31 MOONEY RD - BUILDING INSPECTION (2) r The Commonwealth of Massachusetts REC CITY OF Board of Building Regulations and Standards INSPEC IOi4.SALEM -, Massachusetts State Building Code, 780 CMR Revised Mar 2011 Building Permit Application To Construct, Repair, Renovate Or Dermal"? A i One-or Two-Family Dwelling R 'J This Section For Official Use Only Building Permit Number: Date Appl' d: q av) Building Official(Print Name) Signature Date SECTION 1: SITE INFORMATION l� 1.1 Property Address: 1.2 Assessors Map&Parcel Numbers 31 MOONEY ROAD 14 11 I L l a Is this an accepted street?yes no Map Number Parcel Number 1.3 Zoning Information: 1.4 Property Dimensions: RESIDENTIAL Zoning District Proposed Use Lot Area(sq ft) Frontage(ft) 1.5 Building Setbacks(ft) Front Yard Side Yards Rear Yard Required Provided Required Provided Required Provided 1.6 Water Supply: (M.G.L c.40,§54) 1.7 Flood Zone Information: 1.8 Sewage Disposal System: Public❑ Private❑ Zone: _ Outside Flood Zone?Check if yes❑ Municipal❑ On site disposal system ❑ SECTION 2: PROPERTY OWNERSHIP' 2.1 Owner of Record: PAUL KELLEY SALEM, MA Name(Print) City,State,ZIP 31 MOONEY ROAD 978-745-8496 PAKELY(@MSN.COM No.and Street Telephone Email Address SECTION 3:DESCRIPTION OF PROPOSED WORK'(check all that apply) New Construction❑ Existing Building❑ Owner-Occupied ❑ Repairs(s) ❑ 1 Alteration(s) ❑ 1 Addition ❑ Demolition ❑ Accessory Bldg. ❑ Number of Units I Other ❑ Specify:SOLAR PV Brief Description of Proposed Work':Install Solar Electric panels on roof of existing home to be interconnected with the home's Electrical System(18 panels at 4.68 kW) SECTION 4: ESTIMATED CONSTRUCTION COSTS Item Estimated Costs: Labor and Materials) Official Use Only L Building $3500 1. Building Permit Fee: $ Indicate how fee is determined: 2. Electrical $8500 ❑Standard City/Town Application Fee ❑ Total Project Cost'(Item 6)x multiplier x 3. Plumbing $ 2. Other Fees: $ 4.Mechanical (HVAC) $ List: 5.Mechanical (Fire $ Su ression Total All Fees: $ Check No. Check Amount: Cash Amount: 6. Total Project Cost: $ 12 000 ❑Paid in Full ❑Outstanding Balance Due: SECTION 5: CONSTRUCTION SERVICES 5.1 Construction Supervisor License(CSL) 107663 8/29/2017 SOLARCITY CORP./CRAIG ELLS License Number Expiration Date Name of CSL Holder - 24 ST MARTIN DRIVE BLD 2 UNIT 11 List CSL Type(see below) u No.and Street Type Description MARLBOROUGH, MA 01752 U Unrestricted(Buildings u to 35,000 cu.ft. City/Town, State,ZIP R Restricted I&2Famil Dwelling M Masonry RC Roofing Covering WS Window and Siding SF Solid Fuel Burning Appliances 978-215-2383 CELLS@SOLARCITY.COM I Insulation Telephone Email address D Demolition 5.2 Registered Home Improvement Contractor(HIC) 168572 3/8/17 SOLARCITY CORP. HIC Registration Number Expiration Date HIC Company Name or HIC Registrant Name 800 Research Dr kstrickland@solarcity.com No.and Street Email address Wilmington Ma. 01887 978-215-2366 City/Town, State,ZIP Telephone SECTION 6: WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152.§ 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the Issuance of the building permit. Signed Affidavit Attached? Yes ..........❑ No........... ❑ SECTION 7a: OWNER AUTHORIZATION TO BE COMPLETED WHEN OWNER'S AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I,as Owner of the subject property,hereby authorize SularClty/Kelly Strickland to act on my behalf, in all matters relative to work authorized by this building permit application. 'See ContracVOwner Authorization 4/21/2015 Print Owner's Name(Electronic Signature) Date SECTION 7b: OWNEW OR AUTHORIZED AGENT DECLARATION By entering my name below,I hereby attest under the pains and penalties of perjury that all of the information contained in this application is ue and accurate to the best of my knowledge and understanding. ' 4/21/2015 Print Owner's r Authorized Agent's Name(Electronic Signature) Date NOTES: 1. An Owner who obtains a building permit to do his/her own work,or an owner who hires an unregistered contractor (not registered in the Home Improvement Contractor(HIC)Program),will not have access to the arbitration program or guaranty fund under M.G.L. c. 142A.Other important information on the HIC Program can be found at m .mass. ov/oca Information on the Construction Supervisor License can be found at www.mass.gov/dpss 2. When substantial work is planned,provide the information below: Total floor area(sq. ft.) (including garage, finished basement/attics,decks or porch) Gross living area(sq. ft.) Habitable room count Number of fireplaces Number of bedrooms Number of bathrooms Number of halfibaths Type of heating system Number of decks/porches Type of cooling system Enclosed Open 3. "Total Project Square Footage"may be substituted for"Total Project Cost" CITY OF S.0 E2Nl, NWSACHUSETTS • BUILDING DEPART.%E.V'T ' 120 WASHINGTON STREET,Ya FLOOR TEL (978)745-9595 FAX(978) 740-9846 KI,%fBERLEY DRISCOLL MAYOR THoms ST.PtEm DIRECTOR OF PUBLIC PROPERTY/BU HMING COMMISSIONER Construction Debris Disposal Affidavit (required for all demolition and renovation work) In accordance with the sixth edition of the State Building Code, 780 CMR section 111.5 Debris, and the provisions of MGL c 40, S 54; Building Permit# is issued with the condition that the debris resulting from this work shall be disposed of in a properly licensed waste disposal facility as defined by MGL c l 11, S 150A. The debris will be transported by: SolarCity (name of hauler) The debris will be disposed of in : SolarCity Wilmington (name of facility) 800 Research Dr. Wilmington Ma (address of facility) �I sign,tune of permit applicant 4/21/2015 date dcbris tr.dce a The Commonwealth of Massachusetts Department of Industrial Accidents ' Ogee of Investigations I Congress Street,Suite 100 Boston,MA 02114-2017 www mass gov/dia Workers'Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Apalicant Information Please Print Leeibly Name(BusinesslOrganization/individual): SOLARCITY CORP Address:3055 CLEARVIEW WAY City/State/Zip:SAN MATEO, CA 94402 Phone#:888-765-2489 Are you an employer?Check the appropriate box: Type of pro]ect(required): I.0 1 am a employer with 5000 4. ❑ I am a general contractor and I Cam (full and/or part-time).* have hired the subcontractors 6. ❑New construction 2.❑ 1 am a sole proprietor or partner- listed on the attached sheet. 7. ❑ Remodeling ship and have no employees These sub-contractors have S. ❑ Demolition working for me in any capacity. employees and have workers' y ❑ Building addition [No workers' comp. insurance comp. insurance? required.] 5. ❑ We are a corporation and its I0.❑ Electrical repairs or additions 3.❑ 1 am a homeowner doing all work officers have exercised their I I.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑ Roof repairs insurance required.] t c. 152,§1(4),and we have no SOLAR/PV employees. [No workers' 13.■❑Other comp, insurance required.] *Any applicant that checks box#I must also fill out the section below showing Iheit workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit anew affidavit indicating such. tContractors tbat check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that Is providing workers'compensation Insurance for my employees. Below Is lite policy and job site Information. Insurance Company Name:LIBERTY MUTUAL INSURANCE COMPANY — Policy#or Self-ins. Lic. #:WA7-66D-066265-024 Expiration Date:09/01/2015 Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby cerly�ander the pains mid penalties of perjury float the information provided above Is true and correct. � =TSignaturc Phone#• Off etal use only. Do not write In this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: A�® CERTIFICATE OF LIABILITY INSURANCE °080014°""""' THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsemen s. PRODUCER CONTACT MARSH RISK&INSURANCE SERVICES NAME: 345 CALIFORNIA STREET,SURE 1300 PH_ ONE N IAIc Net, CALIFORNIA LICENSE NO.0437153 ADDDDRIES , SAN FRANCISCO,CA 94104 "'— INSURENRAL FORDINO COVERAGE NAIC0 998301-STND-GAWUE-14-15 INSURER A:LIB'Mutual Fire Insurance Company 16586 INSUREOPh(650)963-5100 INSURER 8:Liberty Insurarm Corporation 42404 SoleCily Co(poration INSURER C:MA 3055 Cleanser Way INSURER D: San Mateo,CA 94402 INSURERE: INSURER F: COVERAGES CERTIFICATE NUMBER: SEA-00244026so2 REVISION NUMBER:4 THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL UBR POUCYNUMBER MMIDDYEFF POUCYMMIDD EXPLTR LIMITS A GENERAL LIABILITY T82.661-066265.OU 09/01/2014 091012015 EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY PREMISES(Ea DBE TO RENTED ocwnerrcel $ 100000 . CIAIMS4AADE EXI OCCUR MED EXP(Any one peraonf $ 10,000 PERSONAL S ADV INJURY $ _ 1'000,000 GENERAL AGGREGATE $ 2,000,000 GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGO $ 2,000,000 X1 POLICYX LOC PRO- Dedudble $ 25,0D0 A AUTOMOBILE LIABILITY AS2-661-066265-044 091012014 091012015 COMBINED SINGLE LIMIT 7 000000 Ea accident) X_ ANY AUTO BODILY INJURY(Per person) $ ALL OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTOX HREDS AUTOS AUTOS % NOWOWNED IPPROP�d1YDAMAGE S AUTOS ) X Phys.Damage COMP/COLL DEO: $ $1,000/$1.000 UMBRELLA LUIS OCCUR EACH OCCURRENCE E EXCESS LIAB _ _CLAIMS-MADE AGGREGATE $_ DELI I I RETENTION $ B WORKERS COMPENSATION WA7.66D-066265-024 0910120A 09/012015 X WC SALT eR B AND ERPLOYERRnP A81Lm WC7.66l-M265-034(W0 091012014 0910 015 1,000,000 ANY PROPRIETOR/PARTNERIEXECUTIVE YIN NIA - El EACH ACCIDENT $ _ OFFICEPJMEM13ER EXCLUDED? B (Mandatory In NHl 'WC DEDUCTIBLE:$350,000' E.L.DISEASE-EA EMPLOYEE $ 1,000A00 Ilyes descibeunder 1,000,000 DESCRIPTION OF OPERATIONS below E L.DISEASE-POLICY LIMB $ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If more space Is required) Evidence of Insurance. - CERTIFICATE HOLDER CANCELLATION SdarCity Corporation SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE 3055 Cleanneis Way THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN San Mateo,CA 94402 ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE of Marsh Risk&Insurance Services Chades Marmolelo 01988.2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD ✓�f2e V4'!lt'/IIZO�IZLl1E'�xl� O�i,/�'(.Q'd;1G�ll2tl.Q� n Office of Consumer Affairs and Business Regulatio 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 168572 Type: Supplement Card SOLAR CITY CORPORATION Elmiration: 3/8/2017 CRAIG ELLS ----- 3055 CLEARVIEW WAY --- - - SAN MATEO, CA 94402 Update Address and return card.Mark reason