Paul DiBiase
Osborne Hills Realty Trust
PO Box 780
Lynnfield,MA 01940
Re: Certificates of Compliance for Osborne Hills Subdivision Lots
Dear Mr. DiBiase:
Enclosed,please find the following Certificates of Compliance:
DEP#64-452, Lot 35, 16 Osborne Hill Drive
DEP #64-454, Lot 14,25 Osborne Hill Drive
DEP #64-458,Lot 17,20 Amanda Way
These documents must be recorded at the South Essex County Registry of Deeds. Please
fill out and return the Recording Information on page 3 of the certificates, which will
indicate to the Salem Conservation Commission that the documents have been recorded.
If you have any questions please feel free to contact me at 978-619-5685.
SincerelyVevme
To
Conservation Agent
Enclosure
CC: DEP Northeast Regional Office
Ajay Narang
David Mackey
David Hanglin
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-452
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Pr Wded by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 780
cursor-do not u e e return Melling Address
s th
key. Lynnfield MA 01940
Cityrtown _. state Zip Code
1110 m 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued
Osborne Hills Realty
Trust
b° Name
7/12/2007 64-452
Dated -- DEP File Number
3. The project site is located at:
16 Osborne Hill Drive Salem
Street Address City/Town
Map 9, Part 1 35
Assessors Map/Plat Number Pardel(Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex South 27225 312
County Book Page
Certificate
4: A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/9/2014 6 9/13/2016
Date
wpefmneb.d=•ree.5rA/14 WPA Fa ea Cerdfiade of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64452
1 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-feferenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions:The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued by:
Conservatlon Co mission Dare of Is ante
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
hh,>l):/iwww.mass.gov/eea/agencies/massdep)about/contacts/fiind-the-massdeo-
regional-office-for-your-city-or-town.htm I).
Signatures:
I—
r
.pahmeh.dm•rev.W9/14 WPA Form 8%Cetefimte or Compliance•Page 2 or3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-452
Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:------------------------------------------------------------------------------------ ----------
Conservation Commission --
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County _.. ..
for:
i
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number _
Signature of Applicant
wWm8b.dGc-rev.5129114 WPA Form 89,CerNaMe of compliance-Page 3 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-454
"11 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
fors on the
computer,use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 780
cursor-do not use the return Mailing Address
key. Lynnfield MA 01940
Cityrrown State Zip Code -.
A0 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued y
Osborne Hills Realty Trust
Name
7/12/2007 64-454
Dated DEP File Number
3. The project site is located at:
25 Osborne Hill Drive Salem
Street Address Cityrrown - I
Map 9, Part 1 14
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different) _ - - --
Essex South 27225 242
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/912014&9/13/2016
Date
vpeemeb.dm•rev.50114 WPA F=Be,CeNfio9te Of Compile=•Page 1 of 3
7J
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply.
(� Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced.The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued by:
571, ` n io i l6
Conserve on Conimisslon Dat of lss nce
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http://www mass gov/eea/agencies/massdep/abouticontacts/ind-the-massdep-
re final-office-f f- our-ci -or-town.html).
Signatures:
nsfrmfib.d •rev.628114 WPA F"86,Cerbficale of Gompliame•Page 2 of 3
r
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
- WPA Form 8B — Certificate of Compliance 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: --------------------------------------------------------------------------------------------
Conservation Commission _
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County _
for:
Property Owner - -
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land,the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number _
Signature of Applicant
wpahm9e.tloc•rev.5/2W14 WPA Fc m 3a,Cedfr led Compliance•Page 3 of 3
Massachusetts Department of Environmental Protection
i Bureau of Resource Protection - Wetlands DEP File Number:
`} WPA Form 8B — Certificate of Compliance 64-458
- { Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 780
cursor-do not use the return Mailing Address
key. Lynnfield MA 01940
r City?own State Zip Code
9y 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
Osborne Hills Realty Trust
Name
6/26/2007 _ 64-458
Dated - DEP File Number
3. The project site is located at: I
I
20 Amanda Way Salem
Street Address City?own
Map 9 Part 1 Lot 17
Assessors Map/Plat Number - Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Osborne Hills Realty Trust
Property Owner(if different)
Essex South 27225 284
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
1/7/2013
Date
wpafrm8b.boc rev.12/2M9 WPA Form 86,Cerliricale of Compllance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number-
WPA Form 8B — Certificate of Compliance
,t -458
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 P ovided by DEP
B. Certification
Check all that apply:
Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions:The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
l
C. Authorization
Issued by:
Salem
Conservation Commission Date of Isguanoe
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office (See
http://www.mass.clov/dep/abouYregion/findyour.htm).
Signa res:
wpafrn9b.0oc•rev.12/23)09 WPA Form eB,Certifcate of Compliance•Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number.
WPA Form 8B — Certificate of Compliance 64-458
I Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To:-------------------------------------------------------------- ------------------------------------
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County- - ... ..
for:
Property Owner and has been noted in the chain of title of the affected property on:
j
Date ... . Book - Page
If recorded land, the instrument number which identifies this transaction is:
If registered land,the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpehmBb.dw•rev.1PlPffi09 WPA Form ae.Cenifimte of compliance-Page 3 of 3
Professignal Land Surveyors&Civil Engineers
ESSEX SURVEY SERVICE 1958- 1966
OSBORI, PALMER 1911 -1970
BRADFORD&WEED 1885- 1972
I
July 2,2014
JUL 24 2C14
Salem Conservation Commission
Ms. Julia Knisel, Chair DEPT.OF PLANKiNG&
120 Washington Street COMMUNITY DEVELOPMENT
Salem,MA 01970
RE: DEP 64-454
F 12795
LOT 14 OSBORA HILL DRIVE
SALEM, MA
Dear Madam Chairperson:
Please be advised I have completed an As Built Plan of the above referenced property
and reviewed the Order of Conditions. I fmd the construction to be in substantial
compliance.
I have noted the following deviations.
The house is larger
The driveway is smaller
Sincerely,
Christopher R. Mello, PLS
President
CRM:lc
cc: Mr. Paul Dibiase
_ 104 LOWELL STREET
PEABODY, MASS. 01960
TELEPHONE: 978-531-6121 FAX: 978-5315920
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8A — Request for Certificate of Compliance 64A54
Massachusetts Wetlands Protection Act M.G.L. c, 131, §40 Provided by DEP
ELI. P
A. Project Information
Important:
When filling out 1- This request is being made by:
forms on the Osborne H ealty Trust
computer, use Name
only the tab
key to move P. O. Box 760
Your cursor- Meiling Address
do not use the Lynnfield MA 01940
return key. Dityrrown state Zlp Code
781-334-9899
V� Phone Number
IL 2. This request is in reference to work regulated by a final Order of Conditions issued to:
Osborne Hills Really Trust
Applicant
July 12 2007 64-454
Dated DEP File Number
Upon completion
of the work 3. The project site is located at:
authorized In 25 Osborne Hill Drive Salem
an Order of street Address
Conditions,the CilyJTown
property owner Map 9 Part 1 Lot 14
must request a Asseaews Map/Plat Number Parcel/Lot Number
Certificate of 4 The final Order of Conditions was recorded at the Registry of Deeds for:
Compliance g UY
from the issuing Same
authority stating property Owner(d diHerenQ
that the work or portion of the Essex South 27225 242
work has been county Book Page
satisfactorily N/A
completed. CerUflcate(if registered land)
5. This request is for certification that(check one);
® the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed(use additional paper if necessary),
❑ the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wAromiNem-re..5/1e/11
page or
Massachusetts Department of Environmental Protection
p DEP file Number.
Bureau of Resource Protection - Wetlands
/ WPA Form BA — Request for Certificate of Compliance 64-454
Massachusettstl s We and Protection Act M.G.L. c. 131 §40
Provided by DEP
A. Project Information (cunt.)
6, Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions(OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office(see http'//www.mass,govleealagencies/massdeo/about/contactslfind-the-massdep-regional-oftice-
for-your-city-or-town.htm I).
wpafmmh.acc—m SGHn� Paea z ol]
Massachusetts Department of Environmental Protection
DEP File Number:
Bureau of Resource Protection - Wetlands
WPA Form 7 — Extension Permit for Orders of Conditions #64-454
Wetlands Protection A M. .L. . 13 Provided by DEP
Massachusetts et ds Act M.G.L. c 1, §40
A. General Information
Important:
When filling out 1. Applicant:
forms on the Osborne Hills Realty Trust
computer, use --- — -------
only the tab Name
key to move PO Box 780
your cursor• Mailing Address
do not use the Ly_nnfield________ _ — MA __ __ 01940
return key. City/Town State Zip Code
,, 2. Property Owner(if different):
Name
ream
Mailing Address
Cityrrown State Zip Code
B. Authorization
The Order of Conditions(or Extension Permit) issued to the applicant or property owner listed above on:
July 12, 2007 SALEM
Date Issued by: Conservation Commission
for work at: Osborne Hills Drive lot 1�_ Map 9 _ Lot 1 (portion) _
Street Address Assessors Map/Plat Number ParceVLot Number
recorded at the Registry of Deeds for:
Essex 27225 _ 242
County Book Page
Certificate(if registered land)
is hereby extended until: July_q 2013
Date Date the Order was last extended(if applicable)
This date can be no mor n 3 years from the expiration date of the Order of Conditions or the latest
extension. Only pired Or rs of Conditions or Extension may be extended.
