Loading...
1 PARKER CT - BUILDING INSPECTION (2) ab CK > S13 �$q2- The Commonwealth of Massachusetts CITY OF ;a Board of Building Regulations and Standards al p�+ ' SALEM Massachusetts State Building Code, 780 CMR Revised war 2011 Building Permit Application To Construct, Repair, Renovate Or Demolish a One or Two-Family Dwelling I This Section For Official Use Only Ln!l Building Permit Number: Date pplied: LJ-1 Building Official(Print Name) Signature abate M SECTION 1: SITE INFORMATION n —i 1.1 Property Address: 1.2 Assessors Map& Parcel Numbers 1 Parker Ct. OD D Lla Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information:_ - - -- - -- ---- -1_4 Property Dimensions:- - -- - - T11111111-1 District Proposed Use Lot Area(sq h) Frontage(Il) � m 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 W ater Supply: (M.G.L c.40.§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Zone: Outside Flood Zone? Public❑ Private ElCheckif yes❑ Municipal ❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner of Record: Cresene Sanglap Salem, MA 01970 Name(Print) City,State.ZIP 1 Parker Ct. (978)430-7712 No.and Street Telephone Entail Address SECTION 3: DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ Alteration(s) ❑ Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units I Other 5(specilq: Solar Brief Description of Proposed Work': Install 2.08kw solar panels on roof.Will not exceed roof panel, but will add 6" to roof height. 8 panels total. SECTION 4:ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Official Use Only (Labor and Materials) I. Building $ 420.00 1. Building Permit Fee: $ Indicate how fee is determined: ❑ Standard City/Town Application Fee 2. Electrical $ 5,580.00 ❑Total Project Cost'(item 6)s multiplier x 3. Plumbing $ 2. Other Fees: $ 4. Mechanical (HVAC) $ List: 5. Mechanical (Fire $ Suppression) Total All Fees: $ Check No. Check Amount: Cash Amount: 6.Total Project Cost: $ 6,000.00 0 paid in Full 13 Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 103631 8!30/17 Gregg LaCasse License Number Expiration Date Name of CSL Holder List CSL fype(see below) U 20 Patterson Brook Rd. Unit 10 No.and Street Type Desta iption U Unrestricted(Buildings u2 to 35.000 cu. it.) W.Wareham, MA 02576 R Restricted I&I Family Dwelling City/Town,State.ZIP M Masomv RC Rooting Coveting WS Window and Siding SF Solid Fuel Burning Appliances (508)291-0007 I 1Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 170355 10/12/15 Tom Blumetti/Trinity Solar HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name --- 20 Patterson Brook Rd.-Unit 10— -_-- No.and Street Email address W.Wareham, MA 02576 (508)291-0007 Cit /Town. State,ZIP fele hone SECTION 6:WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........isr No.......__❑ SECTION 7a:OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT L as Owner of the subject property,hereby authorize Tom Blumetti to act on my behalf, in all matters relative to work authorized by this building permit application. Please see attached letter. 