for change. ONaCAr b i Address { Renewal j I Employment I I Lost Card ( --' Omce orCousumer Affairs&Business Regulation License or registration valid for individul use only T( G HOME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: t\ +) t Office of Consumer Affairs and Business Regulation '{ `C Registration: 168572 Type: 10 Park Plaza-suite 5170 Expiration: 31812017 Supplement Card Boston,MA 02116 SOLAR CITY CORPORATION - CRAIG ELLS 24 ST MARTIN STREET BLO 2UNIm.t--�l .._— / 1�,7_ / _ - &AhLBOROUGH,MA 01752 Undersecretary s4 Not valid witholll.ut signature t 0 'A.1ssacnufrtl$ t)nnnt tPlnn! sI a oli•, ialcl, -- Boarn of pmlmny Rot�wabaas t�•u S::rnrtaros annse CS-107663 . .1 CRAIG ELLS 206 BAKER STREET Keene NHI 03431 ann� . rm 08/29/2017 s epa> Uicc�lzcrlecr affC� crJJcc� rcrJ ,f1 =1 r Office o onsumer Af airs fand Business Regulahon 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration: 168572 Type: Supplement Card SOLAR CITY CORPORATION Expiration: 3/8/2017 KELLY STRICKLAND 3055 CLEARVIEW WAY — SAN MATEO, CA 94402 Update Address and return card.Mark reason for change. SCA 1 a 20W05H i ❑ Address Renewal [] Employment ❑ Lost Card Office or Consumer Affairs&Business Regulation License or registration valid for individul use only " OME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Office of Consumer Affairs and Business Regulation Registratlon: 168572 Type: 10 Park Plaza-Suite 5170 ''' ,' Expiration: 3/8/2017 Supplement i;ard Boston,MA 02116 SOLAR CITY CORPORATION KELLY STRICKLAND 24 ST MARTIN STREET BLD 2UNI1��+- ->6..p_tI rwiatho ALBOROUGH,MA 01752 Undersecretary ` �oTtut signature DocuSign Envelope C:BA4567C5-B81B-4E3C-A2D5-0FDC54E13ED1 10, SolarCity. .•,, 3055 Clearview Way,San Mateo,CA 94402 SolarLease T (888)SOL-CITY F(650)560-6460 SOLARCITY.COM SUMMARY Date: 3/18/2015 Customer Name and Address Customer Name Installation Location Contractor License Paul Kelley 31 Mooney Rd MA HIC 168572/EL•1136MR 31 Mooney Rd Salem, MA 01970 Salem,MA 01970 Estimated Solar Energy Production First Year Annual Production: 6,112 kWh Initial Term Total Production: 116,603 kWh Payment Terms Amount Due at Contract Signing: $0 Amount Due when Installation Begins: $0.00 Amount Due following Bldg. Inspection: $0.00 Estimated Price per kWh First Year: $0.1200 Annual Increase: 2.90% First Year Monthly SolarCity Bill: $61.12 Lease Term 20 Years SolarCity's Promises to You: Your Prepayment and Transfer Choices During the Term: • SolarCity will insure,maintain,and repair the System(including • If you move,you may transfer this agreement to the purchaser of the inverter)at no additional cost to you as specified in the your Home,as specified in the agreement. agreement. • If you move,you may prepay the remaining payments(if any)at a • SolarCity will provide 24f7 web-enabled monitoring at no additional discount. cast to you,as specified in the agreement. • SolarCity will provide a money-back production guarantee,as Your Choices at the End of the Initial Term: specified in the agreement. . SolarCity will remove the System at no additional cost to you. • SolarCity will warranty your roof against leaks and restore your . You can upgrade to a new System with the latest solar roof at the end of the agreement as specified in the agreement. technology under a new contract. • The pricing in this Lease is valid for 30 days after 3/18/2015. If you don't sign this Lease and return it to us on or prior to 30 days • You may renew your agreement for up to ten(10)years in two(2) after 3/18/2015, SolarCity reserves the right to reject this Lease five(5)year increments. unless you agree to our then current pricing. • Otherwise,the agreement will automatically renew for an • We are confident that we deliver excellent value and customer additional one(1)year term at 10% less than the then-current service.AS A RESULT,YOU ARE FREE TO CANCEL ANYTIME average rate charged by your local utility. AT NO CHARGE PRIOR TO CONSTRUCTION ON YOUR HOME. SolarLease,version 6.8.3,March 16th,2015 629709 v �1,}y❑�j�- EFA Compliant Document 'G 7rL Document Generated on,3/18/2015 DocuSign Envelope HID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 1. INTRODUCTION This SolarLease®(this"Lease')is the agreement between you 3. SYSTEM DESCRIPTION and SolarCity Corporation(together with its successors and Item assigns,"SolarCity"or"we"),covering the lease to you of the solar panel system(the"System")described below.The System 5.000 kW DC(STC)photovoltaic system will be installed by SolarCity at the address you listed above. This Lease will refer to this address as the"Property"or your Photovoltaic Modules "Home."This Lease is up to thirteen (13)pages long and has Inverter(s) up to three(3) Exhibits depending on the state where you live. This Lease has disclosures required by the Federal Consumer Mounting system Leasing Act and,where applicable,state law. SolarCity provides you with a Performance Guarantee and Limited Warranty(the Monitoring system "Limited Warranty").The Limited Warranty is attached as Electric meter number: Exhibit 2. SolarCity will also provide you with a System user manual entitled"Solar Operation and Maintenance Guide"(the Extras: "Guide'),that contains important operation,maintenance and service information.This is a legally binding agreement,so Standard PowerGuide please read everything carefully including all of the exhibits. If you do not meet your contract obligations under this Lease, you may lose your rights to the System. If you have any questions regarding this Lease,please ask your SolarCity sales consultant. 2. LEASE TERM SolarCity agrees to lease you the System for 20 years(240 full calendar months),plus,if the Interconnection Date is not on the first day of a calendar month,the number of days left in that partial calendar month,including the Interconnection Date.We refer to this period of time as the"Lease Term."The Lease Term begins on the Interconnection Date.The Interconnection Date is the date that the System is turned on and generating power. SolarCity will notify you by email when your System is ready to be turned on. ❑fa ❑� SolarLease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 4. LEASE PAYMENTS;AMOUNTS A. Amounts Due at Lease Signing,Installation and Building B. Monthly Payments: Inspection: Your first monthly payment is$61.12, Payments Due at Signing: followed by 11 monthly payments of$61.12 each, Amount Due at Lease Signing: $0.00 followed by 12 monthly payments of$62.89 each, Delivery/Installation Fee: $0.00 followed by 12 monthly payments of$64.71 each, Total Due at Lease Signing: $0.00 followed by 12 monthly payments of$66.59 each, followed by 12 monthly payments of$68.52 each, Payments Due at Installation: $0.00 followed by 12 monthly payments of$70.51 each, followed by 12 monthly payments of$72.55 each, Payments Due after Building Inspection: $0.00 followed by 12 monthly payments of$74.65 each, followed by 12 monthly payments of$76.81 each, followed by 12 monthly payments of$79.04 each, followed by 12 monthly payments of$81.33 each, followed by 12 monthly payments of$83.69 each, followed by 12 monthly payments of$86.12 each, followed by 12 monthly payments of$88.62 each, followed by 12 monthly payments of$91.19 each, followed by 12 monthly payments of$93.83 each, followed by 12 monthly payments of$96.55 each, followed by 12 monthly payments of$99.35 each, followed by 12 monthly payments of$102.23 each, followed by 12 monthly payments of$105.19 each. Your total lease payments,excluding tax,are$19,505.88.Your estimated average monthly tax payments are$0.00. Your first Monthly Payment is due on the first day of the first full calendar month following the Interconnection Date. After your first Monthly Payment,future Monthly Payments(and any applicable taxes)are due on the first day of the calendar month. C. Other Charges: D. Total of Payments(A+B+C)=$19,505.88 This is the total amount you will have paid by the end of this Lease. It If you make your Monthly Payments by allowing us to includes the Monthly Payments stated above and estimated taxes of automatically debit your checking or savings account,then you will $0.00. receive a discount of$7.50 on your Monthly Payments.The Monthly Payments listed above reflect this discount. If you do not allow the automatic debit,this discount will not be applied to your Monthly Payments and each Monthly Payment will be$7.50 greater. Sclarlease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant ❑ DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 E. Purchase Option At End of Lease Term: F. Other Important Terms: I If you are not in default under this Lease,you will have an option to See Section 2 above for additional information on the Lease Term and purchase the System at the end of the Lease Term for$19,425.00. also see below for additional information on termination,purchase options,renewal options,maintenance responsibilities,warranties,late and default charges and prohibition on assignment without SolarCity's consent. Payments due upon installation are due immediately prior to commencement of installation. (xii) return any documents we send you for signature 5. LEASE OBLIGATIONS (like incentive claim forms)within seven(7)days of (a) System,Home and Property Maintenance receiving them;and You agree to: (xiii) maintain and make available, at your cost,a (i) only have the System repaired pursuant to the functioning indoor internet connection with a router, Limited Warranty and reasonably cooperate when one DHCP enabled Ethernet port with internet repairs are being made; access and standard AC power outlet close (ii) keep trees,bushes and hedges trimmed so that the enough and free of interference to enable an System receives as much sunlight as it did when internet-connected gateway provided by SolarCity SolarCity installed it; to communicate wirelessly with the system's inverter(typically this is 80 feet,but may depend on (iii) keep the panels clean,pursuant to the Limited Warranty and the Guide; site conditions).See Section 2(d)of the Limited Warranty for details;and (iv) not modify your Home in a way that shades the System; (xiv) if your home is governed by a home owner's (v) be responsible for any conditions at your Home association or similar community organization,obtain that affect the installation(e.g. blocking access to all approvals and authorizations for the System the roof