48 CAVENDISH CIRCLE - BUILDING JACKET M
llp
UPC 10330
No. 153L_, Aker
HASTINGS, HN
j
CITY OF SALEM
-OVOCCUPANCT
LCERTIN
T
Issued.201.1 Permit
SALEM, MASSACHUSETTS 01970
Ci Of Salem Buildin De t
APPLICANT19
PERMIT NO 4 -)
-ADDRESS
E�
CITU (CONTR S`UCENSEj
PERMIT TO STATE zip CODE 17;3, 7 - TEL.NO Eih.1
(-TYPE STORY Ch1 NUMBER OF
Of_IIMP�OVEMENT.N. 'ILL -
(PROPOSED SE) DWELLING UNITS
AT(LOCATION)-0,048
ZONING
DISTRICT-1
ETWEENi_
(CROSS STREET) AND
(CROSS STREET(
SUBDIVISION LOT BLOCK I L01
SIZE
BUILDING IS TO BE FT WIDE By�FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
REMARKS: Li'Ll-i f', t r (TYPE)
AREA OR
VOLUME
ICU ESTIMATED COST$ V PERMIT
OWNER FEE $
ADDRESS ='901
REi . BUILDING DEPT.
BY
FN
i
May 19,2000
Building Commissioner
Salem Building Department
Salem Town Halt
Salem,Massachusetts 01790
Re: Control Construction Certificate to Occupy
Dear Building Commissioner:
1, Ray A. Renzoni,Registered Architect in Massachusetts, certify that 1 have performed the
necessary professional services;observed the construction;was present on the construction site
as required under Chapter 1,Section 116 of the State Code;and made periodic observations and
reports.
To the best of my knowledge,l have determined that the work proceeded in accordance with
regulations,permits and the submitted documents approved for the building permit.
Therefore,I request that a Certificate of Occupancy be issued for 48 Cavendish Circle,
Salem,Massachusetts,Unit 167 B.
I thank you for your cooperation.
Sincerely,
�jV P•kf y`�;•.
�No.4019�� st�fdau
1' bFl401 .�
A. Renwni
Registered Architect
�; ? °`1:,:•."r NCARB/ASID
Architectu'0I Innovations, @1J SouLfi St. ■EjHrlin, MA U1503 @1978] B38-2976