Loading...
3 CHANDLER ROAD - BUILDING JACKET GIGI (05 c� PT -;f TIONA EO RVICES TtJ-- [ L4 13 So INSPE� gJ The Commonwealth of Massachusetts t arp �► } Board of Building Regulations and Stands s CITY OF Massachusetts State Building Code,780 CMR SALEM $a: Revised Alar 2011 Building Permit Application To Construct,Repair, Renovate Or Demolish a One-or Two-Family Dwelling This Section For Official Use Only Building Permit Number: Dat Ap lied: Building Official(Print Name) Signature Date SECTION l:SITE INFORMATION 1.1 Pro erty Address: 1.2 Assessors Map&Parcel Numbers panoI(I(P k V-d L I a Is this an accepted street?yes X no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: Zoning District Proposed Use Lot Area(sq fl) Frontage(It) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply:(M.O.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone?Check ifyes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner'of Recor tinda Raymond Salem MA. Name(Print) Chandler Rd. City,State,ZIP 978-744-9228 Marknlinda2@comcast.net No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Altcration(s) ❑ 1 Addition ❑ Demolition ❑ Accessory Bldg.❑ Number of Units_ I Other ❑ Specify: Brief Description of Proposed Work: kS ph-&—i-pv -}0.1G SolcU— SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only Labor and Materials) I.Building $ 6b 0 I. Building Permit Fee:$ Indicate how fee is determined: 2.Electrical $ nil ❑Standard City/Town Application Fee W ❑Total Project Cost'(Item 6)x multiplier x 3.Plumbing $ 2. Other Fees: $ ( 4.Mechanical HVAC) $ List: i 5.Mechanical (Fire $ Suppression) Total All Fees:$ r� C!, Check No. Check Amount: Cash Amount:_ 6.Total Project Cost: $Q311 -?/. ❑Paid in Full ❑Outstanding Balance Due: L__ SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) OL{5254 S -�CtLmel s SV\erYV-La-r) License Number Expiration ate Name of CSL Holder 2 , 1 e'l�1 o S-1Yep-t List CSL Type(see below) U No.and Street Type Description SoLu.c (!S A t O I CI D LP U Unrestricted(Buildin s u to 35,000 cu.ft. R Restricted 1&2 Family Dwellin City/Town,S • %IP M Mason RC Roofinut Covcnn WS Window and Siding _ SF Solid Fuel Burning Appliances -rBI6 �J yyingsto Vlu'I Qt 1 Insulation Tele hone Email address r`'1 D Demolition 5.�2 (R�e�giistered Home Improvement Contractor(HIC) INC)—a1011YVI.��O�QY1_/eV2�ODeY PLC- 1'lO�b4`b Na�e o HIC Registrant Name HIC Registration Number E piraton Date 4CRC3mND w . NnGtSol0.r�JvtvtvLkSolnr No.and Street Email address C DM 4�r-oVo L?1— $t}100q '1$13 0 53 0 105 City/Town,State,ZIP Telephone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes .........z A No...........❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1,as Owner of the subject property,hereby authorize VIV I✓t So lar- to act on my hb�If. all�ulwork authorized by this building permit application. 8/18/14 Print Owner's Name(Electr6nuk Signature) Date SECTION 7b:OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in Ih' p1 lion is true and accurate to the best of my knowledge and understanding. Cl -M Print Ow s x rized Agent's Name(Electronic Signature) Dale NOTES: I. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.pov/oca Information on the Construction Supervisor License can be found at www.mass.eov/dRs 2. When substantial work is planned,provide the information below: Total floor area(sq.ft.) (including garage,finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost". vovunt. s o l a r 4931 North 301)west Structural Group Provo,UT84604 P: (801)234-7050 Scott E. Wyssling, PE Head of Structural Engineering scoff.wyssling(g)vivintsolar.com August 16,2014 Mr. Dan Rock, Project Manager Vivint Solar 24 Normac Road Woburn MA 01801 Re: Structural Engineering Services Raymond Residence 3 Chandler Road, Salem MA AR#3218968 4.76 kW System Dear Mr. Rock: Pursuant to your request, we have reviewed the following information regarding solar panel installation on the roof of the above referenced home: 1. Site Visit/Verification Form prepared by a Vivint Solar representative identifying specific site information including size and spacing of rafters for the existing roof structure. 2. Design drawings of the proposed system including a site plan, roof plan and connection details for the solar panels. This information was prepared by the Design Group and will be utilized for approval and construction of the proposed system. 3. Photovoltaic Rooftop Solar System Permit Submittal identifying design parameters for the solar system. 4. Photographs of the interior and exterior of the roof system identifying existing structural members and their conditions. Based on the above information we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: Description of Residence: The existing residence is typical wood framing construction with the roof system consisting of 2 x 6 dimensional lumber at 16"on center. Collar ties were not present during the inspection. The attic space is partially finished and photos indicate that there was free access to visually inspect the size and condition of the roof rafters. All wood material utilized for the roof system is assumed to be Spruce-Pine-Fir #2 or better with standard construction components. Our review of the photos of the exterior roof does not indicate any signs of settlement or misalignment caused by overstressed underlying members. Stability Evaluation: A. Wind Uplift Loading 1. Refer to attached Ecolibrium Solar calculations sheet for ASCE/SEI 7-10 Minimum Design Loads for Buildings and other Structures, wind speed of 100 mph based on Exposure Category"B" and 44 degree roof slopes on the dwelling areas. Ground snow load is 40 PSF for Exposure"B", Zone 2 per(ASCE/SEI 7-10). 