Loading...
64-506 - 1 MARTIN LANE - CONSERVATION COMMISSION 1 Mattin Ln. lot 211 '1 h 3 �onIDtt� tq J!, ,O �R CITY OF SALEM �AMmg CONSERVATION COMMISSION December 17, 201? Jeffrey Halloran 100 Cabot Street Beverly, MA 01915 Re: Certificates of Compliance for DEP #64-504 (3 Martin Lane), #64-505 (4 Martin Lane), and #64-506 (2 Martin Lane) Determination of Applicability for 6 Martin Lane Dear Mr. Halloran: Enclosed, please find the certificates of compliance for 2, 3, and 4 Martin Lane. These documents must be recorded at the Essex County Registry of Deeds. Please till out and return the Recording Information on page 3 of each certificate, which will indicate to the Salem Conservation Commission that the documents have been recorded. Please also find the enclosed determination of applicability for 6 Martin Lane for your file. Because this determination is issued for work that has already been completed, no further action is needed. 1f you have any further questions please feel free to contact me at 978-619-5685. Sincerely, Tom Devine Conservation Agent/Staff Planner Enclosures CC: DEP Northeast Regional Office Eastern Land Survey Associates Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131 , §40 A. General Information Important: When fining out From: forms on the Salem computer, use ------- - --- -- --- ------------ ------ only the tab -conservation Commission key to move To: Applicant Property Owner (if different from applicant) your cursor - do not use the Jeffrey Halloran return key. Name Name 100 Cabot Street faD Mailing Address Mailing Address N Beverly MA _01915 City/Town State Zip Code City/Town _State Zip Code rYV/I .�pi P 1. Title and Date (or Revised Date if applicable) of Final Plans and Other Documents: As-Built/Certificate of Compliance Plan of Land 12/3/2012 Title Dale Title -. - --- -Date-- --- - Title __._ __ _—_ - — Date 2, Date Request Filed: 12/3/2012 B. Determination Pursuant to the authority of M.G.L. c. 131, § 40, the Conservation Commission considered your Request for Determination of Applicability, with its supporting documentation, and made the following Determination. Project Description (if applicable): Grading and stabilization of approximately 260 square feet within the outer buffer zone to a wetland resource area. Project Location: 6 Martin Lane Salem Street Address - City/Town 9 30 (partial) Assessors Map/Plat Number Parcel/Lot Number wpalorm2.doc-nelerr i W lion of Applicability-rev.1016104 Page 1 0!5 ElMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s) is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination - Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions (issued following submittal of a Notice of Intent or Abbreviated Notice of Intent) or Order of Resource Area Delineation (issued following submittal of Simplified Review ANRAD) has been received from the issuing authority (i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s) is an area subject to protection under the Act. Removing, filling, dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a. The boundary delineations of the following resource areas described on the referenced plants) are confirmed as accurate. Therefore, the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ❑ 2b. The boundaries of resource areas listed below are not confirmed by this Determination regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. ❑ 3. The work described on referenced plan(s) and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. ❑ 4. The work described on referenced plants) and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review (if work is limited to the Buffer Zone). ❑ 5. The area and/or work described on referenced plan(s) and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation wpaform2.00c•Determination of Applicability•rev.10/6104 Page 2 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability 71 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: ❑ 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives limited to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ❑ 1. The area described in the Request is not an area subject to protection under the Act or the Buffer Zone. 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ❑ 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpaform2.tloc•Determination of Applicability•rev.1016104 Page 3 of 5 Massachusetts Department of Environmental Protection Sir Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(site applicable statuatory/regulatory provisions) - 6. The area and/or work described in the Request is not subject to review and approval by: Name of Municipality -- Pursuant to a municipal wetlands ordinance or bylaw. Name - Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on by certified mail, return receipt requested on Date Date / This Determination is valid for three years from the date of issuance (except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office (see http://www.mass.gov/dep/about/reciion.findyour.htm) and the property owner (if different from the applicant). �_ ' \ V (")- Date vvpalorm2.boc Delemmiation of Appllcabilily•rev.1016104 Page 4 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of Applicability IL L- 1Massachusetts Wetlands Protection Act M.G.L. c. 131 , §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office (see hltp://www.mass.gov/dep/about/region.findvour.htm) to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form) as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Act or regulations, the Department of Environmental Protection has no appellate jurisdiction. wpaform2 Aoc-Dearminali on of Applicability-rev 1016104 Page 5 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Request for Departmental Action Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. Request Information Important: When filling out 1, Person or party making request (if appropriate, name the citizen group's representative): forms on the computer, use -. ---- - only the tab Name key to moveyour cursor- Mailing Address do not use the return key . . _ .. -- ----_-__--_--- City/Town State Zip Code r'h Phone Number Fax Number(if applicable) -' Project Location Mailing Address _ ------ -- - City/Town State Zip Code 2. Applicant (as shown on Notice of Intent (Form 3), Abbreviated Notice of Resource Area Delineation (Form 4A); or Request for Determination of Applicability(Form 1)): Name Mailing Address CitylTown State Zip Code Phone Number Fax Number(if applicable) 3. DEP File Number: B. Instructions 1. When the Departmental action request is for (check one): ❑ Superseding Order of Conditions ($100 for individual single family homes with associated structures; $200 for all other projects) ❑ Superseding Determination of Applicability ($100) ❑ Superseding Order of Resource Area Delineation ($100) Send this form and check or money order for the appropriate amount, payable to the Commonwealth of Massachusetts to: Department of Environmental Protection Box 4062 Boston, MA 02211 wpaform2 doc-Request for Departmental Action Fee Transmittal Form-rev.1016c4 Page 1 of 2 7LE11Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands 11 Request for Departmental Action Fee Transmittal Form 1, Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Instructions (cont.) 2. On a separate sheet attached to this form, state clearly and concisely the objections to the Determination or Order which is being appealed. To the extent that the Determination or Order is based on a municipal bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. 3. Send a copy of this form and a copy of the check or money order with the Request for a Superseding Determination or Order by certified mail or hand delivery to the appropriate DEP Regional Office (see http://www.mass.gov/dep/about/region/findvour htm). 4. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, if he/she is not the appellant. wpaform2.doc Request for Departmental Action Fee Transmittal Farm•rev.1016/04 Page 2 of 2 Massachusetts Department of Environmental Protection `r< Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-504 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 p'rovided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer,use Jeffrey Halloran only the tab key Name to move your 100 Cabot Street cursor-do not use the return Mailing Address key. Beverly __ MA 01915 City/Town Stale Zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Kenneth Steadman rean� e Name—._.