or removing a tree that is in the way, prior required by that organization and advise us of any work you have done on your home that was not requirements of that organization that will otherwise permitted); impact the System,its installation or operation. (vi) not remove any markings or identification tags on (b) System Construction,Repair,Insurance and the System; SolarCity's obligations: (vii) permit SolarCity, after we give you reasonable notice,to inspect the System for proper operation SolarCity agrees to: as we reasonably determine necessary; (i) schedule the installation of the System at a (viii) use the System primarily for personal,family or mutually convenient date and time; household purposes, but not to heat a swimming (ii) construct the System according to written plans pool; you review; (ix) not do anything,permit or allow to exist any (III) provide you with a web-enabled meter to condition or circumstance that would cause the accurately measure the amount of power the System not to operate as intended at the Property; System delivers to you; (x) notify SolarCity if you think the System is damaged (iv) notify you if the System design has to be materially or appears unsafe;if the System is stolen;and changed so that you can review any such changes; prior to changing your power supplier; (v) clean up after ourselves during the construction of (xi) have anyone who has an ownership interest in your the System; Home sign this Lease; (vi) repair the System pursuant to the Limited Warranty and reasonably cooperate with you when scheduling repairs; SolarLease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 (vii) create a priority stream of operation and You agree that you will not make any modifications, maintenance payments to provide enough cash improvements,revisions or additions to the System or take flow in our financing transactions to pay for the any other action that could void the Limited Warranty on the Limited Warranty obligations and the repair and System without SolarCity's prior written consent. If you make maintenance of the System in accordance with this any modifications, improvements,revisions or additions to Lease even if SolarCity ceases to operate;and the System,they will become part of the System and shall be (viii) not put a lien on your Home or Property. SolarCity's property. (c) Home Renovations or Repairs (h) Access to the System If you want to make any repairs or improvements to the (i) You grant to SolarCity and its employees,agents Property that could interfere with the System(such as and contractors the right to reasonably access all repairing the roof where the System is located),you may only of the Property as necessary for the purposes of remove and replace the System pursuant to the Limited (A)installing,constructing,operating,owning, Warranty. repairing,removing and replacing the System or (d) Automatic Payment; Fees;Late Charges making any additions to the System or installing complementary technologies on or about the In addition to the other amounts you agree to pay in this location of the System; (B)enforcing SolarCity's Lease,you agree to pay the following: rights as to this Lease and the System; (C) " (i) Automatic Payment Discount:All prices include installing,using and maintaining electric lines, a$7.50 monthly discount for allowing us to inverters and meters,necessary to interconnect the automatically debit your checking or savings System to your electric system at the Property account for payments. You will not receive a $7.50 monthly discount if you do not allow the and/or to the utility's electric distribution system;or automatic debit; (D)taking any other action reasonably necessary in connection with the construction,installation, (ii) Returned Check Fee: $25(or such lower amount operation,maintenance,removal or repair of the as required by law)for any check or withdrawal System.This access right shall continue for up to right that is returned or refused by your bank; ninety(90)days after this Lease expires to provide and SolarCity with time to remove the System at the (iii) Late payments:accrue interest at twelve percent end of the Lease Term. SolarCity shall provide you (12%)annually or the maximum allowable by with reasonable notice of its need to access the applicable law. Property whenever commercially reasonable. (e) Insurance (ii) During the time that SolarCity has access rights you shall ensure that its access rights are SolarCity shall insure the System against all damage or loss preserved and shall not interfere with or permit any unless(i)that damage or loss is caused by your gross third party to interfere with such rights or access. negligence;or(ii)that damage or loss is caused by ball You agree that the System is not a fixture, but strikes;or(III)you intentionally damage the System. SolarCity has the right to file any UCC-1 financing (f) Estimated Taxes statement or fixture filing that confirms its interest in You agree to pay any applicable sales or use taxes on the the System. Monthly Payments due under this Lease. If this Lease contains a purchase option at the end of the Lease Term, (1) Indemnity you agree to pay any applicable tax on the purchase price for To the fullest extent permitted by law,you shall indemnify, the System. You also agree to pay as invoiced any defend, protect,save and hold harmless SolarCity,its applicable personal property taxes on the System that your employees,officers,directors,agents,successors and local jurisdiction may levy.The total estimated amount you assigns from any and all third party claims,actions,costs, will pay for taxes over the Lease Term is$0.00. expenses(including reasonable attorneys'fees and expenses),damages, liabilities, penalties,losses,obligations, (g) No Alterations P )�d g � libili � p �l � injuries,demands and liens of any kind or nature arising out Solarlease,version 6.8.3,March 16th,2015 629709 ❑ UPf'.NUA Nmnlian} 0 DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 of,connected with, relating to or resulting from your (iii) your meeting the applicable credit score; negligence or willful misconduct;provided,that nothing herein shall require you to indemnity SolarCity for its own 00 confirmation of rebate,tax credit and renewable negligence or willful misconduct.The provisions of this energy credit payment availability in the amount paragraph shall survive termination or expiration of this used to calculate the Monthly Payment amounts Lease. set forth in this Lease; Q) Monthly Payments (v) confirmation that SolarCity will obtain all applicable benefits referred to in Section 9; The MonthlyPayments section Section 4 B describes our Y ( ( )) Y monthly payment obligations under this Lease.YOU AGREE (vi) receipt of all necessary zoning, land use and THAT THIS IS A NET LEASE AND THE OBLIGATION TO building permits; and PAY ALL MONTHLY PAYMENTS AND ALL OTHER AMOUNTS DUE UNDER THIS LEASE SHALL BE NO completion of any renovations,improvements or ABSOLUTE AND UNCONDITIONAL UNDER ALL changes reasonably required at your Home or on CIRCUMSTANCES AND SHALL NOT BE SUBJECT TO the Property(e.g. removal of a tree or roof repairs ANY ABATEMENT, DEFENSE,COUNTERCLAIM, SETOFF, necessary to enable SolarCity to safely install.the System); and RECOUPMENT OR REDUCTION FOR ANY REASON WHATSOEVER, IT BEING THE EXPRESS INTENT OF THE (viii) if your home is governed by a home owners PARTIES THAT ALL AMOUNTS PAYABLE BY YOU association or similar community organization,your HEREUNDER SHALL BE AND CONTINUE TO BE receipt of all approvals and authorizations for the PAYABLE IN ALL EVENTS INCLUDING BY YOUR HEIRS System required by that organization and advising AND ESTATE AND, EXCEPT AS SET FORTH BELOW IN us of any requirements of that organization that will SECTIONS 6, 23 AND 24,YOU HEREBY WAIVE ALL otherwise impact the System,its installation or RIGHTS YOU MAY HAVE TO REJECT OR CANCEL THIS operation. LEASE,TO REVOKE ACCEPTANCE OF THE SYSTEM,OR TO GRANT A SECURITY INTEREST IN THE SYSTEM. SolarCity may terminate this Lease without liability if, in its reasonable judgment, any of the above listed conditions(i) (k) You authorize SolarCity,or its designee,to obtain your credit through(vi)will not be satisfied for reasons beyond its reasonable report now and in the future,check your credit and control. Once SolarCity starts installation,however,it may not employment history, answer questions others may ask regarding your credit and share your credit information with terminate this Lease for the failure to satisfy conditions(i)through SolarCity's financing'partners.You certify that all information (vi)above. you provide to us in connection with checking your credit will (b)Amendments,Your Right to Terminate for Material be true and understand that this information must be updated upon request if your financial condition changes. Changes. Both parties will have the right to terminate this Lease,without 6. CONDITIONS PRIOR TO INSTALLATION OF THE SYSTEM penalty or fee,if SolarCity determines after the engineering site (a)SolarCity's Obligation to Install and Lease audit of your Home that it has misestimated by more than ten SolarCity's obligations to install and lease the System are percent(10%)any of(i)the System size,(ii)the System's total conditioned on the following items having been completed to its cost or(iii)the System's annual production. Such termination right reasonable satisfaction: will expire at the earlier of(A)one(1)week prior to the scheduled System installation date and(B)one(1)month after we inform you (i) completion of(A)the engineering site audit(a in writing of the revised size,cost or production estimate. If thorough physical inspection of the Property, neither party exercises their right to terminate this Lease following including, if applicable,geotechnical work), (B)the final System design,and(C)real estate due such a 10%change,then any changes to the System will be diligence to confirm the suitability of the Property documented in an amendment to this Lease. You authorize for the construction,installation and operation of SolarCity to make corrections to the utility paperwork to conform the System; to this Lease or any amendments to this Lease we both sign. 0i) approval of this Lease by SolarCity's financing partner(s); SolarLease,version 6.8.3,March 16th,2015 629709 S PNUFO fnm Mmnt DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 