10/6/15 Print Owners Name(Electronic Signature) Date SECTION 7b: OWNER' OR AUTHORIZED AGENT DECLARATION By entering my name below, I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of ity, knowledge and understanding. Tom Blumetti 94. /;& ,-- 10/6/15 Print Owner's or Authorized Agent's Name(Electronic Signature) Date NOTES: I. An Owner who obtains a building petniit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC) Program), will not have access to the arbitration program or guaranty fund under M.G.L.c. 142A.Other important information on the HIC Program can be found at www.mass.gov/oda Information on the Construction Supervisor License can be found at www.mass.,*ov/dps 2 When substantial work is planned, provide the information below: Total floor area(sq. ft.) (including garage.finished basement/attics.decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of half/baths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" Trinity Solar 20 Patterson Brook Road Wareham, MA 02571 508-291-0007 Date: T I, Sanglap, Cresene , do hereby grant Trinity Solar the right to sign on Inomm.,—N—,) my behalf in all matters regarding the permit applications through the township of Salem for the installation of solar panels and all other la�w,m�oann related work on my property at 1 Parker Court . Please accept this (suz<,Anaas) document,with full signature, in place of all application signatures. Furthermore, should there be any issues or discrepancies with the paperwork, please contact Danielle DeVito at'rrinity Solar, 732-780-3779 ext. 9044 or danielle.devito@trinitysolarsystems.com. Sincerely, 1 Parker Court Homeowner's signature Street Address Sanglap, Cresene Salem MA 01970 Print name City,State,Zip Code 978-430-7712 Phone Number t 'rte ar opo CERTIFICATE OF LIABILITY INSURANCE DA E,MM,DD YY: ��' 1C✓29 '2Ula ' THIS CERTIFICATE.IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS ++ CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES i BELOW THIS CERTIFICATE CF INSURANCE (DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(Si AUTHORIZED REPRESENTATIVE OR PROCUCEF.ANC THE CERTIFICATE HOLDER,. ' I IMPORTANT If,he certlbcale holder Is an ADDITIONAL WSUREC. the pchcyhes; must De endorsed, If SUBRCGATION IS WAIVED. sublccz tc the leans and conciticns of the policy certain policies may require an endorsement A statement on this certificate does not confernonts to the i Ce holder in lieu Gi such endorsement(s)- flRODUCER CONTAC Barbare Hays NAME: _ DITTMAR AGENCY PHONE (732)462-2343 F' I-1321Taa- 1-, 713 Court Sr2eet EMAII. - Iom Nal; 8 . AD bahavdenBdit:.mar�esurance.com 1.V HCX 11611 �I_ NAIC4 INSURER Si AGFORDINC COVHRAOE Freeitol u K" 3-172E INSURER PDT-Gerlin America Insurance I INSURED msuRERat.czth River Ins uxance Com an Trinity Hea cine & hiE Inc. , DSA: Trir_i cy Solar IrySURERL LIC d's, London EPTP Future Holdings LLC INSURER O: 2211 Allenwood Road INSURER E: Wall NJ 07719 INSURER F: COVERAGES CERTIFICATE NUMBER:2014-15 Liab Master REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NCTMTHSTANDING ANY REOUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER'DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFOROED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHGWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. IILTPNSO