____ - - - 9/23/2010 64-504 Dated DEP File Number 3. The project site is located at: 3 Martin Lane Salem_ Street Address City/Town 14- - -- - --- 30 Partial)--- -- Assessors N1aplPlat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Kenneth Steadman Property Owner(if different) Essex South County Book Page 518045 Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 11/28/2012 Date wpalrrn8b.are•ie,12,23,09 WPA Form 88,Certificate of Compliance-Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: ?; WPA Form 8B — Certificate of Compliance � 64-504 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Prewded by oEP B. Certification Check all that apply: Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued by: C-on— -- -- — -- ---- serva lon COmniission Dat of I nuance This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.gov/dep/abOLIt/region/findyour.htm), Signatures: wpafrm6b doc rev.12/23209 VVPA Form ee.Cerlificale of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number, WPA Form 8B — Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 sa_eoa t1 _rov Pided by DEP- D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To: ——- - - —- - - -— - -—— - - -— - - - - -— —-— --- - - - - - - -— - - ——- - - -— - Conservation Commission Please be advised that the Certificate of Compliance for the project at: -- __-_ - -- --- Project Location DEP— File Number Has been recorded at the Registry of Deeds of: County for: Property Owner - and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number signature of Applicant - wpalrm8bdoc•rev.12123109 WPA Form 8B,Certificate of Compliance•Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: F; WPA Form 8B — Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, 40 64-Sos � Provided by DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer, use Jeffrey Halloran only the tab key Name to move your 100 Cabot Street cursor-do not use the return Mailing Address key. Beverly MA 01915 CilyrTown State Zip Code e 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: srN, Kenneth Steadman _ Name 9/23/2010 _ 64-505 Dated DEP File Number 3. The project site is located at: 4 Martin Lane _ Salem Street Address City/Town 14 30 (Partial) Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Kenneth Steadman Property Owner(if different) Essex South County Book Page 518044 _ Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: 11/28/2012 Dale --- -- — ------------ wpalrm0b.doc rev.12/23/09 WPA Form 06.Certificate of Compliance•Page 1 of 3 Massachusetts Department of Environmental Protection -- Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 813 — Certificate of Compliance !' 64-505 Massachusetts Wetlands Protection Act M.G.L. c. 1 -- —31 , 40 Provided by DEP B. Certification Check all that apply: Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued by: 50.�a—. 1 _(/A_ Conservation Commission Date f Iss nce This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.gov/dep/aboutlregion/findvour.htm). Signatur 1 wpafrmBb.doc•rev.12/23/09 WPA Form 89,Certificate of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number . " WPA Form 8B - Certificate of Compliance 64-505 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 P o ided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. Conservation Commission Please be advised that the Certificate of Compliance for the project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County for: Propertyowner and has been noted in the chain of title of the affected property on: Date Book Page If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: Document Number Signature of Applicant wpafrm8b.boc•rev.1223109 WPA Form 88,Certificate of Compliance•Page 3 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 813 — Certificate of Compliance 06 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 pro 5dedby DEP A. Project Information Important: When filling out 1. This Certificate of Compliance is issued to: forms on the computer, use Jeffrey Halloran only the tab key Name to move your 100 Cabot Street cursor-do not use the return Mailing Address key. Beverly__ __ _MA _ 01915 r� City/Town State Zip Code 2. This Certificate of Compliance is issued for work regulated by a final Order of Conditions issued to: Kenneth Steadman Name 9/23/2010 64-506 Dated DEP File Number 3. The project site is located at: 2 Martin Lane Salem__ _ Street Address City/Town 14 30 (Partial) Assessors Map/Plat Number Parcel/Lot Number the final Order of Condition was recorded at the Registry of Deeds for: Kenneth Steadman Property Owner(if different) Essex South County Book Page 518045 Certificate 4. A site inspection was made in the presence of the applicant, or the applicant's agent, on: •11/28/2012 Date wpafmnft do,-rev.12123109 WPA Form 8B,Certifcale of compliance•Page 1 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: WPA Form 8B — Certificate of Compliance 64-506 _J Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP B. Certification Check all that apply: Complete Certification: It is hereby certified that the work regulated by the above-referenced Order of Conditions has been satisfactorily completed. ❑ Partial Certification: It is hereby certified that only the following portions of work regulated by the above-referenced Order of Conditions have been satisfactorily completed. The project areas or work subject to this partial certification that have been completed and are released from this Order are: ❑ Invalid Order of Conditions: It is hereby certified that the work regulated by the above-referenced Order of Conditions never commenced. The Order of Conditions has lapsed and is therefore no longer valid. No future work subject to regulation under the Wetlands Protection Act may commence without filing a new Notice of Intent and receiving a new Order of Conditions. ❑ Ongoing Conditions: The following conditions of the Order shall continue: (Include any conditions contained in the Final Order, such as maintenance or monitoring, that should continue for a longer period). Condition Numbers: C. Authorization Issued by: o o teCsevation o Date f f danec This Certificate must be signed by a majority of the Conservation Commission and a copy sent to the applicant and appropriate DEP Regional Office (See http://www.mass.gov/dep/about/region/findyour htm). Signatures: p� wpalrmi doc rev.12123109 WPA Form 513,Certificate of Compliance•Page 2 of 3 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP File Number: \� WPA Form 8B — Certificate of Compliance 64-506 Massachusetts Wetlands Protection Act M.G.L. c. 131, I 40� Provided by DEP D. Recording Confirmation The applicant is responsible for ensuring that this Certificate of Compliance is recorded in the Registry of Deeds or the Land Court for the district in which the land is located. Detach on dotted line and submit to the Conservation Commission. To:-- ------ --- - ---- -------- - -- --------.- ---- - ----- ---- --- ------ --- --- - - --- Conservation Commission - Please be advised that the Certificate of Compliance for the project at: Project Location DEP File Number Has been recorded at the Registry of Deeds of: County - ------ -.---- for: Property Owner and has been noted in the chain of title of the affected property on: Dale----- ---- --- --------Book ----- -- Page --- If recorded land, the instrument number which identifies this transaction is: If registered land, the document number which identifies this transaction is: — - — -- Docu-ment Number Signature of Applicant - - wpafrm8b.doc-rev.1223I09 WPA Form 8B,Certificate of Compliance•Page 3 of 3 04/09/2012 13:08 FAX R 0004/0004 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands #64-506 MassDEP File# WPA Form 5 - Order of Conditions Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cayfrown A. General Information Importaft When filing 1.From: Salem motion Commission out forts on the 2.This issuance is for a.®Order of Conditions b. Amended Order of Conditions computer. (check one): use only the tat key to 3..To: Applicant move your cursor-do Kenneth Steadman not use the a.First Name b.Last Name return key. c.Organization 67 Village Street d.MailingAddress Marblehead Massachusetts 01945 e.cayfrown f.State g.Zip Code 4.Property Owner(if different from applicant): a.Fast Name b.Last Name Bartlett&Steadman Development Corp. a Organization 67 Village Street d.Mailing Address - Marblehead Massachusetts 01945 e.Crtyfroten f.State g.Zip Code 5.Project Location: 1 Martin Ln(tot 211 VVdch Hill Subdivision) Salem a.Street Address b.Cityfrown map 14 portion of lot 30 a Assessors Map/Plat Number d.ParceVLot Number Latitude and Longitude,if known: 42 d30 m35 s 70 d55 m09 s N d.Latkude e.Longitude wpsrormsdoc•m.122309 S RI I�I��IIlilt 11111111.293396 Page 1 of 12 `��gOYfMT,,A CITY OF SALEM ` mac CONSERVATION COMMISSION gl✓'YIYP.�� September 28, 2010 Kenneth Steadman 67 Village Street Marblehead, MA 01945 Re: Orders of Conditions—DEP#64-504, 64-505, 64-506 4 Martin Lane (Lot 214 Witch Hill Subdivision) 3 Martin Lane (Lot 212 Witch Hill Subdivision) 1 Martin Lane (Lot 211 Witch Hill Subdivision) Dear Mr. Steadman: Enclosed, please find the Orders of Conditions for the above referenced projects. Following the 10-day appeal period (as of October 4, 2010), these document and the attached Special Conditions must be recorded at the Essex County Registry of Deeds (Shetland Park 45 Congress Street, Suite 4100 Salem, Massachusetts). Once recorded, please return a copy of Page 12 of each Order, which will indicate to the Commission that the documents have been recorded. As indicated in the Order, prior to any work commencing: 1. these Orders must be recorded, 2. signs shall be displayed showing DEP File # 64-504, 64-505, and 64-506 within public view, and 3. contact me at least 48 hours prior to any activity to schedule a pre-construction meeting to review the Orders with your hired contractor. If you have any further questions,please feel free to contact me at 978-619-5685. Sincerely, Tom D me Conservation Agent/Staff Planner Enclosures CC: DEP Northeast Regional Office Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands #64-506 WPA Form 5 - Order of Conditions MassDEP File# \ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/Town A. General Information Important: Salem When filling 1. From: Conservation Commission out fors on the 2. This issuance Is for computer, (check one): a.®Order of Conditions b.