This Extensi Permit must b signed by a majority of the Conservation Commission and a copy sent to
the applicant nd the approp ate DEP Regional Office (http:/Avwv.mass.gov/dep/about/region/flndyour.html
Signatur July_8, 2010
Date
i
wpafwrn doe•rev.3112010 Page 1 d 2
Massachusetts Department of Environmental Protection DEP File Number
- Bureau of Resource Protection - Wetlands
WPA Form 7 — Extension Permit for Orders of Conditions #64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
C. Recording Confirmation
The applicant shall record this document in accordance with General Condition 8 of the Order of
Conditions (see below), complete the form attached to this Extension Permit, have it stamped by the
Registry of Deeds, and return it to the Conservation Commission.
Note: General Condition 8 of the Order of Conditions requires the applicant, prior to commencement of
work, to record the final Order(or in this case, the Extension Permit for the Order of Conditions) in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of
the affected property. In the case of recorded land, it shall be noted in the Registry's Granter Index under
the name of the owner of the land upon which the proposed work is to be done. In the case of registered
land, it shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the
proposed work is done.
Detach this page and submit it to the Conservation Commission prior to the expiration of the Order of
Conditions subject to this Extension Permit.
To:
Salem _
Conservation Commission
Please be advised that the Extension Permit to the Order of Conditions for the project at:
Lot 14 Osborne Hills Dirve #64454
Project Location DEP File Number
has been recorded at the Registry of Deeds of:
Essex
County
for:
Osborne Hill Realty Trust
Property Owner
and has been noted in the chain of title of the affected property in accordance with General Condition 8 of
the original Order of Conditions on:
Date Book Page
If recorded land the instrument number which identifies this transaction is:
Instrument Number
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
,vpeformLdoc•rev.3/112010 Page 2 of 2
CITY OF SALEM
` CONSERVATION COMMISSION
July 25, 2014
Paul DiBiase
Osborne Hills Realty Trust
PO Box 780
Lynnfield, MA 01940
Re: Certificates of Compliance for Osborne Hills Subdivision Lots
Dear Mr. DiBiase:
Enclosed, please find the following Certificates of Compliance:
DEP#64-451, Lot 36, Osborne Hill Drive: Complete Certificate of Compliance
DEP#64-452, Lot 35, Osborne Hill Drive: Partial Certificate of Compliance
DEP#64453, Lot 15, Osborne Hill Drive: Complete Certificate of Compliance
DEP#64-454, Lot 14, Osborne Hill Drive: Partial Certificate of Compliance
These documents must be recorded at the South Essex County Registry of Deeds. Please
fill out and return the Recording Information on page 3 of the certificates, which will
indicate to the Salem Conservation Commission that the documents have been recorded.
If you have any questions please feel free to contact me at 978-619-5685.
Sincerely,
Tom Devine
Conservation Agent
Enclosure
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64451
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to: i
forms on the
computer,use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 760
cursor-do not
use the return Mailing Address
key. Lynnfield MA 01940
Cityrl-own Slate Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued y
Osborne Hills Realty Trust
rs Name
7/12/2007 64-451
Dated DEP File Number
3. The project site is located at:
18 Osborne Hill Drive Salem
Street Address Cityfrown
Map 9, Part 1 36
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(d different)
Essex South 27225 326
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/9/2014
Date
wpairmab.doc-rev.5/29114 WPA Farm aa,C.nifi ala of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number
:
WPA Form 813 — Certificate of Compliance 64-451
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
�!r Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issu by:
Conservation Commission ate of seance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http//www mass gov/eea/agencies/massdep/about/contacts/find-the-massdeo-
regional-office-for-your-city-or-town.html).
atyr •s:
AV
wpafraft We•rev.5129/14 MA Fo m 813,Camino,of Canpliance•Page 2 of 3
\ Massachusetts Department of Environmental Protection
l Bureau of Resource Protection - Wetlands DEP File Number:
1 WPA Form 8B — Certificate of Compliance 64-451
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: ---------------------------------------------------- ---------------- ------------------
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
i
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm8b eoc•rev.SQ9114 WPA Form 88,Certificate of Compliable•Page 3 0 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-452
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer,use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 780
cursor-do not use the return Mailing Address
key. Winnfield MA 01940
�h
�I City?own State Zip Code
u 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued to:
Osborne Hills Realty Trust
Name
7/12/2007 64-452
Dated DEP File Number
3. The project site is located at:
16 Osborne Hill Drive Salem
Street Address Cityrrown
Map 9, Part 1 35
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex South 27225 312
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/9/2014
Date
wpafrmeb.Eoc-rev.529114 WPA Form ea,Celibate of compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
(; WPA Form 86 — Certificate of Compliance 64-452
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
❑ Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
)� Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
bgan cor pleted and are r �
elele sed from t is O(\der a1re: f
/O V� h✓ fe(D-1 S. I L /u1,0'� .F� 6.� /SC fti9a ✓lien i
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issued by:
ZV i
Conservation Commission Date of Issuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http://www.mass.gov/eea/agencies/massdeo/about/contacts/find-the-massdeo-
reg i ona I-office-for-you r-city-or-town.h tm I).
-Mf- '
"afrm8b •rev.5129114 WPA Form 8e,Ceniecate of Compliance•Pape 2 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-462
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: --------------------------------------------------------------------------------------------
Conservation Commission
I
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrm52doc-rev.5129114 WPA Form aB,Certificate of Compliance-Page 3 of 3
Massachusetts Department of Environmental Protection
�— Bureau of Resource Protection - Wetlands DEP File Number:
}� WPA Form 8B — Certificate of Compliance 64453
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer, use Osborne Hills Realty Trust
only the lab key Name
to move your PO Box 780
cursor-do not use the return Mailing Address
key.
Lynnfield MA 01940
4—y Cityrrown State Zip Code
m 2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued y
Osborne Hills Realty Trust
Name
7/12/2007 64-453
Dated DEP File Number
3. The project site is located at:
27 Osborne Hill Drive Salem
Street Address Cityfrown
Map 9, Part 1 15
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex South 27225 256
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/9/2014
Date
w af.ft doc•re¢5Q9114 WPA Farm 98,cmificete of Compliance•Page 1 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection -Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64453
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check allthat apply:
Icy Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
❑ Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released from this Order are:
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
I
C. Authorization
Issued by:
M /
Conse ation Commission ate of ssuance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office(See
http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-
regional-office-for-your-city-or-town.html).
inS e /
r/
wpafrm8odoc•rev.5129114 WPA Form Be,Certilcale of Compliaoae•Page 2 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-453
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: ---------------------------------------- ----------------------------------------------
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
a
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpafrMft, c•rev.5r 9114 WPA Form 8B,Cedificaie of Compliance•Page 3 of 3
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
A. Project Information
Important:
When filling out 1. This Certificate of Compliance is issued to:
forms on the
computer, use Osborne Hills Realty Trust
only the tab key Name
to move your PO Box 780
cursor-do not use the return Mailing Address
key. Lynnfield MA 01940
Cityrrown State Zip Code
2. This Certificate of Compliance is issued for work regulated by a final Order of
Conditions issued y
Osborne Hills Realty Trust
"0 Name
7/12/2007 64-454
Dated DEP File Number
3. The project site is located at:
25 Osborne Hill Drive Salem
Street Address Cityrrown
Map 9, Part 1 14
Assessors Map/Plat Number Parcel/Lot Number
the final Order of Condition was recorded at the Registry of Deeds for:
Property Owner(if different)
Essex South 27225 242
County Book Page
Certificate
4. A site inspection was made in the presence of the applicant, or the applicant's agent,
on:
7/9/2014
Date
wpalrm8b.doc•rev.5129/14 WPA Form Be,Certificate o1 Compliance•Pape 1 of
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 8B — Certificate of Compliance 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
B. Certification
Check all that apply:
❑ Complete Certification: It is hereby certified that the work regulated by the
above-referenced Order of Conditions has been satisfactorily completed.
