38 PEABODY ST - BUILDING INSPECTION The Commonwealth of Massachusetts _7 I Zq
Department of Public Safety
Massachusetts State Building Code(780 CMR)
Building Permit Application for any Building other than a One-or Two-Family Dwelling
(This Section For Official Use Only).
Building Permit Number: Date Applied: Building Officiate
SECTION 1:LOCATION(Please indicate Block 0 and Lot#for locations for which a street address is not available) -
38 Peabody Street Salem,MA 01970
No.and Street City/Town Zip Code Name of Building(if applicable)
- SECTION 2 PROPOSED WORK
Edition of MA State Code used 780 CMR If New Construction check here or check all that apply in the two rows below
Existing Building YES IRepair YES I Alteration YES lAddition NO IDemolition (Please fill out and submit Appendix 1)NONE -
Change of Use NO Change of Occupancy NO 10ther Specify: Z
Are building plans and/or construction documents being supplied as part of this permit application? Yes o .�
Is an Independent Structural Engineering Peer Review required? No G "�I1
Brief Description of Proposed Work: Work includes Selective Scope and upgrades to various kitchen cabinets and countertops, new appliancesiousS6 upgrades
to flooring in various bathroom and kitchens,upgrades to various plumbing fixtures in bathrooms,new roofing membrane on all buildings,wix repl^re Mnt,
masonry restoration,upgrades to life safety(Fire Alarm),installation of various new light fixtures,repairs and upgrades to various exterior balcoj&s. Z m
<
PJ r
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY r <_
Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) U1 T'1
Existing Use Group(s): RESIDENTIAL(R-2) Proposed Use Group(s):RESIDENTIAL(R-2) -
SECTION 4:BUILDING HEIGHT AND AREA
JJExistinR lProposed
No.of Floors/Stories(include basement levels)&Area Per Floor(sq.ft.) 1 q 1 1786 1 No Changes to stories or Area
Area(sq.ft.)an Total d Total Height(ft.) 7144 36'+/- No Change to total area or height
SECTION 5:USE GROUP Check as applicable'
A:Assembly A-1 A-2 Nightclub A-3 A-4 A-5 B: Business E:Educational
F: Factory F-1 F2 H: High Hazard H-1 H-2 H-3 H4 H-5
I: Institutional I-1 1-2 1-3 1-4 M: Mercantile R: Residential R-2
S:Storage S-I S-2 I U:Utility ISpecial Use and please describe below:
Special Use:
SECTION 6:CONSTRUCTION TYPE Check as applicable)
- -
IA IB BA IIB IIIA Hill IV VA VB
SECTION 7:SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) - - -
Water Supply:Public Flood Zone Information: Sewage Disposal: ITrench Permit Debris Removal:
Outside Flood Zone Municipal Trench permit pulled by Licensed Disposal Site
sitework contractor
Railroad right-of-way: Hazards to Air Navigation: 'NIA Historic Commission Review Process:
Not Applicable Is Structure within airport approach area? Is their review completed?
No Not Required
SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY
Edition of Code:8th Edition 780 CMR Use Group(s): R-2 Type of Construction:III B Occupant Load per Floor: 8
r Does the building contain a Sprinkler System?:NO Special Stipulations:NO
SECTION 9: PROPERTY OWNER AUTHORIZATION -
Name and Address of Property Owner SALEM POINT 11 LIMITED PARTNERSHIP
No.and Street 102 Lafayette Street City/Town Salem,MA Zip 01970
Property Owner Contact Information: North Shore Community Development Coalition Contact:Mickey Northcutt,CEO
Telephone No.(business) (978)745-8071 e-mail address mickey@northshorecdc.org
If applicable,the property owner hereby authorizes NEI General Contracting
Street Address 27 Pacella Park Drive City/Town Randolph,MA 02368
to act on the property owner's behalf,in all matters relative to work authorized by this building permit application.
I
n
SECTION 10:CONSTRUCTION CONTROL(Please fill out Appendix 2)
(If building is less than 35,000 cu.ft.of enclosed space andf or not under Construction Control then check here and skip Section 10.1)
10.1 Registered Professional Responsible for Construction Control
Name(Registrant) Cliff Boehmer,Davis Square Architects Registration Number 10697
Telephone No.617-764-3700 e-mail address cboehmer'ddavissquarearchitects.com Discipline Architectural
Street Address 240A Elm Street City/Town Somerville State MA Zip 02144 Expiration Date 08/14
102 General Contractor
Company Name NEI General Contracting
Name of Person Responsible for Construction Douglas Grant Barnum,Superintendent License No.and Type CS-069714
Street Address 27 Pacella Park Drive City/Town Randolph State MA Zip 02368
781-885-3792 781-6644811 gbaroum®neigc.com
Telephone No.(business) Telephone No.(cell) e-mail address
SECTION 11:WORKERS COMPP.NSATION INSURANCE AFFIDAV[7(M.G.L.c.152.§25C(6))
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the budding permit.
Is a signed Affidavit submitted with this application? Yes
SECTION 12.CONSTRUCTION COSTS AND PERMIT FEE _^
Item Estimated Costs:(Labor and Total Construction Cost(from Item 6)_
Materials) $11 per$1,000 of Construction Cost for each building as per the attached breakdown
1.Building $305,116.57 $305,116.57/1000=$3,356.28
2.Electrical $ BY OTHERS Enclose check payable to City of Salem
3.Plumbing $ BY OTHERS (contact municipality)and write check number here 26339
4.Mechanical(HVAC) $ BY OTHERS
5.Mechanical(Other) $ BY OTHERS
6.Total Cost $305,116.57
SECTION 13.SIGNATURE OF BUILDING PERMIT APPLICANT -
By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this
application is true and accurate to the best of my knowledge and understanding.