TVPE OF I:7E SURANCE POU EfF POUCYEXP LIMITS POUCY NUMBER GENERAL 4LIBIutt EACH OCCURRENCE 3 1_1000,000 X cONNERCIAL GE NERAL UPBIUTY PREMI a U 1 $00,000 A E OCCUR 000065614 1/1/2014 1/1/2015 MED EXP(Mry ons pe2on) S PERSONAL d ADV INJURY 3 11000,000 GENERAL AGGREGATE S 2,000,000 GEN' AGGREGATE OMIT AP?LIES PER: PRODUCTS-COMPlOPAGG S 2,000,000 X POUCV ARO- LOC $ AUTOMOBILE UABIUTYficM IAB SI UMI 11000,000 A X ANY AUTO BODILY IWURY(Par p .r) S AUUTOOBS AUTOSULED AGCC000065614 1/1/2014 1/1/2015 BODILY IWURY(Pal ar,HMPm S HIRED AUTOS ANON-OV NED E S LAeeahoan S UMBRELLA UAB OCCUR XMERIIO12014 1/1/2014 1/1/2015 FSCS OCCURRENCE S 1$,000,000 B jZ EXOE55lNe OLAIMS-MADE AGGREGATE 5 1510001000 DED RETENTIONS 1NDER11012014 /1/2014 1/1/2015 Ulnftxof 810,000,000 5 $1$,000,000 A WORKERS CO.MPENSAWN WOSTAtU- I 0TH AND EMPL)YERS'LIABILITY, Y'N JER ANY PROPRIETDWPARTNEWE%ECLJTryE EL S EACH ACCIDENT OFFICENMEMaER EXCWOED- NIA 1 000 000 IMrufiib Yin NH) 000065614 1/1/2014 1/1/2015 EL DISEASE•EA ENIPLOYEE 3 1 000 DOD Ifyyss,4game u' OESDRIPOON OF OPERAnONS Uabw E.L.DISEASE-POLICY UMIT $ 11000,000 C Errors G Omiss]cns GIARK0201402 /30/2014 /30/2015 per O,,e,ence $2,000,000 Pollution Liability Aggregate $2,000,000 DESCMPRON OF OPERATIONS f LOCATIONS I VEHICLES IAtlaan ACORO tot,A441NAnel Remedca Sche4uw,if more apaw is laquira4l NJ CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Trinity Heating n Air, ACCORDANCE WITH THE POLICY PROVISIONS. Znc. T/A Trinity Solar 2211 Allenwood Road AUTHORIZED REPRESENTATIVE Wa11 Twp, NJ 07719 Barbara Bayden/BAH �c�C--- ACORO 25(2010105) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025'2owas)ot The ACORD name and logo are registered marks of ACORD Massne h tiserts Co are)a S.Iree ,Salle 04 w, mia'.1 a ce A Mda'ic aujldoo->Ico at rlictorN,Flect I ici a nsop I uprobito-N. 7+) Bi. FILEr ;v?Th i cir. 'ERMi-I Til(_1 il F}lorlT) invelir :fm Lon_ IT,-Iii, Trinity Solar AJ,,yeyS: 2211 Allenwood Rd. Cjtv/State,,Zip: Wall, NJ 07719 pt-,One 732-780-3779 Are you go imuli Check the appropriate box: Type of project(required) f 0 1 air,<nI ah 300 emrinyeesfrii and/or part-ane).` 7_ E] New construction 2.7 1 cro,sole parpnetar or,parmer,hip and have no employees working fininQ In 8. E] Remodeling any'apacin, [No workers-comp. assioncurice eqiI 9, C3 Demolition 3 1101an i horniso,,re,do,og all work myself(No vrkzcs comp insurance equiscd J 0® Building addition 4 17 J aisT it homeowner and will be unison conttadms to InGialli work ox,my P11)[1i,cy T',Ili tattoo,that all contractors either have workers COMPCITSWI011 licurance Or are bale l LZ Electrical repairs or additions Proprietors with no carrolovees. 12.E]Plumbing repairs or additions 5,M I am a general controcto,and i have hined the sub-cournictoon listed on tire attached ibe-a I-t.E]Roofnepairs These sub-contrac[ors have employees and have worker,'comp urcaustric-; 6�we are a corporation"it as Offiin CCni have esinticd their tight ofcasimption per Nl(,;L C 14,C]Other lie,§1(4) and we have no employees.