Partial Certification: It is hereby certified that only the following portions of work
regulated by the above-referenced Order of Conditions have been satisfactorily
completed.The project areas or work subject to this partial certification that have
been completed and are released�frgqm this Order are:
AU 6A 3\ms S . C-M`` P kd-c- bLL= (-=su
�Qrdo��rs�nw A- 'Art,&$ .
❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the
above-referenced Order of Conditions never commenced. The Order of
Conditions has lapsed and is therefore no longer valid. No future work subject to
regulation under the Wetlands Protection Act may commence without filing a new
Notice of Intent and receiving a new Order of Conditions.
❑ Ongoing Conditions: The following conditions of the Order shall continue:
(Include any conditions contained in the Final Order, such as maintenance or
monitoring, that should continue for a longer period).
Condition Numbers:
C. Authorization
Issue yi by:
onservation Commission D e of Isguance
This Certificate must be signed by a majority of the Conservation Commission and a
copy sent to the applicant and appropriate DEP Regional Office (See
http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-
regional-office-for-your-city-or-town.html).
a
`r,-1
wpafrm8b.doc•rev.5r29114 WPA Form 8B,Certificate of Compliame•Page 2 of 3 '
i
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 86 — Certificate of Compliance 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP
D. Recording Confirmation
The applicant is responsible for ensuring that this Certificate of Compliance is recorded in
the Registry of Deeds or the Land Court for the district in which the land is located.
Detach on dotted line and submit to the Conservation Commission.
To: ------- -------- --- ------------------------------------
Conservation Commission
Please be advised that the Certificate of Compliance for the project at:
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County
for:
Property Owner
and has been noted in the chain of title of the affected property on:
Date Book Page
If recorded land, the instrument number which identifies this transaction is:
If registered land, the document number which identifies this transaction is:
Document Number
Signature of Applicant
wpalrm8b.doc•rev.529114 WPA Fwm 80,Cediecafe of Compliance-Page 3 of 3
CONUIT
CITY OF SALEM
CONSERVATION COMMISSION
August 6, 2007
Mr. Paul DiBiase
Osborne Hills Realty Trust
PO Box 780
Lynnfield, Massachusetts 01940
Re: Order of Conditions—DEP#64-454
Lot 14 Osborne Hills Drive, Salem MA
Dear Mr. DiBiase:
Enclosed, please find the Order of Conditions for the above referenced project.
Following the 10-day appeal period (as of August 15, 2007), this document and the
attached Special Conditions must be recorded at the Essex County Registry of Deeds (36
Federal Street, Salem, MA). Once recorded, please return a copy of Page 9 of the Order,
which will indicate to the Commission that the document has been recorded.
As indicated in the Order, prior to any work commencing, this Order must be recorded, a
sign shall be displayed showing DEP File # 64-454 within public view, and contact me at
least 48 hours prior to any activity to schedule a pre-construction meeting to review the
Order with your hired contractor.
If you have any further questions,please feel free to contact me 978.619.5685.
Sincerely,
Carey Duqu
Conservation Agent/Staff Planner
Enclosures
CC: DEP Northeast Regional Office
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
A. General Information
Important: Salem
When filling From: 1.Conservation Commission
out forms on
the computer, 2. This issuance is for(check one): a. ® Order of Conditions b. ❑ Amended Order of Conditions
use only the
tab key to 3. To: Applicant:
move your
cursor- do not Osborne Hills Realty Trust
use the return a. First Name b.Last Name c.Company
key. ��� PO Box 780
_�V d.Mailing Address
k
Lynnfield MA 01940
e.City/1-own I.State g.Zip Code
4. Property Owner (if different from applicant):
a. First Name b. Last Name c.Company
J.Mailing Address
e.Cityl1'own f.State g.Zip Code
5. Project Location:
Lot 14 Osborne Hills Drive Salem
a.Street Address b.City/Town
Map 9 _Parcel 1 (portion)
c.Assessors Map/Plat Number d. Parcel/Lot Number
Latitude and Longitude, if known (note: 42-30-23 70-55-40
electronic filers will click for GIS locator): e. Latitude f.Longitude
s. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel):
Essex
a.County b.Certificate(if registered land)
c. Book d.Page
7. Dates: May 14 2007 July 12, 2007 August 6, 2007
a. Date Notice of Intent Filed b. Date Public Hearing Closed c. Date of Issuance
8. Final Approved Plans and Other Documents (attach additional plan or document references as
needed):
Site Development Permit Plan
a. Plan Title
Eastern Land Survey Associates Chris Mello Christopher Mello Land Surveyor
b.Prepared By c.Signed and Stamped by
May 3, 2007 1°_P0'
d. Final Revision Date e. Scale
f.Additional Plan or Document Title g. Date
wpaforM5.doc• rev.3/1/05
Page i of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings
1. Findings pursuant to the Massachusetts Wetlands Protection Act:
Following the review of the above-referenced Notice of Intent and based on the information provided
in this application and presented at the public hearing, this Commission finds that the areas in which
work is proposed is significant to the following interests of the Wetlands Protection Act. Check all that
apply:
a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution
d. ® Private Water Supply e. ❑ Fisheries f. ® Protection of Wildlife
Habitat
g ® Groundwater Supply h. ® Storm Damage Prevention i. ® Flood Control
2. This Commission hereby finds the project, as proposed, is: (check one of the following boxes)
Approved subject to:
a. ® the following conditions which are necessary in accordance with the performance standards set
forth in the wetlands regulations. This Commission orders that all work shall be performed in
accordance with the Notice of Intent referenced above, the following General Conditions, and any
other special conditions attached to this Order. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these
conditions shall control.
Denied because:
b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the
wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice
of Intent is submitted which provides measures which are adequate to protect these interests, and a
final Order of Conditions is issued. A description of the performance standards which the
proposed work cannot meet is attached to this Order.
c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the
effect of the work on the interests identified in the Wetlands Protection Act. Therefore, work on this
project may not go forward unless and until a revised Notice of Intent is submitted which provides
sufficient information and includes measures which are adequate to protect the Act's interests, and a
final Order of Conditions is issued. A description of the specific Information which is lacking and
why it is necessaryis attached to this
Order as per 310 CMR 10.05(6)(c).
Inland Resource Area Impacts: Check all that apply below. (For Approvals Only)
3. ® Buffer Zone Impacts: Shortest distance between limit of project disturbance and 36
wetland boundary(if available) a.linear feet
Resource Area Proposed Permitted Proposed Permitted
Alteration Alteration Replacement Replacement
4. ❑ Bank
a.linear feet b. linear feet c.linear feet d.linear feet
5. ❑ Bordering Vegetated
Wetland a.square feet b.square feet c.square feet d.square feet
6. ❑ Land Under Waterbodies a.square feet b.square feet c.square feet d.square feet
and Waterways
e.cu.yd dredged f.cu.yd dredged
wpaform5.dx rev.3/1/05
Page 2 of 9
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Findings (cont.)
Resource Area Proposed Permitted Proposed Permitted
7. ❑ Bordering Land Alteration Alteration Replacement Replacement
Subject to Flooding a.square feet b.square feet c.square feet d.square feet
Cubic Feet Flood Storage
e.cubic feet f.cubic feet g.cubic feet h.cubic feet
s. ❑ Isolated Land Subject
to Flooding a square feet b.square feet
Cubic Feet Flood Storage c.cubic feet d.cubic feet e.cubic feet f.cubic feet
s. ❑ Riverfront area
a.total sq.feet b.total sq.feet
Sq ft within 100 It
c.square feet d.square feet e.square feet f.square feet
Sq ft between 100-200 ft
g.square feet h.square feet i.square feet j.square feet
Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only)
to. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
11. ❑ Land Under the Ocean a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below
13. ❑ Coastal Beaches a.square feet b.square feet C.c/y nourishmt. d.c/y nourishmt.
14. ❑ Coastal Dunes
a.square feet b.square feet c.ay nourishmt. d.c/y nourishmt
15. ❑ Coastal Banks
a.linear feet b.linear feet
1e. ❑ Rocky Intertidal Shores
a.square feet b.square feet
17. ❑ Salt Marshes
a.square feet b.square feet c.square feet d.square feet
18. ❑ Land Under Salt Ponds a.square feet b.square feet
c.cu.yd dredged d.cu.yd dredged
19. El Land Containing
Shellfish a.square feet b.square feet c.square feet d.square feet
20. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
a.cu.yd dredged b.cu.yd dredged
21. ❑ Land Subject to Coastal
Storm Flowage a.square feet b.square feet
wpaform5.doc• rev.3/1105
Page 3 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
(only applicable to approved projects)
1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory
measures, shall be deemed cause to revoke or modify this Order.
