 1 ac No: (732)780-8414 78 Court Street EMAIL ADDRESS bahayden@ditt�rinsurance.com : P.O. BOX 1180 INSURERS AFFORDING COVERAGE NAICs Freehold NJ 07728 INSURER A:HDI-Geri ing America Insurance Co. INSURED INSURER B:LlO d's London Trinity Heating S Air Inc., DBA: Trinity Solar INSURERc:North River Insureance Co. BPTP Future Holdings, LLC INSURER D: 2211 Allenwood Road INSURER E: Wall Twp NJ 07719 1 INSURER F: COVERAGES CERTIFICATE NUMBER:2015-16 Liab Master REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. NSR TYPE OF INSURANCE ADD SUSR2= POLICY NUMBER sMIODYIYYYY MMIDDIY UP I'YY LIMITS TR X COMMERCIAL GENERALLIABILITY EACH OCCURRENCE $ 2,000,000 DAMAGE TO RENTED 500,000 A CLAIMS-MADE X OCCUR PREMISES Ea occurrence S EGOCC0o006S615 11/1/2015 11/1/2016 MED UP(Any one person) S PERSONAL B ADV INJURY $ 1,000,000 GEN L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE S 2,000,000 X POLICY❑ JF PRCT LOG PRODUCTS-COMPIOPAGG $ 2,000,000 OTHER: Employee Benefi6 S 1,000,000 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 2,000,000 Ea accident A X ANY AUTO BODILY INJURY(Per Person) S ALL OWNED SCHEDULED LA0CC000065715 11/1/2015 11/1/2016 BODILY INJURY(Per accident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE S HIRED AUTOS AUTOS Per accido. PIP-Extended $ 8,000 A UMBRELLA LIAR OCCUR F-1Ox00000065615 11/1/2015 11/1/2016 EACH OCCURRENCE $ 31000,000 Q X EXCESS LIAR CLAIMS-MADE AGGREGATE $ 3,000,000 DED RETENTION$ 1 15227985133 11/1/2015 11/1/2016 Limit x of$3,000,000 is 21,000,000 WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY STATUTE YIN ER ANY PROPRIETORIPARTNER,rEXECUTIVE ❑W NIA E.L.EACH ACCIDENT $ 1 000 000 (Mandatory in MEn NH)BER EXCLUDED?A EW000000056515 11/1/2015 11/1/2016 E.L.DISEASE-EAEMPLOYE $ 1,000,000 (Manda If yes,describe under DESCRIPTION OF OPERATIONS below EL.DISEASE-POLICY LIMITI 5 1,000,000 B Errors & Omissions FGIARK0201403 5/30/2015 5/30/2016 Per Occurrence $2,000,000 Pollution Liability Aggregate $2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Addhional Remarks Schedule,may be anached if more apace is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Trinity Heating S Air, Inc. THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN 20 Patterson Brook Road ACCORDANCE WITH THE POLICY PROVISIONS. Wareham, MA 02571 AUTHORIZED REPRESENTATIVE Bar]Dara Hayden/BP,H I ©1988-2014 ACORD CORPORATION. All rights reserved. l ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD INS025(201401) The Contmonivealth of Massachusetts Department of IndastrlalAceldents Wworkers' I Cotigress Street,Suite 100 Boston,MA 02114-2017 svirmittass.govIdra Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED KITH TIf$PER:M11Tr4NC AUTHORITY. Aonlicant Information .Please Print Leeibly Name (Busiuess/Orgmnl2ation/Individual}: Trinity Solar _ Address: 2211 Allenwood Road City/State/Zip: Wall, NJ 07719 Phone#: 732-780-3779 Are yea as employer?Check the appropriate has: Type of project(required): LVlam o employer ssith_3nn cmployccs(full and/orpan-time).' 7. ❑New Construction 2.❑lama sole pmpnetm nr partnership and have no employees working for me a, g- ❑Remodeling anycavacity.[No workers'comp.trisumnce requhed.i 9. El Demolition 3.❑I am ahomcmvner doing all work myself(Noworkers comp.insurmue requaed.l t 10❑Building addition 4.❑I am a hommwmer and svil I is hiring contractors to conduce all work on my property. 1 will emado that all connectors either have workers'compensation insurance or we sale I LVEleeirieal repairs or additions piopriewrs with ao employees. 12.❑Plumbing repairs or additions 5.❑1urn a general camhoclur and I have hired the sub-contnetors tilled on livanached sheet 13.❑Roof repairs These subcommctoe have employees and have workers'comp.insu ince.l 6.Q we are a corporation and its officers have exercised their right of exemption per M0L c. 14.❑Other_ 152,11(4)•and wa have no employees.INo workers'comp.insurance requited.] -Any applicant that checks box 0I must also fill out the section Maw showing theincorlim'compensation policy information. t Homeoivnms who submit(his affidavit indicating they are doing all work and died hire outside contractors must suhmil a nmv affidavil indicating such lContractots that check this box must anached an additional sheet shoving the dome of the sub-contrdoms;and slate whetter or not those entities have employees. If the sub-contractors have employees,they must provide their workers•comp.policy number. l ant an employer that is providing workers'compensnolon insurance for ray employees. Below Is the policy and job site information. Insurance Company Name: The Dittmar Agent Policy N or Self-ins,Lie,N: FNAir(`f'0000,65.61.5 Expiration Date: 1 1/1 11 6 Job Site Address: 14 Pleasant Street City/StatelZip: Salem,MA 01970 Attach a copy of file workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of investigations of the DIA for insurance coverage verification. do Irereb(•cerN y under the wins an�`dJpenpattles of perjury that the Information propided above is true and correct. Signature• .•f 7,f 7T.M j'Lpu Date: 3/23116 Phone N: offletat ase only. Do not write In this area,to be completed by cloy or town offlelal City or Town: PermitlLicense N Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: PhoneN: G C r ;1A : I G7ll/' CCG 1C C/' _ 'l/C 6%.l,it /_'f' /l.;.F/Ky !�. r n4 ;a Office of Consumer Affairs end Business Regulation 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 170355 Type: Supplement Card TRINITY HEATING & AIR, INC. Expiration: 1 011 2/2 01 7 -- GREGG LAEASSE— 20 PATTERSON BROOK ROAD UNIT 10 — --- WEST WAREHAM, MA 02576 Update Address and return card.Mark reason for change. SCA i 0 20M 35111 j Address Renewal Employment U Lost Card iK..J)N.....f!/.///4 'Ce Of Cansamer ARNIr9&Business Regulation License Or registration valid for IndlVldnl use Only ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation Registration: 170355 TYPO 10 Park Plaza-Suite 5170 Expiration: 10112/2017 Supplement Card Boston,MA 02116 TRINITY HEATING&AIR;INC. GREGG LACASSE \ 20 PATTERSON BROOK ROAD WTEV WAREHAM, MA 02576 Undersecretary N tva L ',th0ut si store Massachusetts Department of Public Safety ®i Board of Building Regulations and Standards License: CS-103631 Construction Supervisor GREGG LACASSE' a..- 14 PINE ISLAND RDp MATTAPOISETTMA - ( -JZZK r •Expiration: .Commissioner 09/30/2017 DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Stc,475, Houston.TX 77046 S u 1 y�t 1 It y�/'�Jva 3' 281985.9900 www.sunnova.com SUMMARY Homeowner Name and.4dd,e s Co-Owner Name(if An}) installation Location Connacr r lnRmnanon and License Joe Patti 14 PLEASANT ST SALEM, Trinity Solar 14 PLEASANT ST MA 01970-3824 2211 Allenwood Rd SALEM, Wall,New Jersey 07719 MA 01970-3824 License MA-170355 NY-52821 NY- Cnmrnct ID H2409780100 NJ- IK000932593 13VH01244300 MD-109285 Estimated Solar Energy Production Estimated First Year Annual Production: 3,626 kWh Estimated Initial Tenn Total Production: 85,432 kWh Payment Terms Amount Due at Contract Signing: $0.00 Installation Fee: $0.00 Annual Increase of Solar Energy Rate: 2.9%/year First Year Solar Energy Rate, if paid by ACH: SO.120/kWh First Year Solar Energy Rate, if not paid by ACH: $0.132/kWh Monthly Bill in First Year, if paid by ACFI: $36.26/month Monthly Bill in First Year, if not paid by ACH: $39.89 i month 1. Introduction. month. We refer to this period of time as the"Tent." The Term begins on the Interconnection Date. The This Power Purchase Agreement(this"Power Purchase "Interconnection Date" is the date that the System is turned Agreement"or"PPA")is the agreement"Power between you and S on and generating power. Sunnova will notify you by email unnova Energy Corporation(together with its successors and assigns,"Sunnova"or"we"),covering the sale to you when the System is ready to be armed on. of the power produced by the solar panel system(the "System")described below. Sunnova agrees to sell to you, 3. Power Purchase Agreement Paymeots; Amounts. and you agree to buy from Sunnova.all of the power produced by the System on the terms and conditions (a) Power Price. are purchasing the power the described in this Power Purchase Agreement. The System System producees.s. The price of that power is set forth on the`Value Statement"attached as Schedule A. will be installed by Sunnova or a contractor acting on Sunnova's behalf at the address you listed above. This Power Purchase Agreement will refer to this address as the (b) Payments. Schedule A details,among other things, "Property"or your"Home." Sunnova provides you with a (i)the price per kWh you will be charged per Year; Limited Warranty(the"Limited Warranty"). The Limited (h) the annual price per kWH percentage increase(if Warranty is attached as Exhibit 1. This is a legally binding any);(iii) Sunnova's estimate of the power that is expected to be produced by the System during the agreement with disclosures required by Law, so please read first Year;(iv) Sunnova's estimate of the amount of everything carefully. If you have any questions regarding this Power Purchase Agreement,please ask your Sunnova power that is expected to be produced by the System sales consultant. Note that references in this PPA to the over the entire Term(excluding any renewal term"day"means a calendar day. period(s)extending the Term as provided in Section t 0); and(v)your Monthly Payment amount for the 2. Perm. first Year. Your"Monthly Payment" is calculated based on the following: (A)the annual price per Sunnova agrees to sell you the power generated by the kWh multiplied by(B)the estimated kWh output per System for 25.00 years(300nionths), plus, if the Year("Estimated Annual Production")divided by Interconnection Date is not on the first day of a calendar (C)twelve(12). Each Monthly Payment is due on month,the number of days left in that partial calendar the seventeenth(17th)calendar day of the month for Contract ID: IK000932593 'c 20082015 Sunnova[netgy Gorpoiation.All Rights Reserved. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 10 East Greeuway Plaza Ste 475, Houston.TX 77046 S U n nt lva r 281.9U9900 www.sumrova.coni tire previous calendar month unless it is not a by more than 110%of the Estimated Annual business day,in which event,the Monthly Payment Production for the first Year. for such month will be due on the first business day after the seventeenth calendar day of such month. (d) Pavment Reconciliation. if(i)the System is off line Any payments due upon instal lation are due for more than seven(7)full twenty-four(24)hour immediately prior to commencement of installation. days cumulatively during the Tenn(for example, You will not make a Monthly Payment if you fully you remove the System to do renovations to your prepay this PPA as provided in Section 4(p. Home);or(ii)you take some action that significantly reduces the output of the System;or(iii)you don't (c) Yearly Adjustment to Monthly Payment(s)& trim your bushes or trees to their appearance when Estimated Annual Production. You will have regular you signed this PPA to avoid foliage growth from access to information on the System's actual output shading the System, then Sunnova will reasonably via your Sunnova online account The actual kWh estimate the amount of power that would have been output per Year("Actual Annual Production")may delivered to you during such outages or reduced vary from the Estimated Annual Production due to production periods and shall treat this reasonable weather and other conditions. You agree that the estimate as part of the Actual Annual Production for exclusive means to monitor and measure the Actual - that Year for purposes of this paragraph. You will Annual Production is via the System's meter; not be charged for the System being off line due to provided,however, if the System's meter Summer's fault,or if it's due to grid failure or power malfunctions or becomes inoperable,Sunnova will outages caused by someone other than you. reasonably estimate the amount of power that would have been delivered to you during the period in which the System's meter was malfunctioning or inoperable and shall treat this reasonable estimate as 4. Power Purchase Agreement Obligations. part of the Actual Annual Production for that Year for purposes of this paragraph. Your Monthly (a) System,Home and Property Maintenance Payment may adjust each Year if(i)there is a price You agree to: per kWh annual increase during the Term as set forth in Schedule A and/or(ii)Actual Annual Production (i) only have the System repaired pursuant to varies from the Estimated Annual Production as set the Limited Warranty and reasonably forth on Schedule A. After the end of each Year cooperate when repairs are being made; during the Tenn, Sunnova will notify you of the Actual Annual Production for the previous Year and (ii) keep trees,bushes and hedges trimmed so of any adjustment to the Estimated Annual that the System receives as much sunlight as Production and Monthly Payments for the current it did when Sunnova initially installed the Year and thereafter. If the Actual Annual Production System; is less than the Estimated Annual Production for the previous Year,Sunnova(it will pay you an amount (iii) keep the panels clean, pursuant to the equal to the difference between the Estimated Limited Warranty and the Guide(as such Amoral Production and the Actual Annual term is defined in Exhibit 1); Production("Overestimate of Production") multiplied by the annual price per kWh for that Year (iv) not modify your Home in a way that shades (including any annual kWh price percentage increase the System; previously agreed upon as provided in Schedule A) and(it) may,at its option,decrease the Estimated (v) be responsible for any conditions at your Annual Production and the Monthly Payments for Home that affect the installation(e.g., the current Year. If the Actual Annual Production is blocking access to the roof,or removing a more than the Estimated Annual Production for die tree that is in the way,prior work you have previous Year, Sunnova may,at its option,(i)apply done on your home that was not permitted); the difference between the Actual Annual Production and the Estimated Annual Production to an (vi) not remove any markings or identification Overestimate of Production for the current Year or a tags on the System; subsequent Year and/or(ii)increase the Estimated Annual Production and the Monthly Payments for [vii) permit Sunnova, after we give you the current Year and thereafter. In no event shall reasonable notice,to inspect the System for Sunnova increase the Estimated Annual Production Contract ID:IK000932593 2 C 2008-20I5 Sunn...41 P:nergy C'orporatlon,Ail Rights Reserved. DocuSign Envelope ID:9F71 B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475, Houston.Tk 77046 Sun nt va r 281,985.9900www.sunnova.com proper operation as we reasonably (vi) insure the System against all damage or loss determine necessary; unless(A)that damage or loss is caused by your negligence; m (B)you intentionally (viii) use the System primarily for personal, damage the System; family or household purposes,but not to heat a swimming pool, and not to provide (vii) repair the System pursuant to the Limited power to any property outside of your Warranty and reasonably cooperate with Home; - you when scheduling repairs; (ix) not do anything,permit or allow to exist any (viii) create a priority stream of operation and condition or circumstance that would cause maintenance payments to provide enough the System not to operate as intended at the cash now in our financing transactions to Property; pay for the Limited Warranty obligations and the repair and maintenance of the (x) notify Sunnova if you think the System is System in accordance with this PPA even if damaged or appears unsafe; if the System is Sunnova ceases to operate; stolen;and prior to changing your power supplier; (ix) not put a lien on your Home or Property: and (xi) have anyone who has an ownership interest in your Home sign this Power Purchase (x) install, operate and maintain the System in Agreement;and accordance with applicable net metering and interconnection laws. (xii) return any documents we send you for signature(like incentive claim forms) (c) Home Renovations or Repairs within seven(7)days of receiving them: If you want to make any repairs or improvements to and the Property that could interfere with the System (xiii) authorize Sunnova to make inquiries (such as repairing the roof where the System is concerning your credit history and standing located),you may only remove and replace the System pursuant to the Limited Warranty. from time to time. (d) Automatic Payment, Fees;Late Charges In addition to the other amounts you agree to pay in (b) System Construction,Repair,Insurance and this Power Purchase Agreement,you agree to pay the Sunnova's obligations: following: Sunnova agrees to cause our contractors to: (i) Automatic Payment Discount: All prices include a ten percent(10%)monthly (i) schedule the installation of the System at a discount for using automatic payment. You mutually convenient date and time; will not receive a ten percent(10/o) monthly discount if you do not shake (ii) construct the System according to written automatic Monthly Payments through your plans you review; checking or savings account; (iii) provide you with a meter to accurately (n) Late Payments: accrue interest at the measure the amount of power the System lesser of twelve percent(12/r)annually delivers to you; or the maximum allowable rate by applicable law beginning on the sixteenth (iv) notify you if the System design has to be (16th)day after the date the payment was materially changed so that you can review due and continuing until paid in full; and any such changes; (ili) Returned Check,Fee: $25.00(or such lower (v) clean up after ourselves during the amount as required by law)for any check or construction of the System withdrawal right that is returned or refused ' by your bank; and. Contract 11): IK000932593 .. LS 2008-2111J Sunnova lineryy Cnq,or�fion.All Rib�ta Reserved. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475, Houston,TX 77046 S U n nt Jva 'r 281.985.9900www.sunnova.eom (iv) Product Change Fee: if after you sign this days after this Power Purchase Agreement Power Purchase Agreement, but before we expires to provide Sumnova with time to begin installation, you decide you would remove the System at the end of the Power prefer an alternative Sunnova product you Purchase Agreement Sunnova shall will pay a$250 change fee. provide you with reasonable notice of its need to access the Property whenever (e) Estimated'raxes conurneciallyreasonable. You agree to pay any applicable Saks or use taxes on (ii) During the time that Sunnova has access the Monthly Payments(or prepayment,as rights you shall ensure that its access rights applicable)clue under this PPA. If this PPA contains are preserved and shal I not interfere with or a purchase option,you agree to pay any applicable permit any third party to interfere with such tax on the purchase price for the System. You also rights or access. You agree that the System agree to pay as invoiced any applicable personal is not a Fixture,but Sunnova has the right to property taxes on the System that your local file any UCC-1 financing statement or jurisdiction may levy. The total estimated amount fixture filing that confirms its interest in the you will pay for taxes over the Tenn is$0.00 System. assuming that tax rates stay the same as they are on the date of this PPA. to the event the tax rates (h) Indemnity change during the Term that amount will change. To the littlest extent permitted by law,you shall (f) No Alterations indemnify,defend, protect, save and hold harmless Sunnova,its employees,officers,directors,agents, You agree that you will not make or allow any other successors and assigns from any and all third party party to make any modifications,improvements, claims,actions,costs,expenses(including attomeys' revisions or additions to the System or take any other fees and expenses).damages, liabilities,penalties, action that could void the Limited Warranty on the losses,obligations, injuries,demands and liens of System without Sunnova's prior written consent. If any kind or nature arising out of,connected with, you make or allow any other party to make any relating to or resulting from your negligence or modifications,improvements,revisions or additions willful misconduct;provided,that nothing herein to the System,they will become part of the System shall require you to indemnify Sunnova for its own and shall be Sunnova's property. negligence or willfid misconduct. The provisions of this paragraph shall sunive termination or expiration (g') Access to the System of this Power Purchase Agreement. (I) You grant to Sunnova and its employees, agents and contractors the right to (I) Payments reasonably access all of the Property as necessary for the purposes of(A)installing, Schedule A describes your payment obligations constructing,operating,owning, repairing, under this PPA. SUBJECT TO SECTION 3(b) removing and replacing the System or ABOVE.YOU AGREE THAT THE OBLIGATION making any additions to the System or TO PAY ALL PAYMENTS AND ALL OTHER installing complementary technologies on AMOUNTS DUE UNDER THIS PPA SHALL BE or about the location of the System; (B) ABSOLUTE AND UNCONDITIONAL UNDER enforcing Sunnova's rights as to this Power ALL CIRCUMSTANCES AND SHALL NOT BE Purchase Agreement and the System;(C) SUBJECT TO ANY ABATEMENT,DEFENSE, installing,using and maintaining electric COUNTERCLAIM, SETOFF, RECOUPMENT OR lines and inverters and meters, necessary to REDUCTION FOR ANY REASON interconnect the System to your electric WHATSOEVER,IT BEING THE EXPRESS system at the Property and/or to the utility's INTENT OF THE,PARTIES THAT ALL electric distribution system;or(D)taking AMOUNTS PAYABLE BY YOU HEREUNDER anv other action reasonably necessary in SHALL BE,AND CONTINUE TO BE,PAYABLE connection with the construction. IN ALL EVENTS INCLUDING BY YOUR HEIRS installation,operation, maintenance, AND ESTATE AND.EXCEPT AS SET FORTH removal or repair of the System. This access BELOW IN SECTIONS 5 AND 25, YOU HEREBY right shall continue for up to ninety(90) WAIVE ALL RIGHTS YOU MAY HAVE TO REJECT OR CANCEL THIS PPA,TO REVOKE Contract ID: B0000932593 4 2008-201,Sumwca Energy CorporntiAn,All Rights Reser,tA. DocuSign Envelope ID:9F71B70E-76Ct-4C76-A01,5-51C2AA9277C3 sun20 East Grecuway Plaza Ste 475, Houston.TA 77046 ��va i _81_985.9900 www.sunnova.com ACCEPTANCE OF THE SYSTEM,OR TO than the Actual Post-Prepayment Production,you GRANT A SECURITY INTEREST IN THE will owe nothing to Sunnova. SYSTEM. (j) Option to Prepay all Payments Remaining on the 5. Conditions Prior to Installation of the System; Chance PPA Orders. You may prepay all payments remaining on this PPA (a) Sunnova's obligation to install the System and sell at any time provided you notify Sunnova of your you the power it produces is conditioned on the desire to prepay. The amount you prepay will be following items having been completed to its based on the following:(i)all accrued but unpaid reasonable satisfaction: Monthly Payments,taxes,late charges,penalties, interest and all or any other sums then accrued or due (i) completion of(A)the engineering site audit and owing,plus('ii)the amount set forth on Schedule (a thorough physical inspection of the A in the column titled"Prepay Option,"which Property, including,if applicable, amount may be adjusted at the time of prepayment to geotechnical work),(B)the final System reflect Sunnova's estimate of the kWh output per design,and(C)real estate due diligence to Ycar from the time of prepayment to the end of the confirm the suitability of the Property for Tenn("Estimated Post-Prepayment Produc(ion")and the construction,installation and operation discounted to present value at 5%per annum,plus of the System; (in)reasonable compensation,on a net after tax basis assuming a tax rate of 35%, for the loss or recapture (ii) approval of this Power Purchase Agreement of(A)the investment tax credit equal to thirty by Sutmova's financing sources; percent(30%)of the System cost, including installation;and(B)accelerated depreciation over (iii) your meeting Strutova's credit underwriting five(5)years equal to eighty five percent(85%)of criteria then in effect; the System cost, including installation,and for the loss of any anticipated benefits pursuant to Section 8 (iv) confirmation of rebate, tax credit and of this PPA(Sunnova shall furnish you with a detailed calculation of such compensation if such a renewable energy credit payment claim is made). After you notify Sunnova of your availability in the amount used to calculate desire to prepay,Sunnova will provide a notice to the Monthly Agreement; you ("Prepayment Notice')informing you of the Power Purchaasee set forth in this A Aggree Estimated Post-Prepayment Production and the (v) confirmation that Sunnova will obtain all amount you need to pay to prepay the PPA(the "Prepayment Amount)". The Prepayment Amount is applicable benefits referred to in Section 3; due within fifteen(15)days Front the date of the Prepayment Notice.After you timely pay the (0) receipt of all necessary zoning,land use and Prepayment Amount in full,you will not make any building permits;and further Monthly Payments. At the end of the Term, Sunnova will notify you of the actual kWh output per (vii) completion of any renovations, Year from the date of your prepayment to the end of improvements or changes reasonably the Term("Actual Post-Prepayment Production"). required at your Home or on the Property If,at the end of the Term,the Estimated Post- (e.g..removal of a tree or necessary roof Prepayment Production is greater than the Actual repairs to enable us to safely install the Post-Prepayment Production, Sunnova will pay you, System). the homeowner who prepaid this PPA,within sixty (60)days after the end of the Term an amount equal Sunnova may tetminate this Power Purchase to the difference, if any,between the Actual Post- Agreement without liability if,in its judgment,any Prepayment Production and the Estimated of the above listed conditions will not be satisfied for Prepayment Production multiplied by the price per any reasons. Once Sunmova starts installation.. kWh at the end of the Term(a"Prepayment however,it may not terminate this Power Purchase Rebate"). Sunnova will send the Prepayment Rebate Agreement for your failure to satisfy the above listed to the last address we have for you in our file and it conditions. is your responsibility to notify Sunnova if you move. If the Estimated Post-Prepayment Production is less (b) Amendments;Your Right to Terminate for Material Changes Before installation. Contract ID: IK000932593 5 e 2008-201,Sunno%e Energy Corporation.All Right.Reser,cxt. DocuSign Envelope ID: 9F71B70E-76C1-4C76-A0I 6-51C2AA9277C3 1_0 East Ureenway Plaza Ste 475, Houston,TX 77046 Sun na va 28i.985.9900wvw.sunnova.com Both parties will have the right to terminate this generated from the System. You shall at all times keep the PPA,without penalty or fee, if Sunnova determines System free and clear of all liens. claims, levies and legal after the engineering site audit of your Home that it processes not created by Sunnova,and shall at your expense has misestintated the System's annual production by protect and defend Sunnova against the same. more than ten percent(10%). Such tetntination tight will expire at the earlier of(i)one(1)week prior to YOU UNDERSTAND AND AGREE THAT ANY AND the scheduled System installation date and(ii)one ALL(i)TAX CREDITS(it)TAX INCENTIVES,(iii) (1)month after we inform you in writing of the RENEWABLE ENERGY CREDITS, GREEN TAGS,OR revised production estimate. If neither party CARBON OFFSET CREDITS, (iv)UTILITY REBATES, exercises their right to terminate this PPA following OR(v)ANY OTHER NON-POWER ATTRIBUTES OF a ten percent(10%)change in the System's THE SYSTEM ARE THE PROPERTY OF AND FOR production.then any changes to the System will be THE BENEFIT OF SUNNOVA,USABLE AT ITS SOLE documented in an amendment to this PPA. You DISCRETION. SUNNOVA SHALL HAVE THE authorize Sunnova to make corrections to the utility EXCLUSIVE RIGHT TO ENJOY AND USE ALL SUCH paperwork to conform to this PPA or any BENEFITS, WHETHER SUCH BENEFITS EXIST NOW amendments to this PPA we both sign. OR IN THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING INTO ANY AGREEMENT WITH 6. Warranty- YOUR UTILITY THAT WOULD ENTITLE YOUR YOU UNDERSTAND THAT THE SYSTEM IS UTILITY TO CLAIM ANY SUCH BENEFITS WARRANTED SOLELY UNDER THE LIMITED RETAINED BY COOPERSUNNOVATE YOU AGREE TO WARRANTY ATTACHED AS EXHIBIT 1,AND THAT REASONABLY COOPERATE WITH EDITS,SUN`N VA SO THERE ARE NO OTHER REPRESENTATIONS OR THAT Cl'MAY CLAIM CREDNY ITS. X.CREDITS, W-ARRANTIES,EXPRESS OR IMPLIED,AS TO THE RENEWABLE ENERGY CREDCfS,REBATES, CARBON OFFSET CREDITS OR ANY OTHER MERCHANTABILITY,FITNESS FOR ANY PURPOSE. DE CONDITION,DESIGN,CAPACITY. SUITABILITY OR TO THE FROM.THE SYSTEM. Y L MAY ENTERING PERFORMANCE OF THE SYSTEM OR ITS TO THE EXTENT ALLOWABLE BYLAW,ENTERING INSTALLATION.THE WARRANTY SET FORTH INTERCONNECTION CONET NETT ON AGREEMENTS. 