[No,workers'romp insurance required_I Twit appi icanc that checks box 81 must also[ill Out the Section below shCoying their workers compensation policy information I loto,owners who sabrout this amdait indicating they eradomi;all cauda and then late outside contractors must submit a now affidavit indicating such 'Ciomacxrs that check this box most attached an additional sheershowingthic name of live-3ob-commictors;and state whether arrant those states have dmpoyticS, if the sub-contractors have employees,they must provide their workers'comp policy number. I am an employer That is providing workers'compensation insurance for my employees. Below is the policy and job site information. trtsurance Company Marret Pulicy.4 or Self-ins.Lic,#: E 0/6 ir(f zloiw Expiration Date: Job Site Address: I— RCKLr al, city/sateizip: 54 /ti,4 o t Attach a copy of the workers' compensation policy declaration page(showing the policy numberafid expiration date). Failure to secure coverage as required under NIGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of investigations of the DIA for insurance coverage verification. I do hereby cerci y hounder the pains av-R effalties offiberiuror that the information provided above is true and correct. —ff? ' - Signature: --L— -xiail— Dare, to/b/I Phone#: Qj]icird ase only. Do not write in rihis area, to be completed by city or town official City or Town: Pernot[License# Issuing Authority(circle tI L Board of Ho:aith I BuiRdling Doipairtmew 3, Cily/Trown Clerk 4, Electrical Inspector 5. Plumbing Inspector 6.Other Phone#:Contact Person: Rai c .3 i1C; Business f ,I r F _ It :1Ti - i '[i�?� .La'•t. ,! c .��� RzgisUation 170355 Type Corporatior PXPIra tic, 11021201 T* 24a06E. v\jIE 11:'•.it✓ , ;'A s if Update Add,�sz and reiu:n vzrri,Mark r?x301:, r ehar•g: Address .—. Renewal Employment Lasr,Card . Office of Cunsemer Affairs&Business Regulation License or registration valid for individul use only ME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: a gistration. 170385 Type: 'Office of Consumer Affairs and Business Regulation '}, pination: 1011212045 Corporation 10 Park Plaza-Suite 5170 etc.- Boston,MA 02116 TRINITY HEATING&AIR,INC, j TOM BLUMETTI 20 P.ATTERSON BROOK ROAD U D Edf INAREHA.M• MA 02576 llndenecretnry Not valid witfiout signature i i �u.Z wf�'i.. 1t�L �<,.. n�z'L1c1, Registration 170355 ,Yoe 3e!pclemeot Card -Vita'ilo , Illi 7[w ' 20 PATTER-SC.,N; Update Add«ss and e>=auPn.:eras. Mari asxsuc foyr4aige. Addro=s R &i,cne-vnl r; Employment - Les?C:ard of'Cnnsumer Affairs&9uslocssRegula5,:n License cr registration valid far individul use only ffrice 7ME IMPROVEMENT i:ONTRACTGR. before the expiration date. If found return to: c Office of Consumer Affairs and Business Regulation pogistratlon: 170355 Type: IQ Park Plaza-Suite 5176 ._ Expiration: 19/'1211015 Supplement Card Boston,MA 02116 TRINITY HEATING&AIR, INC. GREGG LACASSE 20 PATTERSON BROOK ROAD U -+=+%s-- --- al �I WAREHAM,IIIA 02576 o valid w ou afore Undersecretary _czns� GS-103631 _.n sir,:. _• 3:ce.,, ,_. GREGG LACASSE 14 PINE ISLAND RD_'' e MATTAPOISETT MIL 0 �r.,i "..� _xp�ration :.