2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any
injury to private property or invasion of private rights.
3. This Order does not relieve the permittee or any other person of the necessity of complying with all
other applicable federal, state, or local statutes, ordinances, bylaws, or regulations.
4. The work authorized hereunder shall be completed within three years from the date of this Order
unless either of the following apply:
a. the work is a maintenance dredging project as provided for in the Act; or
b. the time for completion has been extended to a specified date more than three years, but less
than five years, from the date of issuance. If this Order is intended to be valid for more than three
years, the extension date and the special circumstances warranting the extended time period are
set forth as a special condition in this Order.
5. This Order may be extended by the issuing authority for one or more periods of up to three years.each
upon application to the issuing authority at least 30 days prior to the expiration date of the Order.
6. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse,
rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard,
pipe, tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing.
7. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such
an appeal has been taken, until all proceedings before the Department have been completed.
8. No work shall be undertaken until the Order has become final and then has been recorded in the
Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title
of the affected property. In the case of recorded land, the Final Order shall also be noted in the
Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to
be done. In the case of the registered land, the Final Order shall also be noted on the Land Court
Certificate of Title of the owner of the land upon which the proposed work is done. The recording
information shall be submitted to this Conservation Commission on the form at the end of this Order,
which form must be stamped by the Registry of Deeds, prior to the commencement of work.
9. A sign shall be displayed at the site not less then two square feet or more than three square feet in
size bearing the words,
"Massachusetts Department of Environmental Protection"[or, "MA DEP"]
"File Number 64-454 "
w aform5.doc• rev.311/05
Pape 4 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
C. General Conditions Under Massachusetts Wetlands Protection Act
10. Where the Department of Environmental Protection is requested to issue a Superseding Order, the
Conservation Commission shall be a party to all agency proceedings and hearings before DEP.
11. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of
Compliance (WPA Form 8A) to the Conservation Commission.
12. The work shall conform to the plans and special conditions referenced in this order.
13. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the
Conservation Commission in writing whether the change is significant enough to require the filing of a
new Notice of Intent.
14. The Agent or members of the Conservation Commission and the Department of Environmental
Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours
to evaluate compliance with the conditions stated in this Order, and may require the submittal of any
data deemed necessary by the Conservation Commission or Department for that evaluation.
15. This Order of Conditions shall apply to any successor in interest or successor in control of the
property subject to this Order and to any contractor or other person performing work conditioned by
this Order.
16. Prior to the start of work, and if the project involves work adjacent to a Bordering Vegetated Wetland,
the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden
stakes or flagging. Once in lace t p he wetland boundary markers shall be maintained until a Certificate
of Compliance has been issued by the Conservation Commission.
17. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully
stabilized with vegetation or other means. At no time shall sediments be deposited in a wetland or
water body. During construction, the applicant or his/her designee shall inspect the erosion controls
on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately
control any erosion problems that occur at the site and shall also immediately notify the Conservation
Commission, which reserves the right to require additional erosion and/or damage prevention controls
it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of
work line has been approved by this Order.
18. All work associated with this Order is required to comply with the Massachusetts Stormwater Policy
Standards.
Special Conditions:
If you need more
space for
additional
conditions,
select box to
attach a text
document
wpafcrrt5.dm• rev.311/05
Page 5 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
D. Findings Under Municipal Wetlands Bylaw or Ordinance
1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No
z. The hereby finds (check one that applies):
Conservation Commission
3. ❑ that the proposed work cannot be conditioned to meet the standards set forth in a municipal
ordinance or bylaw specifically:
a. Municipal Ordinance or Bylaw b.Citation
Therefore, work on this project may not go forward unless and until a revised Notice of Intent is
submitted which provides measures which are adequate to meet these standards, and a final Order of
Conditions is issued.
4. ❑ that the following additional conditions are necessary to comply with a municipal ordinance or
bylaw:
a.Municipal Ordinance or Bylaw b.Citation
The Commission orders that all work shall be performed in accordance with the following conditions
and with the Notice of Intent referenced above. To the extent that the following conditions modify or
differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the
conditions shall control.
If you need more c. The special conditions relating to municipal ordinance or law areas follows:
space for P 9 P y
additional p conditions, The special conditions attached to this Order of Conditions relate to both the City of Salem's local
select box to ordinance and the Massachusetts Wetlands Protection Act,
attach a text
document
wpafo,m .doc• rev.3/1/06
Page 6 0l 9
L11Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
E. Issuance
This Order is valid for three years, unless otherwise specified as a special �F
condition pursuant to General Conditions#4, from the date of issuance. 1.D e of Issuance
Please indicate the number of members who will sign this form: six (6)
This Order must be signed by a majority of the Conservation Commission. 2.Number of signers
The Order must be mailed by certified mail (return receipt requested) or hand delivered to the applicant. A
copy also must be mailed or hand delivered at the same time to the appropriate Department of
Environmental Pr egional Office, if not filing electronically, and the property owner, if different
from applicant
Signatures
Notary Acknowledgement
Commonwealth of Massachusetts County of Essex
On this 12 July 2007
Day Of Month Year
Before me, the undersigned Notary Public, K. Cornacchio, A. Hamilton, M. Blier, D. Pabich,
personally appeared D. Summer, and K. Glidden
proved to me through satisfactory evidence of identification, which was/were
personally known
Description of evidence of identification
to be the person whose name is signed on the preceding or attached document, and acknowledged to
me that he/she signed it voluntarily for its stated purpose.
As member of Salem
Citylrown Conservation Commission
�t rAREYR.
,,uv Public
�7*H OF 4ASSACt1{MlM
Signature of No ary Public
Carey R. Duques
Printed Name of Notary Public
Place notary seal and/or any stamp above August 16, 2013
My Commission Expires(Date)
This Order is issued to the applicant as follows:
❑ by hand delivery on X by certified mail, return receipt requested, on
Date Date
wpaform5.doc• rev,311/05
Page 7 of 9
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
F. Appeals
The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject
to this Order, or any ten residents of the city or town in which such land is located, are hereby notified of
their right to request the appropriate DEP Regional Office to issue a Superseding Order of Conditions.
The request must be made by certified mail or hand delivery to the Department, with the appropriate filing
fee and a completed Request of Departmental
Action Fe
e Transmittal Form, as provided in 310 CMR
10.03(7) within ten business days from the date of issuance of this Order. A copy of the request shall at
the same time be sent by certified mail or hand delivery to the Conservation Commission and to the
applicant, if he/she is not the appellant. Any appellants seeking to appeal the Department's Superseding
Order associated with this appeal will be required to demonstrate prior participation in the review of this project.
Previous participation in the permit proceeding means the submission of written information to the
Conservation Commission prior to the close of the public hearing, requesting a Superseding Order or
Determination, or providing written information to the Department prior to issuance of a Superseding Order
or Determination.
The request shall state clearly and concisely the objections to the Order which is being appealed and how
the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands
Protection Act, (M.G.L. c. 131, § 40) and is inconsistent with the wetlands regulations (310 CMR 10.00).
To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts
Wetlands Protection Act or regulations, the Department has no appellate jurisdiction.
Section G, Recording Information is available on the following page.
wpafarm5.do rev.3/1/05
Page 8 d9
LlMassachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands DEP File Number:
WPA Form 5 - Order of Conditions 64-454
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
G. Recording Information
This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in
which the land is located, within the chain of title of the affected property. In the case of recorded land, the
Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land
subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court
Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information
on Page 7 of this form shall be submitted to the Conservation Commission listed below.
Salem
Conservation Commission
Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission.
------------------------------------------------------------------------------------------------------------------------
To:
Salem
Conservation Commission
Please be advised that the Order of Conditions for the Project at:
Lot 14 Osborne Hills Drive 64-454
Project Location DEP File Number
Has been recorded at the Registry of Deeds of:
County Book Page
for:
Property Owner
and has been noted in the chain of title of the affected property in:
Book Page
In accordance with the Order of Conditions issued on:
Date
If recorded land, the instrument number identifying this transaction is:
Instrument Number
If registered land, the document number identifying this transaction is:
Document Number
Signature of Applicant
nalorrtSAX rev.3/1/05
Page 9 of 9
i
Attachment to Order of Conditions # 64-454
e Pa 1 f g o 6
SALEM CONSERVATION COMMISSION
DEP FILE #64-454
Lot 14 Osborne Hills Drive (off Marlborough Road)
City of Salem, Massachusetts
ADDITIONAL FINDINGS
Based on the Estimated Habitats or Rare Wildlife and Certified Vernal Pools Map (June 1, 2003) from Natural
Heritage & Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has
been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any
vernal pools.