2. Total area subject to wind uplift is calculated for the Interior, Edge and Corner Zones of the dwelling. vivi t. s o l a r Page 2 of 2 B. Loading Criteria 10 PSF= Dead Load roofing/framing 40 PSF=Live Load (ground snow load) 5 PSF= Dead Load solar panels/mounting hardware Total Dead Load=15 PSF The above values are within acceptable limits of recognized industry standards for similar structures. Analysis performed of the existing roof structure utilizing the above loading criteria indicates that the existing rafters will support the additional panel loading without damage, if installed correctly. C. Roof Structure Capacity 1. The photographs provided of the attic space and roof rafters show that the framing is in good condition with no visible signs of damage caused by prior overstressing. D. Solar Panel Anchorage 1. The solar panels shall be mounted in accordance with the most recent "Ecolibrium Solar Installation Manual', which can be found on the Ecolibrium Solar website (ecolibriumsolar.com). If during solar panel installation, the roof framing members appear unstable, deteriorated, structurally compromised or deflect non-uniformly, our office should be notified before proceeding with the installation. 2. Maximum allowable pullout per lag screw is 235 Ibs/inch of penetration as identified in the National Design Standards (NDS) of timber construction specifications for Hem-Fir (North Lumber) assumed. Based on our evaluation,the pullout value, utilizing a penetration depth of 2 '/z', is less than what is allowable per connection and therefore is adequate. Based on the variable factors for the existing roof framing and installation tolerances, using a thread depth of 2 1/2'with a minimum size of 5/16"lag screw per attachment point for panel anchor mounts should be adequate with a sufficient factor of safety. 3. Considering the roof slopes, the size, spacing, condition of roof, the panel supports shall be placed at and attached to no greater than every fourth roof rafter as panels are installed perpendicular across rafters and no greater than the panel length when installed parallel to the rafters (portrait). No panel supports spacing shall be greater than four(4) rafter spaces or 64"o/c, whichever is less. 4. Panel supports connections shall be staggered to distribute load to adjacent rafters. Based on the above evaluation, it is the opinion of this office that with appropriate panel anchors being utilized the roof system will adequately support the additional loading imposed by the solar panels. This evaluation is based on information supplied to us at the time of this report and current industry standards and practices. Should you have any questions regarding the above or if you require further information do not hesitate to contact me. ery truly yours, � OF ESgcy� _P� Scott E.Wy ling, 50 wI ti MA License No. 9pF EGISTEP'� ESSIONM. vivint. solar Layout Skirt o Coupling Warning: PV Modules may need to be shifted with respect to roof trusses to comply with 0 Clamp maximum allowable overhang. 19)Tana Solar TSM-250 PA05AB MODULES WITH A Q) 60'OF V PVC CONDUIT Enphase M216-60-2LL-S2x-ZC MICRO-INVERTER V FROM JUNCTION BOX TO ELEC PANEL MOUNTED ON THE BACK OF EACH MODULEcn C F---- - - - ----_--- ——— �rK tom ¢� z C yo O PV SYSTEM SIZE: I I D, cu 4.75 kW DC I I s� JUNCTION BOX ATTACHED TO ARRAY USING ECO HARDWARE TO KEEP JUNCTION BOX OFF ROOF ) c 1,2 a < mom � � U W W Z m J J J Z m w ¢ 3 SHEET NAME: V INTERCONNECTION POINT, LOCKABLE DISCONNECT SWITCH, W Z _ ANSI METER LOCATION, — ——— ——— X UTILITY METER LOCATION J d 3 Chandler Rd , Salem MA 01970 NU SHEET NUMBER: PV SYSTEM SITE PLAN 4 SCALE: 3/32"= V-0" > r -- J Gki�iDtt-12 (Zp r Supe Tab. ftwn ws h 1 Aron rarem-am /// I 5 M EAD® KEEPING YOU ORGANIZED No. 10301 mm pa=8 man=@ iwzmum GET ORGMMATSMEAD.COM CITY OF SALEM, MASSACHUSETTS ENGINEERING DEPARTMENT 120 WASHINGTON STREET,4TH FLOOR TEL. (978)745-9595 EXT. 5670 KIMBERLEY DRISCOL.L FAX(978)745-0349 MAYOR DAVID H.KNOWLTON,P.E. CITY ENGINEER CURB CUT APPLICATION CURB CUTS ARE TO BE APPLIED FOR AND PERFORMED ONLY BY A LICENSED DRAINLAYER IN THE CITY OF SALEM FEE PAYABLE TO THE CITY OF SALEM $100.00 CHECK IS TO BE ISSUED BY DRAINLAYER DATE OF REQUEST:0— Z©— ?©1b LICENSED DDDRAINLAYER7. � �{�.---� PROPERTY OWNER: W4YcCyc LOCATION OF CURB CUT (Address): LOOKING AT PROPERTY WHAT SIDE IS THE CUT TO BE DONE: LENGTH OF CUT: (FEET) DIG SAFE# ("0 Please include 8 % x 11 drawing of site work U✓u Fi 4it N14"y ***FOR OFFICE USE ONLY*** 57?-�06 151 . APPROVED BY BUILDING DEPARTMENT: ✓. 12 DATE: APPROVED BY ENGINEERING DEPARTMENT: DATE: NOT APPROVED: DEPARTMENT: EXPLANATION: