Loading...
116 NORTH ST - BPA-16-418 r , i The Commonwealth ctWfi6O�Ml ut W Department of Public.Safety Massachusetts State Building V( P Building Permit Application for any Building otherYtiart s One-r Two-Family Dwelling .(This Section For Official Use Only) Building Permit Number. Date Applied: Building Official: rE:dition TION 1:LOCATION(Please indicate Block#and Lot#for locations for which a street address is not available) y 7ytreet City/Town Zip Code Name of Budding(if applicable) SECTION 2 PROPOSED WORK MA State Code used_ If New Construction check here❑or check all that apply In the two rows bA/ �, ` _1_ Existing Building Me- Repair Alteration ❑ Addition ClDemolition ❑ (Please fill uut and submit Appendix Change of Use ❑ Change of Occupancy ❑ Other ❑ Specify: �/`R.trb Are building plans and/or construction documents being supplied as part of this permit application? Yes ❑ No Bf Is an Independent Structural Engineering Peer Review required? Yes UK No ❑ Brief Description of Prog�sed Wg1k: Re LUtO v 2 � 4 NG ( Gi hrJl rcb'� ,< (cX ,,— ;+-ln S aw. 2 ,-S k c SECTION 3.COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATION,ADDITION,OR CHANGE IN USE OR OCCUPANCY Check here if an Existing Building Investigation and Evaluation is enclosed(See 780 CMR 34) O Existing Use Group(s): Proposed Use Group(s). SECTION 4,BUILDING HEIGHT AND AREA Existing Proposed No.of Floors/Stories(include basement levels)&Area Per Floor.(sq. ft.) Total Area(sq.ft.)and Total Height(ft.) SECTION 5:USE GROUP(Check as a Iicable) A: Assembly A-1❑ A-2❑ Nightclub ❑ A-3 ❑ A4❑ A-5❑ B. Business ❑ E: Educational ❑ F: Facto F-I❑ F2❑ Fit.—High Huard H-1❑. H-2❑ H-3 Cl H4❑ H-5❑ 1: Institutional 1-1❑. 1-2❑ 1-3❑ 14 Cl M: Mercantile❑ R. Residential R-10 R-2❑ R 3❑ R4❑ S: Storage SI ❑ S-2❑ U. Utility❑ Special Use❑and please describe beluw: Special Use: SECTION 6e CONSTRUCTION TYPE(Check as a Iicable) IA ❑ IB ❑ IIA ❑ 11813 HfA ❑ IIIB ❑ IV ❑ 1 VA ❑ VB ❑ SECTION 7.SITE INFORMATION(refer to 780 CMR 111.0 for details on each item) Water Supply: Flood Zone Information: Sewage Disposal: Trench Permit: Debris Removal: Public❑ Check if outside Flood Zone❑ Indicate municipal❑ A trench will not be Licetsed Disposal Site❑ required❑or trench or specify: Private❑ or indentify Zone: or on site system❑ permit is enclosed❑ Railroad right-of-way: Hazards to Air Navigation: M!4 t lictoriy C.munissim I:�:�i�a..I'r�xts: Not Applic I Is Structure within airport approach area? Is their review completed? or Consent to Build enclosed❑ 1 Yes❑ or No❑ 1 Yes❑ No ❑ SECTION 8:CONTENT OF CERTIFICATE OF OCCUPANCY Edition of Code: Use Grnup(s): Type of Construction:. Occupant Load per Floor Does the building contain an Sprinkler Systenn?: Special Stipulations: ry)14% % rJ 5 Ip 10CANT r _ SECTION 9., PROPERTY OWNER AUTHORIZATION Name and Address of Property Owner n ' S¢eve /'dl�'Gnearu r 12 y( y�tf e S y Sc (en l 01971� Name(Print) No.and Street City/Town Zip Property Owner Contact Information:,:., Title J Telephone No.(business) Telephone No. (cell) e-mail address If applicable,the property owner hereby authorizes Name Street Address City/Town State Zip to act on the property owner's behalf,in all matters relative to work authorized by this budding permit application. SECTION 10.CONSTRUCTION CONTROL(Please fill out Appendix 2) If building is less than 35,000 cu.ft.of enclosed space and/or not under Construction Control then check here 0 and skip Section 10.1 10.1 Registered Professional Responsible for Construction Control Name(Registrant) Telephone No. e-mail address Registration Number Street Address City/Town State Zip Discipline Expiration Date 10.2 General Contractor Rd70 � dS Company Name S 0 �� Name of Person Res p nstble for Cons ction License No. and Type if Applicable j0 !fie���w�, 70 Street Address City/Town State Zip � 337 ypo , " niz,�,,,ky �Gar.lccdt Telephone No. business telephone No. cell e-mail address SECTION 11: DOAIPENSA'FION INSUR:NIC1:APF'IDAVUI' M.G.L.c.152.§25C 6 A Workers'Compensation Insurance Affidavit from the MA Department of Industrial Accidents must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Is a signed Affidavit submitted with this application? - Yes 0 No 0 SECTION 12 CONSTRUCTION COSTS AND PERMIT FEE Item Estimated Costs:(Labor orrJ and Materials) Total Construction Cost(from Item 6)_$ l I. Building 3 6 a Building Permit Fee-Total Construction Cost x—(Insert here 2.Electrical $ appropriate municipal factor)=$ 3.Plumbing $ Note:Minimum fee=$ (contact mums i ly) d.Mechanical (HVAC) $ AZ S.Mechanical Other $ Enclose check a able to %U P'Y 6.Total Cost 3 % O-o-p (contact municipality)and write check number here SECTION 13:SIGNATURE OF BUILDING PERMIT APPLICANT By entering any name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is true and accurate to the best of my knowledge and l/understanding. /l.