This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L. Chapter 131, Section 40 and the City
of Salem Wetlands Protection Ordinance, Salem Code Chapter 34,Section 34-1 —34-13.
This Order permits the construction of a single family home, associated utilities, driveway, retaining wall,
grading and landscaping on Lot 14 located on Osborne Hills Drive in Salem. The approved work is noted on the
approved plans cited on the Order of Conditions. The proposed retaining wall requires an approval from the
building inspector for the retaining wall proposed on the property. The applicant shall install a City of Salem
wetland marker on a post located along the property line abutting the wetland resource area. The Conservation
Commission approves the proposed work so long as the applicant obtains the necessary 401 Water Quality
Permit as deemed necessary by the DEP. A site walk with the Conservation Agent will determine if trees of
large caliper will need to be removed and if the applicant shall be required to plant trees in strategic locations, to
replace those removed, ultimately providing canopy to adjacent wetland, in locations to be approved by the
Conservation Agent. The Commission determined that language shall be included in the deed for Lot 14 located
on Osborn Hills Drive, stating that the owner(s)of Lot 14,pursuant to said Order of Conditions and the
Massachusetts Wetlands Protection Act, are prohibited from certain activities. Certain prohibited activities shall
remain in affect notwithstanding the issuance of a Certificate of Compliance relating to the Order of Conditions.
These prohibited activities include: installation of a swimming pool, re-grading or filling of the lot,adding
additional impervious material such as bituminous concrete or regular concrete or any other activity that would
be regulated by the Massachusetts Wetlands Protection Act. The activities that are prohibited, however, may
occur upon appropriate approvals obtained from the Salem Conservation Commission or the Massachusetts
Department of Environmental Protection or any successor entity. Proposed and approved work will occur
within the Buffer Zone of Bordering Vegetated Wetlands. Language shall also be included in the association
documents stating "The subdivision is developed within and around Wetland areas that are subject to the
jurisdiction of the Salem Conservation Commission. The dumping of leaves, yard waste, debris or any other
material into any Wetland area or into the Open Space or Common Parcels is prohibited. The Owners of any
Lot responsible for violating this prohibition shall be responsible financially and criminally for any violation of
this prohibition, including all costs (including court costs and attorney fees)associated with the restoration of
the disturbed area."
GENERAL CONDITIONS
1: This Order of Conditions must be recorded in its entirety (all 6 pages) at the Essex County Registry of
Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day
appeal period and within 30 days of the issuance. A copy of the recording information must be
Attachment to Order of Conditions # 64-454
Page 2of 6
submitted to the Salem Conservation Commission before any work approved in this Order
commences.
2. Approval of this application does not constitute compliance with any law or regulation other than
M.G.L Chapter 131, Section 40,Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands
Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13.
3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No
alteration of wetland resource areas or associated buffer zones, other than that approved in this Order,
shall occur on this property without prior approval from the Commission.
4. Prior to any work commencing, a sign shall be displayed showing DEP File#64-454, and not placed on
a living tree.
5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the
date of the issuance of this Order.
6. With respect to this Order, the Commission designates the Conservation Agent as its agent with powers
to act on its behalf in administering and enforcing this Order.
7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at
any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131,
Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or
documentation that it deems necessary for that evaluation.
8. The term"Applicant"as used in this Order of Conditions shall refer to the owner, any successor in
interest or successor in control of the property referenced in the Notice of intent, supporting documents
and this Order of Conditions. The Commission shall be notified in writing within 30 days of all
transfers of title of any portion of the property that takes place prior to issuance of the Certificate of
Compliance.
9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and
approvals associated with this project. These permits may include but are not necessarily limited to the
following:
(1) Section 404 of the Federal Water Pollution Control Act(P.L. 92-500, 86 stat. 816),U.S. Army
Corps of Engineers.
(2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority
of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00.
(3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch. 21A ss7
and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the
septic system within 100 feet of wetlands shall be submitted to the Commission prior to
construction initiation.
(4) Design Requirements for Construction in Floodplains under the State Building Code (780 CMR
744.).
10. If there are conflicting conditions within this Order, the stricter condition(s) shall rule.
11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and
surface waters during construction or after completion of the project.
Attachment to Order of Conditions # 64-454
Page 3of 6
12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods
and boundary during construction if necessary.
13. The Commission reserves the right to impose additional conditions on portions of this project or this site
to mitigate any actual or potential impacts resulting from the work herein permitted.
14. The work shall conform to the following attached plans and special conditions:
Final Approved Plans
Lots 13-15 and 35-36 Site Development Permit Plan Located in Salem MA
(Title)
May 3, 2007
(Dated)
Christopher R. Mello, Land Surveyor
(Signed and Stamped by)
City of Salem Conservation Commission
(On file with)
15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved
plan(s) shall require the applicant to file a Notice of Project Change with the Commission. The Notice
shall be accompanied by a written inquiry prior to their implementation in the field, as to whether the
change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend
this Order of Conditions. A copy of such request shall at the same time be sent to the Department of
Environmental Protection.
16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has
been issued,the applicant or current landowner shall submit to the Commission a statement signed by the
buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of
the Order of Conditions.
PRIOR TO CONSTRUCTION
17. Prior to the commencement of any activity on this site other than activities listed above,there
shall be a Pre-Construction Meeting between the project supervisor, the contractor responsible for the
work, and a member of the Conservation Commission or its Administrator to ensure that the
requirements of the Order of Conditions are understood. The staked erosion control line shall be
adjusted, if necessary, during the pre-construction meeting. Please contact the Conservation Commission
Agent at(978) 745-9595 ext 311 at least forty-eight (48) hours prior to any activity to arrange for the
pre-construction meeting.
18. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and
erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The
Commission and/or its Administrator shall inspect and approve such installation at the pre-construction
meeting.
19. No clearing of vegetation, including trees, or disturbance of soil shall occur prior to the pre-construction
meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre-
construction meeting if absolutely necessary in order to place erosion control stakes where required.
Attachment to Order of Conditions # 64-454
Page 4of 6
20. There shall be 20 hay bales and wooden stakes under cover on the site to be used only for emergency
erosion control.
EROSION CONTROL
21. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction,
and shall be maintained during construction in the wetland areas and buffer zones. The erosion control
specifications provided in the Notice of Intent and the erosion control provision in the Order will be the
minimum standards for this project; the Commission may require additional measures.
22. All debris,fill and excavated material shall be stockpiled a location far enough away from the wetland
resource areas to prevent sediment from entering wetland resource areas.
23. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or
replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed.
24. The area of construction shall remain in a stable condition at the close of each construction day.
25. Any de-watering of trenches or other excavation required during construction shall be conducted so as
to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered
through hay bale sediment traps, silt filter bags or other means approved by the Commission or its
Administrator.
26. Within thirty (30)days of completion of construction on any given portion of the project,all disturbed
areas in the completed portion of the site shall be permanently stabilized with rapidly growing
vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas.
27. If soils are to be disturbed for longer that two(2) months, a temporary cover of rye or other grass should
be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth,
exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to
prevent soils from being washed by rain or flooding.
DURING CONSTRUCTION
28. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all
times when work is in progress.
29. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on
the approved plan(s).
30. All waste products,grubbed stumps, slash;construction materials,etc. shall be deposited at least 100 feet
from wetland resource areas and 200 feet from river.
31. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage
system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be
immediately removed.
32. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil
prior to seeding and final stabilization.
33. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale
barriers and/or silt bags to filter silt from stormwater before it enters the drainage system.
34. There shall be no pumping of water from wetland resource areas.
Attachment to Order of Conditions # 64-454
Page 5of 6
35. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other
components shall be fixed immediately.
36. During construction, all drainage structures shall be inspected regularly and cleaned as necessary.
37. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance
of enforcement actions by the Conservation Commission including,but not limited to,civil administrative
penalties under M.G.L Chapter 21 A, section 16.
AFTER CONSTRUCTION
38. Upon completion of construction and final soil stabilization, the applicant shall submit the following to
the Conservation Commission to request a Certificate of Compliance (COC):
(1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if
required by the Conservation Commission at the time of request).
(2) A letter from a Registered Professional Engineer certifying compliance of the property with this
Order of Conditions.
