53 NORTH WASHINGTON SQ - BUILDING INSPECTION +. The Commonwealth of Massachusetts
Department of Public Safely
Male 0urldmll Code 1780(-'\IR)ti•eenlh Edo I ion
City of Salem !
Buildinjil Permit A lication for any Building other than a I-or 2-Family Dwelling
I rhos?sw ion�For It
Build L'.r Only)
Building Prrmu Num r:lx Daly ApphrJ: 1 �
-!_l�J.L_ Bwl hn¢In pt,ct
5SECTION I. LOCATION tPlease indicate Block a and Lots for locations for which a street address is not available)
3 Float, JarJil t"r11Pm Nlq,:r�
�. X., and"reel Cnc /Tuty It Zito Gwlr Name of Building;Irt.,pl+hcablrl
SECTION 2:PROPOSED WORK
It New Cunstrua•uun check here❑ur check all thal apply m the twu ruws below
rArebuilding
ddingi �- -Repair.- -A(Irrafiun -Addilhm-Q- Drmuliliam-E3--(Rlrasr-(i11-tut-and.ubmtt-Appavtda-Jj—_—c Q Other ❑ Specify:
plans and/or curutructiun documents bring suppliedas pan of this permitapplicatiun? Yes ❑ Nu Q
ndent Struclunl Enginrrrin):Prrr Rrvirw rr.tairrd?1 Yes ❑ No ❑
tion of Prupowd Work:
SECTION 3:COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR
CHANGE IN USE OR OCCUPANCY
Check here if an Existing Building Evaluation is enclosed(Sre 780CMR 3402.0) ❑
Existing Use Croup(s): Proposed Use Croup(s): r
Existing Hazard Index 780 CMR 34: Proposed Hazard Index 780 CMR 34:
SECTION 4:BUILDING HEIGHT AND AREA
Existing Proposed
Nu.of Flawrs/Storirs(include basement levels)&Area Per Floor(sq.ft.)
Total Area(sal.ft.)and Total Height(ft.)
SECTION S:USE GROUP(Check as a licable)
A: Assembly A-1 ❑ A-2r ❑ A-2nc❑ A-3 ❑ A-4❑ A-5 D I B: Business ❑ E: Educational ❑
F: Facto F-1 ❑ F2❑ H: Is IXft Hazard H-1 ❑ H-2 13 H-3 O H-4❑ H-5❑
1: Institutional I.1 ❑ 1.2 Q 1.3❑ 1-4❑ M: Mercantile❑ R: Residential R-I❑ R-2❑ R-3❑ R-4 O
S: Store a 5-I ❑ }2 ❑ W Utility❑ I Special Use❑and pleasle dewnbe below:
Sprc:al Usr:
SECTION 6:CONSTRUCTION TYPE.(Check as applicable)
IA ❑ is IIAO 1180 IIIA ❑ 1110 ❑ IV ❑ VA ❑ VB ❑
SECTION 7: SITE INFORMATION (refer 10.780 C.MR 111.0 for details on each itelnl
i
Water Supply: Flood Zone Information: Sewage Disposal: trench Permit: ' Debris Removal:
I'uhhc❑ L hvd,ii.mi,tde I'I,.,d Z.,nc D hld,c.,le mtirlopal❑ A lunch will not be t.,:vn`ud D,.l......I So,Cl
I','1%.IIV❑ ,,r mdL-ntdt Z.,nv nr un .c.trm Q required Our trvnch „r .l•e.rn
permit ,.a•nalu`ral❑ _
i Railroad right.uf-way: Hazards to Air Nivigalion: V 1 I L.1,•.. t ..,,,nu-.,..,,
\, 1 \p)•h..,bl.'O L`In,alun•utlhm u,rpurl..plv, ddt.,n•a• i. Ihc,r n•a iv.. :,•n,ll.I,.I'
I,,.rnl 11, Itudd om 1, -a'd❑ h•.❑ „r\.,Q 1 r`❑ \., Q
iEcr1O.V 8:ION TENT OF CERTIFICA rE OF OCCUPANCY - _—�
I .Wnm.a l . Jc __ L-c l.,,,.,/•,., _ (,l•a.,I 1 ,m.lru.b.nt t:ri u),.u,l l , .,.I lcr ll ,n —..J
I6. ihr l•,nl,hnq. mlein u, 'll,ru,Alcr Tt.lrm' `lav'lal`bpulal„ n.