�mmiss�n�a 0813012017 Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President September 25,2015 Salem Building Dept. Salem, MA Re: Solar Electric Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing 2x6 at 16" o.c.with 8'-5"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load(modules plus all mounting hardware) • 30 psf snow live load(50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Cresene Sanglap, 1 Parker Ct. Salem, MA This installation design is in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws, codes,and ordinances,and specifically, International Residential Code/IRC 2009, 2011 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64"o.c.span along the rail between mounting brackets and secured using 5/16"x 3 1/Y" length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min. 2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18" of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more.Slide the 3B-inch mounting bolts into the footing bolt slots. The rails will be attached to the footings with the flange nuts. Very truly yours, O ti 'z n ' eri Con Richard rdon, .E. Massachusetts P.E. icense No.49993 CIVIL, MECHANICAL, & ELECTRICAL ENGINEERING ��TSN OF MASSgCyY& 2 m� o nwNAnD e. � C IyDON N O MECt1ANIGAI U NO,49993 'OFcisVE E' y SciONA` INSTALLATION OF NEW ROOF MOUNTED PARKER CT• 2.08kW PV SYSTEM 10 N r, 1 PARKER CT SALEM, MA 01970 A - { I Issuetll Revsons I VICINITY MAP SITE PigSCALENTS ms � SANGUP,CPESENE r 1PirviiV PEti .i14i PI AJtlress'. ', IPANKEN CT SALEM,MA 419]0 CAROAi.xere, .1-FATATHES'EAFRIxI,Eo GENERAL NO TEs CAPRI NOR C ATI ARAN IISLID SHEETINDEX 1,FIT INSTAL I ATINT c EP TO e E. PV-1 COVER SHEET W/SITE INFO&NOTES D7.7nnm: ENIANUIOLIJLAVIADRIAN c PER111:I'S 1.1 1.111111BE All Al .E PAT 11 C-�ULTANH,11 PV-2 ROOF PLAN W/MODULE LOCATIONS PRoaosEo aueKw s LI 111E I AID PV-3 ELECTRICAL 3 LINE DIAGRAM sownsrsreM CONTAINED IN THE CRAVING Ed a I: ` AND .1111FRI 11, VALLPARED FES".A u Po n xoxE FRALIKIN oA 2 THE INATAT'AUDI CONTRACTOR IS oNET BE UTILIZED AS CON, f oEVER,SIRREORtm, 0CQUIP 'IF 11I n _ W n/EYri 01 111. I THE R'EAS TAR AN r FACTOR IF ON.O."ITARC"PLAR E am F, .1-11CONSTRUCTOrvxACTIVITIES, A I FUEL E.1IRERA1 CT.E RATIO PAR A Er.mN,CI.,A'AT FON NOT N CONTRACT y`y5ltlni lnlOxnd,ion: PRIOR TO NOTALLATEL" ABBREVIATIONS R'A 'LET T V BLE THE IE TO NP/E ns ALTO 'PG,PERINTHR F-TA1111RIS 11Ud1m ALL CHEF'INS 111 OR TOP-A11 1111 O VS Sd tERC nI ED0AT N N OABC 4 EPA AM AD AFFIRLTO OA lNL M000iFb MF IDEFERESSSG� R,..AFEIv/rv0 C CrCOV OE GUNR BAR 11 AFF ABOVE FIREII IT AHR -A O.AAEk B"BUIIUTTAA.P.R ABDUL.FARE A BRAIN.OF "ONALL-1.1 o. E ' .RAF11Ure oHN LNF v 'EDADVICE :TEE,. L;AIR A H1,111 ..sr u mR nc A` T A "'.I —NECTRIERED1 FIT SALE NEUTRAL L.u. uxovA 'OR lA.N111 C -R I BULL PONTIAbeOREFLESECT ARVANEINOG FO SU OF TOO A 81 VC kNRTNI TUBE I TV'AID"'A I CR COPPER Rev.Nn. SM1ee, IN TALLI'AT DO DIRECT CURREN I ABLE AT THE O C ET 11 RIFLES IN VNIFTC. ED CTie S O c- S WE ,CTROATFr.R PLESELIBETRATERANTAITACIRD _IUIT,.1 TIRE,AND1I rD IRA CE,11- eOALLE R2 PV — 1 CODE ARP L IRESTUALUBBI AND AT BID 5BOUND FAIR T INTERRUPTER ISTAI LEEAUIAEI�UNEATC AR(O'BN BRAIN SHELF Al RICH. cr m+ais EN ARE P S OR R RATED ESS UNABLE PN rtrt5fi