(3) An "As-Built" plan signed and stamped by a Registered Professional Engineer or Land Surveyor
showing post-construction conditions within all areas under the jurisdiction of the Massachusetts
Wetlands Protection Act. This plan shall include at a minimum:
(a) All wetland resource area boundaries with associated buffer zones and regulatory setback
areas taken from the plan(s)approved in this Order of Conditions;
(b) Locations and elevations of all stormwater management conveyances, structures and best
management designs,including foundation drains,constructed under this Order within any
wetland resource area or buffer zone;
(c) Distances from any structures constructed under this Order to wetland resource areas-
"structures"include,but are not limited to,all buildings,septic system components, wells,
utility lines,fences,retaining walls,and roads/driveways;
(d) A line delineating the limit of work-"work"includes any filling,excavating and/or
disturbance of soils or vegetation approved under this Order;
39. When issued, the Certificate of Compliance must be recorded at the Essex County Registry of Deeds
and a copy of the recording submitted to the Salem Conservation Commission.
40. If the completed work differs from that in the original plans and conditions, the report must specify how
the work differs; at which time the applicant shall first request a modification to the Order. Only upon
review and approval by the Commission, may the applicant request in writing a Certificate of
Compliance as described above.
41. Erosion control devices shall remain in place and properly functioning until all exposed soils have been
stabilized with final vegetative cover and the Conservation Commission and/or its Administrator has
authorized their removal.
ADDITIONAL CONDITIONS
42. Applicant shall obtain necessary permits from the building inspector for the construction of the retaining
wall on Lot 14.
43. Applicant shall obtains the necessary 401 Water Quality Permit as deemed necessary by the DER
Attachment to Order of Conditions # 64-454
Page 6of 6
44. Applicant shall have a site walk with the Conservation Agent to determine if trees of large caliper will
need to be removed and if the applicant shall be required to plant trees in strategic locations,to replace
those removed, ultimately providing canopy to adjacent wetland, in locations to be approved by the
Conservation Agent. Number of trees to be planted to be approved by the Conservation Agent and/or
the Conservation Commission.
45. The applicant shall include the following language in the deed for Lot 14 located on Osborn Hills Drive:
"the owner(s) of Lot 14, pursuant to said Order of Conditions and the Massachusetts Wetlands
Protection Act, are prohibited from certain activities. Certain prohibited activities shall remain in affect
notwithstanding the issuance of a Certificate of Compliance relating to the Order of Conditions. These
prohibited activities include: installation of a swimming pool, re-grading or filling of the lot, adding
additional impervious material such as bituminous concrete or regular concrete or any other activity that
would be regulated by the Massachusetts Wetlands Protection Act. The activities that are prohibited,
however, may occur upon appropriate approvals obtained from the Salem Conservation Commission or
the Massachusetts Department of Environmental Protection or any successor entity." A copy of the
deed shall be submitted to the Conservation Agent to be included in the project file for DEP#64-454.
46. The applicant shall include language in the association documents stating "The subdivision is developed
within and around Wetland areas that are subject to the jurisdiction of the Salem Conservation
Commission. The dumping of leaves, yard waste, debris or any other material into any Wetland area or
into the Open Space or Common Parcels is prohibited. The Owners of any Lot responsible for violating
this prohibition shall be responsible financially and criminally for any violation of this prohibition,
including all costs (including court costs and attorney fees)associated with the restoration of the
disturbed area." A copy of the association documents shall be submitted to the Conservation Agent to
be included in the project file for DEP#64-454.
47. The applicant shall install a City of Salem wetland marker on a post located along the property line
abutting the wetland resource area.
OSBORNE HILLS REALTY TRUST
PO Box 780
Lynnfield, MA 01940
Ph. 781-334-9899 Fx. 781-334-0111
REC',� . QED
June 29, 2010 . JUL 0 2 2010
DEPT. OF PLANNING a
Mr. David Pabich, Chairman
comet uNrn coPMeNT
Salem Conservation Commission
120 Washington Street, 3rd Floor
Salem, MA 01970
RE: Strongwater Crossing A/K/A Osborne Hills Subdivison
Order of Condition Extensions
Dear Mr. Chairman;
The above 'referenced project has several Order of Conditions due to expire on
July 12, 2010 and July 26, 2010.
Due to economic difficulties, this development is not yet completed. Therefore,we
respectfully request an extension of time to complete the work authorized by the
Order of Conditions referenced below for a period of three years, until July 12, 2013
and July 26, 2013.
DEP #64-451 DEP#64-455 DEP #64-459
DEP #64-452 DEP #64-456
DEP #64-453 DEP #64-457
DEP #64-454 DEP#64-458
Could you kindly include us on the agenda of your next regularly scheduled meeting
so that we may discuss this issue with the board.
Thank you in advance for your cooperation in this matter.
Your rul
aul DiBiase
Osborne Hills Realty Trust,Trustee
PD/lc
Cc via fax: Attorney Brian McGril
Cc via fax: Frank Taromino,Conservation Agent
OSBORNE HILLS
LOTS 13-15 & 35-36
Lot Filing Type Maximum Distance Distance Roof Impervious Impervious Comments
Wall Height Work to Dwelling to Recharge Coverage as Coverage as
Resource Resource Shown on Proposed
Area Area Definitive May 2007
Plan (SF) (SF)
13 RDA -- 67 FT. 112 FT. No 1,920 1,925
14 EOI 7 FT. 36 FT. 80 FT. Yes 1,920 2,160 Increase 240 SF
15 11.5 FT. 15 FT. 52 FT. Yes 1,920 2,160 Increase 240 SF
35 NOI 8 FT. 38 FT. 98 FT. Yes 1,920 2,160 Increase 240 SF
36 NOI 14 FT. 16 FT. 75 FT. Yes 1,920 2,160 Increase 240 SF
r`
CONDMON NO.
The deed for lot 13 shall contain the following restrictive language:
Lot 13 is subject to an Order of Conditions issued by the Salem Conservation
Commission (DEP File# ), recorded at Essex South Registry of Deeds at Book
Page . The owners of Lot , pursuant to said Order of
Conditions and the Massachusetts Wetlands Protection Act, are prohibited from certain
activities. Certain prohibited activities shall remain in affect notwithstanding the issuance
of a Certificate of Compliance relating to the Order of Conditions. These prohibited
activities include: installation of a swimming pool, re-grading or filling of the lot, adding
additional impervious material such as bituminous concrete or regular concrete or any
other activity that would be regulated by the Massachusetts Wetlands Protection Act.
The activities that are prohibited, however, may occur upon appropriate approvals
obtained from the Salem Conservation Commission or the Massachusetts Department of
Environmental Protection or any successor entity.
ARTICLE XH
CONSERVATION COMMISSION
The subdivision is developed within and around Wetland areas that are subject to the
jurisdiction of the Salem Conservation Commission. The dumping of leaves, yard waste,
debris or any other material into any Wetland area or into the Open Space or Common
Parcels is prohibited. The Owners of any Lot responsible for violating this prohibition shall
be responsible financially and criminally for any violation of this prohibition, including all
costs (including court costs and attorney fees) associated with the restoration of the disturbed
area.
�\ COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF ENERGY & ENVIRONMENTAL AFFAIRS
DEPARTMENT OF ENVIRONMENTAL PROTECTION
NORTHEAST REGIONAL OFFICE
205B LOWELL STREET, WILMINGTON, MA 01887 978-694-3200
DEVAL L.PATRICK
IAN A.BOWLES
Governor
ECV� M � � �.
_. Secretary
TIMOTHY P.MURRAY JU�
Lieutenant Governor lr 6 ARLEEN O'DONNELL
Commissioner
DEPT.OF PLMIra,;,
DATE: June 4, 2007 Municipality: SALENC0MMUNITY DEVELOP; . 'o
(city/town)
RE: NOTIFICATION OF WETLANDS PROTECTION ACT FILE NUMBER
The Department of Environmental Protection has received a Notice of Intent filed in accordance with the
Wetlands Protection Act(M.G.L. c. 131, §40):
Applicant: Osborne Hills Realty Trust Owner:
Address: PO Box 780 Address:
Lynnfield,MA 01940
LOCUS: Lot 14 Osborne Hill Drive
This project has been assigned the following file# :NE 064-0454
ISSUANCE OF A FILE NUMBER INDICATES ONLY COMPLETENESS OF SUBMITTAL,NOT
APPROVAL OF APPLICATION
Although a file#is being issued,please note the following:
From the enclosed plans it appears that there were multiple wetland crossings for the subdivision.
Please submit to MassDEP the transmittal number for the 401 WQC. The MassDEP is unable to locate
the 401 WQC.