7. WARRANTY AGREEMENTS, INTERCONNECTION AGREEMENTS,AND YOU UNDERSTAND THAT THE SYSTEM IS WARRANTED FILING RENEWABLE ENERGY/CARBON OFFSET CREDIT SOLELY UNDER THE LIMITED WARRANTY ATTACHED AS REGISTRATIONS AND/OR APPLICATIONS FOR REBATES EXHIBIT 2,AND THAT THERE ARE NO OTHER FROM THE FEDERAL,STATE OR LOCAL GOVERNMENT OR A REPRESENTATIONS OR WARRANTIES,EXPRESS OR LOCAL UTILITY AND GIVING THESE TAX CREDITS, IMPLIED,AS TO THE MERCHANTABILITY, FITNESS FOR ANY RENEWABLE ENERGY/CARBON CREDITS, REBATES OR PURPOSE,CONDITION, DESIGN, CAPACITY, SUITABILITY OR OTHER BENEFITS TO SOLARCITY. PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. You understand that solar renewable energy credits(SRECs)and associated data cannot be generated without internet. As such, 8. TRANSFER you agree to maintain and make available,at your cost,a SolarCity works with banks,large companies and other significant functioning indoor Internet connection with the understanding that financing partners to finance your System. As a result,SolarCity Wi-Fi hotspotting,tethering and intermittent Internet connection will assign this Lease to one of its financing partners. SolarCity will not satisfy this obligation. You also agree to cooperate with may assign,sell or transfer the System and this Lease,or any part SolarCity as necessary to provide any other information required of this Lease or the exhibits,without your consent.Assignment, to generate SRECs and troubleshoot monitoring issues. Your sale or transfer generally means that SolarCity would transfer failure to cooperate with SolarCity with respect to Internet certain of its rights and certain of its obligations under this Lease requirements will result in your obligation to compensate SolarCity to another party. This assignment does not change SolarCity's for all lost SREC revenue and related costs,subject to a monthly obligation to maintain and repair your System as set forth in the charge of no less than$10.00(ten dollars)per month until Limited Warranty. adequate Internet monitoring is implemented or restored. 9. OWNERSHIP OF THE SYSTEM;TAX CREDITS AND 10. PURCHASING THE SYSTEM PRIOR TO THE END OF THE REBATES LEASETERM You agree that the System is SolarCity's personal property under If you are not in default under this Lease,you will have an option the Uniform Commercial Code. You understand and agree that to purchase the System at the end of the Lease Term for this is a lease and not a sale agreement. SolarCity owns the $19,425.00. System for all purposes,including any data generated from the System.You shall at all times keep the System free and clear of 11. RENEWAL all liens,claims,levies and legal processes not created by If you are in compliance with your Lease,you have the option to SolarCity,and shall at your expense protect and defend SolarCity renew your Lease for up to ten(10)years in two(2)five(5)year against the same. renewal periods.We will send you renewal forms three(3) YOU UNDERSTAND AND AGREE THAT ANY AND ALL TAX months prior to the expiration of the Lease Term,which forms CREDITS, INCENTIVES, RENEWABLE ENERGY CREDITS, shall set forth the new Monthly Payments due under the renewed GREEN TAGS,CARBON OFFSET CREDITS, UTILITY Lease,based on our assessment of the then current fair market REBATES OR ANY OTHER NON-POWER ATTRIBUTES OF value of the System. If you want to renew,complete the renewal THE SYSTEM ARE THE PROPERTY OF AND FOR THE forms and return them to us at least one(1)month prior to the BENEFIT OF SOLARCITY, USABLE AT ITS SOLE DISCRETION. expiration of the Lease Term. In the event that you respond that SOLARCITY SHALL HAVE THE EXCLUSIVE RIGHT TO ENJOY you do not agree to the new Monthly Payments,the Lease shall AND USE ALL SUCH BENEFITS,WHETHER SUCH BENEFITS expire by its terms on the termination date. If you don't send us EXIST NOW OR IN THE FUTURE. YOU AGREE TO REFRAIN anything in writing after we send you the renewal forms,then FROM ENTERING INTO ANY AGREEMENT WITH YOUR this Lease shall renew for an additional one(1)year term at ten UTILITY THAT WOULD ENTITLE YOUR UTILITY TO CLAIM percent(10%)less than the then-current average rate charged ANY SUCH BENEFITS. YOU AGREE TO REASONABLY by your local utility and shall continue to renew for one(1)year COOPERATE WITH SOLARCITY SO THAT IT MAY CLAIM ANY terms at that same rate until(1)you give us notice at least thirty TAX CREDITS, RENEWABLE ENERGY CREDITS, REBATES, (30)days prior to a renewal term that you do not wish to renew; CARBON OFFSET CREDITS OR ANY OTHER BENEFITS or(ii)we send you a notice terminating the Lease. FROM THE SYSTEM,THIS MAY INCLUDE,TO THE EXTENT 12. SELLING YOUR HOME ALLOWABLE BY LAW, ENTERING INTO NET METERING ❑ 91 Solartease,version 6.8.3,March 16th,2015 629709 S4Pf./SFF4 fmmnliant DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 (a) If you sell your Home you can: (c) If you sell your Home and can't comply with any of the (1) Transfer this Lease and the Monthly Payments. options in subsection(a)above,you will be in default under this Lease. Section 12(a)includes a Home sale by your If the person buying your Home meets SolarCity's estate or heirs. credit requirements,then where permitted by the local utility,the person buying your Home can sign a transfer (d) Free Assumability.This agreement is free of any restrictions agreement assuming all of your rights and obligations that would prevent the homeowner from freely transferring under this Lease. their home("Property").SolarCity will not prohibit the sale, conveyance or refinancing of the Property. SolarCity may (ii) Move the System to Your New Home. choose to file in the real estate records a UCC-1 financing If you are moving to a new home in the same utility statement("Fixture Filing")that preserves their rights in the district,then where permitted by the local utility,the System.The Fixture Filing is intended only to give notice of System can be moved to your new home pursuant to its rights relating to the System and is not a lien or the Limited Warranty.You will need to pay all costs encumbrance against the Property. SolarCity shall explain - associated with relocating the System,execute and the Fixture Filing to any subsequent purchasers of the provide the same access and ownership rights as Property and any related lenders as requested.SolarCity provided for in this Lease and provide any third party shall also accommodate reasonable requests from lenders consents or releases required by SolarCity in or title companies to facilitate a purchase,financing or connection with the substitute premises. refinancing of the Property. (III) Prepay this Lease and Transfer only the Use of the (e) EXCEPT AS SET FORTH IN THIS SECTION,YOU WILL System. NOT SUBLEASE,ASSIGN,SELL, PLEDGE OR IN ANY At any time during the Lease Term, if the person OTHER WAY TRANSFER YOUR INTEREST IN THE buying your home does not meet SolarCity's credit SYSTEM OR THIS LEASE WITHOUT OUR PRIOR requirements,but still wants the System,then you can WRITTEN CONSENT,WHICH SHALL NOT BE (A)prepay the payments remaining on the Lease(See UNREASONABLY WITHHELD. Section 16(i)(i)and(ii)), (B)add the cost of the Lease to the price of your home; and(C)have the person buying your Home sign a transfer agreement to 13. LOSS OR DAMAGE assume your rights and non-Monthly Payment (a) Unless you are grossly negligent,you intentionally damage obligations under this Lease.The System stays at your the System,or damage or loss to the System is caused by Home,the person buying your Home does not make ball strikes, SolarCity will bear all of the risk of loss,damage, any Monthly Payments and has only to comply with the theft,destruction or similar occurrence to any or all of the non-Monthly Payment portions of this Lease. System. Except as expressly provided in this Lease,no loss, (b) You agree to give SolarCity at least fifteen(15)days but not damage,theft or destruction will excuse you from your more than three(3)months'prior written notice if you want obligations under this Lease, including Monthly Payments. someone to assume your Lease obligations. In connection (b) If there is loss,damage,theft,destruction or a similar with this assumption,you,your approved buyer and occurrence affecting the System,and you are not in default SolarCity shall execute a written transfer of this Lease. of this Lease,you shall continue to timely make all Monthly Unless we have released you from your obligations in Payments and pay all other amounts due under the Lease writing, you are still responsible for performing under this and,cooperate with SolarCity,at SolarCity's sole cost and Lease. If your buyer defaults on this Lease and we have not expense,to have the System repaired pursuant to the yet signed the transfer agreement,you will be responsible Limited Warranty. for their default. We will release you from your obligations under this Lease in writing once we have a signed transfer 14. LIMITATION OF LIABILITY agreement with the person buying your Home(provided such person has been approved as a transferee by la) No Consequential Damages SolarCity in writing). SOLARCITY'S LIABILITY TO YOU UNDER THIS LEASE SHALL BE LIMITED TO DIRECT,ACTUAL DAMAGES [oil �i SolarLease,version 6.8.3,March 16th,2015 629709 *IT UPV../SFFO Gmnlont DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 ONLY.YOU AGREE THAT IN NO EVENT SHALL EITHER (c) take any reasonable action to correct your default or to PARTY BE LIABLE TO THE OTHER FOR prevent our loss;any amount we pay will be added to the CONSEQUENTIAL,INCIDENTAL, PUNITIVE, amount you owe us and will be immediately due; EXEMPLARY,SPECIAL OR INDIRECT DAMAGES. (d) require you,at your expense,to return the System or make. (b) Actual Damages it available to us in a reasonable manner; Except for claims under Section 5(i),neither party's (e) proceed, by appropriate court action,to enforce liability to the other will exceed an amount equal to the performance of this Lease and to recover damages for your maximum amount that could be payable by you under breach; Section 16(i).Damages to your Home,belongings or property resulting from the installation or operation of (f) disconnect,turn off or take back the System by legal the System are covered in Section 6(c)of the Limited process or self-help,but we may not disturb the peace or Warranty. violate the law; (g) report such non-operational status of the