E,ROxExFERRO,uDARNED AIR AREVISER CxASJFARPNOTEEATHAN A,R,EAIEBEADVISED THAT E,.RVLEaxAN,ExF.xAOR"IIIAEAF.FERARTS ARE ELIEeTTOCLARISDO-10AVAT.eNT.OFEW TSEITI SOLAR LFR cRssc`r_i r,UUOIqe NDN S 11 ET G M oo ULe E.LAR I-.IF Fac,LEERING LETTER FOR ERTA.114 UN RAC SOLPR MOUNT DEA. UNDERACT FDDT \ 0E h S ISV IGGIE6 4 ,\ i0 E SUNMODD FIAEIII. nry 0 Grin.., I I.w<cm a APO CSCILLANLIFFO..u \/ "'IF TONEFIRRU REDEDOMPUART FOO ANO ,��m�iINGR RAFTER SOLAR NODULES SHALL NIR DO ARUM LETAILF " Tlt E%I EXCEED EIGHT READ H . L • I lm A O. W Q� swH NIDE ED""RF NI [']ATTACMM ENT ft CLIP DETAIL 4ETAIL3 FOR nu4 [1pV MODULE ATFACHMENT ON A$PH ALT SHINGLE ROOF r1HEI GHTFROM GROUND LEVEL TO PEAK OF ROOF L�UCUE r�J�109V1E rvV seueucl,n SCAI< SGIE.AOT,D..CALE nc1.uooule cllasn.,IOns Is5ue0l Revisions i rvVO. `�WO[SCR I>1101! - Plata.TIFF SANGLAP CRESENE INI UNI PCCI U. 'I,I'D,, RtI PrOjUcl Aeamss: '-❑ 1 PARKER CT SALEM,MA D1E ' Dnlwi�Lp TDIb. FRONT BACK PROPOSED 20RkW _.._.___. ._... SCUFF,SYSTEM . Drawlriq InErmalion Iry cony al vim. l' 1 x i Ae P ue M R2 SVMem lROmallon.2,4a1w Dc JTIll—r i OFAl5lx x 11V[. . SV NU OVA 0 e wI z A mr T U4 Rev.Nn SM1eel <) ROOFTOP SOLAR INSTALIkTION ONLY PV ARRAY WILL NOT EXTEND BEYOND THE EXISTING BUILDING ENVELOPE ARRAY SCHEDULE SYMBOLLEGEND PLUMBING SCHEDULE EQUIPMENT SCHEDULE ®OFF z 10IN R A ev L roe + ERTO UO s Ew ml .1-FLET O55 AL[REEERTOTH Um RAF a , n4os "'A'okINAFF. INslallWOmslGe ® u ArvG GAPj ur.L I tl 36ItYM-3N] Odl oTGAGUIPM OUT ED I �R 1 4 OTHER OBSTRUCTIONS ARRA NA woo - EP IOa,Ta A,LwLNI f ETn,,, 'SOLAR O4DINA o I. A ®IIN . 1 EE .,,LETTERLN I FO I QIIM'..,' M I. A ~ E r,,,CA,l I cense P.BID, Charles P Bonicker Trinity Heathy 8 Air, Inc DDA Trimly SCID NOUN ED 2211 ABAni RO WAII.NJ III UNDER SOLAR MGruLE tl 31nv. SW/I� IN OOVLE NEC 69 n3< SA.ASPS,MP,.V'I Arn ISlxw60r a�lPOROUSix Ste.i L5�1LO vna� ___ ____ 2eAT _____________________________________________________________________ JUNiIION INSH ,. � � P _ _. -___- I I { I I I I ' I CARBON/REI I I I I _ I u0E5LflIDlI 1I Prolocl Tillo: SANGLAP,CPESENE ARRAY CIRCUIT WIRI� I UISHI ACri A.IIII I CO MPL LES WIrM Solt nE[ GFCI RECEPIDER Pi Address: I915A BROADER I.c LEAD MI E%PEG MEA AMBIENT TEMPERATURE PE BASEp ON COIPE. /2 NM CABLE P MRAE MINIM UN MEAN EXTREME ION BULB 120/2bV%1SGA INSTALLATION STALLA UPS iIXt PSH RFU LOCATION MOST SIMILAR ID UTLITY s I PFR%EN OF sr AL LP TION OLOCPP WI. LOWEST EXPECTED AMBIENT METERTEMv=-ts r__ i SALEM,MA 019J0 ].)NICHEST COM MUWs AMBIENT TEMPERATURE BASEDCN ASHRaEN HIGHEST MONTH 2R ORY BUM TEm ERATUE FGR ASTI LOCATED Ma ST SMLAR TO D LDIN,DII33 ALLATION LOCATION. NGHEST CONTNUCTS TEMPY)200 AGORAD rvm AMENT L a2%N EDGE ~ PROOTEDM0p C UVTED � ME(ENl'(EETER In 9T AU R(PALM mURIC ca s 44 ER c). EOR riSS rH en 9 CURRENT CPPRANG CdioULTORS N P _ IAHNI n P/ fo15 KNORD F AND USINTED SVNUT CONUTDOO 1 ES LEAS!O5'ABOVEROOF PNp ULAOS(THEAL OOF UNIT pESTAT TEMPERPTUREofoc ore 1Bss Ua of uN sD suss). M•)PHOTOVOLTAIC POWER SYSTEMS SHALL BE r-- i.rP- O PERMTTED TO OPERATE WITH UNGROUNDED -- ---- -- PH0TOOTTAL SOURCE AND J— - -------------- ra v, 111 ( 1 B E I OUTPUT CIRCUIT PB PER ® -- --r W xEC 690.35 