'O E .TION AGREEMENTS AND FILING HEREIN REPRESENTS THE SOLE AND EXCLUSIVE INTERG BL C REMEDY YOU HAVE AGAINST SUNNOVA RENEWABLE ENERGY/CARBON OFFSET CREDIT RELATING TO THE;SYSTEM OR THE.POWER REGISTRATIONS AND/OR.APPLICATIONS FOR FEDERAL, STATE OR LOCAL PURCHASED THEREUNDER. REBATES FROM THE FEDERAL,GOVERNMENT OR A LOCAL UTILITY AND GIVING THESE TAX CREDITS, RENEWABLE 7. Transfer. ENERGY/CARBON CREDITS, REBATES OR OTHER BENEFITS TO SUNNOVA. Sunnova works with banks,companies and other financing patties to finance the System. As a result, Sunnova may 9. Purchasine the Svstem Prior to the End of the Term. assign this PPA to one of its financing parties.In addition, Sunnova may assign this PPA to its affiliates or a third In addition to purchasing the System at the end of the Term party that purchases the PPA. You agree that Sunnova may (see Schedule A),you have the option to purchase the pledge,assign,sell or transfer the System and this Power System prior to the end of the Term. To exercise this Purchase Agreement,or any part of this Power Purchase option you must be in good standing under this Power Agreement or the exhibits,without your consent. Purchase Agreement and you need to give us at least one Assignment,sale or transfer generally means that Sunnova (1)month's,but not more than three(3)months' prior would transfer all or a portion of its rights and certain of its written notice. You can purchase this Svstem: obligations under this Power Purchase Agreement to (i) on the five(5)year anniversary of the another patty. beginning of the Term and every annual anniversary after the five(5)year anniversary;and 8. Ownership of the Svstem;Tax Credits and Rebates. (ii) at any time after the five(5)year anniversary of the beginning of the Tenn, You agree that the System is and shall remain Sunnova's - when you sell your Home;and exclusive personal property under the Uniform Commercial (iii) if Sunnova ever ceases its operations. Code or otherwise. You understand and agree that this PPA In each of('i), (it)and(iii)above,the price you will pay for is not a contract to sell or lease the System to you. Sunnova the System will be the greater of the System's fair market owns the System for all purposes, including any data value("FMV")and the amount shown on Schedule A. The Contract ID: IK000932593 (i 02008-201 i Sonno-od E]tergv Corporation.All Rights Reserved. DocuSign Envelope ID:9F7l B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475, Houston,TX 77046 S u n nonva 'r 291.985.9900wwxc.surmova.com interests of any financing party shall not be taken into obligations under this Power Purchase account when determining the FMV;a third party Agreement. independent appraiser will be retained to compute the System's FMV. Sunnova's maintenance and repair (ii) Move the System to Your New Hume obligations will end when you purchase the System unless you enter into a new maintenance and repair agreement If you are moving to a new home in the same with Sunnova,provided that you will have no less than a utility district, where permitted by the local ten(W)year warranty on the System beginning on the utility,the System can be moved to your new Interconnection Date that guarantees that the System will be home pursuant to the Limited Warranty. You free from defects in workmanship or defects in,or will need to pay all costs associated with breakdown of,materials or components. relocating the System,execute and provide the same access and ownership rights to Sunnova 10. Renewal. as provided for in this PPA and provide any third party consents or releases required by Ifyou are in compliance with your PPA,you have the Sunnova in connection with the substitute option to renew your PPA for up to ten (10)years in two(2) premises. consecutive five(5)year renewal periods. We will send you renewal farms at least ninety(90)days prior to the (iii) Prepay this Power Purchase Agreement expiration of the Term, which forms shall set forth the new and Transfer only the Use of the System rates per kwh applicable for the renewal term as well as the rates applicable in the event the PPA is renewed for one(1) You can prepay this Power Purchase year as provided for herein. The renewal farms will give Agreement as set forth in Section 4(J).The you the option to:(a)elect to renew the PPA for are Person buying your Home will only need to additional five(5)year term at the rates specified in the sign a transfer agreement to assume your renewal notice,or(b)elect not to renew the PPA. You must rights and non-Monthly Payment obligations make your election whether to renew or not at least thirty under this PPA in substantially the same form (30)days prior to the end of the then current term ofthe as Exhibit 3 to this PPA ('a"Transfer PPA. In the event that you affirmatively elect not to renew Agreement"). this PPA as provided for in part(b)above this PPA shall expire by its terms on the expiration of the then current (b) You agree to give Sunnova at least fifteen(15)days term. If you don't send us anything in writing you will be but not more than three(3)months' prior written deemed to have renewed for an additional one(1)year term notice if you want someone to assume your PPA at a rate which equals the rate per kwh applicable at the obligations. in connection with this assumption, expiration of the then current term plus two point nine you,your approved buyer and Sunnova shal I execute percent(2.9%)and this PPA shall continue to renew for a Transfer Agreement. Unless we have released you additional one(1)year terms on the above described rate from your obligations in writing,you are still terms until(i)you give us notice at least thirty(30)days responsible for perforating under this PPA. If your prior to the expiration of the then current term that you do buyer defaults on this PPA and we have not yet not wish to renew;or(h) we seed you a notice terminating signed theTransfer Agreement,you will be the PPA at least thirhv(30)days prior to the expiration of responsible for their default. We will release you the then current term. from your obligations under this PPA in writing once we have a signed Transfer Agreement with the 11. Selling Your Horne. person buying your Home(provided such person has been approved as a transferee by Sunnova in (a) If you sell your Home you can: writing). (i) Transfer this Power Purchase Agreement (e) If you sell your Home and can't comply with any of and the Monthly Payments the options in subsection(a)above,you will be in default under this Power Purchase Agreement. If the person buying your Home meets Section 11(a)me]tides a Home sale by your estate or Sunnov-a's credit requirements,then where heirs. permitted by the local utility,the person buying your Home can sign a transfer (d) EXCEPT AS SET FORTH IN THIS SECTION, agreement assuming all of your rights and YOU WILL NOT ASSIGN,SELL,PLEDGE OR IN ANY OTHER WAY TRANSFER YOUR. Contract ID: IK000932593 C 200E-201,Sn1111OV8 Energy Corporation.All Rights Reserved. DocuSign Envelope ID:9F71 B70E-76Ct-4C76-A015-51C2AA9277C3 20 East Grecuway Plaza Ste 475 Houston,TX 770,46 S U I 1 nt Iva t 28L985.9900wwNv.sunnova.com INTEREST IN THE SYSTEM OR THIS PPA (a) you tail to make any payment when it is due and WITHOUT OUR PRIOR WRLTTEN CONSENT, such failure continues for a period often(10)days; WHICH SHALL NOT BE UNREASONABLY WITHHELD AS LONG AS YOU AND THE (b) you fail to perform any material obligation that you PROPOSED TRANSFEREE MEET THE OTHER have undertaken in this PPA(which includes doing REQUIREMENT'S SET FORTH HEREIN. something you have agreed not to do,-like alter the System)and such failure continues for a period of fourteen(14)days after written notice; 12. Loss or Damage. (c) you or your guarantor have provided any false or Unless you are negligent or you intentionally damage misleading financial or other information to obtain the System, Sunnova will bear all of the risk of loss, this Power Purchase Agrecmem; damage,theft,destruction or similar occurrence to any or all of the System. (d) you assign,transfer,encumber, sublet or sell this PPA or any part of the System without Sunnova's In the event you are negligent or intentionally prior written consent;or damage the System you shall be liable to pay Sunnova the greater of(a)the actual damages (e) you or any guarantor makes an assignment for the suffered by Sunnova;or(b)the amount determined benefit of creditors, admits in writing its insolvency, in Section 4(1). Except as expressly provided in this files or there is filed against you or it a voluntary PPA,no loss,damage,theft or destruction will petition in bankruptcy, is adjudicated bankrupt or excuse you from your obligations under this PPA, insolvent or undertakes or experiences any including Monthly Payments. substantially similar activity. 13. Limitation of Liability. 