�lLe/4od/1 lJua(deI— f7kr-337- Yoe? r1'Z7- Ple:ue print and �'ggname / Title �TVIephone No. Date O Street Address City/Town State Zip , Municipal Inspector to fill out this section upon application approvab Name Date Mass Building Regulnent of Board Public Safe 1 Z_„ Massachusetts 'License: egPlations an Stands Cons tru CS-065033 - - ros'':. ction Supervisor H O ICK C NIKOLOPpU ,1 1\` 1,F%- BELLEAU RO,gpLO S`. y . . SALEM MA 01970 q CCo nmissiOn/er` Expiration: 07/27/2017 1.JO ENGINEERING, LLCo PO BOX 685, E55EX, MA 01g2q PHONE: q'18-5q0-1100, FAX: q 18-251-OOgb MEMORANDUM Date: May 7, 2016 OF MgSS9c To: Nick Nikolopoulos, Building Superintendent o? LISAJ. so S&H Realty Trust o o'DCNNELL STRUCTURAL f„ No.39117 From: Lisa J. O'Donnell, PE Q9o�9FQ�sTEP��,lkkoe FSSIONAL Subject: 116 North Street, Salem, MA Repair of Building Parapet Lasavj 01b&tUtea Re: Review and Recommendations for Repair Work This memo is intended to review the scope of work for the repair of the brick and concrete parapet on the one-story building at the above referenced address. You and I visited the site on March 31, 2016 to review the existing'condition and the proposed methods of repair. Below I review steps of the work and recommendations for the reconstructed parapet. The work plan you outlined to me included the erection of staging along the building front to allow masons direct access to the work area and to provide protection for the area below the staging, so that the tenant businesses are not impacted while the work progresses. This staging should be tight to the facade so that material cannot fall between it and the building, to the areas below. In addition, the outside perimeter should have protective barrier as well, such as demo fabric fencing or similar material, again, to protect against small, falling debris. Clearly any signage on the front of the building will need to be temporarily removed to accommodate the work. The work may be done in stages along the storefronts, as long as the existing parapet is temporarily braced to the staging where the limits of the work area end. When the staging is in place and secured, the masons are to dismantle the existing parapet, including the brick and concrete blocks, down to the level of the tops of the storefront openings, along with a few blocks between these openings, where they have been pulled out of plumb (as at the paint store sign). The roofing behind the parapet is to be carefully detached from the back as the dismantling progresses and allows, and rolled back and secured for replacement at the end of the work. Once the existing bricks and blocks have been removed to a point where the existing components remain well attached and plumb, the replacement and reconstruction work L f Masonry Parapet Repairs at 116 North Street, Salem, MA Provided to S&H Realty Trust, Salem, MA May 7,2016 Page 2 of 2 can begin. As the parapet is rebuilt, by reassembling the blocks and bricks removed, my recommendation is that brick ties, of sufficient length, are used to tie the masonry parapet back to the face of the building and to the roof sheathing. The sheathing will have been exposed when the rubber roofing is rolled back, so it should be straightforward for ties to be secured to this surface. These will help restrain the masonry back to the roof structure, for additional support. Special attention should be paid to those areas where the tenant businesses will rehang signs, so that extra ties are included in these areas, to help offset the loads from the attached signs. Additionally, I recommend that, once the masonry parapet has been completely dismantled, the existing building and any structure behind this area be inspected to ensure that it is in good condition and serviceable. I believe that you can complete this inspection, however, I am available to review it also, should you have any questions or concerns. Once the parapet has been rebuilt, the rubber roofing should be reattached to the back, to restore the roof. In addition, I recommend that a sealer be used on the masonry, to help ensure its serviceability, considering that the concrete blocks to be reused are made of older concrete. When the above steps and my few recommendations are followed, the reconstructed parapet should be safe and stable for many years to come. Should you or anyone else involved with the work have additional questions or concerns, please contact me at once, so that the work can proceed and this essential repair completed. LJO ENGINEERING, LLG PO BOX 585, E55EX, MA 01g29 - PHONE q-IS-890--I100 - FAX 9-18-251-0098