❑Amended Order of Conditions use only the - tab key to 3. To: Applicant: move your cursor-do Kenneth Steadman not use the a.First Name b.Last Name return k—ey. Af"- iI I I c.Organization �r m 67 Village Street d.Mailing Address Marblehead Massachusetts 01945 e.City/Town f.State g.Zip Code 4. Property Owner(if different from applicant): a.First Name b.Last Name Bartlett&Steadman Development Bartlett Steadman Development Corp. c.Organization 67 Village Street d.Mailing Address Marblehead Massachusetts 01945 e.Ctty/Town f.State g.Zip Code s. Project Location: 1 Martin Ln (lot 211 Witch Hill Subdivision) Salem a.Street Address b.City/rown map 14 portion of lot 30 c.Assessors Map/Plat Number d.Parcel/Lot Number Latitude and Longitude, if known, 42 d30 m35 s 70 d55 m09 s d.Latitude e.Longitude wpelam5.0oc• rev.1212309 PW 1 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands #64-506 El WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem cityrrown A. General Information (cont.) 6. Property recorded at the Registry of Deeds for(attach additional information if more than one parcel): Essex 80814& 80815 a.County - b.Certificate Number(d registered land) c.Book d.Page 7. Dates: August 30 2010 Sept. 23, 2010 Sept. 23, 2010 a.Date Notice of Intent Filed b.Date Public Hearing Closed c.Date of Issuance s. Final Approved Plans and Other Documents(attach additional plan or document references as needed): Site Development Permit Plan Salem MA a.Plan Title Eastern Land Survey Assoc. Inc. Christopher Mello b.Prepared By c.Signed and Stamped by August 24, 2010 1"=20' . d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date B. Findings f. Findings pursuant to the Massachusetts Wetlands Protection Act: Following the review of the above-referenced Notice of Intent and based on the information provided in this application and presented at the public hearing, this Commission finds that the areas in which work is proposed is significant to the following interests of the Wetlands Protection Act(the Act). Check all that apply: a. ® Public Water Supply b. ❑ Land Containing Shellfish c. ® Prevention of Pollution d. ® Private Water Supply e. ® Fisheri es ® Protection of Wildlife g. ® Groundwater Supply h. ® Storm Damage Prevention I. ® Flood Control 2. This Commission hereby finds the project,as proposed,is: (check one of the following boxes) Approved subject to: a. ® the following conditions which are necessary in accordance with the performance standards set forth in the wetlands regulations. This Commission orders that all work shall be performed in accordance with the Notice of Intent referenced above,the following General Conditions, and any other special conditions attached to this Order. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, these conditions shall control. .yaarr&e - w.rvrws Page 4or 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands #64-506 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem city/rows B. Findings (cunt.) Denied because: b. ❑ the proposed work cannot be conditioned to meet the performance standards set forth in the wetland regulations. Therefore, work on this project may not go forward unless and until a new Notice of Intent is submitted which provides measures which are adequate to protect the interests of the Act, and a final Order of Conditions is issued. A description of the performance standards which the proposed work cannot meet is attached to this Order. c. ❑ the information submitted by the applicant is not sufficient to describe the site, the work, or the effect of the work on the interests identified in the Wetlands Protection Act. Therefore,work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides sufficient information and includes measures which are adequate to protect the Act's interests, and a final Order of Conditions is issued. A description of the specific information which is lacking and why it is necessary is attached to this Order as per 310 CMR 10.05(6)(c). Inland Resource Area Impacts: Check all that apply below. (For Approvals Only) 75+/- 3. ® Buffer Zone Impacts: Shortest distance between limit of project a.linear feet disturbance and Bank or Bordering Vegetated Wetland boundary(if available) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement 4. ❑ Bank a.linearfeet b.linear feet c.linear feet d. linear feet 5. ❑ Bordering Vegetated Wetland a.square feet b.square feet c.square feet d.square feet s. ❑ Land Under Waterbodies and a.square feet b.square feet c.square feet d.square feel Waterways e.Hy dredged f.cty dredged 7. ❑ Bordering Land Subject to Flooding a.square feet b.square feet c.square feet d.square feet Cubic Feet Flood Storage e.cubic feet f.cubic feet g.cubic feet h.cubic feet s. ❑ Isolated Land Subject to Flooding a.square feet b.square feet Cubic Feet Flood Storage c cubic feet d.cubic feet e.cubic feet f.cubic feet wpalann5.dac• rev.i WWI) Peas 3 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands #64-506 1 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/rows B. Findings (cunt.) Resource Area Proposed Permitted Proposed Permitted Alteration Alteration Replacement Replacement g. ❑ Riverfront Area a.total sq feet b.total sq.feet Sq ft within 100 It c.square feet d.square feet e.square feet f,square feet Sq it between 100- 200 It g.square feet h.square feet i.square feet j.square feet Coastal Resource Area Impacts: Check all that apply below. (For Approvals Only) to. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below 11. ❑ Land Under the a.Ocean square feet b.square feet c.VY dredged d.cly dredged 12. ❑ Barrier Beaches Indicate size under Coastal Beaches and/or Coastal Dunes below 13. El Coastal Beaches cu yd cu yd a.square feet b.square feet c.nourishment d.nourishment 14. El Coastal Dunes cu yd cu yd a.square feet b.square feet c.nourishment d. nourishment 15. ❑ Coastal Banks a. linear feet b.linear feet 16. ❑ Rocky Intertidal Shores a.square feet D.square feet 17. ❑ Salt Marshes a.square feet b.square feet c.square feet d.square feet 18. ❑ Land Under Salt Ponds a.square feet b.square feet c.c y dredged d.cly dredged 19. ❑ Land Containing Shellfish a.square feet b.square feet c.square feel d.square feet 20. ❑ Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above a.cry dredged b.cly dredged 21. ❑ Land Subject to Coastal Storm a.square feet b.square feet Flowage wpelonn5.Eoc• rov.12r1309 - Pepe 4 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 464-506 WPA Form 5 — Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP-Transaction# Salem Cityrrown B. Findings (cunt.) 22. ❑ Restoration/Enhancement: a.square feet of rvw b.square feet of salt marsh 23. ❑ Stream Crossing(s): a.number of new stream crossings b.number of replacement stream crossings C. General Conditions Under Massachusetts Wetlands Protection Act The following conditions are only applicable to Approved projects. 1. Failure to comply with all conditions stated herein, and with all related statutes and other regulatory measures, shall be deemed cause to revoke or modify this Order. 2. The Order does not grant any property rights or any exclusive privileges; it does not authorize any injury to private property or invasion of private rights. 3. This Order does not relieve the permittee or any other person of the necessity of complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. 4. The work authorized hereunder shall be completed within three years from the date of this Order unless either of the following apply: a. the work is a maintenance dredging project as provided for in the Act; or b. the time for completion has been extended to a specified date more than three years, but less than five years, from the date of issuance. If this Order is intended to be valid for more than three years, the extension date and the special circumstances warranting the extended time period are set forth as a special condition in this Order. 5. This Order may be extended by the issuing authority for one or more periods of up to three years each upon application to the issuing authority at least 30 days prior to the expiration date of the Order. 6. If this Order constitutes an Amended Order of Conditions, this Amended Order of Conditions does not extend the issuance date of the original Final Order of Conditions and the Order will expire on September 23,2013 unless extended in writing by the Department. 7. Any fill used in connection with this project shall be clean fill. Any fill shall contain no trash, refuse, rubbish, or debris, including but not limited to lumber, bricks, plaster, wire, lath, paper, cardboard, pipe,tires, ashes, refrigerators, motor vehicles, or parts of any of the foregoing. 8. This Order is not final until all administrative appeal periods from this Order have elapsed, or if such an appeal has been taken, until all proceedings before the Department have been completed. WPafQ1ff S.Ecc• W.1=:03 . Pape 5 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands #64-506 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/rown C. General Conditions Under Massachusetts Wetlands Protection Act(cunt.) 9. No work shall be undertaken until the Order has become final and then has been recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land upon which the proposed work is to be done. In the case of the registered land, the Final Order shall also be noted on the Land Court Certificate of Title of the owner of the land upon which the proposed work is done. The recording information shall be submitted to the Conservation Commission on the form at the end of this Order,which form must be stamped by the Registry of Deeds, prior or to the commencement of work. 10. A sign shall be displayed at the site not less then two square feet or more than three square feet in size bearing the words, "Massachusetts Department of Environmental Protection"for, 'MassDEP"i `File Number#64-506 " 11. Where the Department of Environmental Protection is requested to issue a Superseding Order, the Conservation Commission shall be a party to all agency proceedings and hearings before MassDEP. 12. Upon completion of the work described herein, the applicant shall submit a Request for Certificate of Compliance(WPA Form 8A)to the Conservation Commission. 