If you have any questions regarding this letter,please contact: Mr.MICHAEL ABELL @(978) 694-
' 3257
Cc: Conservation Commission: Salem Conservation Commission, City Hall 1 Salem Green
This iofarm dim,is available in alternate format.Call Donald M.Games,ADA Coordinator at 617-556-1057.
hq%//w wr.mass.eov/deo •Fax(978)694-3499
`0 Pdnted on Recycled Paper
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
Important:When filling out A. General Information
forms on the
computer, use 1. Project Location (Note: electronic filers will click on button for GIs locator):
only the tab key
to move your Lot 14 Osborne Hill Drive Salem 01970
cursor-do not a. Street Address b.Cit /Town c.Zip Code
use the return y P
key. Latitude and Longitude: 42-30-23 70-55-40
d. Latitude e.Longitude
9 1 (portion)
f.Assessors Map/Plat Number g. Parcel/Lot Number
2. Applicant:
Osborne Hills Realty Trust
a. First Name b. Last Name c.Company
Note: P. O. Box 780
Before d. Mailing Address
completing this nn L field MA 01940
form consult —y
your local e. City/Town f.State g.Zip Code
Conservation 781-844-7026
Commission regarding any h. Phone Number i. Fax Number I. Email address
municipal bylaw 3. Property owner(if different from applicant): ❑ Check if more than one owner
or ordinance.
a. First Name b. Last Name c.Company
d. Mailing Address
e.City/Town I.State g.Zip Code
h. Phone Number i. Fax Number j.Email address
4. Representative (if any):
a. Firm
Attorney John Keilty
b. Contact Person First Name c.Contact Person Last Name
40 Lowell Street
d. Mailing Address
Peabody MA 01960
e.City/Town f.State g.Zip Code
978-531-7900
h. Phone Number i.Fax Number j.Email address
5. Total WPA Fee Paid (from NO]Wetland Fee Transmittal Form):
$500.00 $237.50 $262.50
a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid
6. General Project Description:
Construction of single family dwelling, grading, retaining wall, driveway and landscaping in the Buffer
Zone.
wpaform3.doc•rev.4/12/06 Page 1 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection -Wetlands oEP File Number
WPA Form 3 — Notice of Intent
( Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 S Salem
trranaaction Number
Cityrrown
A. General Information (continued)
7. Project Type Checklist:
a. ® Single Family Home b. ❑ Residential Subdivision
C. ❑ Limited Project Driveway Crossing d. ❑ Commercial/Industrial
e. ❑ Dock/Pier f. ❑ Utilities
g. ❑ Coastal Engineering Structure h. ❑ Agriculture—cranberries, forestry
i. ❑ Transportation j. ❑ Other
8. Property recorded at the Registry of Deeds for:
Essex So. District 313
a.County b. Page Number
17338
c. Book d.Certificate#(if registered land)
9. Has work been performed on the property under an Order of Resource Area Delineation involving
Simplified Review within 3 years of the date of this application?
a. ❑ Yes b. ® No
If yes, no Notice of Intent or Request for Determination of Applicability may be filed for work within the
50-foot-wide area in the Buffer Zone along the resource area during the three-year term of an Order
of Resource Area Delineation, or any Extended Order, or until the applicant receives a Certificate of
Compliance, whichever is later.
10. Buffer Zone Only- Is the project located only in the Buffer Zone of a bordering vegetated wetland,
inland bank, or coastal resource area?
a. ® Yes-answer 11 below, then skip to Section C.
b. ❑ No-skip to Section B.
11. Buffer Zone Setback— For projects that involve work only in the buffer zone, select the applicable
adjacent resource area (check one):
a. ® BVW b. ❑ inland bank c. ❑ coastal resource area
The distance between the closest project disturbance and the associated resource area is:
36 feet
d. linear feet
wpaform3.doc•rev.4/12/06 Page 2 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection -Wetlands DEP File Number
i
WPA Form 3 — Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
B. Resource Area Effects
1. Inland Resource Areas
Check all that apply below. Attach narrative and any supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Bank 1. linear feet 2. linearfeet
number b. ❑ Bordering Vegetated
(provided on
your receipt Wetland 1.square feet 2.square feet
page)with all c. ❑ Land Under 1.square feet 2.square feet
supplementary Waterbodies and
information you Waterways 3.cubic yards dredged
submit to the d. ❑ Bordering Land
Department. Subject to Flooding 1.square feet 2.square feet
3.cubic feet of flood storage lost 4.cubic feet of flood storage replaced
e. ❑ Isolated Land Subject
to Flooding 1.square feet
2.cubic feet of flood storage lost 3.cubic feet of flood storage replaced
❑ For f. ❑ Riverfront area 1. Name of Waterway(if available)
projects
impacted by 1.Width of Riverfront Area (check one):
the riverfront
area and a ❑ 25 ft. - Designated Densely Developed Areas only
buffer zone of
another ❑ 100 ft. - New agricultural projects only
resource
area, add ❑ 200 ft. -All other projects
50%to the
total fee. 2. Total area of Riverfront Area on the site of the proposed project:
Square Feet
3. Proposed alteration of the Riverfront Area:
a.Total Square Feet b. Square Feet within 100 ft. c.Square Feet between 000 ft.and 200 ft.
4. Has an alternatives analysis been done and is it attached to this NOI? ❑ Yes❑ No
5. Was the lot where the activity is proposed created prior to August 1, 19967 ❑ Yes❑ No
wpaform3.doc•rev.4/12/06 Page 3 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection -Wetlands DEP File Number
WPA Form 3 — Notice of intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 `Document Transaction NumberSalem
City/Town
B. Resource Area Effects
2. Coastal Resource Areas:
Check all that apply below. Attach narrative and supporting documentation describing how the
project will meet all performance standards for each of the resource areas altered, including
standards requiring consideration of alternative project design or location.
Online Users:Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any)
document
transaction a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below
number
(provided on b. ❑ Land Under the Ocean 1.square feet
your receipt
page)with all 2.Cubic yards dredged
supplementary information you c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes submit to the below
Department. d. ❑ Coastal Beaches 1. square feet 2.Cubic yards beach nourishment
e. ❑ Coastal Dunes 1. Square feet 2.Cubic yards dune nourishment
f. ❑ Coastal Banks 1. Linear feet
g. ❑ Rocky Intertidal Shores 1.Square feet
h. ❑ Salt Marshes 1.Square feet 2. Sq ft restoration, rehab.,or creation
i. ❑ Land Under Salt Ponds 1.Square feet
2. Cubic yards dredged
j. ❑ Land Containing
Shellfish 1. Square feet 2.Square feet restoration, rehab.
k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the
Ocean, and/or inland Land Under Waterbodies and Waterways,
above
1.Cubic yards dredged
i. ❑ Land Subject to Coastal
Storm Flowage 1. Square feet
3. Limited Project:
Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR
10.24 or 310 CMR 10.53?
a. ❑ Yes ® No If yes, describe which limited project applies to this project:
b. Limited Project
wpaform3.doc•rev.4/12106 Page 4 of 7
Massachusetts Department of Environmental Protection Provided by DER
Bureau of Resource Protection - Wetlands DEP File Number
WPA Form 3 — Notice of Intent
Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
C. Bordering Vegetated Wetland Delineation Methodology
Check all methods used to delineate the Bordering Vegetated Wetland (BVW) boundary:
Online Users: 1. M Final Order of Resource Area Delineation issued by Conservation Commission or DEP
Include your (attached)
document
transaction 2. ❑ DEP BVW Field Data Form (attached)
number
(provided on 3. ❑ Final Determination of Applicability issued by Conservation Commission or DEP (attached)
your receipt
page)with all 4. ❑ Other Methods for Determining the BVW Boundary(attach documentation):
supplementary
information you a. ❑ 50%or more wetland indicator plants
submit to the
Department. b. ❑ Saturated/inundated conditions exist
c. ❑ Groundwater indicators
d. ❑ Direct observation
For all projects
affecting other e. ❑ Hydric soil indicators
Resource
Areas, please f. ❑ Credible evidence of conditions prior to disturbance
attach a
narrative 5. Other resource areas delineated:
theerso reow D. Other Applicable Standards and Requirements
area was
delineated. 1. Is any portion of the proposed project located in estimated habitat as indicated on the most recent
Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and
Endangered Species Program?
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Natural Heritage and Endangered Species Program
Division of Fisheries and Wildlife
2006 Atlas Route 135, North Drive
b. Date of Map Westborough, MA 01581
2. For coastal projects only, is any portion of the proposed project located below the mean high water
line or in a fish run?
a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to:
Division of Marine Fisheries- Southeast Marine Fisheries Station
50A Portside Drive
Pocasset, MA 02559
b. ❑ Not applicable—project is in inland resource area only
3. Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?
a. ❑ Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP
Website for ACEC locations). Note: electronic filers click on Website.
b.ACEC
wpaform3.doc•rev.4112106 Page 5 of 7
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection -Wetlands DEP File Number
1 WPA Form 3 — Notice Of Intent Document Transaction Number
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem
City/Town
D. Other Applicable Standards and Requirements
Online Users: 4. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands
Include your Restriction Act(M.G.L. c. 131, § 40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)?
document
transaction a. ❑ Yes ® No
number
(provided on
your receipt 5. Is any activity within any Resource Area or Buffer Zone exempt from performance standards of the
page) with all wetlands regulations, 310 CMR 10.00.
supplementary
information you a. ❑ Yes ® No If yes, describe which exemption applies to this project:
submit to the
Department. b. Exemption
6. Is this project subject to the DEP Stormwater Policy? a. ❑ Yes ® No
If yes, stormwater management measures are required. Applicants should complete the Stormwater
Management Form and submit it with this form.
b. If no, explain why the project is exempt:
Stormwater management was addressed in the NOI for the subdivision -See O.O.C. DEP File#64-
418.
