Loading...
48 CAVENDISH CIRCLE - BUILDING JACKET M llp UPC 10330 No. 153L_, Aker HASTINGS, HN j CITY OF SALEM -OVOCCUPANCT LCERTIN T Issued.201.1 Permit SALEM, MASSACHUSETTS 01970 Ci Of Salem Buildin De t APPLICANT19 PERMIT NO 4 -) -ADDRESS E� CITU (CONTR S­`UCENSEj PERMIT TO STATE zip CODE 17;3, 7 - TEL.NO Eih.1 (-TYPE STORY Ch1 NUMBER OF Of_IIMP�OVEMENT.N. 'ILL - (PROPOSED SE) DWELLING UNITS AT(LOCATION)-0,048 ZONING DISTRICT-1 ETWEENi_ (CROSS STREET) AND (CROSS STREET( SUBDIVISION LOT BLOCK I L01 SIZE BUILDING IS TO BE FT WIDE By�FT.LONG BY FT.IN HEIGHT AND SHALL CONFORM IN CONSTRUCTION TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION REMARKS: Li'Ll-i f', t r (TYPE) AREA OR VOLUME ICU ESTIMATED COST$ V PERMIT OWNER FEE $ ADDRESS ='901 REi . BUILDING DEPT. BY FN i May 19,2000 Building Commissioner Salem Building Department Salem Town Halt Salem,Massachusetts 01790 Re: Control Construction Certificate to Occupy Dear Building Commissioner: 1, Ray A. Renzoni,Registered Architect in Massachusetts, certify that 1 have performed the necessary professional services;observed the construction;was present on the construction site as required under Chapter 1,Section 116 of the State Code;and made periodic observations and reports. To the best of my knowledge,l have determined that the work proceeded in accordance with regulations,permits and the submitted documents approved for the building permit. Therefore,I request that a Certificate of Occupancy be issued for 48 Cavendish Circle, Salem,Massachusetts,Unit 167 B. I thank you for your cooperation. Sincerely, �jV P•kf y`�;•. �No.4019�� st�fdau 1' bFl401 .� A. Renwni Registered Architect �; ? °`1:,:•."r NCARB/ASID Architectu'0I Innovations, @1J SouLfi St. ■EjHrlin, MA U1503 @1978] B38-2976