13. The work shall conform to the plans and special conditions referenced in this order. 14. Any change to the plans identified in Condition#12 above shall require the applicant to inquire of the Conservation Commission in writing whether the change is significant enough to require the filing of a new Notice of Intent. 15. The Agent or members of the Conservation Commission and the Department of Environmental Protection shall have the right to enter and inspect the area subject to this Order at reasonable hours to evaluate compliance with the conditions stated in this Order, and may require the submittal of any data deemed necessary by the Conservation Commission or Department for that evaluation. 16. This Order of Conditions shall apply to any successor in interest or successor in control of the property subject to this Order and to any contractor or other person performing work conditioned by this Order. 17. Prior to the start of work, and d the project involves work adjacent to a Bordering Vegetated Wetland, the boundary of the wetland in the vicinity of the proposed work area shall be marked by wooden stakes or flagging. Once in place, the wetland boundary markers shall be maintained until a Certificate of Compliance has been issued by the Conservation Commission. wpdam6.doc•m.12MM9 Pape 6 o112 Massachusetts Department of Environmental Protection Provided by MassDEP: L Bureau of Resource Protection -Wetlands 464-506 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTransaction# Salem cityrrown C. General Conditions Under Massachusetts Wetlands Protection Act (cunt.) 18. All sedimentation barriers shall be maintained in good repair until all disturbed areas have been fully stabilized with vegetation or other means.At no time shall sediments be deposited in a wetland or water body. During construction, the applicant or his/her designee shall inspect the erosion controls on a daily basis and shall remove accumulated sediments as needed. The applicant shall immediately control any erosion problems that occur at the site and shall also immediately notify the Conservation Commission, which reserves the right to require additional erosion and/or damage prevention controls it may deem necessary. Sedimentation barriers shall serve as the limit of work unless another limit of work line has been approved by this Order. NOTICE OF STORMWATER CONTROL AND MAINTENANCE REQUIREMENTS 19. The work associated with this Order(the "Project") Is(1)❑ is not(z)®subject to the Massachusetts Stormwater Standards. If the work is subject to the Stormwater Standards,then the project is subject to the following conditions: a) All work, including site preparation, land disturbance, construction and redevelopment, shall be implemented in accordance with the construction period pollution prevention and erosion and sedimentation control plan and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Construction General Permit as required by Stormwater Condition 8. Construction period erosion, sedimentation and pollution control measures and best management practices (BMPs)shall remain in place until the site is fully stabilized. b) No stormwater runoff may be discharged to the post-construction stormwater BMPs unless and until a Registered Professional Engineer provides a Certification that: i. all construction period BMPs have been removed or will be removed by a date certain specified in the Certification. For any construction period BMPs intended to be converted to post construction operation for stormwater attenuation, recharge, and/or treatment, the conversion is allowed by the MassDEP Stonmwater Handbook BMP specifications and that the BMP has been properly cleaned or prepared for post construction operation, including removal of all construction period sediment trapped in inlet and outlet control structures; fi. as-built final construction BMP plans are included, signed and stamped by a Registered Professional Engineer, certifying the site is fully stabilized; N. any illicit discharges to the stormwater management system have been removed, as per the requirements of Stormwater Standard 10; iv, all post-construction stormwater BMPs are installed in accordance with the plans (including all planting plans)approved by the issuing authority, and have been inspected to ensure that they are not damaged and that they are in proper working condition; v. any vegetation associated with post-construction BMPs is suitably established to withstand erosion. WPrmns.dx• M./1MA09 Peas 7 0114 Massachusetts Department of Environmental Protection Provided by MassDEP: _ Bureau of Resource Protection -Wetlands #64-506 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Clly/rown C. General Conditions Under Massachusetts Wetlands Protection Act (cunt.) c) The landowner is responsible for BMP maintenance until the issuing authority is notified that another party has legally assumed responsibility for BMP maintenance. Prior to requesting a Certificate of Compliance, or Partial Certificate of Compliance, the responsible party(defined in General Condition 18(e))shall execute and submit to the issuing authority an Operation and Maintenance Compliance Statement("O&M Statement) for the Stormwater BMPs identifying the party responsible for implementing the stormwater BMP Operation and Maintenance Plan("O&M Plan")and certifying the following: i.)the O&M Plan is complete and will be implemented upon receipt of the Certificate of Compliance, and ii.)the future responsible parties shall be notified in writing of their ongoing legal responsibility to operate and maintain the stormwater management BMPs and implement the Stormwater Pollution Prevention Plan. d) Post-construction pollution prevention and source control shall be implemented in accordance with the long-term pollution prevention plan section of the approved Stormwater Report and, if applicable, the Stormwater Pollution Prevention Plan required by the National Pollution Discharge Elimination System Multi-Sector General Permit. e) Unless and until another party accepts responsibility, the landowner, or owner of any drainage easement, assumes responsibility for maintaining each BMP. To overcome this presumption, the landowner of the property must submit to the issuing authority a legally binding agreement of record, acceptable to the issuing authority,evidencing that another entity has accepted responsibility for maintaining the BMP, and that the proposed responsible party shall be treated as a permittee for purposes of implementing the requirements of Conditions 18(f)through 18(k)with respect to that BMP. Any failure of the proposed responsible party to implement the requirements of Conditions 18(f)through 18(k)with respect to that BMP shall be a violation of the Order of Conditions or Certificate of Compliance. In the case of stormwater BMPs that are serving more than one lot, the legally binding agreement shall also identify the lots that will be serviced by the stormwater BMPs. A plan and easement deed that grants the responsible party access to perform the required operation and maintenance must be submitted along with the legally binding agreement. f) The responsible party shall operate and maintain all stormwater BMPs in accordance with the design plans,the O&M Plan, and the requirements of the Massachusetts Stormwater Handbook. +ps�ms.e�•m lvrsos veao 8 of 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands #64-506 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEPTrarmction# Salem cityrrow C. General Conditions Under Massachusetts Wetlands Protection Act (cont.) g) The responsible party shall: 1. Maintain an operation and maintenance log for the last three(3)consecutive calendar years of inspections, repairs, maintenance and/or replacement of the stonnwater management system or any part thereof, and disposal (for disposal the log shall indicate the type of material and the disposal location); 2. Make the maintenance log available to MassDEP and the Conservation Commission ("Commission")upon request; and 3. Allow members and agents of the MassDEP and the Commission to enter and inspect the site to evaluate and ensure that the responsible party is in compliance with the requirements for each BMP established in the O&M Plan approved by the issuing authority. h) All sediment or other contaminants removed from stonnwater BMPs shall be disposed of in accordance with all applicable federal, state, and local laws and regulations. i) Illicit discharges to the stonnwater management system as defined in 310 CMR 10.04 are prohibited. j) The stormwater management system approved in the Order of Conditions shall not be changed without the prior written approval of the issuing authority. k) Areas designated as qualifying pervious areas for the purpose of the Low Impact Site Design Credit(as defined in the MassDEP Stormwater Handbook, Volume 3, Chapter 1, Low Impact Development Site Design Credits)shall not be altered without the prior written approval of the issuing authority. 