86 CAVENDISH CIRCLE - BUILDING INSPECTION 66 C d sh Orde,
nu
uWo 153E nsT
HASTINGS. NN
�EJC. 0. COPY
v nCpA
CERidRCA,s�7f��,OF-OCCUPANCY
CITY OF SALEM Issued:(.aJ�eLPermit k 00
SALEM, MASSACHUSETTS 01970 Ci of Salem Building Dept,
DATE FEBRUARY 23 19 00 PERMITNO._ 1002-2000
APPLICANT FAFARD DEV CORP ADDRESS 290 ELIOT STREET 1562
(NO 1 (STREET) (CONTR'S LICENSE)
CITY ASHLAND STATE MA ZIPCODE 01721 TEL.NO. 508-881-1600
NUMBER OF
PERMIT ro NEW BUILDING (_) STORY TWD OR MORE FAMILY DWELLING UNITS 4
(TYPEOF IMPROVEMENT) NO. (PROPOSED USE)
ZONING
AT(LocniloN) 0086 CAVENDI-SH—CI-RGLE>U161C DlsrRlcr R3
INO.J (STREET)
BETWEEN AND
(CROSS STREET) {CROSS STREET}
SUBDIVISION MAP 07 LOT 0081 BLOCK 868 SIE 15. 79 ACRES
BUILDING ISTOBE FT.WIDE BY FT.LONG BY--.-FT IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION avpE)
REMARKS. BUILD 4 UNIT CONDOMINIUM AS PER PLANS. BLDG 1611UNIT C, COACH STYLE, 3 DF
AREAOR QQ
90, 000 PERPERMIT 901. 25
VOLUME ESTIMATED COST W
(CUBICISOUARE FEET)
OWNER FAFARD R. E. D. C. BUILDING DEPT.
ADDRESS 290 ELIOT STREET BY J
`\ o
June 20, 2000
Building Commissioner
Salem Building Department
Salem Town Hall
Salem, Massachusetts 01790
Re: Control Construction Certificate to Occupy
Dear Building Commissioner:
I, Ray A. Renzoni, Registered Architect in Massachusetts, certify that I have performed the
necessary professional services; observed the construction; was present on the construction site
as required under Chapter 1, Section 116 of the State Code; and made periodic observations and
reports.
To the best of my knowledge, I have determined that the work proceeded in accordance with
regulations, permits and the submitted documents approved for the building permit.
Therefore, I request that a Certificate of Occupancy be issued for 86 CavendishCircle,
Salem, Massachusetts, Unit 161 C.
I thank you for your cooperation.
Sincerely, art/
aY A. Renzoni
Registered Architect
NCARB/ASID
Architectural Innovations n1 South St. ■Berlin, MA 01503 ■(978) 838-2976