System to your 15. DEFAULT utility,informing them that you are no longer net metering; You will be in default under this Lease if any one of the following (h) charge you a reasonable reconnection fee for reconnecting occurs: the System to your utility or turning your System back on (a) you fail to make any payment when it is due and such after we disconnect or turn off the System due to your failure continues for a period of ten(10)days; default; (b) you fail to perform any material obligation that you have (i) recover from you(i)all accrued but unpaid Monthly undertaken in this Lease(which includes doing something Payments,taxes, late charges,penalties, interest and all or you have agreed not to do, like alter the System)and such any other sums then accrued or due and owing, plus(ii)the failure continues for a period of fourteen(14)days after unpaid balance of the aggregate rent,each payment written notice; discounted to present value at 5% per annum, plus(III) (c) you or your guarantor have provided any false or misleading reasonable compensation,,on a net after tax basis assuming a tax rate of 35/o,for the loss or recapture of(A) financial or other information to obtain this Lease; the investment tax credit equal to thirty percent(30%)of the (d) you assign,transfer, encumber,sublet or sell this Lease or System cost, including installation;and(B)accelerated any part of the System without SolarCity's prior written depreciation over five(5)years equal to eighty five percent consent;or (85%)of the System cost, including installation,and for the (e) you or any guarantor makes an assignment for the benefit loss of any anticipated benefits pursuant to Section 9 of this of creditors,admits in writing its insolvency,files or there is Lease(SolarCity shall furnish you with a detailed calculation filed against you or it a voluntary petition in bankruptcy,is of such compensation if such a claim is made);or adjudicated bankrupt or insolvent or undertakes or (j) use any other remedy available to us in this Lease or by experiences any substantially similar activity. law. 16. REMEDIES IN CASE OF DEFAULT You agree to repay us for any reasonable amounts we pay to correct or cover your default.You also agree to reimburse us for If this Lease is in default,we may take any one or more of the any costs and expenses we incur relafing to the System's return following actions. If the law requires us to do so,we will give you resulting from early termination. By choosing any one or more of notice and wait any period of time required before taking any of these remedies, SolarCity does not give up its right to use another these actions.We may: remedy.By deciding not to use any remedy should this Lease be (a) terminate this Lease and your rights to possess and use the in default, SolarCity does not give up our right to use that remedy System; in case of a subsequent default. (b) suspend our performance under this Lease; We may submit to credit reporting agencies(credit bureaus)negative credit reports that would be reflected on your credit record if you do not pay any amounts due under this Lease as required. gy6i see Solarl-ease,version 6.8.3,March 16th,2015 629709 RAPNUFA r. m.Miant DocuSign Envelope ID:BA4567C5-B81 B-4E3C-A2D5-0FDC54E13ED1 17. SYSTEM REMOVAL: RETURN class,non-representative)basis.The arbitrator will not award relief At the end of the Term or the termination of this Lease, if you have for or against anyone who is not a party. If either of us arbitrates a not renewed this Lease or exercised your purchase option(if any) Dispute,neither of us,nor any other person,may pursue the and you have not defaulted,then within ninety(90)days you Dispute in arbitration as a class action,class arbitration,private agree to call SolarCity at the telephone number listed in Section 7 attorney general action or other representative action, nor may any of Exhibit 2 to schedule a convenient time for SolarCity to remove such Dispute be pursued on your or our behalf in any litigation in the System from your Home at no cost to you. any court.Claims regarding any Dispute and remedies sought as part of a class action;class arbitration,private attorney general or 18. APPLICABLE LAW;ARBITRATION other representative action are subject to arbitration on an PLEASE READ THIS SECTION CAREFULLY.ARBITRATION individual(non-class,non-representative)basis,and the arbitrator REPLACES THE RIGHT TO GO TO COURT, INCLUDING THE may award relief only on an individual(non-class,non- RIGHT TO A JURY AND THE RIGHT TO PARTICIPATE IN A representative)basis.This means that the arbitration may not CLASS ACTION OR SIMILAR PROCEEDING. IN ARBITRATION, address disputes involving other persons with disputes similar to A DISPUTE IS RESOLVED BY AN ARBITRATOR INSTEAD OF A the Disputes between you and SolarCity. JUDGE OR JURY. The arbitrator shall have the authority to award any legal or The laws of the state where your Home is located shall govern this equitable remedy or relief that a court could order or grant under Lease without giving effect to conflict of laws principles.We agree this agreement.The arbitrator, however, is not authorized to that any dispute,claim or disagreement between us(a"Dispute") change or alter the terms of this agreement or to make any award shall be resolved exclusively by arbitration. that would extend to any transaction other than yours.All statutes of limitations that are applicable to any dispute shall apply to any The arbitration,including the selecting of the arbitrator,will be arbitration between us. The Arbitrator will issue a decision or administered by JAMS,under its Streamlined Arbitration Rules(the award in writing,briefly stating the essential findings of fact and "Rules")by a single neutral arbitrator agreed on by the parties conclusions of law. within thirty(30)days of the commencement of the arbitration. The arbitration will be governed by the Federal Arbitration Act(Title BECAUSE YOU AND WE HAVE AGREED TO ARBITRATE ALL 9 of the U.S. Code). Either party may initiate the arbitration process DISPUTES, NEITHER OF US WILL HAVE THE RIGHT TO by filing the necessary forms with JAMS.To learn more about LITIGATE THAT DISPUTE IN COURT,OR TO HAVE A JURY arbitration,you can call any JAMS office or review the materials at TRIAL ON THAT DISPUTE,OR ENGAGE IN DISCOVERY www.jamsadr.com.The arbitration shall be held in the location that EXCEPT AS PROVIDED FOR IN THE RULES.FURTHER,YOU is most convenient to your Home. If a JAMS office does not exist WILL NOT HAVE THE RIGHT TO PARTICIPATE AS A within fifty(50)miles of your Home,then we will use another REPRESENTATIVE OR MEMBER OF ANY CLASS PERTAINING accredited arbitration provider with offices close to your Home. TO ANY DISPUTE.THE ARBITRATOR'S DECISION WILL BE FINAL AND BINDING ON THE PARTIES AND MAY BE If you initiate the arbitration,you will be required to pay the first ENTERED AND ENFORCED IN ANY COURT HAVING $125 of any filing fee. We will pay any filing fees in excess of$125 JURISDICTION, EXCEPT TO THE EXTENT IT IS SUBJECT TO and we will pay all of the arbitration fees and costs. If we initiate REVIEW IN ACCORDANCE WITH APPLICABLE LAW the arbitration,we will pay all of the filing fees and all of the GOVERNING ARBITRATION AWARDS.OTHER RIGHTS THAT arbitration fees and costs. We will each bear all of our own YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE attorney's fees and costs except that you are entitled to recover AVAILABLE IN ARBITRATION. your attorney's fees and costs if you prevail in the arbitration and the award you receive from the arbitrator is higher than SolarCity's 19. WAIVER last written settlement offer. When determining whether your Any delay or failure of a party to enforce any of the provisions of award is higher than SolarCity's last written settlement offer your attorneys fees and costs will not be included. this Lease,including but not limited to any remedies listed in this s Lease,or to require performance by the other party of any of the Only Disputes involving you and SolarCity may be addressed in provisions of this Lease,shall not be construed to(1)be a waiver the arbitration. Disputes must be brought in the name of an of such provisions or a party's right to enforce that provision;or(ii) individual person or entity and must proceed on an individual(non- effect the validity of this Lease. SolarLease,version 6.8.3,March 16th,2010 629109 SAPP./UFA C .Mmnt 91 DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 20. NOTICES All notices under this Lease shall be in writing and shall be by personal delivery,facsimile transmission,electronic mail, overnight courier,or certified,or registered mail, return receipt requested,and deemed received upon personal delivery, acknowledgment of receipt of electronic transmission,the promised delivery date after deposit with overnight courier,or five (5)days after deposit in the mail. Notices shall be sent to the person identified in this Lease at the addresses set forth in this Lease or such other address as either party may specify in writing. Each party shall deem a document faxed or sent via PDF as an original document. 