1) Access for maintenance, repair, and/or replacement of BMPs shall not be withheld. Any fencing constructed around stomlwater BMPs shall include access gates and shall be at least sin inches above grade to allow for wildlife passage. Special Conditions(if you need more space for additional conditions, please attach a text document): SEE ATTACHED SPECIAL CONDITIONS Pap 9d12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection - Wetlands #64-506 WPA Form 5 - Order of Conditions MassDEP File# \ Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem City/rows D. Findings Under Municipal Wetlands Bylaw or Ordinance 1. Is a municipal wetlands bylaw or ordinance applicable? ® Yes ❑ No 2. The Salem hereby finds(check one that applies): Conservation Commission a. ❑that the proposed work cannot be conditioned to meet the standards set forth in a municipal ordinance or bylaw, specifically: 1.Municipal Ordinance or Bylaw 2.Citation Therefore, work on this project may not go forward unless and until a revised Notice of Intent is submitted which provides measures which are adequate to meet these standards, and a final Order of Conditions is issued. b. ❑that the following additional conditions are necessary to comply with a municipal ordinance or bylaw: - -1.Municipal Ordinance or Bylaw - _ 2.Citation --- 3. The Commission orders that all work shall be performed in accordance with the following conditions and with the Notice of Intent referenced above. To the extent that the following conditions modify or differ from the plans, specifications, or other proposals submitted with the Notice of Intent, the conditions shall control. The special conditions relating to municipal ordinance or bylaw are as follows(if you need more space for additional conditions, attach a text document): »varorms.ea• m,.1203W Peas 10 o/12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 464-506 El WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityrrown E. Signatures This Order is valid for three years, unless otherwise specified as a special Sept. 23 2010 condition pursuant to General Conditions#4,from the date of issuance. 1.Date of issuance Please indicate the number of members who will sign this form. This Order must be signed by a majority of the Conservation Commission. 2.Number of Signers The Order must be mailed by certified mail(return receipt requested)or he d elivered to applicant.A copy also must be mailed or hand delivered at the same time to the appro riate Depa of Environmental Protection Regional Office, if not filing electronically,and a pro r, if eerent from applicant. S ntres 55 ❑ by hand delivery on ❑ by certified mail, return receipt requested, on Date Date F. Appeals The applicant, the owner, any person aggrieved by this Order, any owner of land abutting the land subject to this Order,or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate MassDEP Regional Office to issue a Superseding Order of Conditions. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and a completed Request of Departmental Action Fee Transmittal Form, as provided in 310 CMR 10.03(7)within ten business days from the date of issuance of this Order. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant, If he/she is not the appellant. Any appellants seeking to appeal the Departments Superseding Order associated with this appeal will be required to demonstrate prior participation in the review of this project. Previous participation in the permit proceeding means the submission of written information to the Conservation Commission prior to the dose of the public hearing, requesting a Superseding Order, or providing written information to the Department prior to issuance of a Superseding Order. The request shall state dearly and concisely the objections to the Order which is being appealed and how the Order does not contribute to the protection of the interests identified in the Massachusetts Wetlands Protection Act(M.G.L. c. 131, §40), and is inconsistent with the wetlands regulations(310 CMR 10.00). To the extent that the Order is based on a municipal ordinance or bylaw, and not on the Massachusetts Wetlands Protection Act or regulations, the Department has no appellate jurisdiction. •yalmrd.am• w 12raM Page 11 W 12 Massachusetts Department of Environmental Protection Provided by MassDEP: Bureau of Resource Protection -Wetlands 464-506 WPA Form 5 - Order of Conditions MassDEP File# Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 eDEP Transaction# Salem Cityrrown G. Recording Information This Order of Conditions must be recorded in the Registry of Deeds or the Land Court for the district in which the land is located, within the chain of title of the affected property. In the case of recorded land, the Final Order shall also be noted in the Registry's Grantor Index under the name of the owner of the land subject to the Order. In the case of registered land, this Order shall also be noted on the Land Court Certificate of Title of the owner of the land subject to the Order of Conditions. The recording information on this page shall be submitted to the Conservation Commission listed below. Salem Conservation Cammisslon Detach on dotted line, have stamped by the Registry of Deeds and submit to the Conservation Commission. .................................................. ............................................................ To: Salem Conservation Commission Please be advised that the Order of Conditions for the Project at: 1 Martin Ln (lot 211 Witch Hill Subdivision) ff64-506 Project Location MassDEP File Number Has been recorded at the Registry of Deeds of: Essex County - --- - Book Page for. Property Owner and has been noted in the chain of title of the affected property in: Book- — -- Page In accordance with the Order of Conditions issued on: Dare If recorded land, the instrument number identifying this transaction is: Instrument Number If registered land, the document number identifying this transaction is: Document Number - - Signature of Applicant ryeMm5.d=• rev.12/2309 Pape 12 al 12 o.' Attachment to Order of Conditions # 64-506 � r Page 1of 5 SALEM CONSERVATION COMMISSION DEP FILE #64-506 1 Martin Lane (Lot 211 Witch Hill Subdivision) City of Salem,Massachusetts ADDITIONAL FINDINGS Based on the Estimated Habitats of Rare Wildlife and Certified Venial Pools Map (June 1, 2003) from Natural Heritage & Endangered Species Program(NHESP) of the Massachusetts Division of Fisheries and Wildlife, it has been determined that this project does not occur near any habitat of state-listed rare wildlife species nor contains any vernal pools. This Order is issued under the Massachusetts Wetlands Protection Act,M.G.L.Chapter 131, Section 40 and the City of Salem Wetlands Protection Ordinance, Salem Code Chapter 34, Section 34-1 —34-13. This Order permits the construction of a single family house(35'x50')and associated appurtenances on the 10,471 square foot lot within a Buffer Zone to a Bordering Vegetated Wetland at 1 Martin Lane (Witch Hill Subdivision Lot 211). At their closest point,the approved activities are approximately 75+/-feet from the resource area. GENERAL CONDITIONS 1. This Order of Conditions must be recorded in its entirety(including all 5 pages of Special Conditions) at the Essex County Registry of Deeds or the Land Court for the district in which the land is located, after the expiration of the 10-day appeal period and within 30 days of the issuance. A copy of the recording information must be submitted to the Salem Conservation Commission before any work approved in this Order commences. 2. Approval of this application does not constitute compliance with any law or regulation other than M.G.L Chapter 131, Section 40, Wetlands Regulations 310 CMR 10.00 and the City of Salem Wetlands Protection Ordinance,Salem Code Chapter 34,Section 34-1 —34-13. 3. All work shall be performed in accordance with this Order of Conditions and approved site plan(s). No alteration of wetland resource areas or associated buffer zones,other than that approved in this Order, shall occur on this property without prior approval from the Commission. 4. Prior to any work commencing on site,a DEP Sign showing DEP File#64-506 must be installed at the entrance to the site and seen from the public way,but not placed on a living tree. 5. No work approved in this Order may commence until the ten(10)day appeal period has lapsed from the date of the issuance of this Order. 6. With respect to this Order,the Commission designates the Conservation Agent as its agent with powers to act on its behalf in administering and enforcing this Order. 7. The Commission or its Agent,officers,or employees shall have the right to enter and inspect the property at any time for compliance with the conditions of this Order,the Wetlands Protection Act MGL Chapter 131, Attachment to Order of Conditions # 64-506 1- 7 Page 2of 5 Section 40,the Wetlands Regulations 310 CMR 10.00,and shall have the right to require any data or documentation that it deems necessary for that evaluation. 8. The term"Applicant'as used in this Order of Conditions shall refer to the owner,any successor in interest or successor in control of the property referenced in the Notice of intent,supporting documents and this Order of Conditions. The Commission shall be notified in writing within 30 days of all transfers of title of any portion of the property that takes place prior to issuance of the Certificate of Compliance. 9. It is the responsibility of the applicant to procure all other applicable federal, state and local permits and approvals associated with this project. These permits may include but are not necessarily limited to the following: (1) Section 404 of the Federal Water Pollution Control Act(P.L.92-500, 86 stat. 816), U.S. Army Corps of Engineers. (2) Water Quality Certification in accordance with the Federal Water Pollution Control under authority of sec. 27(5)of Chapter 21 of the Massachusetts General Laws as codified in 314 CMR 9.00. (3) Sewer Extension Permit from the DEP Division of Water Pollution Control under G. L. Ch.21 A ss7 and 314 CMR 7.00. Any Board of Health permit for septic system design for any portion of the septic system within 100 feet of wetlands shall be submitted to the Commission prior to construction initiation. (4) Design Requirements for Construction in Floodplains under the State Building Code(780 CMR 744.). 