ESI NGDC ERA%ER SACK CEN IEP yr �J NE nuLrS u,L1 1LDI AS 5 ALL EOm PMEm INSTALLED OUTDOORS SHALL HP\ry. —�— 2r20A BAG:TEED BREAKER --------J nEnF3 FALSE, w/BREAKER LOCH ! CAIHUULATIONS faP EU HK 690.60 DISHONOR.. on 1,111, RECORD CONDUCTOR PNP PCITY PER STRING AL NZ�vl y-ilxx 1.1.11IUITA1 (NE ALUNDI B)(L)]'. (15.W1,23)1-NUEVA ANG 1#10 DERATED AMPAOT! AMR IE I IE Pi 55L.TEMP DEBATING FACTOR'D iva� All CEW SHARING-2 CLC' 100 (AD-96)_00 JOloa FRT—NR­---j. SM1eel ms Sai ]O A 1RE REDUCED CONSULTOR AMPACIT VAUE vmP .THEREFORE\WPE SIZE S IOTA L PEOU (Y 1 0o ss zso< TWT+ ' AWG 11O,DEPATEOD CAMPAC tt AMBIENT TTM TEMP. TSMS NL' 1.a SACEWAYrE TTING`3 CCCi EES /1 Wt 14 LAND CALIF ADN'I.V—IND FAIL, ( © TOTALG r ao1 "w"°m mP' 2-r THEREFORE c RE SIZE is vKIO I wA+E TOTALCALCULATIONFOR Py CURRENT:RIPOORxT ��SO LAR 10,00A UCZ "..A V O LO -- 20A OVERCURREM PROTECTION 15 VALID Optimize Engineering Co., LLC P.O. Box 264•Farmville•VA 23901 Ph: 434.574.6138.E-mail: grichardpe@aol.com Richard B. Gordon, P.E. President September 25, 2015 Salem Building Dept. Salem, MA Re: Solar Electric Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure, roof loading,and proposed site location of installation: 1. Existing roof framing: Conventional framing 2x6 at 16"o.c.with 8'-5"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load (modules plus all mounting hardware) • 30 psf snow live load (50 psf ground snow live load reference) • 4.5 psf dead load roof materials • Exposure Category B, 115 mph wind uplift live load of 19.6 psf(wind resistance) 3. Address of proposed installation: Residence of Cresene Sanglap, 1 Parker Ct.Salem, MA This installation design is in general conformance to the manufacturer's specifications, and is in compliance with all applicable laws,codes,and ordinances,and specifically, International Residential Code/IRC 2009, 2011 NEC,and 2012 ICC Energy Code. The spacing and fastening of the Unirac mounting brackets is to have a maximum of 64" o.c.span along the rail between mounting brackets and secured using 5/16"x 3'/2" length corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters, there shall be a minimum of 2 mounting brackets per rafter&min. 2" penetration of lag bolt per bracket,which is adequate to resist all 115 mph wind live loads including wind shear. The mounting brackets shall alternate between adjacent rafters between rail rows for better distribution of roof load. Penetration of anchors for modules mounted within 18"of ridge and edges of roof is to be a minimum of 3". Rails may be attached to either of two mounting holes in the L-feet. Mounting in the lower hole for a low profile, more aesthetically pleasing installation or mount in the upper hole for a higher profile to maximize airflow under the modules to cool them more.Slide the 311-inch mounting bolts into the footing bolt slots. The rails will be attached to the footings with the flange nuts. Very truly yours, Optimize Engineering Conn, LLC l Richard Gp n, .E. Massachusetts P.E. License No.49993 CIVIL,MECHANICAL,& ELECTRICAL ENGINEERING ASN OF MASSq�,4�<.' O p,.oANOQN V, GOR ,\GP& �O MEGN 49999 :[ RFGISZE�Gam/ OFF.>>"SIONP