I
SECTION 9: PROPERTY OWNER AUTHORIZATION
Ne mc.u,J .\.Lire..ul I'nq•crty Diener
\,,mv tl'rutt) No. anal Street lilt, r,nvn
Pn,l•crtc lht ncr Conlart Inlurm itsun: s
53 34 I
`r.tiv i, �oNT— rrt�unne No.lb Telephone No. (cell) r-maul .idJrc..
If apl•hc.,blr, the prnprrtc utt ncr hereby authorizes
t s
Name Slnrl.\ddrr.�a lilti TownState Lip
to.ict.m the •ro •a•rte ott ner',brhallf, m.dl matters rc•lattcr to work aulhuntad by Ihs bu ldin •1,vrnut .) • .hc.n,on. ,
SECTION 10:CONSTRUCTION CONTROL (Please fill out Appendix 2)
t ll hu hhn•;s los than Aoix)cu.it.ut one Iosaal I,Jcv and/or nol under Consiruauu,Cunuul then check hot❑anal •k. ,rveon 10 I1
10.1 Registered Professional Responsible for Construction Control
�ON21 ��IV�, —,:Sd2,. �A7. ----
--t
(R-h a r. / r rp unr o. t r m ti .i rrss rgutr. ion Number�
n X 59 yKW )A tnlL� � (1lg —
�— State Li Discipline Ex irauun Dale
StreetAddress City/7uwn P V V
eneral Contractor I
ny Namr:1/✓� / )7,f0i3O,1 a���m ptmsible fur Consuuctiurs rcenm No. and Type i7r�(�plicabl )un
VQIQ (V W "7ddress City/Town Stale Zip
ne No.(bustnrss) Tel--hone No. cell - email address
SEC IUN 11:WORKERY COXMN ANCE AFFIDAVIT(M.G.L.e.132.11 25C(6))
A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and
submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit.
Is a si ned Affidavit submitted with this application? Yes O No O
SECTION 12:CONSTRUCTION COSTS AND PERMIT FEE
Item Estimated Costs:(Labor Tutal Construction Cost(from Item 6).f
and Materials)
1. Building f Building Permit Fee-Total Cunstructiun Cost x _(Insert here
2. Electrical f appropriate municipal factor)=f
3. Plumbing f
3. Mechanical (HVAC) f Mote:Minimum fee.f (contact municipality)
5. Mechanical (Other) f Enclose check payable to
6. Total Cost f (contact mlmici alit )and write check number here
SECTION I3:SIGNATURE OF BUILDING PERMIT APPLICANT
fiv entering my name below,I hereby altrst under the pains and penalises of perjury that all u(the;nformalion n,n6uned in this
.,pplicatmn ,A true and accurate to the brat nt my knutvlcalge and underslandmg.
iI'L•.,.v pnnt .�nJ •,gn muriv rite -___— Ici,N-ne \�, __— 1).uc
,utvi %,Urea. litt: r.,stn ?L;to Lip --
�t4•
I
Municipal Inspector to till out this section upon application approval:
n IL; •41 S o +
t
60
' L��QrN 7AE R40
� L�uBt�,vUT
DATE: 3-n-20n 53 WASHINGTON SOUAREI DWG. NO:
9CALB 11/2'-T-O• SALEM, MA
naei�.�n erip�ranua wc. ®'�
oC&AMMI AI c+ jjnTl 10 AI r-N=A it 0 •�•�^•�•��_ \ C�—�11�
Il
r
4- K
DATE: a-n-zon 53 WASHINGTON SQUARE TWO.NO:
SCALE: 11/2'-1 SALEM, MA'-0'
TABEFL)CM" N:ENGEFR,'p WC.