10. If there are conflicting conditions within this Order,the stricter condition(s)shall rule. 11. All work shall be performed so as to ensure that there will be no sedimentation into wetlands and surface waters during construction or after completion of the project. 12. The Commission or its Agent shall have the discretion to modify the erosion/siltation control methods and boundary during constnrction if necessary. 13. The Commission reserves the right to impose additional conditions on portions of this project or this site to mitigate any actual or potential impacts resulting from the work herein permitted. 14. The work shall conform to the following attached plans and special conditions: Final Approved Plans SITE DEVELOPMENT PERMIT PLAN LOCATED IN SALEM, MASS (Title) 8/24/2010 (Dated) Christopher R. Mello (Signed and Stamped by) City of Salem Conservation Commission (On file with) 15. Any proposed changes in the approved plan(s)or any deviation in construction from the approved plan(s)shall require the applicant to file a Notice of Project Change with the Commission. The Notice shall be accompanied by a written inquiry prior to their implementation in the field,as to whether the od N Attachment to Order of Conditions # 64-506 Page 3of 5 change(s) is substantial enough to require filing a new Notice of Intent or a request to correct or amend this Order of Conditions. A copy of such request shall at the same time be sent to the Department of Environmental Protection, 16. In conjunction with the sale of this property or any portion thereof before a Certificate of Compliance has been issued,the applicant or current landowner shall submit to the Commission a statement signed by the buyer that he/she is aware of an outstanding Order of Conditions on the property and has received a copy of the Order of Conditions. 17. Condition Number_as indicated shall continue in force beyond the Certificate of Compliance,in perpetuity,and shall be referenced to in all future deeds to this property. PRIOR TO CONSTRUCTION 18. Prior to the commencement of any activity on this site other than activities listed above,there must be a Pre-Construction Meeting on site between the project supervisor,the contractor responsible for the work, and the Conservation Agent and/or a member of the Conservation Commission to ensure that the requirements of the Order of Conditions are understood. The staked erosion control line shall be adjusted,if necessary,during the pre-construction meeting. Please contact the Conservation Agent at (978)619-5685 at least forty-eight(48) hours prior to construction to arrange for the Pre- Construction Meeting. 19. Prior to the pre-construction meeting and commencement of any activity on this site,sedimentation and erosion control barriers shall be installed as shown on the approval plan(s)and detail drawings. The Commission and/or its Agent shall inspect and approve such installation at the pre-construction meeting. 20. No clearing of vegetation,including trees,or disturbance of soil shall occur prior to the pre-construction meeting. Minimal disturbance of shrubs and herbaceous plants shall be allowed prior to the pre- construction meeting if absolutely necessary in order to place erosion control stakes where required. 21. There shall be hay bales and wooden stakes stored under cover on the site to be used for emergency erosion control purposes. EROSION CONTROL 22. Appropriate erosion control devices shall be in place prior to the beginning of any phase of construction, and shall be maintained during construction in any wetland resource area and/or buffer zones. The erosion control measures shown on the approval plan(s)and provisions in the Order will be the minimum standards for this project; the Commission or its Agent may require additional measures. 23. All debris, fill and excavated material shall be stockpiled a location far enough away from the wetland resource areas to prevent sediment from entering wetland resource areas. 24. Erosion and sedimentation control devices shall be inspected after each storm event and repaired or replaced as necessary. Any accumulated silt adjacent to the barriers shall be removed. 25. The area of construction shall remain in a stable condition at the close of each construction day. 26. Any de-watering of trenches or other excavation required during construction shall be conducted so as to prevent siltation of wetland resource areas. All discharge from de-watering activities shall be filtered o @ Attachment to Order of Conditions # 64-506 ` Page 4of 5 through hay bale sediment traps,silt filter bags or other means approved by the Commission or its Administrator. 27. Within thirty(30)days of completion of construction on any given portion of the project,all disturbed areas in the completed portion of the site shall be permanently stabilized with rapidly growing vegetative cover, using sufficient top soil to assure long-term stabilization of disturbed areas. 28. If soils are to be disturbed for longer that two(2)months,a temporary cover of rye or other grass should be established to prevent erosion and sedimentation. If the season is not appropriate for plant growth, exposed surface shall be stabilized by other appropriate erosion control measures, firmly anchored, to prevent soils from being washed by rain or flooding. DURING CONSTRUCTION 29. A copy of this Order of Conditions and the plan(s)approved in this Order shall be available on site at all times when work is in progress. 30. No alteration or activity shall occur beyond the limit of work as defined by the siltation barriers shown on the approved plan(s). 31. All waste products,grubbed stumps,slash;construction materials,etc.shall be deposited at least 100 feet from wetland resource auras and 200 feet from river. 32. Cement trucks shall not be washed out in any wetland resource or buffer zone area,nor into any drainage system. Any deposit of cement or concrete products into a buffer zone or wetland resource area shall be immediately removed. 33. All exposed sub-soils shall be covered by a minimum of three(3)inches of quality screened loam topsoil prior to seeding and final stabilization. 34. Immediately following drainage structure installation all inlets shall be protected by silt fence,haybale barriers and/or sift bags to filter silt from stormwater before it enters the drainage system. 35. There shall be no pumping of water from wetland resource areas. 36. All equipment shall be inspected regularly for leaks. Any leaking hydraulic lines,cylinders or any other components shall be fixed immediately. 37. During construction,all drainage structures shall be inspected regularly and cleaned as necessary. 38. The applicant is herby notified that failure to comply with all requirements herein may result in the issuance of enforcement actions by the Conservation Commission including, but not limited to,civil administrative penalties under M.G.L Chapter 21A,section 16. AFTER CONSTRUCTION 39. Upon completion of construction and final soil stabilization, the applicant shall submit the following to the Conservation Commission to request a Certificate of Compliance(COC): (1) A Completed Request for a Certificate of Compliance form(WPA Form 8A or other form if required by the Conservation Commission at the time of request). (2) A letter from a Registered Professional Engineer certifying compliance of the property with this Order of Conditions. J Attachment to Order of Conditions #64-506 ` Page Sof 5 (3) An "As-Built'plan signed and stamped by a Registered Professional Engineer or land Surveyor showing post-construction conditions within all areas under the jurisdiction of the Massachusetts Wetlands Protection Act. This plan shall include at a minimum: (a) All wetland resource area boundaries with associated buffer zones and regulatory setback areas taken from the plan(s)approved in this Order of Conditions; (b) Locations and elevations of all stormwater management conveyances,structures and best management designs,including foundation drains,constructed under this Order within any wetland resource area or buffer zone; (c) Distances from any structures constructed under this Order to wetland resource areas- structures include,but are not limited to,all buildings,septic system components,wells, utility lines,fences,retaining walls,and roads/driveways; (d) A line delineating the limit of work-`work"includes any filling,excavating and/or disturbance of soils or vegetation approved under this Order; 40. When issued,the Certificate of Compliance must be recorded at the Essex County Registry of Deeds and a copy of the recording submitted to the Salem Conservation Commission. 41. If the completed work differs from that in the original plans and conditions, the report must specify how the work differs;at which time the applicant shall first request a modification to the Order. Only upon review and approval by the Commission,may the applicant request in writing a Certificate of Compliance as described above. 