15. Remedies in Case of Default. (a) No Consequential Damages If this Power Purchase Agreement is in default,we may take any one or more of the following actions. if the law SUNNOVA'S LIABILITY 'IO YOU UNDER THIS requires us to do so,we will give you notice and wait any POWER PURCHASE AGREEMENT SHALL.BE period of time required before taking any of these actions. LIMITED TO DIRECT,ACTUAL DAMAGES We may: ONLY. YOU AGREE THAT IN NO EVENT SHALL EITHER PARTY BE LIABLE TO THE (a) terminate this PPA; OTHER FOR CONSEQUENTIAL, INCIDENTAL, PUNITIVE, EXEMPLARY, SPECIAL OR (b) take any reasonable action to correct your default or INDIRECT DAMAGES. to prevent our loss;any amount we pay will be added to the amount you owe us and will be immediately (b) Actual Damages due; EXCEPT FOR CLAIMS UNDER SECTION 4(H), (e) require you,at your expense,to return the System or NEITHER PARTY'S LIABILITY"TO THE OTHER make it available to us in a reasonable manner; WILL EXCEED AN AMOUNT EQUAL TO THE MAXIMUM AMOUNT THAT COULD BE (it) proceed,by appropriate court action,to enforce PAYABLE BY YOU UNDER SECTION I5(H). performance of this PPA and to recover damages for DAMAGES TO YOUR HOME,BELONGINGS OR your breach; PROPERTY RESULTING FROM THE INSTALLATION OR OPERATION OF THE (e) disconnect,hunt off or take back the System by legal SYSTEM ARE COVERED IN THE LIMITED process or self-help,but we may not disturb the WARRANTY. peace or violate the law; 14. Default (f) report such non-operational status of the System to your utility,infornring them that you are no longer You will be in default under this Power Purchase net metering; Agreement if any one of the following occurs: Contract ID: IK000932593 R d'2008-2015 Sunnova Enemy Corporntion.All RigW Reserved. DocuSign Envelope ID:9F71B70E-76C1-4076-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475,Houston.. TX 77046 S U n nova 1 28i985.9900 www.sunnovu.com (g) chatge you a reasonable reconnection fee for The laws of the state where your Home is located,without reconnecting the System to your utility or turning the giving effect to conflict of laws principles.shall govern this System back on after we disconnect or turn off the PPA,except the Federal Arbitration Act, 9 U.S.C. § 1,et System clue to your default; seq.,shall govern interpretation,enforcement and proceedings under Section 18,and not the arbitration acts, (It) recover from you(i)all accrued but unpaid Monthly statutes or rules-of any other jurisdiction. Payments,taxes,late charges,penalties,interest and all or any other sums then accrued or due and owing, is. Arbitration. plus(ii)the estimated amount of future Monthly PLEASE READ THIS SECTION CAREFULLY. Payment,each payment discounted to present value at 5%per annum, plus('iii)reasonable compensation, ARBITRATION REPLACES THE RIGHT TO GO TO on a net after tax basis assuming a tax rate of 35%, COURT, INCLUDING THE RIGHT TO A JURY TRIAL for the loss or recapture of(A)the investment tax AND THE RIGHT TO PARTICIPATE IN A CLASS credit equal to thirty percent(30%)of the System ACTION OR SIMILAR PROCEEDING. IN cost, including installation;and(B)accelerated ARBITRATION,A DISPUTE IS RESOLVED BY AN depreciation over five(5)years equal to eighty five percent(85%)of the System cost, including ARBITRATOR INSTEAD OF A JUDGE OR JURY, installation,and for the loss of any anticipated In(his Section,the words"you"and"your"mean any benefits pursuant to Section 8 of this PPA(Sunnova shall furnish you with a detailed calculation of such person signing this Agreement as a Buyer or Co-Buyer. compensation if such a claim is made);or Unless the context requires otherwise,the words"we,""us" and`bur"mean the Contractor named above and any (i) use any other remedy available to us in this PPA or assignee of this Agreement. by law. The laws of the state where your Home is located shall We may submit to credit reporting agencies(credit govern this Agreement without giving ettect to conflict of bureaus)negative credit reports that would be reflected on laws principles.If you are in default under this Agreement, your credit record if you do not pay any amounts due under Sunnova may elect, at its sole discretion,remedies available this PPA as required. under the terms of this Lease;at law, or in equity. We agree You agree to repay its for any reasonable amounts we incur that any other dispute,claim or disagreement between us(,a to correct or cover your default and to enforce our rights "Dispute")shall be resolved exclusively by arbitration under this PPA including,but not limited to,attorney's fees except as specifically provided below. and court costs. You also agree to reimburse us for any costs and expenses we incur relating to the System's return The arbitration,including the selecting of the arbitrator, will resulting from early termination.By choosing any one or be administered by JAMS, under its Streamlined Arbitration more of these remedies,Sunnova does not give up its right Rules(the"Rules") by a single neutral arbitrator agreed on to use another remedy. By deciding not to use any remedy by the parties within thirty(30)days of the commencement should this Power Purchase Agreement be in default, Sunnova does not give up our right to use that remedy in of the arbitration. The arbitration will be governed by the case of a subsequent default Federal Arbitration Act(Title 9 of the U.S. Code)and not any state law. Either party may initiate the arbitration 16. System Removal; Return process by filing the necessary forms with JAMS.To learn At the end of the Term or the termination of this PPA, if more about arbitration,you can call any JAMS office or you have not renewed this PPA or exercised your purchase review the materials at www_jamsadr.com.The arbitration option(if any)and you have not defaulted,then within shall be held in the location that is most convenient to your ninety(90)days you agree to call Sunnova at the telephone number listed in Exhibit 1,or any other number we notify Home. If a JAMS office does not exist in the county where You of in the future,to schedule a convenient time for you live,then we will use another accredited arbitration Sunnova to remove the System from your Home at no cost provider with offices close to your Hone. to you unless the termination was due to your default which is addressed in Section IS. If you initiate the arbitration, you will be required to pay the first$125 of any filing fee. We will pay any filing fees in 17. Applicable Law excess of$125 and we will pay all of the arbitration fees and costs. If we initiate the arbitration, we will pay all of the Contract ID: IK000932593 9 ,'_'0o8-loin Sumiovu Energy corporaiion.All Rtghu'Reserved. DocuSign Envelope ID: gF71B70E-76C1-4C76-A015-51C2AA9277C3 20 East Grecaway Plaza Sic 475, HOUSton,TX 77046 S u n nI va 'i 28L985.9900 ivtiL%w.sunnova.com filing fees and all of the arbitration fees and costs. We will PROCEEDING IN CONNECTION WITH ANY SUCH each bear all of our own respective attorney's tees,witness DISPUTE. fees, and costs unless the arbitrator decides otherwise. BECAUSE YOU AND WE HAVE AGREED TO The arbitrator shall have the authority to award any legal or ARBITRATE ALL DISPUTES EXCEPT AS equitable remedy or relief that a court could order or grant SPECIFICALLY PROVIDED IN THE LAST under this Agreement. The arbitrator,however, is not PARAGRAPH OF THIS SECTION,YOU AND WE WILL authorized to change or alter the terns of this Agreement or NOT HAVE THE RIGHT TO LITIGATE THAT DISPUTE to make any award that would extend to any transaction IN COURT,OR TO HAVE A JURY TRIAL ON THAT other than.yours. All statutes of limitation that are DISPUTE,OR ENGAGE IN DISCOVERY EXCEPT AS applicable to any Dispute shall apply to any arbitration PROVIDED FOR IN THE RULES. FURTHER,YOU between you and us. The arbitrator will issue a decision or WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A award in writing.briefly stating the essential findings of fact REPRESENTATIVE OR MEMBER OF ANY CLASS and conclusions of law. PERTAINING TO ANY DISPUTE. THE Only Disputes involving you and us may be addressed in the ARBITRATOR'S DECISION WILL BE FINAL AND arbitration. Disputes must be brought in the name of an BINDING ON THE PARTIES AND MAY BE ENTERED individual person to entity and must proceed a mt AND ENFORCED 1N ANY COURT HAVING individual person or nonrepresentative)basis. The JURISDICTION,EXCEPT TO THE EXTENT IT IS WITH arbitrator will not award relief for or against anyone who is SUBJECT L REVIEW L ACCORDANCE GOVERNING not a patty to the Dispute. If you and we arbitrate a Dispute, APPLICABLE FEDERAL LAW"HERRIGHTS none of you or us, nor any other person,may pursue the YOU ARBITRATION W AW ARDS. E IN CO R1GFM THATALSO Dispute in arbitration as a class action,class arbitration, YOU E V WOULD I HAVE IN COURT MAY ALSO private attorney general action or other representative NOT RE AVAILABLE IN ARBITRATION. action,nor may any such Dispute be pursued on your or our NOTWITHSTANDING THE FOREGOING,NOTHING behalf in any litigation in any court except as specifically HEREIN CONTAINED SHALL BAR YOU OR US provided below. Claims regarding any Dispute and FROM: (I)OBTAINING INJUNCTIVE RELIEF FROM A remedies sought as part of a class action,class arbitration, COURT AGAINST THREATENED CONDUCT THAT private attorney general or other representative action are COULD CAUSE IRREPARABLE HARM. LOSS OR subject to arbitration only on an individual(non-class,non- DAMAGE. UNDER THE USUAL EQUITY RULES. representative)basis,and the arbitrator may award relief INCLUDING THE APPLICABLE RULES FOR only on an individual(non-class,non-representative)basis. OBTAINING RESTRAINING ORDERS AND This means that the arbitration may not address disputes PRELIMINARY INJUNCTIONS;OR(11)OBTAINING A imvol.in-other persons with disputes similar to the Disputes JUDGMENT FROM A COURT HAVING JURISDICTION between you and us. if any part of this paragraph of this CONFIRMING THE AWARD OF THE ARBITRATOR; Section is found to be unenforceable by an arbitrator or a OR(III)OBTAINING RESOLUTION OF A DISPUTE IN A SMALL CLAIMS COURT IF THE DISPUTE FALLS tour having jurisdiction over a Dispute,then this entire Section(except for this sentence and the following sentence) WITHIN THE JURISDICTION OF THE SMALL CLAIMS COURT(PROVIDED, HOWEVER,THAT NO ATTEMPT p shall be automatically inapplicable to that Dispute. IS MADE TO TRANSFER RESOLUTION ION OF SUCH.A EVEN IF ANY PART OF THIS SECTION IS FOUND TO DISPUTE FROM A SMALL CLAIMS COURT TO A BE UNENFORCEABLE AS DESCRIBED ABOVE,YOU COURT OF GENERAL JURISDICTION). AND WE EACH AGREE TO WAIVE THE RIGFI"f TO A TRIAL BY JURY IN CONNECTION WITH ANY BY SIGNING BELOW,YOU AGREE 1N ADVANCE TO SUBMIT DISPUTES'IO ARBITRATION WITH AN DISPUTE THAT MIGHT ARISE BETWEEN OR ARBITRATION FIRM APPROVED BY STATE INVOLVING YOU AND US.AND THE RIGHT TO REGULATORS.TO THE EXTENT REQUIRED. PARTICIPATE IN A CLASS ACTION OR SIMILAR Contract ID: IK000932593 t0 C,1 2008-2015 SuonJvu F,uer-gy Corporati,,n,All Rights ReservW. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475,Houston,TX 77046 S U n nova t 281.985.9900 wticvv.sunnova_com 19. Waiver. or PDF signature page containing the signature(electronic. Any delay or failure of a party to enforce any of the faxed, PDF or original) is binding upon the parties. provisions of this PPA, including but not limited to any remedies listed in this PPA,or to require performance by the other party of any of the provisions of this PPA,shall 24. Further Assurances. not be construed to(i)be a waiver of such provisions or a You will cooperate filly with us to effect the intent and party's right to enforce that provision;or(n)affect the provisions of this PPA and, from time to time,to execute validity of this PPA. and deliver any and all other agreements,documents or 20. Notices. instruments,and to take such other actions,as Sunnova may determine to be reasonably necessary or desirable to effect All notices under this PPA shall be in writing and shall be the intent and provisions of this PPA. by personal delivery, facsimile transmission,electronic mail,overnight courier,or certified or registered mail, REST OF PAGE INTENTIONALLY LEFT BLANK return receipt requested,and deemed received upon personal delivery,acknowledgment of receipt of electronic transmission, the promised delivery date after deposit with overnight courier,or five(5)days after deposit in the mail. Notices shall be sent to the person identified in this PPA at the addresses set forth in this PPA or such other address as either party may specify in writing. Each party shall deem a document faxed to it as an original document. 21. Entire Agreement; Changes. This PPA contains the parties' entire agreement regarding the sale and purchase of power generated by the System. There are no other agreements regarding this PPA,either written or oral. Any change to this PPA must be in writing and signed by both parties. If any portion of this PPA is determined to be unenforceable,the remaining provisions shall be enforced in accordance with their terms or shall be interpreted or re-written so as to make them enforceable. 22. Publicity. Sunnova will not publicly use or display any images of the System unless you initial the space below. If you initial the space below,you give us permission to take pictures of the System as installed on your Home to show to other customers or diSplay on our site. meo ner- Int[i Is 23. Counterparts. This PPA may be executed simultaneously in any number of counterparts. Each counterpart shall be deemed to be an original,and all such counterparts shall constitute one and the same instrument. the parties agree that this PPA and signature pages may be signed electronically and transmitted between them by facsimile or by electronic mail and that electronic, Faxed and PDF signatures shall constitute original signatures and that an electronic, faxed Contract ID: IK000932593 I1 t 200$-206 Sumhova&ieigy Corporation.All Rig6rs Reserved. DocuSign Envelope ID:9F71670E-76C1-4C76-A015-51C2AA9277C3 20 East(rrecnway Plaza Stu 475,Houston-TX 77046 S u n nt/+�Jva 'r _81.985.9900 www.sunnova.com I ' 25. NOTICE OF RIGHT TO CANCEL. AFTER THE DATE OF THIS TRANSACTION. SEE 'THE OWNER,MAY CANCEL THIS EXHIBIT 4,THE ATTACHED NOTICE OF You, THE AT ANY TIME PRIOR S CANCELLATION FORM FOR AN EXPLANATION OF THIS RIGHT. MIDNIGHT OF THE SEVENTH CALENDAR DAY I have read this Power Purchase Agreement and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Power Purchase Agreement. DO NOT SIGN THIS CONTRACT IF THERE ARE ANY BLANK SPACES. : Joe M�;e P 7k Signature: Date: 3-10-16 Co-Owner's Name(if any): Signature: Date: Sunnova Energy Corporation: ynda Attaway SVP Operations Sunnova Energy Corporation _ Date: Contract ID: IK000932593 12 0200s-201i SVaaOlVB Encigy Corporatism,All Rights Reserved. DocuSign Envelope ID:9F71 B70E-76C1-4C76-A015-51C2AA9277C3 ` '^ 20 East Ureenway Plaza Ste 475, 1louston,TX 7 r sunnn d046 T 28 L985.9900 wr�v.sunnova.Com Schedule A: Value Statement Estimated Solar Energy Production Estimated First Year Annual Production: 3,626 kWh Estimated Initial Term Total Production: 85,432 kWh Payment Terms Amount Due at Contract Signing: 50.00 Installation Fee: 50,00 Annual Increase of Solar Energy Rate: 2.9%/year First Year Solar Energy Rate, if paid by ACH: $0.120/kWh First Year Solar Energy Rate, if not paid by ACH: $0.132/kWh Monthly Bill in First Year, if paid by ACH: $36.26/month Monthly Bill in First Year, if not paid by ACH: 539.89/month By your initials here you acknowledge that you have reviewed this Schedule A: 9 Prepay Option Purchase Option End of Annual Price per kWh Annual Price per kWh Estimated kWh Estimated Price to Minimum Cash j Year (assuming payment by (assuming payment by per year Prepay the Remainder of Purchase Price' Credit Card) ACH) the Initial Term' I 50.132 $0.120 3.626 $7,941,36 50.00 2 50.136 $0.123 3,607 $7,880.96 50.00 3 50.140 $0.127 3,588 $7,806.63 50.00 4 $0.144 $0.131 3,570 $7,718.47 $0.00 5 $0.148 $0.135 3,552 $7,613.40 $0.00 6 so.Ii2 $0.138 3,534 $7,491.36 $10,614.00 7 $0.157 $0.142 3,516 $7,351.23 $10,040.56 8 $0.161 $0.147 3.498 $7,192.81 $9,426.30 9 SO.166 $0.151 3A80 $7,012.90 $8,765.94 10 $0.171 $0.155 3,462 $6,811.12 58,057.95 II 50.176 $0.160 3,444 $6,586.09 $7,299.38 12 50.181 $0.164 3,426 $6,337.18 57,017.72 13 $0.186 $0.169 3.408 $6,061.14 56,707.22 14 50.191 $0.174 3,390 $5,757.15 56,367.09 15 $0.197 $0.179 3,373 55,423.48 $5,995.49 16 $0,203 $0.184 3,356 55,059.01 $5,591.26 17 $0.209 $0.190 3,339 54,660.42 $5,150.82 18 $0.215 $0.195 3,322 $4,226.37 $4,672.77 19 $0.221 $0.201 3,305 53,754.70 $4,154.83 20 $0.227 $0.207 3188 $3,243.62 $3,595.1.3 21 $0.234 $0.213 3,271 52,689.84 $2,990.1.2 22 $0.241 $0 219 3,254 $2,091.29 $2,337.62 23 $0.248 $0.225 3,237 $1,445.32 $1,634.83 24 $0.255 $0.232 3,220 $749.30 $878.95 25 $0.262 $0.238 23 203 $0.00 $0.00 1) Per Section 9,the price you will pay to purchase the System will be the greater of the System's fair market value("FM V-) and the amount shown above on Schedule A. 2)Per Section 4 0)of the PPA,the prepayment amounts shown above reflect a 5%present value discount rate. W 20052015 Sunnmi Encrg-v COtporatiun,All Rights Roscrve.1, DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 �� ��`v'� 20 East Giveaway Plaza Ste 475, Houston,TX 77046 T 23L985g900wm;°wsuonova.com EXHIBIT 1 LIMITED WARRANTY 1. INTRODUCTION This Limited Warranty(this`Limited Warranty")is Stmnova's agreement to provide you warranties on the System you are hosting pursuant to our PPA. The System will be professionally installed by a contractor acting on Sunnova's behalf at the address you listed in the PPA.We will refer to the installation location as your"Property'or your"Home." This Limited Warranty begins when our contractor starts installing the System at your Home. We look forward to helping you produce eleau,renewable solar power at your Horne.To the extent that you prepay the PPA or purchase the System daring the Tenn of the PPA,this Exhibit I shall continue to apply and be enforceable until what would have been the end of the original"term. For purposes of this Limited Warranty the term"Sunnova"means Sunnova Energy Corporation or its successors and assigns. 