21. ENTIRE AGREEMENT;CHANGES This Lease contains the parties'entire agreement regarding the lease of the System. There are no other agreements regarding this Lease,either written or oral.Any change to this Lease must be in writing and signed by both parties. If any portion of this Lease is determined to be unenforceable,the remaining provisions shall be enforced in accordance with their terms or shall be interpreted or re-written so as to make them enforceable. REST OF PAGE INTENTIONALLY LEFT BLANK SolarLease,version 6.8.3,March 16th,2015 629109 UPWWA Cmmnlma t DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54L13ED1 22. PRIVACYIPUBLICITY I have read this Lease and the Exhibits in their entirety and I acknowledge that I have received a complete copy of this Lease. You grant SolarCity the right to publicly use,display,share, and advertise the photographic images, Project details,price and any other non-personally identifying information of your Project. Customer's Name:Paul Kelley SolarCity shall not knowingly release any personally identifiable information about you or any data associating you with the Project DO -d Eby' location.You may opt-out of these publicity rights by giving us Signature: iR; written notice and mailing it to: SolarCity Corporation,Attention: C571e149=34EF... Publicity Opt Out,3055 Clearview Way,San Mateo, CA 94402. Date: 3/ 701 S 23. NOTICE OF RIGHT TO CANCEL YOU MAY CANCEL THIS LEASE AT ANY TIME PRIOR TO Customer's Name: MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE YOU SIGN THIS LEASE.SEE EXHIBIT 1_THE ATTACHED Signature: NOTICE OF CANCELLATION FORM,FOR AN EXPLANATION OF THIS RIGHT. Date: 24. ADDITIONAL RIGHTS TO CANCEL IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL THIS LEASE UNDER SECTIONS 6 AND 23,YOU MAY ALSO _i;.,;SolarCity._ CANCEL THIS LEASE AT NO COST AT ANY TIME PRIOR TO COMMENCEMENT OF CONSTRUCTION ON YOUR HOME. SolarLease 25. Pricing SOLARCITY APPROVED The pricing in this Lease is valid for 30 days after 3/18/2015. If ' you don't sign this Lease and return it to us on or prior to 30 days after 3/18/2015, SolarCity reserves the right to reject this Lease Signature: unless you agree to our then current pricing. LYNOON RIVE.CEO SolarLease rw'SolarCity. Date: 3/18/2015 SolarLease,version 6.8.3,March 16th,2015 629709 ❑ SAPC/grrA r. m.M M 9 DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 Solarl-ease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant ❑� { DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 EXHIBIT 1 (SOLARCITY COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Notice of Cancellation Date of Transaction:The date you signed the Lease. You may CANCEL this transaction,without any penalty or obligation,within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within TEN DAYS following receipt by the seller(SolarCity Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(SolarCity Corporation)at your residence,in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may,if you wish,comply with the instructions of the seller(SolarCity Corporation)regarding the return shipment of the goods at the seller's (SolarCity Corporation's)expense and risk. If you do make the goods available to the seller(SolarCity Corporation)and the seller (SolarCity Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(SolarCity Corporation),or if you agree to return the goods to the seller(SolarCity Corporation)and fail to do so,then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice,or any other written notice,or send a telegram to SolarCity Corporation,Document Receiving,6611 Las Vegas Blvd.S.,Unit 200, Las Vegas, NV 89119 NOT LATER THAN MIDNIGHT of the date that is THREE BUSINESS DAYS from the date you signed the Lease. I, Paul Kelley,hereby cancel this transaction on [Date). Customer's Signature: Customer's Signature: SolarLease,version 6.8.3,March 16th,2015 629709' ❑� 4 SAPC/SEFA Compliant - DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 EXHIBIT 1 (CUSTOMER COPY) NOTICE OF CANCELLATION STATUTORILY-REQUIRED LANGUAGE Notice of Cancellation Date of Transaction:The date you signed the Lease. You may CANCEL this transaction,without any penalty or obligation,within THREE BUSINESS DAYS from the above date. If you cancel, any property traded in,any payments made by you under the contract or sale and any negotiable instrument executed by you will be returned within TEN DAYS following receipt by the seller(SolarCity Corporation)of your cancellation notice,and any security interest arising out of the transaction will be canceled. If you cancel,you must make available to the seller(SolarCity Corporation)at your residence,in substantially as good condition as when received,any goods delivered to you under this contract or sale,or you may, if you wish,comply with the instructions of the seller(SolarCity Corporation)regarding the return shipment of the goods at the seller's (SolarCity Corporation's)expense and risk. If you do make the goods available to the seller(SolarCity Corporation)and the seller (SolarCity Corporation)does not pick them up within 20 days of the date of your notice of cancellation,you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller(SolarCity Corporation),or if you agree to return the goods to the seller(SolarCity Corporation)and fail to do so,then you remain liable for performance of all obligations under the contract. To cancel this transaction,mail or deliver a signed and dated copy of this cancellation notice,or any other written notice,or send a telegram to SolarCity Corporation,Document Receiving,6611 Las Vegas Blvd.S.,Unit 200,Las Vegas, NV 89119 NOT LATER THAN MIDNIGHT of the date that is THREE BUSINESS DAYS from the date you signed the Lease. I,Paul Kelley,hereby cancel this transaction on [Date]. Customer's Signature: Customer's Signature: SolarLease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 . Solarlease,version 6.8.3,March 16th,2015 - 629709 SAPC/SEFA Compliant DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 Exhibit 2 PERFORMANCE GUARANTEE AND LIMITED WARRANTY 1. INTRODUCTION This Performance Guarantee and Limited Warranty(this"Limited Warranty")is SolarCity's agreement to provide you warranties on the System you leased. The System will be professionally installed by SolarCity at the address you listed in the Lease.We will refer to the installation location as your"Property"or your"Home." This Limited Warranty begins when we start installing the System at your Home. We look forward to helping you produce clean,renewable solar power at your Home. 2. LIMITED WARRANTIES (a) Limited Warranties SolarCity warrants the System as follows: (t) System Warranty During the entire Lease Term,under normal use and service conditions,the System will be free from defects in workmanship or defects in,or a breakdown of,materials or components(the"System Warranty'); (if) Roof Warranty When we penetrate your roof during a System installation we will warrant roof damage we cause due to our roof penetrations. This roof warranty will run the longer of(A)one(1)year following the completion of the System installation;and(B)the length of any existing installation warranty or new home builder performance standard for your roof(the"Roof Warranty Period");and (III) Repair Promise During the entire Lease Term, SolarCity will honor the System Warranty and will repair or replace any defective part,material or component or correct any defective workmanship,at no cost or expense to you(including all labor costs),when you submit a valid claim to us under this limited Warranty(the"Repair Promise"). If we damage your Home,your belongings or your Property we will repair the damage we cause or pay you for the damage we cause as described in Section 6.SolarCity may use new or reconditioned parts when making repairs or replacements.SolarCity may also,at no additional cost to you,upgrade or add to any part of the System to ensure that it performs according to the guarantees set forth in this Limited Warranty. Cosmetic repairs that do not involve safety or performance shall be made at SolarCity's discretion. (b) Warranty Length (1) The warranties in Sections 2(a)(i)and(a)(iii)above will start when we begin installing the System at your Home and continue through the entire Lease Term.Thus,for as long as you lease the System from SolarCity,you will have a System Warranty and our Repair Promise. III) The Roof Warranty Period may be shorter than the System Warranty,as described in Section 2(a)(ii)above. (III) If you have assumed an existing Lease,then this Limited Warranty will cover you for the remaining balance of the existing Lease Term. (c) Performance Warranties and Guarantee (i) Power Production Guarantee SolarCity guarantees that during the Lease Term the System will generate kilowatt-hours(kWh)as set forth in the table below and calculated as follows.To calculate the guaranteed amount of kWh for an applicable two-year period("Guaranteed kWh")we will take the applicable year's Total kWh in the chart below minus the Total kWh from two years prior,also as indicated in the chart below: Year Total kWh Guaranteed PricelkWh 2 11,584 0.1241 SolarLease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant Ni t DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 " 4 23,052 0.1327 6 34,405 0.1420 8 45,646 0.1518 10 56,774 0.1624 12 67,791 0,1737 14 78,699 0.1857 16 89,497 0.1986 18 100,188 0.2124 20 110,772 0.2272 A. If at the end of each successive 24 month anniversary of your first monthly payment the cumulative Actual kWh(defined below) generated by the System is less than the Guaranteed kWh,then we will send you a refund check equal to the difference between the cumulative Actual kWh and the Guaranteed kWh multiplied by the Guaranteed Energy Price per kWh(defined below). Your cumulative Actual kWh is dependent on a shading percentage of 0.00%on your Home. If this shading percentage increases,your Guaranteed Actual kWh will be reduced proportionately. For example,if the first 24 month period commences on October 1,2013 and ends on September 30,2015,and the energy the System was supposed to generate is less than the energy the system was guaranteed to generate during such 24 month period,we will pay you the difference in the Actual kWh and the Guaranteed kWh multiplied by the Guaranteed Energy price per kWh within thirty(30)days after we receive your request. See the table below for a real world example. Example Guaranteed Example Actual kWh Example Guaranteed Example kWh $/kWh Energy Price Payment to You 10,000 9,500 $0.10 $50.00 B. If at the end of each successive 24 month anniversary of your first monthly payment the Actual kWh is greater than the Guaranteed kWh during any 24 month period,this surplus will be carried over and will be used to offset any deficits that may occur in the future. If over the course of the Term your System produces more energy than the Guaranteed Output then this additional energy is yours at no additional cost. "Actual kWh"means the AC electricity produced by your System in kilowatt-hours measured and recorded by SolarCity during each successive 24 month anniversary of your first monthly payment. To measure the Actual kWh we will use the PowerGuide Solar Monitoring Service or to the extent such services are not available,we will estimate the Actual kWh by reasonable means. "Guaranteed Energy Price per kWh"is set out in the table immediately after the first paragraph in Section 2(c)(i)above. (ii) PowerGuidelm Solar Monitoring During the Lease Term,we will provide you at no additional cost our PowerGuide Solar Monitoring Service("PowerGuide"). PowerGuide is a proprietary