42. Erosion control devices shall remain in place and properly functioning until all exposed soils have been stabilized with final vegetative cover and the Conservation Commission and/or its Agent has authorized their removal. ADDITIONAL CONDITIONS 43. Construction material and equipment shall be stored outside of the buffer zone. 44. A silt sock shall be installed in the adjacent catch basin(s). Massachusetts Department of Environmental Protection Provided by Mass DEP: Bureau Of ReSOUFCe Protection - Wetlands MassDEP File Number WPA Form 3 — Notice of Intent • Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Document Transaction Number' Salem Cityrrown Important:When filling out A. General Information forms on the computer, the tab key 1. Project Location (Note: electronic filers will click on button to locate project site): onlyto move your 1 Martin Lane Salem cursor-do not a.Street Address 01970 use the return b.City/Town c.Zip Code key. Latitude and Longitude: 42-30-35 70-55-09 d.Latitude e.Longitude Map '14 Lot 00301 Lot211 f.Assessors Map/Plat Number g.Parcel/Lot Number 2. Applicant: Kenneth G. Steadman a.First Name b. Last Name Note: Before c.Organization completing this form consult67 Village Street your local d.Street Address Conservation Marblehead MA 01945 Commission a.City/Town I.State regarding any g.Zip Code municipal bylaw 781-631-3751 or ordinance. h.Phone Number i.Fax Number j.Email Address •, 3. Property owner(required if different from applicant): ❑ Check if more than one owner a.First Name b.Last Name Bartlett & Steadman Development Corp. c.Organization 67 Village Street d.Street Address Marblehead MA 01945 e.City/Town I.State g.Zip Code 781-631-3751 h.Phone Number 1. Fax Number /.Email address 4. Representative(if any): Attorney George W. Atkins III a.First Name b.Last Name Ronan, Segal & Harrington c.Company 59 Federal Street d.Street Address Salem MA 01970 e.City/Town I.State g.Zip Code 978-744-0350 h.Phone Number 1.Fax Number /.Email address 5. Total WPA Fee Paid (from N01 Wetland Fee Transmittal Form): 500.00 237.50 262.50 a.Total Fee Paid b.State Fee Paid c.City/Town Fee Paid wpaform3.doc•rev. 11/16/09 Page 1 of 8 Massachusetts Department of Environmental Protection Pro!O hyMas`sDEP r i ate+ a Bureau of Resource Protection - Wetlands MasSDEP„sue Nymgar a ,h WPA Form 3 - Notice of intent Doc4ment Tra Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem ,"" 1SachunN�mbat„i Cityrrown A. General Information (continued) 6. General Project Description: Construction of single family dwelling driveway, utilities grading and landscaping 7a. Project Type Checklist: 1. Z Single Family Home 2. ❑ Residential Subdivision 3. ❑ Limited Project Driveway Crossing 4. ❑ Commercial/Industrial 5. ❑ Dock/Pier 6. ❑ Utilities 7. ❑ Coastal Engineering Structure 8. ❑ Agriculture (e.g., cranberries,forestry) 9. ❑ Transportation 10. ❑ Other 7b. Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal)or 310 CMR 10.53(inland)? • 1. ❑ Yes Z No If yes, describe which limited project applies to this project: 2.Limited Project _. 8. Property recorded at the Registry of Deeds for: Essex South 80814 &80815 a.County b.Certificate#(if registered land) c.Book d.Page Number B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1. Z Buffer Zone Only—Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2. ❑ Inland Resource Areas(see 310 CMR 10.54-10.58; if not applicable, go to Section B.3, Coastal Resource Areas). Check all that apply below. Attach narrative and any supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. For all project affecting other Resource Area Size of Proposed Alteration Proposed Replacement(If any) Resource Areas, please attach a a. ❑ Bank narrative 1.linear feet 2.linear feet the resource how b. ❑ Bordering Vegetated the resource area was Wetland 1.square feet 2.square feet delineated. c. ❑ Land Under 1.square feet 2.square feet Waterbodies and Waterways 3,cubic yards dredged wpaform3.doc•rev. 11/16/09 Page 2 of 8 Massachusetts Department of Environmental Protection Provided by MassD�P k k,, Bureau of Resource Protection -Wetlands ,J�1assDEP 5ilar u}nber + WPA Form 3 — Notice of Intent sFt;Y r ` '" ' �t,DbthfhEnt,Transechon Number Massachusetts Wetlands Protection Act M.G.L. C. 131, §40 Salem " City/Town B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont'd) Resource Area Size of Proposed Alteration Proposed Replacement(if any) d.❑ Bordering Land Subject to Flooding 1.square feet 2.square feet 3.cubic feet of 4.flood storage lost cubic feet replaced e.El Isolated Land Subject to Flooding 1.square feet 2.cubic feet of flood storage lost 3.cubic feet replaced f. ❑ Riverfront Area 1.Name of Waterway(if available) 2.Width of Riverfront Area(check one): ❑ 25 ft. -Designated Densely Developed Areas only ❑ 100 ft. -New agricultural projects only ❑ 200 ft. -All other projects 3.Total area of Riverfront Area on the site of the project: proposed square feet • a. Proposed alteration of the Riverfront Area: a.total square feet b.square feet within 100 ft c.square feet between too ft.and 200 ft. s. Has an alternatives analysis been done and is it attached to this NO1? ❑ Yes❑ No 6.Was the lot where the activity is proposed created prior to August 1, 1996? ❑ Yes❑ No 3. ❑ Coastal Resource Areas: (See 310 CMR 10.25-10.35) Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location. Online Users: Include your Resource Area Size of Proposed Alteration Proposed Replacement(if any) document transaction number a. ❑ Designated Port Areas Indicate size under Land Under the Ocean, below (provided on your receipt b. ❑ Land Under the Ocean page)with all 1.square feet supplementary information you submit to the 2.cubic yards dredged Department. c. ❑ Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below d. ❑ Coastal Beaches 1—.square feet 2.cubic yards beach nourishment e. ❑ Coastal Dunes 1.square feet q 2.cubic yards dune nourishment wpaform3.doc•rev. 11/16/09 Page 3 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP Bureau of Resource Protection - Wetlands 'MassDEP File Number , WPA Form 3 — Notice of Intent • =:Document Trprim*bn NumberLl ; Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem City/Town B. Buffer Zone 8r Resource Area Impacts (temporary & permanent) (cont'd) Size of Proposed Alteration Proposed Replacement of any) f. ❑ Coastal Banks 1.linear feet g. ❑ Rocky Intertidal Shores 1.square feet h.❑ Salt Marshes 1.square feet 2.sq ft restoration,rehab.,creation i. ❑ Land Under Salt Ponds 1.square feet 2.cubic yards dredged I. ❑ Land Containing Shellfish 1.square feet k. ❑ Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1.cubic yards dredged • I. ❑ Land Subject to Coastal Storm Flowage 1.square feet 4. ❑ Restoration/Enhancement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here. a.square feet of BVW b.square feet of Salt Marsh 5. ❑ Project Involves Stream Crossings a.number of new stream crossings b.number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1. Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State-Listed Rare Wetland Wildlife published by the Natural Heritage and Endangered Species Program (NHESP)?To view habitat maps, see the Massachusetts Natural Heritage Atlas or go to http/twww mass goyldfweleldfw/nheso/regulatory review/priority habitat/online viewer htm. a. ❑ Yes ® No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife • 2006 Route 135, North Drive b.Date of map Westborough, MA 01581 wpaformIdoc•rev. 11/16/09 Page 4 of 8 Massachusetts Department of Environmental Protection Pro,ded gy MassoEP :� Bureau of Resource Protection - Wetlands u` a(ylagsDE�file Nutnbsr '_ WPA Form 3 — Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D°cumeMTrensachohNumbetj aY.s Salem Chy/Town C. Other Applicable Standards and Requirements (cont'd) If yes, the project is also subject to Massachusetts Endangered Species Act(MESA) review(321 CMR 10.18). To qualify for a streamlined, 3G-day, MESA/Wetlands Protection Act review, please complete Section CA.C, and include requested materials with this Notice of Intent(NOI); OR complete Section C.1.d, if applicable. If MESA supplemental information is not included with the NOI, by completing Section 1 of this form, the NHESP will require a separate MESA filing which may take up to 90 days to review(unless noted exceptions in Section 2 apply, see below). 1. c. Submit Supplemental Information for Endangered Species Review" 1. ❑ Percentage/acreage of property to be shared: (a)within wetland Resource Area percentage/acreage (b)outside Resource Area percentage/acreage 2. ❑ Assessor's Map or right-of-way plan of site 3. ❑ Project plans for entire project site, including wetland resource areas and areas outside of wetlands jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work" • (a)❑ Project description (including description of impacts outside of wetland resource area& buffer zone) (b) ❑ Photographs representative of the site (c)❑ MESA filing fee(fee information available at: hftp:/Avww.mass.gov/dfwele/dfw/nhesr)/regulatory review/mesa/mesa fee schedule htm). Make check payable to"Commonwealth of Massachusetts-NHESP' and mail to NHESP at above address Projects altering 10 or more acres of land, also submit. (d)❑ vegetation cover type map of site (a)❑ Project plans showing Priority&Estimated Habitat boundaries d. OR Check One of the Following 1.❑ Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/dfwele/dfw/nhesp/regulatory review/mesa/mesa exemptions htm; the N01 must still be sent to NHESP If the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2.❑ Separate MESA review ongoing. a.NHESP Trecldng# b.Date submitted to NHESP ome projects not in Estimated Habitat may be located in Priority Habitat,and require NHESP review(see ttptlp://www.mass.cov/dfVvele/dfw/nhesp-/nhesp,htm, regulatory review lab). Priority Habitat includes habitat for state-listed plants and strictly upland species not protected by the Wetlands Protection Act. MESA projects may not be segmented (321 CMR 10.16).The applicant must disclose full development plans even if such plans are not required as part of the Notice of Intent process. wpaform3.doc•rev. 11/16/09 Page 5 of 8 Massachusetts Department of Environmental Protection Provided by MassDEP Bureau of Resource Protection -Wetlands MassDEP File Namber L7 WPA Form 3 - Notice of Intent DntTre a Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Salem ooume. , n aotionNumber City/Town C. Other Applicable Standards and Requirements (cont'd) 3.