BY: AAV REMEDIAL STRUCTURAL DETAILS ' w SK-311B
wAVI arm
7x 7r _ aAAw
8 TUDS
DATE-3-n-20n 53 WASHINGTON SQUARE Dwc. No:
SCALE: t 1/z•-l'-o• SALEM, MA
By: AAV
JAIROB
REMEDIAL STRUCTURAL DETAILS SK-311A
"..bu m w vs wo
r
COMcheck Software Version 3.8.0
�(lEnvelope Compliance Certificate
2009 IECC
Section 1: Project Information
Project Type:Alteration
Project Title:The Inn on Washington Square
Construction Site: Owner/Agent: Designer/Contractor:
53 Washington Street North Ryan McShere
Salem,MA 01970 Pitman and Wardley Architects
32 Church Street
Salem, MA 01970
pitmanwardley@verizon.net
Section 2: General Information
Building Location(for weather data): Salem,Massachusetts
Climate Zone: Sa
Activity Tvoeis) - Floor Area
Multifamily 4806
Section 3: Requirements Checklist
Climate-Specific Requirements:
R-Value Proposed Max.Allowed
Post-Alteration Assembly Cavity Cont. U-Factor SHGC U-Factor SHGC
Roof 1:Attic Roof with Wood Joists 38.0 0.0 0.027 — 0.027 --
Exterior Wall 1:Wood-Framed, 16"o.c. 19.0 4.0 0.051 -- 0.064 ---
Window 1:Wood Frame:Single Pane,Clear Exemption: Storm -- -- — -- ---
window alteration.
Door 1:Wood — — 0.350 — 0.700 —
Floor 1:Wood-Framed 30.0 0.0 0.034 --- 0.034 ---
Air Leakage, Component Certification, and Vapor Retarder Requirements:
1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance
with the manufacturer's installation instructions. -
2. Windows,doors,and skylights certified as meeting leakage requirements.
3. Component R-values&U-factors labeled as certified.
❑ 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels.
Lj 5. 'Other'components have supporting documentation for proposed U-Factors.
I] 6. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that
achieves the rated R-value without compressing the insulation.
❑ 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
❑ 8. Cargo doors and loading dock doors are weather sealed.
O 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk.
O 10.Building entrance doors have a vestibule equipped with closing devices.
Exceptions:
❑ Building entrances with revolving doors.
Project Title:The Inn on Washington Square Report date: 03/22/11
Data filename: Untitled.cck Page 1 of 6
❑ Alteration projects that replace an existing door,provided,however,that existing vestibules(i.e.,pre-alteration)are not removed.
0 Doors that open directly from a space less than 3000 sq.ft.in area.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope alteration project represented in this document is consistent with the building plans,
specifications and other calculations submitted with this permit application.The proposed envelope alteration project has been designed to
meet the 2009 IECC requirements in COMcheck Version 3.8.0 and to co y with the mandatory requirements in the Requirements Checklist.
�Y�► M�s►,�-a- %�—� sue- a 2
Name-Title Signature Date
Project Title: The Inn on Washington Square Report date:03/22/11
Data filename: Untitled.cck Page 2 of 6
COMcheck Software Version 3.8.0
Interior Lighting Compliance
9 9
Certificate
2009 IECC
Section 1: Project Information
Project Type:Alteration
Project Title :The Inn on Washington Square
Construction Site: - Owner/Agent: Designer/Contractor:
53 Washington Street North Ryan McShera
Salem,MA 01970 Pitman and Wardley Architects
32 Church Street
Salem, MA 01970
pitmanwardley@verizon.net
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts If:2 (Bx C)
Multifamily 4806 0.7 3364
Total Allowed Watts= 3364
Area Category Exemption Qualifications
Total Wattage Total Pre-Alt. #Fixtures
Activity Area Pre-Alt. Post-Alt. Fixtures Repl./Added
Section 3: Interior Lighting Fixture Schedule
A B C D E
Fixture ID:Description I Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Waft.
Multifamily(4806 sq.ft.)
Compact Fluorescent 1:Triple 4-pin 42W/Electronic 1 30 42 1260
Incandescent l: Incandescent 50W 1 8 50 400
Compact Fluorescent 2:Quad 4-pin 18W/Electronic 1 12 18 216
Total Proposed Watts= 1876
Section 4: Requirements Checklist
Lighting Wattage:
1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Wafts Proposed Wafts Complies
3364 1876 Passes
Controls, Switching, and Wiring:
❑ 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to
vertical fenestration.