monitoring system designed and installed by SolarCity that captures and displays historical energy generation data over an Internet connection and consists of hardware located on site and software hosted b SolarCity. If our System 9 Y ty Y Y is not operating within normal ranges, PowerGuide will alert us and we will remedy any material issues promptly. (d) Maintenance and Operation Solarl-ease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant "I 1 DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 (1) General When the System is installed SolarCity will provide you with a copy of its Solar Operation and Maintenance Guide.This Guide provides you with System operation and maintenance instructions,answers to frequently asked questions,troubleshooting tips and service information. (if) PowerGuide PowerGuide requires a high speed Internet line to operate.Therefore,during the Lease Term,you agree to maintain the communication link between PowerGuide and the System and between PowerGuide and the Internet. You agree to maintain and make available,at your cost,a functioning indoor Internet connection with a router,one DHCP enabled Ethernet port with intemet access and standard AC power outlet close enough and free of interference to enable an intemet-connected gateway provided by SolarCity to communicate wirelessly with the system's inverter(typically this is 80 feet,but may depend on site conditions). This communication link must be a 10/100 Mbps Ethernet connection that supports common Internet protocols(TCP/IP and DHCP). If you do not have and maintain a working high speed Internet line then(A)we will not be able to monitor the System and provide you with the Power Production Guarantee or provide PowerGuide;and(B)you will be required to provide SolarCity with annual production information from your inverter. (a) Making a Claim;Transferring this Warranty (i) Claims Process You can make a claim by: A. emailing us at the email address in Section 7 below; B. writing us a letter and sending it overnight mail with a well-known service;or C. sending us a fax at the number in Section 7 below. (ii) Transferable Limited Warranty SolarCity will accept and honor any valid and properly submitted Warranty claim made during any Lease Term by any person who either purchases the System from you or to whom you properly transfer the Lease. (f) Exclusions and Disclaimer The limited warranties and guarantee provided in this Limited Warranty do not apply to any lost power production or any repair,replacement or correction required due to the following: (i) someone other than SolarCity or its approved service providers installed,removed,re-installed or repaired the System; (ii) destruction or damage to the System or its ability to safely produce power not caused by SolarCity or its approved service providers while servicing the System(e.g.if a tree falls on the System we will replace the System per the Lease,but we will not repay you for power it did not produce); (iii) your failure to perform,or breach of,your obligations under the Lease(e.g. you modify or alter the System); (iv) your breach of this Limited Warranty,including your being unavailable to provide access or assistance to us in diagnosing or repairing a problem,or your failing to maintain the System as stated in the Solar Operation and Maintenance Guide; (v) any Force Majeure Event(as defined below); (vi) shading from foliage that is new growth or is not kept trimmed to its appearance on the date the System was installed; (vii) any system failure or lost production not caused by a System defect(e.g.the System is not producing power because it has been removed to make roof repairs or you have required us to locate the inverter in a non-shaded area); (viii) theft of the System(e.g.if the System is stolen we will replace the System per the Lease,but we will not repay you for the power it did not produce);and (ix) damage or loss to the System due to ball strikes. Solarl-ease,version 6.8.3,March 16th,2015 629709 O SAPC/SEPA Compliant - 01 t DocuSign Envelope ID:BA4567C5-BB1B-4E3C-A2D5-OFDC54E13ED1 This Limited Warranty gives you specific rights,and you may also have other rights which vary from state to state.This Limited Warranty does not warrant any specific electrical performance of the System,other than that described above. Snow or ice may accumulate on rooftops and on solar panels during snow storms.Accumulated snow or ice may slide or fall,resulting in property damage or bodily harm. If and when conditions safely allow you to remove accumulated snow or ice,you should do so to reduce the likelihood of excess snow sliding or falling. THE LIMITED WARRANTIES DESCRIBED IN SECTIONS 2(a)and(c)ABOVE ARE THE ONLY EXPRESS WARRANTIES MADE BY SOLARCITY WITH RESPECT TO THE SYSTEM. SOLARCITY HEREBY DISCLAIMS,AND ANY BENEFICIARY OF THIS LIMITED WARRANTY HEREBY WAIVES,ANY WARRANTY WITH RESPECT TO ANY COST SAVINGS FROM USING THE SYSTEM.SOME STATES DO NOT ALLOW SUCH LIMITATIONS, SO THE ABOVE LIMITATIONS MAY NOT APPLY TO YOU. 3. SOLARCITY'S STANDARDS For the purpose of this Limited Warranty the standards for our performance will be(i)normal professional standards of performance within the solar photovoltaic power generation industry in the relevant market;and(ii)Prudent Electrical Practices. "Prudent Electrical Practices"means those practices,as changed from time to time,that are engaged in or approved.by a significant portion of the solar power electrical generation industry operating in the United States to operate electric equipment lawfully and with reasonable safety,dependability,efficiency and economy. 4. SYSTEM REPAIR,RELOCATION OR REMOVAL (a) Reoatr. You agree that if(i)the System needs any repairs that are not the responsibility of SolarCity under this Limited Warranty,(ii)the system needs to be removed and reinstalled to facilitate remodeling of your Home or(III)the system is being relocated to another home you own pursuant to the Lease,you will have SolarCity,or another similarly qualified service provider,at your expense,perform such repairs, removal and reinstallation,or relocation on a time and materials basis. (b) Removal/Moving. SolarCity will remove and replace the System from your roof while roof repairs are being made for a payment of$499. You will need to provide storage space for the System during such time.Where permitted under the Lease,SolarCity will work with you to conduct an audit of your existing Home and new home to determine if a move is commercially feasible. This audit will cost$499. If SolarCity determines that a move is commercially feasible,it will then move the System for an additional payment of$499. (c) Return. If at the end of the Term you want to return the System to SolarCity under Section 17 of the Lease then SolarCity will remove the System at no cost to you. SolarCity will remove the posts,waterproof the post area and return the roof as dose as is reasonably possible to its original condition before the System was installed(e.g.ordinary wear and tear and color variances due to manufacturing changes are excepted). SolarCity will warrant the waterproofing for one(1)year after it removes the System. You agree to reasonably cooperate with SolarCity in removing the System including providing necessary space,access and storage,and we will reasonably cooperate with you to schedule removal in a time and manner that minimizes inconvenience to you. 5. FORCE MAJEURE If SolarCity is unable to perform all or some of its obligations under this Limited Warranty because of a Force Majeure Event,SolarCity will be excused from whatever performance is affected by the Force Majeure Event,provided that: (a) SolarCity,as soon as is reasonably practical,gives you notice describing the Force Majeure Event; (b) SolarCity's suspension of its obligations is of no greater scope and of no longer duration than is required by the Force Majeure Event(i.e.when a Force Majeure Event is over,we will make repairs);and (c) No SolarCity obligation that arose before the Force Majeure Event that could and should have been fully performed before such Force Majeure Event is excused as a result of such Force Majeure Event. "Force Majeure Event'means any event,condition or circumstance beyond the control of and not caused by SolarCity's fault or negligence. It shall include,without limitation,failure or interruption of the production,delivery or acceptance of power due to:an act of god;war(declared or undeclared);sabotage;riot;insurrection;civil unrest or disturbance;military or guerilla action;terrorism;economic sanction or embargo;civil strike, work stoppage,slow-down,or lock-out;explosion;fire;earthquake;abnormal weather condition or actions of the elements;hurricane;flood; lightning;wind;drought;the binding order of any governmental authority(provided that such order has been resisted in good faith by all reasonable legal means);the failure to act on the part of any governmental authority(provided that such action has been timely requested and diligently Solarl-ease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant ❑� ❑� DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 pursued);unavailability of power from the utility grid,equipment,supplies or products(but not to the extent that any such availability of any of the foregoing results from SolarCity's failure to have exercised reasonable diligence);power or voltage surge caused by someone other than SolarCity including a grid supply voltage outside of the standard range specified by your utility;and failure of equipment not utilized by SolarCity or under its control. 6. LIMITATIONS ON LIABILITY (a) No Consequential Damages YOU MAY ONLY RECOVER DIRECT DAMAGES INCLUDING THOSE AMOUNTS DUE PURSUANT TO SECTIONS 2(c)AND 6(C)UNDER THIS LIMITED WARRANTY,AND IN NO EVENT SHALL SOLARCITY OR ITS AGENTS OR SUBCONTRACTORS BE LIABLE TO YOU OR YOUR ASSIGNS FOR SPECIAL,INDIRECT,PUNITIVE,EXEMPLARY,INCIDENTAL OR CONSEQUENTIAL DAMAGES OF ANY NATURE, SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF INCIDENTAL OR CONSEQUENTIAL DAMAGES,SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. (b) Limitation of Duration of Implied Warranties ANY IMPLIED WARRANTIES,INCLUDING THE IMPLIED WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE AND MERCHANTABILITY ARISING UNDER STATE LAW,SHALL IN NO EVENT EXTEND PAST THE EXPIRATION OF ANY WARRANTY PERIOD IN THIS LIMITED WARRANTY. SOME STATES DO NOT ALLOW LIMITATIONS ON HOW LONG AN IMPLIED WARRANTY LASTS,SO THE ABOVE LIMITATION MAY NOT APPLY TO YOU. (c) Limit of Liability Notwithstanding any other provision of this Limited Warranty to the contrary,SolarCity's total liability arising out of relating to this Limited Warranty shall in no event: (i) For System Replacement: exceed the greater of(a)the sum of the Lease payments over the Term of the Lease;and(b)the original cost of the System;and (ii) For damages to your Home,Belongings and Property: exceed two million dollars($2,000,000). 