❑ Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation&Management Permit with approved plan. 2. For coastal projects only, is any portion of the proposed project located below the mean high water line or in fish run? a.❑ Not applicable-project is in inland resource area only b.❑ Yes ❑ No If yes, include proof of mailing or hand delivery of NOI to either: South Shore-Cohasset to Rhode North Shore-Hull to New Hampshire: Island, and the Cape&Islands: Division of Marine Fisheries- Division of Marine Fisheries- Southeast Marine Fisheries Station North Shore Office Attn: Environmental Reviewer Attn: Environmental Reviewer 1213 Purchase Street-3rd Floor 30 Emerson Avenue New Bedford, MA 02740-6694 Gloucester, MA 01930 Also if yes, the project may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact • MassDEP's Southeast Regional Office. 3. Is any portion of the proposed project within an Area of Critical Environmental Concern(ACEC)? Online users: a. El Yes ® No If yes, provide name of ACEC (see instructions to WPA Form 3 or MassDEP Include your Website for ACEC locations). Note: electronic filers click on Website. document transaction b.ACEC number (provided on 4. Is any portion of the proposed project within an area designated as an Outstanding Resource Water your receipt (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? page)with all supplementary a. ❑ Yes ® No information you submit to the 5. Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Department. Restriction Act (M.G.L. c. 131, §40A) or the Coastal Wetlands Restriction Act(M.G.L. c. 130, § 105)? a. ❑ Yes ® No 6. Is this project subject to provisions of the MassDEP Stormwater Management Standards? a.® Yes. Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)-(q) and check if: I.❑ Applying for Low Impact Development(LID) site design credits(as described in Stormwater Management Handbook Vol. 2, Chapter 3) 2.❑ A portion of the site constitutes redevelopment 3.❑ Proprietary BMPs are included in the Stormwater Management System. • b.❑ No. Check why the project is exempt: Project Stormwater Management was 1.❑ Single-family house addressed under DEP File No. 64-391 wpaform3.doc•rev. 11/16/09 Page 6 of 8 Massachusetts Department of Environmental Protection Provided byMassDEP Bureau of Resource Protection - Wetlands ;MasgDEa Rlla N�mga� WPA Form 3 - Notice of Intent ` . Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Sal merttTransactionNumbgri Salem City/Town C. Other Applicable Standards and Requirements (cont'd) 2.❑ Emergency road repair 3.❑ Small Residential Subdivision(less than or equal to 4 single-family houses or less than or equal to 4 units in multi-family housing project)with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent(NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page)for any of the following information you submit to the Department. 1.® USGS or other map of the area(along with a narrative description, if necessary)containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2. 0 Plans identifying the location of proposed activities(including activities proposed to serve as a Bordering Vegetated Wetland [BVWj replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3. ❑ Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s), Determination of Applicability, Order of Resource Area Delineation, etc.), • andattach documentation of the methodology. a. ® List the titles and dates for all plans and other materials submitted with this NOI. Site Development Permit Plan a.Plan Title Eastern Land Survey Associates Inc. Christopher R. Mello P.L.S. b.Prepared By c.Signed and Stamped by August 23 2010 1"=20' d.Final Revision Date e.Scale f.Additional Plan or Document Title g.Date 6. ❑ If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.❑ Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7. ❑ Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8. 0 Attach NOI Wetland Fee Transmittal Form 9. ❑ Attach Stormwater Report, if needed. wpaform3.doc•rev. 11/16/09 Page 7 of 8 Massachusetts Department of Environmental Protection Provided by MSssDEP } Bureau of Resource Protection - Wetlands j�lasDEp Fde M1)umbgr �, WPA Form 3 - Notice of Intent • Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 " Doournent Trq{�$echoY{l °FnbeFy Salem Citylrown E. Fees I. ❑ Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NO]Wetland Fee Transmittal Form)to confirm fee payment: J�) 9�a// 6-7 -- 2.Municipal Check Number 3.Check date 9616 E-- a(0-lo 4.State Check Number 5.'CIh/eck date 7.P 6.Payor name on check:Fist Name ayor name on check:Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, §40. Notice must be made by Certificate of Mailing or in writing by hand . delivery or certified mail (return receipt requested)to all abutters within 100 feet of the property line of the project location. 1.Si Ilcan 2.Dat �Z�I1 O lure o ner(iftdiffereryt) 4.Date �"�7 ' / U i e of Representative(rf ,,,,= 6.Date For Conservation Commission: Two copies of the completed Notice of Intent(Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent(Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the"yes" box in any part of Section C, Item 3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. • wpafonn3.doc•rev. 11/16/09 Page 8 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form • Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Important: A. Applicant Information When filling out forms on the 1. Applicant: computer,use only the tab key Kenneth G. Steadman to move your a.First Name cursor-do not b.Last Name use the return key. c.Organization 67 d. Village Street d. m Mailing Address Marblehead MA 01945 rom e.Cdy/Town f.State g.Zip Code 781-631-3751 h.Phone Number i.Fax Number �. Emad Address 2. Property Owner(if different): a.Fast Name b.Last Neme Bartlett & Steadman Development Corp c.Orgamzatlon 67 Village Street d.Mailing Address Marblehead MA 01945 • e.City/Town f.State g.Zip Code _ 781-631-3751 h.Phone Number I.Fax Number t.Email Address 3. Project Location: 1 Martin Lane Salem a.Street Address b.City/-Town To calculate filing fees,refer B. Fees to the category fee list and The fee should be calculated using the following six-step process and worksheet. Please see examples In the Instructions before filling out worksheet. instructlons for ruling 3(Notice A Ste 1rT a of Activity: Describe each Form 3(Notice of p yp ty� type of activity that will occur in wetland resource area and Intent). buffer zone. Step 2/Number of Activities: Identify the number of each type of activity. Step 3/Individual Activity Fee: Identify each activity fee from the six project categories listed in the instructions. Step 4/Subtotal Activity Fee: Multiply the number of activities (identified in Step 2)times the fee per category(identified in Step 3)to reach a subtotal fee amount. Note: If any of these activities are in a Riverfront Area in addition to another Resource Area or the Buffer Zone, the fee per activity should be multiplied by 1.5 and then added to the subtotal amount. Step 5/Total Project Fee: Determine the total project fee by adding the subtotal amounts from Step 4. Step 6/Fee Payments: To calculate the state share of the fee, divide the total fee in half and subtract $12.50. To calculate the city/town share of the fee, divide the total fee in half and add $12.50. WparormMm-Weiland Fee Tra Hw Form•rev.2/21M Page 1 of 2 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands NOI Wetland Fee Transmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Fees (continued) Step 1/Type of Activity Step 2/Number Step Step 4/Subtotal Activity of Activities 3/individual Fee Activity Fee Construction of Single Family 1 500.00 500.00 Dwelling Step 5/Total Project Fee: 500.00 • Step 6/Fee Payments: Total Project Fee: 500.00 a.Total Fee from step 5 State share of filing Fee: 237.50 b.1/2 Total Fee less$12.50 City/Town share of filling Fee: 262.50 c.1/2 Total Fee plus$12.50 C. Submittal Requirements a.) Complete pages 1 and 2 and send with a check or money order for the state share of the fee, payable to the Commonwealth of Massachusetts. Department of Environmental Protection Box 4062 Boston, MA 02211 b.) To the Conservation Commission:Send the Notice of Intent or Abbreviated Notice of Intent;a copy of this form; and the city/town fee payment. To MassDEP Regional Office(see Instructions): Send a copy of the Notice of Intent or Abbreviated Notice of Intent;a copy of this form;and a copy of the state fee payment. (E-filers of Notices of Intent may submit these eleotroniaaliy.) WpWorm9.dee•Wetland Fee Tmm UW Form•rev,20/08 Pape 2 of 2 • Curt+ � �,�/rl /J��.G -��xt � f� 5!u n _ Goff Coww y(p { il r '�� �•' "' ' s +s'�� "x. �.v' � y h x°�=' .. 'Y,nS��z +��'� 1 c . v � f a n � , x qjy Y 4 y n r - k �s� _ �� itµ F� avr 'J: a �' f' gin✓ � t }j �� x i� � �,k 3 h :_ / c• � d ,�, r t; hb��5 ` G = �' S,� a�sax« *�? f t � 2 8 �, ��• �` .?„ as ' »9sx z , '� f y a is hr ` � - . NJy pjYy k n t { k � � -7°� 'x`�z' ''r�' :, � ,k"° �'' �v' � �"" s r�' k� + ,w.• ��� ru � s ' a sr v va r= s- i'4a Caro O. �rh 's' �°I PlYnc� "� 4 ' /G 1 .•a g ."tirPti � tl r`" s{}' � +�F r x4� f v �{ y tit � i .� SUb3 f •'. �rh 'x n4 ry FT . / � / •(R S, A JS ;� „„�, � ?; fly. �,��� ' ��• � ��`� � �r,�, wa q ,;, %: � ✓((�(f�� i xx5� v • a rt Y p /Ai e v, ♦ r ,�.a, x x �s IUD a i+ / r ��.1 � U�. 9y✓ .. . C 4 V f K 4 _ x /• � b v • I �� I 3n0 'J�) f:�(Yx" /5JRM � 55' 743 344 sw+frvsMrr+sxu .S 0 7 _ 2 3 4 r: CopyriOM(C)7988,Earthviaions,Ix.