Cj 3. Daylight zones have individual lighting controls independent from that of the general area lighting.
Exceptions:
Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device.
Square Report date:0 3 122111
Project Title: The Inn on Washington S q
Data filename: Untitled.cck Page 3 of 6
❑ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a
separate switch for general area lighting.
❑ 4. Independent controls for each space(switch/occupancy sensor).
Exceptions:
❑ Areas designated as security or emergency areas that must be continuously illuminated.
❑ Lighting in stairways or corridors that are elements of the means of egress.
❑ 5. Master switch at entry to hotel/motel guest room.
Cl 6. Individual dwelling units separately metered.
❑ 7. Medical task lighting or arlihistory display lighting claimed to be exempt from compliance has a control device independent of the control
of the nonexempt lighting.
❑ 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either
controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle
lamp luminaires independently of other lamps,or switching each luminaire or each lamp.
Exceptions:
❑ Only one lumnaire in space.
❑ An occupant-sensing device controls the area.
❑ The area is a corridor,storeroom,restroom, public lobby or sleeping unit.
❑ Areas that use less than 0.6 Watts/sq.ft.
❑ 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft.
Exceptions:
❑ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security.
❑ 10.Photocell/astronomical time switch on exterior lights.
Exceptions:
❑ Lighting intended for 24 hour use.
❑ 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts).
Exceptions:
❑ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair.
Section 5: Compliance Statement
Compliance Statement: The proposed lighting alteration project represented in this document is consistent with the building plans,
specifications and other calculations submitted with this permit application.The proposed lighting alteration project has been designed to meet
the 2009 IECC,Chapter 8,requirements in COMcheck Version 3.8.0 and to comply with the mandatory requirements in the Requirements
Checklist.
9'c 4 RCSt r_� 341 Ij
Name-Title Sign um Date
Project Title: The Inn on Washington Square Report date: 03/22/11
Data filename: Untitled.cck Page 4 of 6
COMcheck Software Version 3.8.0
Exterior Lighting Compliance
Certificate
2009 IECC
Section 1: Project Information
Project Type:Alteration
Project Title :The Inn on Washington Square
Exterior Lighting Zone: 2(Residential mixed use area)
Construction Site: Owner/Agent: Designer/Contractor:
53 Washington Street North Ryan McShera
Salem,MA 01970 Pitman and Wardley Architects
32 Church Street
Salem,MA 01970
pitmanwardley@verizon.net
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D E F
Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed
Watts Wattage Watts Watts
I Unit (B x C)
Main entry 6 ft of door width 20 Yes 120 100
Total Tradable Watts'= 120 100
Total Allowed Watts= 120
Total Allowed Supplemental Watts"= 600
Wattage tradeoffs are only allowed between tradable areas/surfaces.
"A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID:Description I Lamp I Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Main entry(6 it of door width):Tradable Wattage
Incandescent 1:Incandescent 50W 1 2 50 100
Total Tradable Proposed Watts= 100
Section 4: Requirements Checklist
Lighting Wattage:
1. Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable .
areas/surfaces,total proposed watts must be less than or equal to total allowed watts.
Compliance:Passes.
Controls, Switching, and Wiring:
2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting.
Fl 3. Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time
switch.
❑ 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor.
Li 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours.
Exterior Lighting Efficacy:
Project Title: The Inn on Washington Square Report date: 03/22/11
Data filename: Untitled.cck Page 5 of 6
6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumen/watt.
• Exceptions:
Lighting that has been claimed as exempt and is identified as such in Section 3 table above.
`Lighting that is specifically designated as required by a health or life safety statue,ordinance,or regulation.
LJ Emergency lighting that is automatically off during normal building operation.
Lighting that is controlled by motion sensor.
�-
Section 5: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proedaqwgresrien
ystem has bee esigned to meet the 2009 IECC
requirements in COMcheck Version 3.8.0 and to comply with the mants i e Re ents Checklist.
�..3
Name- itle gnature Date
Project Title: The Inn on Washington Square Report date: 03/22/11
Data filename: Untitled.cck Page 6 of 6