2. LIMITED WARIL4NTIES (a) Limited Warranties Sunnova warrants the System as follows: (i) System Warranty Daring the entire Power Purchase Agreement Tern,under normal use and service conditions,the System will be free from defects in workmanship or detects in,or a breakdown of,materials or components(the"System Warranty"); (ii) Roof Warranty When our contractors penetrate your roof during a System installation we will warrant roof damage caused by our contractors due to our roof penetrations. This roof warranty will run the longer of(A)one(1)year following the completion of the System installation;and(B)the length of any existing installation warranty or new home builder performance standard for your roof(the"Roof Warranty Period");and (ill) Repair Promise During the entire Power Purchase Agreement Term,Sunnova will honor the System Warranty and will repair or replace any defective part,material or component or correct any defective workmanship,at no cost or expense to you (including all labor costs),when you submit a valid claim to us under this Limited Warranty. If our contractors damage your Home,your belongings or your Property we will cause our contractors to repair the damage they cause or pay you for the damage as described in Section 6.Sunnova may use new or reconditioned parts when making repairs or replacements. Sunnova may also,at no additional cost to you,upgrade or add to any part of the System as it deems advisable in its discretion. Cosmetic repairs that do not involve safety or pertonnance shall be made at Sunnova's discretion. (b) Warranty Length (i) The warranties in Sections 2(a)(i)and 2(a)(iii)above will start when our contractors begin installing the System at your Home and continue through the entire Power Purchase Agreement Term but never less than ten(10)years"Thus,for as tong as you host the System from Sunnova under a PPA,you will have a Svstem Warranty and our Repair Promise. (ii) The Roof Warranty Period may be shorter than the System Warranty,as described in Section 2(a)(ii)above. (ill) if you have assumed au existing PPA in accordance with the terms and conditions of the PPA,then this Limited Warranty will cover you for the remaining balance of the existing Power Purchase Agreement Term. Contract ID: 1K000932593 'o 200E 2015 Suraw%n Energy Corporation,All Right;Reserved. DocuSign Envelope ID:9F71 B70E-76C1-4C76-A01 S-51 C2AA9277C3 ^` '^ 20 Esunn ast Greenway Plaza Stc 475,Houston. IX 77046 ( ,V d T 281.985.9900 wm=w.sunnova.com (e) Maintenance and Operation General When the System is installed Sunnova will provide you with a copy oi'its Solar Operation and Maintenance Guide_This Guide provides you with System operation and maintenance instructions,answers to frequently asked questions, troubleshooting tips and service information. (H) Power Monitor 'I he Power Monitor requires access to cellular networks in order to operate. If cellular service is not available then(A)we will not be able to monitor the System;and(B)you will be required to provide Sunnova with annual production information from your inverter or(C)Sunnova,in its sole discretion,will estimate production. In connection with such any such estimated production by Sunnova.Sumova will make commercially reasonable methods to estimate the missing kWh based on available information and such estimate will be included in the calculations under Exhibit A for such period. In the event that no such information is reasonably accessible,Sunnova will make the adjustment based on the original kWh expectation attributable to such period. (d) Making a Claim; Transferring this Warranty (i) Claims Process You can make a claim by: A. emailing us at the email address in Section 7 below; B. writing us a letter and sending it ovemioht mail with a well-knownh ser vice; C. sending us a fax at the number in Section 7 below;or D. creating a claim through our online customer portal(as more particularly set forth in the Solar Operation and Maintenance Guide when the System is installed). (ii) Transferable Limited Warranty Sunnova will accept and honor any valid and properly submitted Warranty claim made during any Tenn by any person who either purchases the System from you or to whom you property transfer the PPA in accordance with the terms and conditions contained in the PPA. (e) Exclusions and Disclaimer The limited warranties provided in this Limited Warranty do not apply to any lost power production or any repair, replacement or correction required due to the following: (i) someone other than Sunnova or its approved service providers installed,removed,re-installed or repaired the System; (ii) destruction or damage to the System or its ability to safely produce power not caused by Sunnova or its approved service providers while servicing the System(e.g., if a tree falls on the System we will replace the System per the Power Purchase Agreement,but we will not repay you for power it did not produce); (iii) your failure to perform or breach of,your obligations under the Power Purchase Agreement(e.g.,you modify or alter the System): (iv) your breach of this Limited Warranty,including your being unavailable to provide access or assistance to us or our contractors in diagnosing or repairing a problem,or your failing to maintain the System as stated in the Solar Operation and Naintenance Guide: (v) any Forme Majeure Event(as defined below); Contract ID: IK000932593 oS-201 moca Energy Coghoraoon.Alt Rigllk Re,en c& DocuSign Envelope ID:9F71670E-76Ct-4C76-A015-51C2AA9277C3 sun nrwa 20 East Gicenway Plaza Ste 475.Houstoa,'LX 77046 T 281.9g9.9900 www.sannova.com (vi) shading from foliage that is new growth or is not kept trimmed to its appearance on the date the System was installed; Nut any system failure or lost production not caused by a System defect(e.g.,the Systcm is not producing power because it has been removed to make roof repairs or you have required us to locate the inverter in a non-shaded area);and (viii) theft of the System(e.g.,if the System is stolen we will replace the System per the Power Purchase Agreement,but we will not repay you for the power it did not produce). (ix) a power or voltage surge caused by someone other than Sunnova or the Installer,including a grid supply voltage outside of the standard range specified by the local utility or the System specifications or as a result of a local power outage or curtailment;and (x) a change in usage of the Property or any buildings at or near such Property that may affect insulation without Sumrova's prior written approval. This Limited Warranty gives you specific rights,acid you may also have other rights which vary from state to state.This Limited Warranty does not warrant any specific electrical performance of the System. THE LIMITED WARRANTIES DESCRIBED IN SECTION 2(a)ABOVE ARE THE ONLY WARRANTIES MADE BY SUNNOVA WITH RESPECT TO THE SYSTEM. SUNNOVA HEREBY DISCLAIMS,AND ANY BENEFICIARY OF THIS LIMITED WARRANTY HEREBY WAIVES,ANY WARRANTY WITH RESPECT TO ANY COST SAVINGS FROM USING THE SYSTEM. WITHOUT LIMITING THE FOREGOING THERE ARE NO OTHER REPRESENTATIONS OR WARRANTIES, EXPRESS OR IMPLIED,AS TO THE MERCHANTABILITY,FITNESS FOR ANY PURPOSE,CONDITION,DESIGN,CAPACITY, SUITABILITY OR PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. 3. SUNNOVA'S STANDARDS For the purpose of this Limited Warranty the standards for our perfonnance will be(,i)normal professional standards of performance within the solar photovoltaic power generation industry in the relevant market;and(ii)Prudent Electrical Practices. "Prudent Electrical Practices"means those practices,as changed from time to time.that are engaged in or approved by a significant portion of the solar power electrical generation industry operating in the United States to operate electric equipment lawfully and with reasonable safety,dependability,efficiency and economy. 4. SYSTEM REPAIR,RELOCATION OR REMOVAL (a) You agree that if(i)the System needs any repairs that arc not the responsibility of Sunnova under this Limited Warranty,(ii) die system needs to be removed and reinstalled to facilitate remodeling of you Home or(iii)the system is being relocated to another home you own pursuant to the Power Purchase Agreement,you will have Sunnova,or another qualified service provider we approve,at your expense,perform such repairs,removal and reinstallation.,or relocation on a time and materials basis. (b) If you want to return the System to Sunnova under Section 16 of the Power Purchase Agreement then Sunnova will cause our contractors to remove the System at no cost to you. Surmova will cause our contractors to remove the posts,waterproof the post area and return the roof as close as is reasonably possible to its original condition before the System was installed(e.g. ordinary wear and tear and color variances due to manufacturing changes are excepted). Sunnova will warrant the waterproofing for one(1)year after it removes the System. You agree to reasonably cooperate with Sunnova or its contractors in removing the System including providing necessary space,access and storage,and we or our contractors will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. 5. FORCE MAJEURE If Sunnova is unable to perform all or some of its obligations under this Limited Warranty because of a Force Majeure Event, Sunnova will be excused from whatever performance is affected by the Force Majeure Event,provided that: Contract ID: IK000932593 '('2008-2019 Sumroea Energy Coipm-ation.All Right;Reser�ed. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 sunn^` ,^ • 20 East Gie-cnway Plaza Sic 475,(Houston,TX 77046 ( ,V d T 281.985.9900 www.suunova.coni (a) Sunnova,as soon as is reasonably practical,gives you notice describing the Force Majeure.Event; (b) Sunnova's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e.,when a Force Majeure Event is over,we will make repairs):and (c) No Sunnova obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result of such Force Majeure Event. "Force Majeure Event"means any event,condition or circumstance beyond the control of and not caused by Sunnova's fault or negligence. It shall include,without limitation,failure or interruption ofthe production;delivery or acceptance ofpower due to: an act of god;war(declared or undeclared);sabotage;riot;insurrection;civil unrest or disturbance;military or guerilla action;terrorism; economic sanction or embargo;civil strike,work stoppage,slow-down,or lock-out:explosion;tire;earthquake;abnormal weather condition or actions of the elements;hurricane; flood;lightning;wind;drought;the binding order of any governmental authority (provided that such order has been resisted in good faith by all reasonable legal means);the failure to act on the part of any governmental authority(provided that such action has been timely requested and diligently pursued);unavailability of power from the utility grid,equipment,supplies or products(but not to the extent that any such availability of any of the foregoing results from Sunnova's failure to have exercised reasonable diligence);power or voltage surge caused by someone other than Sunnova including a grid supply voltage outside of the standard range specified by your utility;and failure of equipment not utilized by Sunnova or under its control. 