Name:Alyson B.Therrien,Project Manager NEI General Contracting Tele No. 781-8853792(office);617-640-7453(cell)
Street Address 27 Pacella Park
""""Drive Randolph,MA 02368
Signature � '1" / m Date: 6/10/14 f /
'- Municipal's Inspector to fill out this section upon application approval: Y
Name ate
i
i
Initial Construction Control Document
To be submitted with the building permit application by a
Registered Design Professional
for work per the 8th edition of the
•'� Massachusetts State Building Code, 780 CMR, Section 107
Project Title: Salem Point Apartments Date:05/02/14
Property Address: 17-19,23-25,41-43, 45-49, and 52 Ward Street,20-22,38,and 46 Peabody Street,
57-59, 64, and 64 '/2 Harbor Street, Salem Ma
Project: Check(x) one or both as applicable: New construction X Existing Construction
Project description:Renovations to existing residential buildings.
I Clifford J.Boehmer MA Registration Number: 10697 Expiration date: 08/14 ,am a registered design professional, and
I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning':
X Architectural Structural Mechanical
Fire Protection Electrical Other:
for the above named project and that to the best of my knowledge, information,and belief such plans,computations and
specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted
engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary
professional services and be present on the construction site on a regular and periodic basis to:
I. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107.
When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a `Final Construction Control Document'.
Enter in the space to the right a"wet"or 1EpED Aa her
electronic signature and seal: oQo f BF
697 im
e s IDS. n ►
;o MA Jy'Y
Phone number: 617-764-3700 Email: cboehmer@davissquarearchitects.com hi :
��t 11/Ui MP59��
1
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen,
provide a description.
Version 06 11 2013
Initial Construction Control Document
W To be submitted with the building permit application by a
Registered Design Professional
for work per the 8lh edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2
Project Title: Salem Point Apartments Date: May 2,2014
Property Address: Salem,MA
Project: Check(x) one or both as applicable: [ ]New construction [x] Existing Construction
Project description: Renovations to existing residential buildings
I Mark F. Rattenburv, MA Registration Number: 42757 Expiration date: June 30, 2014, am a registered design
professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly
supervised the preparation of all design plans,computations and specifications concerning]:
[ ]Entire Project [ ] Architectural [ ] Structural [ ] Mechanical
[ ] Fire Protection [x]Electrical ( ] Other:
for the above named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care,and be present on the construction site on a regular and periodic basis to:
1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures,and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'.
Enter in the space to the right a"wet"or =��yzH of MAssgOti
electronic signature and seal: o MARK F. cm
z RATTENBURY ..1
OO NO.42757
ELECTRICAL
Phone number: 6-4144 A a e
Email: mrattenbury@ury@wbaengineers.com ARo Fc1sTER� OQ'�Fd✓�....
�' FIDAA E. BARBAR
NOTARY PUBLIC
cotatarw�atn+oFMass�suserrs
tiN Conxn.Ezplres t)ct.27,20»
Building Official Use Only
Building Official Name: Permit No.: Date:
1913084 Salem PointWfidavitsVnitial Censer Ctrl Elec 5-2-14.doc
Initial Construction Control Document
1 To be submitted with the building permit application by a
Registered Design Professional
for work per the 8u'edition of the
Massachusetts State Building Code, 780 CMR, Section 107.6.2
Project Title: Salem Point Apartments Date: May 2.2014
Property Address: Salem,MA
Project: Check(x) one or both as applicable: [ ] New construction [x] Existing Construction
Project description: Renovations to existing residential buildings
I Zbigniew M. Woznv, MA Registration Number: 34029 Expiration date: June 30, 2014, am a registered design
professional, and hereby certify, to the best of my knowledge, information and belief, that I have prepared or directly
supervised the preparation of all design plans,computations and specifications concerning':
[ ]Entire Project [ ]Architectural [ ] Structural [x]Mechanical
[ ] Fire Protection [ ]Electrical [x] Other: Plumbing
for the above named project and that such plans, computations and specifications meet the applicable provisions of the
Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I
understand and agree that I (or my designee) shall perform the necessary professional services in accordance with the
Professional Standard of Care, and be present on the construction site on a regular and periodic basis to:
I. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the
contractor in accordance with the requirements of the construction documents. Such review shall not diminish or
relieve the Contractor of its submittal and other responsibilities.
2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and
quality of the work and to determine if the work is being performed in a manner consistent with the approved
construction documents and this code. The Contractor shall be responsible for performing the work in accordance
with the contract documents and shall be exclusively responsible for its construction means, methods, sequences
and procedures,and for construction safety.
4. The performance of the services shall not require any special testing or inspections unless specifically stated in the
Code.
When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent
comments, in a form acceptable to the building official.
Upon completion of the work,I shall submit to the building official a `Final Construction Control Document'.
TH OF I6
Enter in the space to the right a"wet"or ?� '
o ZBIGNIEW
electronic signature and seal: o� M GNm
u WOZNY
MECHANICAL rn
No.34029 l,�OtOt.r j2
�t LE FIDAA E.BARBAR
Phone number: 781-826-4144 NOTARY PUBLIC
Email: zwozny@wbaengineers.com ONMON EntTHOFbaSSaaUSEM
WMYGDmmE)#resOcL2?,20I7
Building Official Use Only
Building Official Name: Permit No.: Date:
J913084 Salem PoinAAffidavitsUnifial Constr Ctrl M-P 5-2-14.doe
i