E. Additional Information
Applicants must include the following with this Notice of Intent(NOI). See instructions for details.
Online Users: Attach the document transaction number(provided on your receipt page)for any of
the following information you submit to the Department.
1. ❑ USGS or other map of the area (along with a narrative description, if necessary) containing
sufficient information for the Conservation Commission and the Department to locate the site.
(Electronic filers may omit this item.)
2. ❑ Plans identifying the location of proposed activities (including activities proposed to serve as
a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative
to the boundaries of each affected resource area.
3. ❑ Other material identifying and explaining the determination of resource area boundaries
shown on plans (e.g., a DEP BVW Field Data Form).
4. ❑ List the titles and dates for all plans and other materials submitted with this NOI.
5. ❑ If there is more than one property owner, please attach a list of these property owners not
listed on this form.
6. ❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed.
7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed.
6. ❑ Attach NOI Wetland Fee Transmittal Form
g. ❑ Attach Stormwater Management Form, if needed.
wpaform3.doc•rev.4/12/06 Page 6 of 7
Massachusetts Department of Environmental Protection Provided by DEP:
Bureau of Resource Protection - Wetlands DEP File Number
1 WPA Form 3 — Notice of Intent
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number
Salem
City/Town
F. Fees
The fees for work proposed under each Notice of Intent must be calculated and submitted to the
Conservation Commission and the Department(see Instructions and NOI Wetland Fee Transmittal
Form).
No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth,
federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts
Bay Transportation Authority.
Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland
Fee Transmittal Form)to confirm fee payment:
1.Municipal Checkmper 2.Check date 7 /`
3.State Check N(umbe// 4.Check date //Vl
5. Payor name on check: First Name 6. Payor name on check: Last Name
G. Signatures and Submittal Requirements
I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying
plans, documents, and supporting data are true and complete to the best of my knowledge. I understand
that the Conservation Commission will place notification of this Notice in a local newspaper at the
expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a).
I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the
require is of M.G.L. c. 131, §40. Notice must be made in writing by hand delivery or certified mail
(rat rec pt re ste to all abutters wi in 100 feet of the property line of the project location.
ignature Applicant Date
Signatur arty if d'if ren Date
Signat a of Repre nt rve(if an Date
or C servation Co mi si
copies of the complete otice of Intent(Form 3), including supporting plans and documents; two copies
of pages 1 and 2 of the NO[Wetland Fee Transmittal Form; and the city/town fee payment must be sent to the
Conservation Commission by certified mail or hand delivery.
For DEP:
One copy of the completed Notice of Intent(Form 3), including supporting plans and documents; one copy of
pages 1 and 2 of the NOI Wetland Fee Transmittal Form; and a copy of the state fee payment must be sent to
the DEP Regional Office(see Instructions) by certified mail or hand delivery. (E-filers may submit these
electronically.)
Other:
If the applicant has checked the"yes" box in any part of Section D, Item 3, above, refer to that section and the
Instructions for additional submittal requirements.
The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely
manner may result in dismissal of the Notice of Intent.
wpafonn3.doc•rev.4/12/06 Page 7 of 7
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
\ NOI Wetland Fee Transmittal Form
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Important: A. Applicant Information
When filling out
forms on the 1. Applicant:
computer, use
only the tab Osborne Hills Realty Trust
key to move a. First Name b. Last Name c.Company
your cursor- P. O. Box 780
do not use the d.Mailing Address
return key. ynnfield MA 01940
e. Cityfrown f.State g.Zip Code
781-844-7026
�I h. Phone Number
a� 2. Property Owner(if different):
a. First Name b. Last Name c.Company
d.Mailing Address
e.City/Town f.State g.Zip Code
h. Phone Number
3. Project Location:
Lot 14 Osborne Hill Drive Salem
a.Street Address b.Cityfrown
To calculate 1 . Fees
filing fees, refer
to the category Notice of Intent(Form 3) or Abbreviated Notice of Intent(Form 4):
fee list and
examples in the The fee should be calculated using the following six-step instructions for 9 g p process and worksheet. Please see
filling out WPA Instructions before filling out worksheet.
Form 3(Notice of
Intent). Step 1/Type of Activity: Describe each type of activity that will occur in wetland resource area and
buffer zone.
Step 2/Number of Activities: Identify the number of each type of activity.
Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the
instructions.
Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2) times the fee per
category (identified in Step 3) to reach a subtotal fee amount. Note: If any of these activities are in a
Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be
multiplied by 1.5 and then added to the subtotal amount.
Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4.
Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract
$12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50.
Wpafonn3doc•Not Wetland Fee Transmittal Form•rev.3/1105
Page 1 of 2
Massachusetts Department of Environmental Protection
I
Bureau of Resource Protection - Wetlands
NOI Wetland Fee Transmittal Form
\ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
B. Fees (continued)
Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity
of Activities 3/Individual Fee
Activity Fee
Category L 1 $500.00 $500.00
Single Family Dwelling)
Step 5/Total Project Fee: $500.00
Step 6/Fee Payments:
Total Project Fee: $500.00
a.Total fee from Step 5
State share of filing fee: $237.50
b. 1/2 total fee less$12.50
City/Town share of filling fee: $262.50
c. 1/2 total fee plus$12.50
C. Submittal Requirements
a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee,
payable to the Commonwealth of Massachusetts.
Department of Environmental Protection
Box 4062
Boston, MA 02211
b.) To the Conservation Commission: Send the Notice of Intent or Abbreviated Notice of Intent,
a copy of this form, and the city/town fee payment.
c.) To DEP Regional Office (see Instructions): Send a copy of the Notice of Intent or Abbreviated
Notice of Intent; a copy of this form; and a copy of the state fee payment. (E-filers of Notices of
Intent may submit these electronically.)
Wpaform3.doc•Not Wetland Fee Transmittal Form•rev.3/1/05 Page 2 of 2
DATE INVOICE AMOUNT 53-179
JOHNR. KEILTY ESQUIRE 1�3
_ Clients Trust Account
40 LOWELL STREET N 0 1890
PEABODY, MASSACHUSETTS 01960
PAMOUNT dkwOLLARS
-.._ . __DATE_ _ __ .._ .._T.OTHEORDER, F__.__.. .._._.....ORQSSAMT,_ _UESCRIPTIQN _NETAMOUNT_
8
0Eastern Bank -Lynn, MA
11100 i8900 1:0 1130 i 7981: 40 13 1311'
DATE INVOICE AMOUNT 53-179
JOHN R. KEILTY, ESQUIRE 113
Clients Trust Account ^I
40 LOWELL
EE]r=
PEABODY, M SSACHU STREET
01960 'V o 18 91
PAMOUNT '—DOLLARS
__. _ .DATE_ _. .. .__ .. _. THE.ORDEROF _.__. _._.. ._QROSSAMT._. ..__...___. OE .TLO ,. ____NET.AMOUNT
Eastern Bank -Lynn, MA
11400 189 1D■ 1:0 1 i 30 i 7981: 40 1324 1311'
NO ME E M'Ni&X
Am [
%(
T7 1-M �gM
q Jil
"p g g a .7,
g
-W.
01 1 �lr
1 7 jy�o
Am
F W k A-
w j
4,�A
" 1o, �s 4 p"
gg...
P"Aw
'2
;RW
-7
4
N
wr TZ Alfrucq
Mlow
MOORE
Q WON"MIN
A L
%j4A\! �l yV'P Attu (,'.rr..f ��A
FIR
�K-17�iM X
Rik WIN
?"
iw NO
11,
nx
eng
LL
i Not.
'i TOT
NO
gi
W4
INS W A--
im,
t M
-1%Numm, s�44 rial A"m-
I Wer"I
FIR
4 00
MIN g
l04
W..... �u WQ;
111ROMER1115 te
FAR
'pu
0 "1 fENg� gfn tlz�g
, ii
1�, , �l
zfty
A� 9t P,
'TOW"
T"I -S� SzNal 1-0 M
WNW