6. LIMITATIONS ON LIABILITY (a) No Consequential Damages IN NO EVENT SHALL SUNTIOVA OR ITS AGENTS OR CONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL,INDIRECT.PUNITIVE,EXEMPLARY,INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES,SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. (b) Limitation of Duration of Implied Warranties IN THE EVENT THAT ANY IMPLIED WARRANTIES,INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING UNDER STATE.LAW THAT CANNOT BE WAIVED,SUCH WARRANTIES SHALL IN NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARRANTY PERIOD IN THIS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPL[ED WARRANTY"LASTS,SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. (c) Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary, Sunnova's total liability arising out of or relating to this Limited Warranty shall in no event: (i) For System Replacement:the original cost of the System;and (ii) For damages to your Home,Belongings and Property: exceed five hundred thousand dollars(S500,000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Power Purchase Agreement to the addresses listed below: TO SUNNOV 4: Sunnova Energy Corporation P.O.Box 56229 Houston,TX 77256-6229 Attention: Warranty Claims Telephone: 281.985.9900 Contract ID: IK000932593 ` 2009 20L Sunnova Enemy Corporation.All Rights Resereed. DocuSign Envelope 10: 9F71B70E-76C1-4C76-A015-51C2AA9277C3 ^` ,� . 20 East Gro �+g euay Plaza Ste 375. 1 iouston,'LY 7 J046 sunn( )v T 2RLgg5.9900wwwsumtova.conr Facsimile: 281.985.9907 Email: customerserviceC.sunnova.com TO YOU: At the billing address in the Power Purchase Agreement or any subsequent billing address you give as. 8. ASSIGNMENT AND TRANSFER OF THIS LIMITED WARRANTY Sunnova may assign its rights or obligations under this Limited Warranty to a third party without your consent,provided that any assignment of Sunnova's obligations under this Limited Warranty shall be to a party professionally and financially qualified to perform such obligation. This Limited Warranty protects only the person who hosts the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer die Power Purchase Agreement in accordance with the terms and conditions contained in the PPA.This Limited Warranty contains the parties'entire agreement regarding the limited warranty ofthe System_ Contract 11): LK000932593 2005 20[i Sunnova Energy Corporation-All Right.,Reset%erl. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 20 East Greenway Plaza Ste 475,1louston,T)f 77046 S U n nava T 281.985,9900 wN+w.Nttrllrnva.cOtlr (CUSTOMER COPY) NOTICE OF CANCELLATION STATUTORILY-REQLTRED LANGUAGE Date of Transaction: You may cancel this transaction, without any penalty or obligation,within three business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within 10 days following receipt by the seller(Sunnova Energy Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(Sunnova Energy Corporation)at your residence, in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may, if you wish,comply with the instmctions of the seller(Sunnova Energy Corporation)regarding the return shipment of the goods at the seller's(Sunnova Energy Corporation's)expense and risk. If you do make the goods available to the seller (Sunnova Energy Corporation)and the seller(Sunnova Energy Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sumrova Energy Corporation),or if you agree to return the goods to the seller(Sunnova Energy Corporation)and fail to do so,then you remain liable for performance of all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice, or send a telegram to Sunnova Energy Corporation,20 East Greenway Plaza Ste 475,Houston,TX 77046 not later than midnight of the date that is 3 business days from the date you signed the Lease. I.hereby CANCEWRESCLND this transaction on (Cancellation Date). Owner's Signature: Joe Patti Co-Owner's Signature: Installation Address: 14 PLEASANT ST SALEM,MA 01970-3824 Contract ID:IK000932593 C,2005 20L Sunnova Energy Co]poration.All Riehrs Reserved. DocuSign Envelope ID:9F71B70E-76C1-4C76-A015-51C2AA9277C3 �� ^` ,^ • 20 East Grcenway Plaza Stu 4-5, 13ouslon,1:\.i?046 ( ,V d 'r 281.9$5.9900wwtc.sunnova.corn (SUNNOVA COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Date of Transaction: You may cancel this transaction,without any penalty or obligation, within three business days from the above date. If you cancel-any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be retumed within 10 days following receipt by the seller(Sunnova Energy Corporation)of your cancellation notice.and any security interest arising out of the transaction will be canceled. If you cancel,you must make avadable to the seller(Sunnova Energy Corporation')at your residence,in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may,if von wish,comply with the instructions of the seller(Sunnova Energy Corporation)regarding the return shipment of the goods at the seller's(-Sunnova Energy Corporation's)expense and risk. if you do make the goods available to the seller (Sunnova Energy Corporation)and the seller(Sunnova Energy Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(Sunnova Energy Corporation),or if you agree to return the goods to the seller(Sunnova Energy Corporation)and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice, or send a telegram to Sunnova Energy Corporation,20 East Greenway Plaza Ste 475,Houston,T% 77046 not later(ban midnight of the date that is 3 business days from the date you signed the Lease. I hereby CANCELIRESCIND this transaction on lCancellation Datel. Owner's Signature: Joe Patti Co-Owner's Signature: Installation Address: 14 PLEASANT ST SALEM,MA 01970-3824 Contract ID: IK000932593 Lt' 2008?41 i Sunnova Lnmgy Corporation.All Rights Resenea. DocuSign Envelope ID: 9F71870E-76C1-4C76-A015-51C2AA9277C3 E STATE SPECIFIC EXCEPTIONS, TERMS AND CONDITIONS Massachusetts The following provisions are hereby agreed to by Sunnova and you Anticipated Start and Completion dates of the construction of the Svstem: The time between evaluation of your home for a System,and your completed System generating power,will vary depending on a number of factors—some outside the control of Sunnova and any contractors. These factors include the process for obtaining the necessary building permits and utility approval for net metering and interconnection of your System. While the timeline will vary depending on these and other factors,the estimated time for completion of a System is between 60 and 210 days. Registration: All home improvement contractors and subcontractors shall be registered. Any inquiries about a contractor or subcontractor relating to a registration should be directed to: Office of Consumer Affairs and Business Regulation Ten Park Plaza,Suite 5170 Boston,MA 02116 Phone:(617)973-8700 Permits: Contractor shall obtain any and all necessary construction-related permits. Owners who secure their own construction-related permits or deal with unregistered contractors shall be excluded from access to the Guarantee Fund. Arbihation: The signatures of the parties to the arbitration provision apply only to the agreement of the parties to alternatee dispute resolution initiated by the contractor. The owner may initiate alternative dispute resolution even where the arbitration section is not signed separately by the parties. 2008 201?S.rnwca P-ncrgy Corporation,A9 Rights Reserved. DocuSign Envelope ID: 9F71 B70E-76C1-4C76-A015-51C2AA9277C3 EXHIBIT 3 TRANSFER AGREEMENT KNOW ALL MEN BY THESE PRESENTS: ,an individual ("Transferor")hereby;TRANSFERS, ASSIGNS and CONVEYS unto an individual ("Transferee"),all of his/her right, title and interest (including any warranties) in and to that certain Power Purchase Agreement dated _, 20 ,for the System located at as the same may have been amended from time to time(collectivel), the"Power Purchase Agreement"). As evidenced by its execution hereof,Transferee hereby accepts the transfer of the Power Purchase Agreement and hereby assumes all duties obligation and liabilities of every Lind and character, including entering into net metering and interconnection agreements, of the Transferor under the Power Purchase Agreement. This Transfer may be executed simultaneously in any number of counterparts. Each counterpart shall be deemed to be an original, and all such counterparts shall constitute one and the same instrument. The parties agree that this Transfer may be signed electronically and transmitted between them by facsimile or by electronic mail and that electronic,faxed and PDF signatures shall constitute original signatures and that an electronic, faxed or PDF signature is binding upon the parties. Capitalized terns not defined herein shall have the meaning set forth in the Power Purchase Agreement. IN WITNESS WHEREOF, the parties have executed this instrument to be effective _, 20_ TRANSFEROR: TRANSFEREE: [NAME] [NAME] AGREED AND ACCEPTED, the undersigned consents to the transfer provided herein. SUNNOVA ENERGY CORPORATION By: Name: Title: C,2008-2015 s.nnma Energy Cotporaiion.All Riches Resemal