7. NOTICES All notices under this Limited Warranty shall be made in the same manner as set forth in the Lease to the addresses listed below: TO SOLARCITY: SolarCity Corporation 3055 Clearview Way San Mateo,CA 94402 Attention: Warranty Claims Telephone: 650-638-1028 Facsimile: 650-638-1029 Email: customercare@solarcity.com TO YOU: At the billing address in the Lease or any subsequent billing address you give us. B. ASSIGNMENT AND TRANSFER OF THIS LIMITED WARRANTY SolarCity may assign its rights or obligations under this Limited Warranty to a third party without your consent,provided that any assignment of SolarCity's obligations under this Limited Warranty shall be to a party professionally and financially qualified to perform such obligation. This Limited Warranty protects only the person who leases the System. Your rights and obligations under this Limited Warranty will be automatically transferred to any person who purchases the System from you or to whom you properly transfer the Lease.This Limited Warranty contains the parties'entire agreement regarding the limited warranty of the System. SolarLease,version 6.8.3,March 16th,2015 629709 SRPC/SEER Compliant ❑•IN+ 1 DocuSign Envelope ID:BA4567C5-B81B-4E3C-A2D5-OFDC54E13ED1 SolarLease,version 6.8.3,March 16th,2015 629709 SAPC/SEFA Compliant ❑� ❑� 1 . s Version#43.0 °R' SolarCity.w April 2,2015 A OF Project/Job#019986 �oS N c RE: CERTIFICATION LETTER g Project: Kelley Residence 0 1 L rA 31 Mooney Rd q 1 4,Q Salem, MA 01970 �F S 1NSA` To Whom It May Concern, 4/0 312 01 5 A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was based on site observations and the design criteria listed below: Design Criteria: -Applicable Codes = MA Res. Code, 8th Edition,ASCE 7-05, and 2005 NDS - Risk Category = II -Wind Speed = 100 mph, Exposure Category C -Ground Snow Load =40 psf - MP1: Roof DL= 11.5 psf, Roof LL/SL= 30.8 psf(Non-PV Areas), Roof LL/SL = 30.8 psf(PV Areas) Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.31364 < 0.4g and Seismic Design Category(SDC) = B < D On the above referenced project, the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead load, PV assembly load, and live/snow loads indicated in the design criteria above. I certify that the structural roof framing and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the MA Res. Code, 8th Edition. Please contact me with any questions or concerns regarding this project. Sincerely, Nick Gordon, P.E. Digitally signed by Nick Gordon Professional Engineer Date:2015.04..03 07:16:55 Main: 888.765.2489 -07'00' t email: ngordon@solarcity.com 3055 Clearview Way San Mateo,CA 94402 T(650)638-1028 (888)SOL-CITY F(650)638-1029 solarcity.com ACf1.CT i-G a:.'3Y HICTHt 96 e3711 a--Ilvf::= O .mMG"1�1i'. MWAW'I?RA'9 NJ 3VHtIBiBUAOQ, OF IIX>i IR Rt PA TMU'J,1"'UP 2MM- YA 1�1c CN e_.. )!a ti).A5"Iin 'ttwerve0- 04.02.2015 *' ° r PV System Structural �:,,." Version#43.0 501arGt Y Design Software �,m,nNIEYHtsBu+3v`i,f«itu�+6. , WfHkfi',d' ,PRO�E('TrIN�^ORMAnON &��TABLE �F CONTENTS,in�i";t�"��l�'p' `„,a:c. '��mu�iania,ii�„a,� �,� .�•»>=„p Protect Name: r�*� "vKelley.Residence;, ��,��,;,,�., AHJ: fi�+:,r�,�y,��;;5alem,� 3L Job Number: 019986 Building Code: MA Res. Code,8th Edition customer Name: -°" "Kelley,.Paul ,+ 'si, fBased Onr I_R_C 2009%IBC 2009 Address 31 Mooney Rd ASCE Code: ASCE 7-05 City/State: :_ �Salem, MA Risk Catey ;d Z p Code 01970 Upgrades Req d? No _� • --� Latitude/:Longitude_. n 42.5086816 70 919742 L _-Stamp Reg'd? SC Office: Wilmington PV Designer: Kyle Lanza AM- v S...�....--_-_.,._�.....__ Gelculatians: Gra son Tonks. EORc 1 ItyNick Gordon P.E:..im Certification Letter 1 Project Information,Table Of Contents, &Vicinity Map 2 Structure Analysis (Loading Summary and Member Check) 3 Hardware Design (PV System Assembly) 4 Note: Per IBC 1613.1; Seismic check is not required because Ss = 0.31364< 0.4g and Seismic Design Category(SDQ = B < D • 107 ,ASP. F i • 31 Mooney Rd,Salem, MA 01970 Latitude:42.50868, Longitude:-70.919742, Exposure Category:C STRUCTUREE ANALYSISLOADING SUMMARYAND MEMBER'CHECKKM +1k -immammMember Properties Summary ,., +, p -• n "iaP „f p fl�D18Dmr Horizontal Member Spans _;Upgraded Rafter Properties .,aA w w {!#p wu H Overh ng 1.16ft Net'W 1.501, a,s{irubHVo-�:Inr HoRoof 7.System Properties wH ��` .,w" an i, i'eiip'."_ Number of Spans(w/o Overhang) 3 San 2 9.53 ft Nominal Yes Roofing Material 4M_Comp Roof°. r.",R,Span 3 E 1.35 ft p, dNh_AXI1 1i€ 8.25 m.^2 w�w{,l Re-Roof Yes San 4 .. p S, 7.56 in.^3 Plywood Sheathin nfi wrrn wwia,3H7tu+�ialr€rimer ,,., g "' {nYes ni9Biftli'if!V i+inpr Fr l! an 5a.,..m € I 8tnnnn+df'i!1�' �1 I'7t xnxw #Y%tka0.B01n."4!t{ine Board Sheathing Solid-Sheathing Total S an 14.54 ft I TL Defl'n Limit 120 Vaulted Ceiling{ „"++ „ k...,u{+No=• 4 PV 1 Start 11.50 ft""®" Wood Species ni iepH+fl<' MSR Ceiling Finish 1/2"Gypsum Board PV 1 End 13.75 ft Wood Grade Rafter Slopean.nnn �&,,,m2P PV2Start t Hn+u++µ ,u " x':, ww mFb'H wny wwc''1650 psi.;ph Rafter Spacing 24"O.C. PV 2 End F, 160 psi Top Lat Bracing? ajl Full "++++'•• PV 3 Start,4711 €! d EX psi"{{u Bot Lat Bracing At Supports PV 3 End Emin 766000 psi .."IfI _ "i'+,"•. ar w Member Loading Summary w­IRE_..:. r�rarwr,nununritiHlbkblu "� iSH(Iiti a; 40 AWE` "Roof"Roof Pitch nnnwv m An+' ^'5 12"" Initial- %nPitch Ad'ust nm s{Non-PV Areas m nn"•" pv Areas't:;,,,r Roof Dead Load DL 11.5 psf x 1.09 12.5 psf 12.5 psf PV Dead Load{{". nm"wA4 mn,: ""^PV-DL'gMII& l.waiiibn 3.0 psf_-II!X., z 1.09 HHIi ° "';3.3 psf,; Roof Live Load RLL 20.0 psf x 0.95 19.0 psf Live/Snow Load wwmnl€unnn+wi (fin,nn i z --a,. i-., q! ,. LL SL ' rR ., `40.0 p5f3l+!" x 0.77,. i z 0.77.n ..ui{�30.8 psf a• ,w dlN7++uw 30.8 psf+nin*i+H Total Load(Governing LQ 9- " ' �kTL t"1019n1141 r,"n,nfl -�•`- ,. ,{r„ u ' wi(IlBIIRbmm 43.3psf,,, 46.6 psf AwKiij Notes: 1. ps=Cs*pf; Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(CO(C.i)(Is)ps; CQ C,=Is 1.0 . iw{{wwrn�HH� Member,Design 5umma per=NDS)' HlpiipHtt"",•ntiwztr r.:l1{n;lr waN m" . Govemin Load Comb r' wr,miCD•,i n¢ CL + n,fln"rra € CL ewhanw!D+ S'ixi, „ ",.:_____., H1:15 .,'".. 1.1s 01111 nwii ^'""Member Analysis Results Summary .m. Maximum w Max Demand I `"(ap Location `tHH°'Ca aci ,ialu, .vrrn{lltN+i DCR . +"'°!� 9k""t ' "�H,HilHH.,,,;aHi Shear Stress 77 psi 1.2 ft. 184 psi 0.42 Bending(+)Stress w •ns 684 psi iwibnr,r{ n+;n 8.1 ft. ul w vor�2182 psi flfiir:: 0.31 w mrqnx+{ eH€i€lib Bending - Stress -1072 psi 13.0 ft. -1524 psi 0.70 Governs Total Load Defection"! np"!;at I i0.19 in ' 1L/658'..-... }?m+fl8.1 ft.�� � d1.04 in......... �L/120= �'^=,rl+ O.li3..... Bending - Stress -1072 psi 13.0 ft -1524 psi 1 0.70 Pass i' �T. �CALCULATIONOF DESIGN WIND LOADS AMP NiitiUn•rsl ,. } i Mounting,Plane Information TII m,r,Ile xNtiSi(EiOitti{x HH' m Farlhtrxix(V({}HHI�(Roofing Material Comp Roof PV SystemaType j+ m•' „r°„ SolarCily SleekMount?� u° •_ m 11ffi Spanning Vents No Stand A off ttachment Hardware xtrnn• RlYam,a " "` _ Roof Slopew _230 67fterSpaCin9 ra. ,v,�«,,,,,,,,rEZZ2� J�i�LiiLLLL'f uu �a 24FO.C.j m*•v�n� amp t�,��sa=u lUI, � xnmm ix Framin T e Direction Y-Y Rafters x X-X Pu_Fbns Only, " s v H 'ail R a NA Purlin SPdcin9,,.. . = � 4.;. x,... „•....�,�„{riuulimix . o._,w ®.• r3 �,.. Tile Reveal Tile Roofs Only NA Tile Attacfirnent le Ti$stem• Roofs On NA „aux r v II, f"�NC 11..a --- . [StandingSeam/Tra Spacing SM Seam On NA Wind Design HHtN{INHNI9m�x nre„rxin "'::7t51.'"- .m..»:mutxnix xnnmHiN,+ '+ ,+1} "�mttfl3liNi_ mrxiinin"„,"`w«miyl„I, Wind Design Code ASCE 7-05 Wmd Design Method=7==M31N �1 ,;, Partially/Fully Enclosed Method {I •'• (`MM'o W Basic Wind Speed V 100 mph Fig 6 1 �xposureetego++ - sa{,ixi4fl r��" C a ui'� � �" Sect on`6.5,6.3.zo Roof Style Gable Roof Fig.6 11B/C/D-14A/B Mean Roof Hei ht+'nu{{"„� i„S�"�;�utm'fl�1 ilk h-,,—TT1==r Section 6.2 Wind Pressure Calculation C efficients x„,n,rtnttHni{ItiN �Nimgngnmtn 14110111111n, " Wind Pressure Exposure K, 0.95 Table 6-3 Topographic Factory k 1�=- rx+ K„ �;Oi� �jlir�' '? .'•"- .100„s --- „. Section b:5.7_ Wind Direcbonality Factor Ka 0.85 Table 6-4 Importance Factor ._oolo,,rimit,xu„�GIIOI.I1Iu`�m :,• n{tNai HHu 1.0 :.�. . .��� ni rtNN„ j1_ milr ixn Table6-1. . ..a qh=0.00256(Kz)(Kzt)(Kd)(V-2)(1) Velocity Pressure qe 20.6 psf Equation 6-15 µ,w..,molkh Wind Pressure', , „s u„=mxNw4linmxnx,N ' Ext. Pressure Coefficient U GC -0.88 Fig.6-11B/C/D-14A B -F 'u 13iilli4!Ii EXt°PressureCoefficent(Down)Nlpl GC"`p°w°i`"414 a •ra f P ' 0.45nHLx - Y6r Fig.6-SSB/C/D-14A/B Desi n Wind Pressure p = qn(GC ) Equation 6-22 Wind me Up ANO ° Mtn,",., ° :",:,, .B. x+Ni1 •^,,,. .. „xri,f-IS 0 psf i��t{.,i¢„ ic, ,,,iH• IAa �'iR1•n.,,,i,:"_. H�IIl ill) Wind Pressure Down aw Nmnnni mN!{r4N 10.0 Psftw•di nNrxt ' (ALLOW_,ABLE STANDOFF SPACINGS.. _ rinnimi p X-Direction ( „rwlxinririrpimNiNNNNP °'° .Y-Direction in Max Allowable Standoff Spacinq Landscape 72' 39' ,n, Max Allowable Cantilever' i3�scape ,m: " n 24"r l fl 'l N Nq'""' Standoff Configuration Landscape Staggered Max Standoff T, rlbutary Area,1`i " Trib ,, + „Am ssiu,+i,u,20 sf{ }rN,{{{,i rlNli{iNo .•' , uxwM` i PV Assembly Dead Load W-PV 3.0 psf Net Wiri&l,p.¢ft at Standofff Tactual � ' '•"'•' 319 Ibs i"" Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand Ca a ' Ci" DCR,+,.• .,r,,,•r ii; Mmi+i+ri@x,rxx!'x;('63.9% xnum+!{E,i,i 1NlniPNN ....... .... II3I,,mrm+PpxlC!""__ Im(n X-Direction Y•Direction'i= Max Allowable Standoff Spacing Portrait 48" 65" Max Allowable Cantleyerit " Portrait u,,,,x,;„ 18'' d ! Standoff Configuration Portrait Staggered Max—Stand [O�ffTnbu-*rv-Area-- •," T�ib; ;,;,; E . .W ., Z22sf PV Assembly Dead Load W-PV 3.0 psf xI Net Wind'Upl ft at Standoff,,;,' uN° T-actual u L� t a =354 lbs xlil _1,ct t'k w. ,� • 'r"„ Stando Uplift Cepacity�of Standoff T-allow 500 Ibs -d6ff De--man rnd- C- a ad r-A DCRT77n r,p ,,�'70.8% ,xr HHV onN� Cti�fl